Single Line Diagram - Load Flow Analysis - GCM Chennai
Single Line Diagram - Load Flow Analysis - GCM Chennai
Single Line Diagram - Load Flow Analysis - GCM Chennai
DISCOM UTILITY
500 MVAsc
42.7 A
Incoming cable
Transformer-1 Transfomer-2
0.63 MVA 0.63 MVA
Charger-5 SPARE
Charger-1 Charger-2 Charger-4
Charger-3 200 kVA
200 kVA 200 kVA 200 kVA
200 kVA
Dec 18, 2021 Project File: CHENNAI_LOAD FLOW ENGINEERS NAME : DARSHIT VYAS TYPE: BOTH TR WORKING
SINGLE LINE DIAGRAM - LOAD FLOW - GCM CHENNAI
DISCOM UTILITY
500 MVAsc
814.5 kVA
Incoming cable
Transformer-1 Transfomer-2
0.63 MVA 0.63 MVA
Charger-5 SPARE
Charger-1 Charger-2 Charger-4
Charger-3 200 kVA
200 kVA 200 kVA 200 kVA
200 kVA
:38:13
:3 Project File: CHENNAI LOAD FLOW Engineer Name : Darshit vyas TYPE : BOTH TR WORKING
Project: EV INFRA ETAP Page: 1
Contract: NA SN:
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: EV INFRA ETAP Page: 2
Contract: NA SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: NA SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
11kv incoming cable-1 -0.361 -0.189 0.361 0.189 0.0 0.0 100.0 100.0 0.00
11kv incoming cable-2 -0.361 -0.189 0.361 0.189 0.0 0.0 100.0 100.0 0.00
BKR O/G-1 CABLES -0.356 -0.172 0.357 0.173 0.8 0.9 97.1 97.4 0.27
BKR O/G-2 CABLES -0.356 -0.172 0.357 0.173 0.8 0.9 97.1 97.4 0.27
Incoming cable 0.722 0.377 -0.722 -0.377 0.0 0.0 100.0 100.0 0.01
TR-1 LV O/G CABLES 0.357 0.174 -0.357 -0.173 0.5 0.6 97.6 97.4 0.18
TR-2 LV O/G CABLES 0.357 0.174 -0.357 -0.173 0.5 0.6 97.6 97.4 0.18
Transfomer-2 0.361 0.189 -0.357 -0.174 3.7 14.7 100.0 97.6 2.44
Transformer-1 0.361 0.189 -0.357 -0.174 3.7 14.7 100.0 97.6 2.44
10.2 32.4
Contract: NA SN:
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Marginal Report
Cable Box LV side-1 Bus Under Voltage 0.433 kV 0.422 97.6 3-Phase
Cable Box LV side-2 Bus Under Voltage 0.433 kV 0.422 97.6 3-Phase
Contract: NA SN:
MW Mvar MVA % PF
Number of Iterations: 3
SINGLE LINE DIAGRAM - Load Flow Analysis - GCM CHENNAI
DISCOM UTILITY
500 MVAsc
616.9 kVA
32.4 A
Incoming cable
616.9 kVA
RMU BUS 32.4 A 1 1 kV
11 kV
616.9 kVA
32.4 A
Transformer-1 Transfomer-2
0.63 MVA 0.63 MVA
Open Open
Project File: CHENNAI_LOAD FLOW ENGINEERS NAME : DARSHIT VYAS TYPE: TR-1 NOT WORKING
SINGLE LINE DIAGRAM - Load Flow Analysis - GCM CHENNAI
DISCOM UTILITY
500 MVAsc
542.3 kW
Incoming cable
Transformer-1 Transfomer-2
0.63 MVA 0.63 MVA
Project File: CHENNAI_LOAD FLOW ENGINEERS NAME : DARSHIT VYAS TYPE: TR-1 NOT WORKING
Project: EV INFRA ETAP Page: 1
Contract: NA SN:
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: EV INFRA ETAP Page: 2
Contract: NA SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract:NA SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
11kv incoming cable-1 0.000 0.000 0.000 0.000 100.0 100.0 0.00
11kv incoming cable-2 -0.542 -0.294 0.542 0.294 0.0 0.0 100.0 100.0 0.00
BKR O/G-1 CABLES 0.000 0.000 0.000 0.000 96.0 96.0 0.00
BKR O/G-2 CABLES -0.531 -0.257 0.533 0.259 1.9 2.1 95.6 96.0 0.42
Incoming cable 0.542 0.294 -0.542 -0.294 0.0 0.0 100.0 100.0 0.00
TR-2 LV O/G CABLES 0.534 0.260 -0.533 -0.259 1.2 1.4 96.3 96.0 0.28
Transfomer-2 0.542 0.294 -0.534 -0.260 8.5 33.7 100.0 96.3 3.73
11.6 37.1
Contract: NA SN:
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Marginal Report
Cable Box LV side-2 Bus Under Voltage 0.433 kV 0.417 96.3 3-Phase
Contract: NA SN:
MW Mvar MVA % PF
Number of Iterations: 3
SINGLE LINE DIAGRAM - Load Flow Analysis - GCM CHENNAI
DISCOM UTILITY
500 MVAsc
32.3 A
Incoming cable
Transformer-1 Transfomer-2
0.63 MVA 0.63 MVA
Project File: CHENNAI_LOAD FLOW ENGINEERS NAME : DARSHIT VYAS TYPE: TR-2 NOT WORKING
SINGLE LINE DIAGRAM - Load Flow Analysis - GCM CHENNAI
DISCOM UTILITY
500 MVAsc
616.1 kVA
32.3 A
Incoming cable
616.1 kVA
RMU BUS 32.3 A 1 1 kV
11 kV
616.1 kVA
32.3 A
Transformer-1 Transfomer-2
0.63 MVA 0.63 MVA
Project File: CHENNAI_LOAD FLOW ENGINEERS NAME : DARSHIT VYAS TYPE: TR-2 NOT WORKING
Project: EV INFRA ETAP Page: 1
Contract: NA SN:
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: EV INFRA ETAP Page: 2
Contract: NA SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: NA SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
11kv incoming cable-1 -0.542 -0.293 0.542 0.293 0.0 0.0 100.0 100.0 0.00
11kv incoming cable-2 0.000 0.000 0.000 0.000 100.0 100.0 0.00
BKR O/G-1 CABLES -0.354 -0.171 0.355 0.172 0.8 0.9 95.7 96.0 0.28
BKR O/G-2 CABLES -0.177 -0.086 0.177 0.086 0.2 0.2 95.9 96.0 0.14
Incoming cable 0.542 0.293 -0.542 -0.293 0.0 0.0 100.0 100.0 0.00
TR-1 LV O/G CABLES 0.533 0.260 -0.532 -0.258 1.2 1.4 96.3 96.0 0.28
Transformer-1 0.542 0.293 -0.533 -0.260 8.5 33.6 100.0 96.3 3.72
10.8 36.1
Contract: NA SN:
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Marginal Report
Cable Box LV side-1 Bus Under Voltage 0.433 kV 0.417 96.3 3-Phase
Contract: NA SN:
MW Mvar MVA % PF
Number of Iterations: 3