7 RCC(M35)
888.818
67.925
956.743
GE & HOSTEL AT SAMASTIPUR
l Carriage
Slurry Cement Coarse Sand Aggregate
0 0 0
0 0 0
0 0
No
0 0 0 carriage
in DSR
0 0 0
Name of work: Shri Ram Janaki Medical College & hospital Samastipur ,Bihar
a 2.6.1 All Kinds of soil 82993.00 cum 280.94 66406.12 3353.80 69759.92 18656135.35 942216.57 19598351.92
1:2:4 (1cement 2coarse sand 4 graded 473.00 cum 4178 300.27 300.27 1254528.06 0.00 1254528.06
4.1.3
stone)
Earthwork in excavation in foundation
trenches in ordinary soil ( vide classification of
soil item -A) and disposal of excavated earth
as obtained to a distance upto 50 M. including
aUlitts, levelling, ramming the foundation
trenches, removing roots of trees, shurbs all
complete as per approved design, building spe
3 2.8 cification and direction of E/l 0 0.00 0.00 0.00 0.00
a 2.8.1 All kinds of soil 2850.00 Cum 321.71 0 0.00 0.00 0.00 0.00
Supplying and Filling in plinth with local
sand/soil and under floors including, watering,
4 2.28 ramming consolidating and dressing complete 92823.50 Cum 240.17 18158.78 18158.78 4361194.19 0.00 4361194.19
1.4.8 (1 Cement :4 coarse sand :8 graded ston
c 4.1.8 e agregate 40 mm nominal size 9868.40 Cum 2960.21 2686.66 42.80 2729.46 7953077.80 126696.99 8079774.79
Centering and shuttering including strutting, p
16 5.9 ropping etc. and removal of form for : 0 0.00 0.00 0.00 0.00
Foundations, footings, bases of columns, etc. f
a 5.9.1 or mass concrete 18022.54 Sqm 187.53 14256.38 61.70 14318.08 2673498.94 11570.60 2685069.54
Walls (any thickness) including attached
pilasters, butteresses, plinth and string
b 5.9.2 courses 12530.61 sqm 323.42 8453.53 2505.30 10958.83 2734040.67 810264.13 3544304.80
etc.
e 5.9.5 Lintels, beams, plinth beams, girders, bressum 132957.00 Sqm 337.51 97606.61 5122.93 102729.54 32943206.94 1729040.10 34672247.05
ers and cantilevers
f 5.9.6 Columns, Pillars, Piers, Abutments, Posts and 93244.44 Sqm 428.61 70437.34 3728.75 74166.09 30190148.30 1598179.54 31788327.83
Struts
Stairs, (excluding landings) except spiral-
g 5.9.7 staircases 6745.00 sqm 387.24 4643.45 32.55 4676.00 1798129.58 12604.66 1810734.24
h 5.9.11 Chimney & shafts 3067.00 sqm 523.23 4780.36 741.40 5521.76 2501227.76 387922.72 2889150.48
Reinforcement for R.C.C. work including straig
24 5.22 htening, cutting, bending, placing in position 0 0.00 0.00 0.00 0.00
and binding all complete.
Thermo-Mechanically Treated bars TMTC-
a 5.22.7A 500-8mm dia. 2027446 Kg 77.91 500602.01 23794.97 524396.98 39001902.60 1853866.11 40855768.71
Thermo-Mechanically Treated bars TMTC-
b 5.22.7B 500-10mm dia. 1604968.06 Kg 77.21 3994567.54 177530.10 4172097.64 308420559.76 13707099.02 322127658.78
5
c 5.22.7C Thermo-Mechanically Treated bars TMTC- 1010251.38 Kg 75.70 791082.14 23937.30 815019.44 59884918.00 1812053.61 61696971.61
500-12mm dia.
Thermo-Mechanically Treated bars TMT Fe-
500-I6/20/25/28/32mrn dia.
5.22.7D/E/
d
F/G 7517933 Kg 76.50 6462843.74 289512.98 6752356.72 494407546.11 22147742.97 516555289.08
a 6.1.14A Cement mortar 1:6 (1 cement: 6 coarse sand ) 4326.20 Cum 4830.87 2892.83 2892.83 13974885.66 0.00 13974885.66
Brick work with fly ash bricks as per IS
26 6.1C 12894(2002) & IS 3495 in foundations and 0 0.00 0.00 0.00 0.00
plinth in :
a 6.1.14C Cement mortar 1:6 (1 cement: 6 coarse sand ) 29777.30 Cum 4928.01 16765.98 16765.98 82622917.10 0.00 82622917.10
Extra for brick work in superstructure above pl
inth level upto floor V Cement mortar 1:6 (1
27 6.3C cement: 6 coarse sand ) 29777.30 Cum 706.83 16765.98 16765.98 11850697.64 0.00 11850697.64
a 6.45.2 Cement mortar 1 : 4 (1 cement : 4 coarse 67731.00 sqm 774.58 29711.07 29711.07 23013600.60 0.00 23013600.60
sand)
Extra for providing and placing in position 2
Nos, 6 mm dia , MS bars at every third course
30 6.21A of half brick masonry (with F. P. S. bricks) 67731.00 sqm 88.28 29711.07 29711.07 2622893.26 0.00 2622893.26
a 20.2.5 600 mm dia pile 48960.00 metre 2110.24 39060 39060.00 82425974.40 0.00 82425974.40
b 20.2.2 400 mm dia pile 32270.00 metre 1118.13 25500 25500.00 28512315.00 0.00 28512315.00
Vertical load testing of piles in accordance
with IS 2911 (Part IV) including installation of
loading platform and preparation of pile head
or construction of test cap and dismantling of
test cap after test etc. complete as per
117 20.6 specification & the direction of Engineer in- 0 0.00 0.00 0.00 0.00
char
20.6.1 Single pile upto 50 tonne capacity 0 0.00 0.00 0.00 0.00
20.6.1.2 Routine test 20.00 per test 18801.98 17 17.00 319633.66 0.00 319633.66
118 20.6.2 Single pile above 50 tonne and up to 100 0 0.00 0.00 0.00 0.00
tonne capacity
20.6.2.2 Routine test 61.00 per test 28829.73 37 37.00 1066700.01 0.00 1066700.01
Integrity testing of Pile using Low Strain/ Sonic
Integrity Test/ Sonic Echo Test method in
accordance with IS 14893 including surface
preparation of pile top by removing soil, mud,
dust & chipping lean concrete lumps etc. and
use of computerised equipment and high
skill trained personal for conducting the test &
119 20.9 submission of results, all complete as per 561.00 per test 822.79 400 400.00 329116.00 0.00 329116.00
130 16.3 Supplying and Stacking at site 0 0.00 0.00 0.00 0.00
16.3.2 63 mm to 45 mm size stone aggregate 1911.00 cum 577.08 924.52 924.52 533522.00 0.00 533522.00
16.3.3 53 mm to 22.4 size stone aggregate 1911.00 cum 593.19 924.52 924.52 548416.02 0.00 548416.02
7
16.3.8 Red Bajri 499.00 cum 1504.16 0 0.00 0.00 0.00 0.00
16.3.9 GOOD EARTH 499.00 Cum 156.70 0.00
Laying, spreading and compacting stone
aggregate of specified sizes to WBM
specifications in uniform thickness, hand
picking, rolling with 3 wheeled road /
vibratory
roller 8-10 tonne capacity in stages to proper
grade and camber, applying and brooming
requisite type of screening / binding material
to fill up interstices of coarse aggregate,
131 16.4 watering and compacting to the required 3914.00 cum 394.99 1849.04 1849.04 730352.31 0.00 730352.31
density .
22.2 KOTA VERTICAL 1882.00 SQM 1627.80 425.02 425.02 691847.56 0.00 691847.56
8
(ITEM CODE-22.3)Providing and laying water
proofing treatment to vertical and
horizontal surfaces of depressed portions of
W.C. kitchen and the like consisting of: (i) 1st
course of applying cement slurry @ 4.4
kg/sqm mixed with water proofing
compound
conforming tc IS 2645 in recommended
proportions.(ii) 11 nd course of 20 mm
cement
148 plaster 1:3 (1 cement:3 coarse
sand)mixed with water proofing compound
in
recommended proportion, (iii) Illrd course of
applying blown or/residual bitumen aplied
22.3 hot 14079.00 sqm 444.30 1809.72 1809.72 0.00 804058.60 804058.60
at 1.7 kg. per sqm of area, (iv) Ivth course of
400 micron thick PVC sheet.(Overlaps at
joints of PVC sheet should be 100 mm wide
and pasted to each other with bitumen @ 1.7
kg/sqni).
188.6
155 CARRIAGE OF MATERIAL 0 0.00 0.00 0.00 0.00
1 Stone Chips (540 KM Pakur) 85177.80 Cum 2223.65 56494.70525 2245.82 58740.52 125624451.33 4993907.19 130618358.52
2 Sone Sand (1+112 from Koilwar by Road) 101681.12 Cum 1685.81 36888.252364 2670.19 39558.44 62186584.72 4501425.50 66688010.22
3 Brick (1K+7p) (Only for Red Bricks) 2083.29 Per 1000 752.53 955.15 955.15 718779.03 0.00 718779.03
4 Local Sand 92823.50 cum 263.78 18158.72 18158.72 4789907.16 0.00 4789907.16
5 Earth 26469.00 cum 266.61 0 0.00 0.00 0.00 0.00
156 Difference 0 0.00 0.00 0.00 0.00
1 Brick (1K+7p) (Only for Red Bricks) 2083.29 Per 1000 290.49 873.01 873.01 253600.67 0.00 253600.67
2 Cemet (PSC) 5 KM mtr 21.26 0 0.00 0.00 0.00 0.00
9
Diluting and injecting chemical emulsion for
pre constructional anti-termite treatment and
creating a continous chemical barrier under all
round the column pits, wall trenches,
basement excavation, top surface plinth
filling, junction of wall and floor, along the
external perimeter of the building, expansion
joints over the top surface of consolidated
earth on which apron is to be laid,
sorrounding of pipes and conduits etc.
1 complete as per specifications.( plinth are of 0 0.00 0.00 0.00 0.00
the building at ground floor only shall be
measured in sqm for payment )