S. No Name of Work Adv Cost (Rs. in Lacs Cost of Tender Documents Time of Completion Earnest Money Class of Contract Major Head of Account
S. No Name of Work Adv Cost (Rs. in Lacs Cost of Tender Documents Time of Completion Earnest Money Class of Contract Major Head of Account
S. No Name of Work Adv Cost (Rs. in Lacs Cost of Tender Documents Time of Completion Earnest Money Class of Contract Major Head of Account
For and on behalf of the Hon’ble Lieutenant Governor J&K UT, tenders are invited
by Executive Engineer, Horticulture (P&M) at Rajbagh by e-tendering mode on
Percentage % basis from approved and eligible Contractors registered with J&K UT Govt.
CPWD, Railways and other State/Central Governments for the following works: -
S. Name of work Adv cost Cost of Tender Time Earnest Class of Major Head of
No (Rs. in documents of Money Contract Account
lacs completion
1 2 3 4 5 6 7 8
Note: - As per circular issued by the Government of Jammu and Kashmir Civil Secretariat
finance department:
The Allotted agency should produce FDR @ 10% of running bills which shall be
treated as bill deposit and shall be released after DLP is over as per the procedure.
5. The bids for the work shall remain valid for a period of 120 days from the date of opening
of Bids
6. The earnest money shall be forfeited, If: -
a. Any bidder/ tendered withdraws his bid/ tender during the period of bid validity or make any
modifications in the terms and conditions of the bid.
b. Failure of Successful bidder to furnish the required performance security within the specified
time limit.
c. Failure of Successful bidder to execute the agreement within 28 days after fixation of contract.
7. Instruction to bidders regarding e-tendering process.
7.1. Bidders are advised to download bid submission manual from the "Downloads" option as
well as from "Bidders Manual Kit" on website www.jktenders.gov.inacquaint bid submission
process.
7.2. To participate in bidding process, bidders have to get 'Digital Signature Certificate (DSC)'
as per Information Technology Act-2000. Bidders can get digital certificate from any approved
Vendor.
7.3. The bidders have to submit their bids online in electronic format with digital Signature.
No bid will be accepted in physical form.
7.4. Bids will be opened online as per time schedule mentioned in Para-1.8.5.Bidders must
ensure to upload scanned copy of all necessary documents with the bid.
Note: - Scan all the documents on 100 dpi with black and white option.
8. The department will not be responsible for delay in online submission due to any reasons.
9.Scanned copy of cost of tender document in shape of Treasury challan in favor of Executive
Engineer Horticulture (P&M) Rajbagh,toExecutive Engineer Horticulture (P&M) Rajbaghmust
be uploaded with the documents of the bid. Including scanned copy of WhatsApp contact
Number.
10. Bidders are advised not to make any change in BOQ (Bill of Quantities) contents. In no
case they should attempt to create similar BOQ manually. The BOQ downloaded should be
used for filling the item rate inclusive of all taxes and it should be saved with the same name
as it contains.
11. Price escalation and Taxes: -The unit rates and prices shall be quoted by the bidder
entirely in Indian Rupees and the rates quoted shall be deemed to include price escalation
and all taxes up to completion of the work, unless otherwise specified. Deduction on account
of taxes shall be made from the bills of the contractor on gross amount of the bill as per the
rates prevailing at the time of recovery.
12. Bidders are advised to use "My Documents" area in their user on e-Tendering portal to
store such documents as are required.
13. Instructions to Bidder (ITB)
13.1. All bidders shall include the following information and documents with their bids: -
a. Copies of original documents defining constitution/ legal status, place of registration
and principal place of Business.
b. Valid GST No. & PAN No.
13.2. The bidder at his own responsibility and risk should visit and examine the site of work
and its surroundings before submission of bid
13.3. Nonattendance of pre-bid meeting will not be cause of disqualification of the bidder.
13.4. All documents relating to the bid shall be in the English Language.
14. If the bidder does not quote rate for any item of the rate list/quantity schedule, cost of
such item/ items shall be deemed to be part of the overall/total contract value. No rate shall
be allowed for such item / items in the allotment of contract.
15. General Conditions of Contract: -
15.1. The date of start of the work shall be reckoned within one week from the date of issuance
2
1979.
o. The Building and other Construction workers (Regulation of employment and Condition of
Page
Sd/-
Executive Engineer
Horticulture (P&M) Construction Division
Kashmir Srinagar
No. EE/Horti/P&M/2022-23/435-38
Dated: -27-06-2022
Copy to the/-