Radiography of Welds - Report No.

22217D Page 1 of 2

Customer: Isa Khoury Metal Indusrty Ltd. Contact Name: Sergey Izbakov
Address: Emek Sarah, anechoshet 37, Beer Sheva
Object: Tank Pen. Sens.: W6 Configuration:
Material: SS316L Standard: ASTM
Place: Isa Khoury Energy: IR 192 Job Contract: SWSI-
Factory/ Beer IK-1122 3
Sheva DrT-004 rev.01
Test G.S.I-04.00.04/
Procedure: Rev.ZF
Interpretation ASME VIII Source 2x3mm Film: AA-400
Code: div1 2021 Size: Kodak, Single
SFD: OFD: Test Date: 06-07-2022 Weld Thickness: 10-12mm
400-1100mm 13-15mm Night Reinforcement: 3mm
SOD = SFD – OFD Interpreter K.Berg Signature:
Level II
Approved K.Berg Signature:
by:
Test scope: The location and quantity of the films were selected by the customer
A: Accepted R: Rejected
Film Designation Finding
R A Remarks
Upper-Head wHead-1
X
0-25
25-60 X

60-90 X

90-125 X

125-160 Porosity X

160-190 X
Upper-Head wHead-2
X
0-30
30-60 X

60-95 Porosity X

95-130 X

130-165 X

165-197 X

Shell –H5A/V18 X

Shell-V19A X
Note: Reason for rejection appears as Bold letters
Total Radiographs: 14 Total Accepted: 14 Total Rejected: ---

GSP-9.1/2B [E] (01/22)


©All rights reserved to Gabi Shoef Ltd Main address
Email & website Tel & fax
Tel: 972-3-9605559, Hayarkon st., Yavne, 34
info@gabishoef.co.il
Fax: 972-3-9604160 Israel, 8122737
www.gabishoef.co.il
Radiography of Welds - Report No. 22217D Page 2 of 2
Notes:
1. Welds of certain steels may develop delayed cracks up to 48 hours after welding. If the inspection was
provided before the 48 hours have been elapsed, the inspection results will not show these possible
delayed cracks.
2. Certain operations such as load tests, heat-treatment, stresses and vibration due to shipment, lifting or
other situations, may cause cracks.
If the inspection was done prior to these operations, the report will not present these possible cracks.
3. Inspection results show situation of part at the moment of inspection.
4. The uncertainty of the inspection is not taken into the account in regard with the inspection standard/code.
►---------------------------------------► End of Report ◄-------------------------------------◄
The test was performed in the accreditation scope of ISO/IEC 17025. The use of ISRAC (The Israeli Laboratory Accreditation Authority) logo relates only to those tests
addressed in the laboratory accreditation scope and performed according to the accreditation regulations. The results of this report refer to the item tested only and it
its slate at the time of testing. ISRAC is not held responsible for any test results, neither the accreditation status indicates any acceptance for the product tested. The
document should be referred in a whole and not in part.

GSP-9.1/2B [E] (01/22)


©All rights reserved to Gabi Shoef Ltd Main address
Email & website Tel & fax
Tel: 972-3-9605559, Hayarkon st., Yavne, 34
info@gabishoef.co.il
Fax: 972-3-9604160 Israel, 8122737
www.gabishoef.co.il

You might also like