PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 2 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
Risk Matrices
1. Assessment of Severity – with the existing risk controls in consideration, each Risk Assessment Team (RAT) member is to rate the most likely severity outcome of
the possible injury or ill-health identified: see Table 1 below.
Table 1
Severity (S) Description
(5) Catastrophic Fatality, fatal diseases or multiple major injuries.
Serious injuries or life-threatening occupational disease (includes amputations, major fractures, multiple injuries, occupational
(4) Major
cancer, acute poisoning).
Injury requiring medical treatment or ill-health leading to disability (includes lacerations, burns, sprains, minor fractures, dermatitis,
(3) Moderate
deafness, work related upper limb disorders).
(2) Minor Injury or ill-health requiring first-aid only (includes minor cuts and bruises, irritation, ill-health with temporary discomfort).
(1) Negligible Not likely to cause injury or ill-health
2. Assessment of Likelihood – with the existing risk controls in consideration, each Risk Assessment Team (RAT) member is to rate the likelihood hazard that may
cause the possible injury or ill-health: see Table 2 below.
Table 2
Likelihood (L) Description
(1) Rare Not expected to occur but still possible.
(2) Remote Not likely to occur under normal circumstances.
(3) Occasional Possible or known to occur.
(4) Frequent Common occurrence.
(5) Almost Certain Continual or repeating experience.
2
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 3 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
3. Risk Matrix provides the useful framework to classify risks identified: see Table 3 below.
Table 3
Likelihood (L)
(1) Rare (2) Remote (3) Occasional (4) Frequent (5) Almost Certain
Severity (S)
(5) Catastrophic (5) Medium (10) Medium (15) High (20) High (25) High
(4) Major (4) Medium (8) Medium (12) Medium (16) High (20) High
(3) Moderate (3) Low (6) Medium (9) Medium (12) Medium (15) High
(2) Minor (2)Low (4) Medium (6) Medium (8) Medium (10) Medium
(1) Negligible (1) Low (2) Low (3) Low (4) Medium (5) Medium
[Risk Level: H = High Risk (15 ~ 25) M = Medium Risk (4 ~ 14) L = Low Risk (1 ~ 3)]
4. Action for Risk Level – the following actions are to be implemented based on the current Risk Level, as shown in Table 4 below.
Table 4
3
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 4 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
Risk Control
Hierarchy of Control
The control of hazards and reduction of risks can be accomplished by following the WSH Hierarchy of Control (see Figure 1). These control measures are not
usually mutually exclusive. Generally, it may be more effective to use multiple control measures, for example, engineering controls work better with
administrative controls like training and Safe Work Procedures.
Figure 1
4
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 5 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
2) STORAGE
2.1 Storage of materials on site
3) DRILLING WORKS
3.1 Drilling of holes into concrete slabs using hand drills
4) INSTALLATION WORKS
4.1 Installation of brackets
5) CUTTING WORKS
5.1 Cutting of pipes using fibre cutter
7) WORKING AT HEIGHTS
7.1 Working at heights using platform ladder / A frame ladder
7.2 Working at heights using scissor lift- (Appointment letter with pass)
8) LIFTING WORKS
8.1 Lifting and installation of pipes (manually)
9) PAINTING WORKS
9.1 Application of touch up paint using roller or paint brush- (SDS for paint)
5
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 6 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
17) HUMAN FACTOR(FOREIGN WORKERS WHO ARE NOT FAMILIAR WITH THE LOCAL
WORKING ENVIRONMENT
17.1 Housekeeping
17.2 Storage of equipment
18) WORKING UNDER ADVERSE WEATHER( EXPOSURE TO HOT WEATHER, LIGHTNING &
HAZY CONDITION
18.1 Emergency occurrence during works
6
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 7 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
21) COVID-19
21.1 COVID-19 Coronavirus
7
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 8 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
1.2 Delivery lorries Person hit by Injury to personnel / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
making deliveries of delivery truck damage to 2) Substitution: NA 2) Substitution: NA Manager)
pipes and fittings to /lorry crane due property/loss of life 3) Engineering -NA 3) Engineering -NA
site using fork lift. to poor traffic 4) Administration: 4) Administration: Chandra (Site
management comply with main con traffic management supervisor to supervise @ Supervisor)
plan remind workers of any
Follow the main con traffic controller obstruction /people training
instruction. ensure vehicle is park and
Only qualified & authorised driver should handbrake applied and wheel
be permitted to drive transport vehicle. 5 2 10 choke to be put on to prevent 5 1 5
Vehicle to travel up to 10km/h while within any movement of vehicle
the work site 5) PPE: NA
Banks man guide truck /lorry when
reversing
5) PPE:
Must wear safety shoes, hand gloves and
safety helmet at all time.
8
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 9 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
2) STORAGE OF MATERIALS
2.1 Storage of Materials Toppling of Injury to personnel/ 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
on site (Pipes and stacked damaged to property 2) Substitution: NA 2) Substitution: NA Manager)
fittings) materials in 3) Engineering -NA 3) Engineering -NA
designate area 4) Administration: 4) Administration: Chandra (Site
All pipes are to be stacked not taller than 1 All lose materials to be stored Supervisor)
meter in boxes and covered.
Guarding barrier to be placed for stacked 5) PPE :NA
pipes
Storage area is to be barricaded up to keep
unauthorized entry.
5) PPE : 4 2 8 4 1 4
Must wear safety shoes, hand gloves and
safety helmet at all time.
9
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 10 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
3) DRILLING
3.1 Drilling of holes Using faulty electric shock (skin 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
into concrete slabs drill or coming or body injuries) 2) Substitution: NA 2) Substitution: NA Manager)
using hand drill in contact with 3) Engineering -NA 3) Engineering -NA
(Ceiling) damaged wires 4) Administration: 4) Administration: Chandra (Site
Pre site inspection to be carried at area of Provide and attend training Supervisor)
work to ensure there is not hidden services Ensure electrical cord has no
lines. defects and hangs 2m above
Electrical tools are to be protected by RCCB the ground level on non-
or double insulated. conductive supports.
LEW to conduct monthly check on it that it Sockets of approved types and
is in good working condition. 4 2 8 of correct colour (industrial 4 1 4
Compatibility of source voltages and tools type plugs/ receptacles) are to
are to be verified before use. be used
Storeman is to check all hand tools is to e 5) PPE:NA
send to LEW for repairs.
5) PPE:
Must wear safety shoes, hand gloves and
safety helmet at all time.
10
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 11 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
4) INSTALLATION OF BRACKETS
4.1 Installation of Worker lose his Head injuries to 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
brackets hold on the passer-by / Property 2) Substitution: NA 2) Substitution: NA Manager)
brackets while damage 3) Engineering -NA 3) Engineering -NA
installation 4) Administration: 4) Administration: Chandra (Site
Area below installation of brackets is to be Workers are to be reminded Supervisor)
barricaded up during TBM to firmly secure
Banks man is to be deployed there to keep in one end of brackets before
others from walking in the work area letting of their hand
House-keeping to be done. 5) PPE :NA
5) PPE : 4 2 8 4 1 4
Must wear safety shoes, hand gloves and
safety helmet at all time.
11
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 12 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
Coming in Hand/ eye injuries 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
contact with the 2) Substitution: NA 2) Substitution: NA Manager)
blade 3) Engineering -NA 3) Engineering -NA
4) Administration: 4) Administration: Chandra (Site
Provide training on the use of machines. Provide and attend training on Supervisor)
Installation of Machine Guard the use of machine
Proper PPE are worn while at work 5) PPE :NA
5) PPE : 3 2 6 3 1 3
Must wear safety shoes, hand gloves and
safety helmet at all time.
12
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 13 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
13
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 14 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
14
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 15 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
15
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 16 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
9) PAINTING WORKS
9.1 Application of Storage of Fire / explosion / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
coating/ touch up paints serious injuries 2) Substitution: NA 2) Substitution: NA Manager)
using roller or paint fatalities 3) Engineering :NA 3) Engineering :NA
brush 4) Administration: 4) Administration: Chandra (Site
Paints should be stored in a dry and in a Workers are reminded during Supervisor)
designated area and should be away from the tool box meeting that there
other flammable materials. are no other hot works that has
“Non-smoking” signs to be put at the paint to be carried out in areas where
storage area. painting works are on-going.
A fire extinguisher is to be placed at the There should be no smoking at
storage area. all times in the storage area.
5 2 10 5 1 5
When carrying out painting works, site 5) PPE:NA
supervisor is to ensure there are no other hot
works being carried out in the same area.
Workers to be briefed on SDS of paint.
5) PPE:
Must wear suitable PPE like safety shoes,
hand gloves and safety helmet at all time.
16
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 17 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
Inhalation of Dizziness/ nausea/ 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
paint fumes unconsciousness 2) Substitution: NA 2) Substitution: NA Manager)
3) Engineering : 3) Engineering :NA
An area where painting is to take place is in 4) Administration:NA Chandra (Site
the open, if more ventilation is required, 5) PPE:NA Supervisor)
blowers / extractors will be used.
4) Administration: NA 3 2 6 - - -
5) PPE:
Suitable long sleeves, eye goggles and
gloves to be worn while at paint
17
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 18 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
Exposure to hot Hand, leg and other 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
surface of the parts of body 2) Substitution: NA 2) Substitution: NA Manager)
machine injuries 3) Engineering : 3) Engineering :NA
Keep clear fingers and hair away from the 4) Administration:NA Chandra (Site
exposed parts. 5) PPE:NA Supervisor)
Don’t place the hand neat the exposed part
Use proper hand tools for the job 4 2 8 - - -
4) Administration:
Provided adequate signage and barricade.
5) PPE:
Must wear safety shoes, hand gloves and
safety helmet at all time.
Whipping of the Physical injuries 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
air hose 2) Substitution: NA 2) Substitution: NA Manager)
3) Engineering : 3) Engineering :NA
Provide anti-whip arrestors to prevent 4) Administration:NA Chandra (Site
whipping of the air hose. 5) PPE:NA Supervisor)
4) Administration:
Provide training for the workers on the safe
4 2 8 - - -
of the air compressor.
5) PPE:
Must wear safety shoes, hand gloves and
safety helmet at all time.
18
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 19 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
19
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 20 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
Misuse oxygen fatality / serious 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
(Explosion) injury /physical 2) Substitution: NA 2) Substitution: NA Manager)
injuries 3) Engineering: 3) Engineering -NA
Never allow oil or grease to come into 4) Administration: Chandra (Site
contact with oxygen valves or cylinder Regularly check the regulator Supervisor)
fittings. is safe for oxygen and for the
Never use oxygen with equipment not cylinder pressure.
designed for it Supervisor monitoring
4) Administration: activities.
Only trained operators are allowed to use 5) PPE:NA
the equipment. 5 2 10 5 1 5
Keep fire extinguisher at all time during the
task.
Supervisor monitoring activities.
5) PPE:
Must wear safety shoes, hand gloves and
safety helmet at all time.
20
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 21 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
Trip and fall Physical injuries 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
(Hit by 2) Substitution: NA 2) Substitution: NA Manager)
wire/hose or 3) Engineering: NA 3) Engineering -NA
other materials) 4) Administration: 4) Administration: Chandra (Site
Hose not allowed running at the walkway. Regular inspection. Supervisor)
3 2 6 3 1 3
Proper housekeeping. Brief to worker.
5) PPE: 5) PPE:NA
Must wear safety shoes, hand gloves and
safety helmet at all time.
Provide fire Improper Physical Injury / 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
extinguisher within storage & death to person (s) 2) Substitution: NA 2) Substitution: NA Manager)
valid expiry date arrangement due to fire / 3) Engineering: NA 3) Engineering -NA
nearby storage area, explosion 4) Administration: 4) Administration: Chandra (Site
inspection by safety Cylinders to be stored at sheltered from Provide fire extinguisher Supervisor)
personnel. combustible materials or heat source. within valid expiry date nearby
5 2 10 5 1 5
Signs indicating “NO SMOKING / NO storage area, inspection by
NAKED FLAME” to be displayed at safety personnel.
storage area. 5) PPE:NA
5) PPE:
Must wear safety shoes, hand gloves and
safety helmet at all time.
21
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 22 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
22
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 23 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
13. Seal up with rivet Caught in rivet Ill-health/ physical 1) Elimination :NA 1) Elimination :NA Pichit (Project On Going
3 and silicon gun, flying injuries (injuries or 2) Substitution: NA 2) Substitution: NA Manager)
object and sharp cutting hand or 3) Engineering: NA 3) Engineering -NA
edge finger & eyes) 4) Administration: 4) Administration: Chandra (Site
Familiarise yourself with the equipment Keep unnecessary personnel Supervisor)
before use. away from work area.
Keep hand or finger away from ejection 5) PPE:NA
area.
Important to grip the handle firmly. 4 2 8 4 1 4
5) PPE:
Must wear safety shoes, hand gloves and
safety helmet & ear plug at all time.
23
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 24 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
24
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 25 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
25
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 26 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
26
WSH Form 02-2
PROPOSED NATURE-BASED ATTRACTION AT MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-BIRD PARK, WEST
Revision: 0
NODE (MULTI-STOREY CAR PARK, ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK WITH COMMERCIAL AND
ANCILLARY FACILITIES), MANDAI LAKE ROAD Sheet: Page 27 of 27
Date: 14-07-2022
RISK ASSESSMENT FOR LPG GAS PIPE INSTALLATION
27