GOVERNMENT OF INDIA
रे ल मं त्रालय
MINISTRY OF RAILWAYS
Indian Railways
Unified Standard Schedule of Rates
(Formation Works, Bridge Works and P. Way Works)
इं जीननयररं ग नवभाग
Engineering Department
दर अनु सू ची
Schedule of Rates
2021
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken
for estimation or justifying rate. This amount/rate has been given for illustration purpose only.
IR Unified Standard Schedule of Rates 2021
INDEX
9 Welding Activities 61
11 Formation Rehabilitation 70
13 Maintenance Activities 79
1.5 Cost of Admixture (plasticizer / super-plasticizer) is included in the item of design mix concrete.
1.6 Payment for cement shall be made extra wherever mentioned in the item for the quantity as per
approved design mix subjected to minimum and maximum limit as prescribed in IS 456. For
nominal mix and other misc items, it shall be as per standard consumption enclosed separately
with this USSOR.
1.7 Cost of shuttering, wherever required, shall be paid separately and is not included in the rate
of item except where specifically mentioned otherwise. Shuttering shall be paid only for the
shuttering area coming in contact with the concrete surface.
1.8 For steel fabrication work, the cost of welding/riveting has been incorporated in the item rate
and no addition on nominal weight of the sections as specified in the drawings shall be
applicable on account of welding/riveting. HSFG bolts, where used, shall be payable.
(i) Cost of all labor, materials, tools & plants, machinery, transportation to the site of
work, all lead & lift, handling, re-handling, erection, testing, supervision & maintenance
for executing the work at site in all respect, unless mentioned specifically otherwise in
the description of an item, required for design, fabrication, execution and testing the
work, conforming to all applicable codes, specifications, manuals and guidelines.
(ii) GST & other taxes, royalties, duties, cess, levies or any other fees that may be
payable under any Central Government, State Government or other Local Bodies Acts
or Rules, mandatory insurance, profit etc.
1.10 Uniform rate of GST apllicable for works contract @12%, Water Charges@ 1% (except supply
items), Contractor's Profit & Overheads (CPOH) @ 15% and Cess @ 1% have been adopted
for all items while arriving at the Rate.
1.11 Procedure for Deletion of Item from “Standard Schedule of Rates”: PCE shall be the
authority to ban execution of any particular item on the Zonal Railway, if they find that the
particular item is not suitable to their Railway system due to any reason.
For this purpose, the item may not be deleted from SOR; but only a letter under the signature
of PCE shall be circulated to all concerned on his Railway, informing the list of items which
shall not be operated by field units, in case, PCE is of the opinion that any particular item
included in ‘Unified Standard SOR’ is having adverse effect and needs to be deleted from it.
The matter shall be referred to Railway Board, which will take necessary decision.
1
IR Unified Standard Schedule of Rates - 2021 General and Operating Instructions
2. Operating Instructions
Numbering System Of SOR Items –
2.1 The system of numbering SOR items has been adopted for easy identification of item and
linkage between item number & description of item. Each Item number of SOR consists of 6
numeric digits, as detailed below:
2.1.1 First 2 digits (left side) indicate Chapter no. e.g. from 01 to 21.
2.1.2 Next one digit indicates Sub-Group within the Chapter.
2.1.3 Next 2 digits are Main Item nos. within one Sub-group.
2.1.4 Next one digit, i.e. right-most digit indicates Sub-item within the main item.
2
IR Unified Standard Schedule of Rates -2021 Chapter -1: Earth Work
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
3
IR Unified Standard Schedule of Rates -2021 Chapter -1: Earth Work
012011 In all conditions and classifications of soil except rock Cum 103.66
012012 Soft rock not requiring blasting Cum 235.77
012013 In hard rock requiring blasting Cum 341.53
012014 In hard rock with hammer / chisel / pavement breaker etc. where Cum 842.58
blasting is not permitted due to special circumstances and if
specifically ordered in writing including drilling and all incidental works
thereto.
012015 Extra for leading of Cut spoil every one km beyond original lead of 2 Cum 5.44
km over item nos. 012011 to 012014
012020 Foundation preparation in cutting - ploughing and pulverizing 15 cm of 100 Sqm 300.90
top of soil with tractor trolley, mixing water to achieve OMC with water
sprinkler or allowing for natural drying, as required, and compaction
with vibratory roller of suitable capacity to achieve 98% MDD for laying
blanketing layer.
012030 Mechanical manufacturing of blanketing material by using only hard Cum 1,639.34
and durable stone crushed in mechanical crusher to different
gradations, wet mixing of the same in designed proportion in Pug mill
or wet mix plant to have uniform gradation including all incidental
transportation, laying over finished formation in uniform layer(s) with
motor grader, compaction with suitable vibratory roller to specified
density and finishing to correct profile, complete as per RDSO
Specification No. RDSO/2020/GE: IRS-0004 with latest correction
slips.
Note: This item shall be used only when entire constituent of
blanketing material is mechanically manufactured by crushing of hard
and durable stone into desired gradation of designed proportion.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
4
IR Unified Standard Schedule of Rates -2021 Chapter -1: Earth Work
012050 Mechanical manufacturing and supply of blanketing material by using Cum 1,202.22
only hard and durable stone crushed in mechanical crusher to different
gradations, wet mixing of the same in designed proportion in Pug mill
or wet mix plant to have uniform gradation as per RDSO Specification
No. RDSO/2020/GE: IRS-0004 with latest correction slips including
transportation to nominated place and stacking.
Note:
1.This item shall be used only when entire constituent of blanketing
material is mechanically manufactured by crushing of hard and
durable stone into desired gradation(s) in designed proportion to meet
prescribed Specification.
2. Measurement shall be done as per Stack measurement.
012060 Manufacturing and supply of blanketing material by wet mixing of Cum 560.98
different types of naturally available suitable soil including additional
blending with naturally available or manufactured material as required
to achieve specified gradation, in designed proportion in Pug mill or
wet mix plant to have uniform gradation as per RDSO Specification
No. RDSO/2020/GE: IRS-0004 with latest correction slips including all
incidental transportation and stacking at site in Stacks.
Note: Measurement shall be done in as per Stack measurement.
013000 Miscellaneous
013010 Felling trees of girth (measured at a height of 1.0 m above ground
level) including leading and stacking of material within 100m.
Note : 1. When stumps are grubbed up in addition, the rates shall be
doubled for trees cut and grubbed 2. Payment for grubbing shall only
be made where specially ordered. 3. Grubbing shall be ordered only
where it is essential to remove the stumps, including the roots, as per
specification. 4. Grubbing shall include removal of roots of trees and
saplings to a depth of 60cm below ground level or 30 cm below
formation level or 15 cm below sub grade level, whichever is lower.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
5
IR Unified Standard Schedule of Rates -2021 Chapter -1: Earth Work
013041 With provision of one 50mm wide retro-reflective tape in horizontal Metre 190.15
direction, duly secured/tight with vertical posts.
013042 With provision of painting verticals & horizontals with red luminous Metre 103.16
paints / strips of 30cm each with a gap of 30 cm.
013050 Provision of barricading with contractor's bamboos / ballies vertical
post of 100mm dia. planted at every 2m interval, projecting at least
1.5m above ground level and driven firmly (minimum 0.5m) inside
ground and including painting verticals & horizontals with red luminous
paints / strips at alternative bay on barricade. Barricades shall be
maintained through out the execution of the work and shall be
removed in workman like manner on completion of the work only after
instruction of Engineer in-Charge.
Note:
(1) 60% payment shall be made on provision of barricading at work-
site and balance 40% payment after removal of barricades.
(2) The released bamboos / ballies shall be the property of the
Contractor.
013051 With 3 horizontal bamboo / balli members of minimum 50mm dia. RM 134.14
spaced equally
013052 Joining with strong nylon rope in one cross and one horizontal pattern RM 78.83
of minimum 5mm dia.
013060 Supplying, driving and erecting in all types of soils, hard wood pile 5m Metre 183.08
to 7m long without joint, 125mm average dia. for protection of bank
slope including two coats of coal tar paint complete, as directed.
Note: Payment will be made as per actual driven length of pile.
013070 Driving rails 90R/52 Kg section below average ground level within the Metre 94.90
slope/toe of embankment including making of nose with contractor’s
own arrangement complete in all respect
Note: Payment will be made as per actual driven length of rail which
will be supplied free by Railways at the site of work.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
6
IR Unified Standard Schedule of Rates -2021 Chapter -1: Earth Work
013092 Below the ballast and above blanket layer with minimum strengths in Sqm 268.56
Grab test, Trapezoidal Tear test and Puncture test of 1750N, 800 N
and 5800 N respectively.
013100 Supplying & laying of drainage composite for use behind abutments, Sqm 680.64
wing walls, return walls and Retaining walls Geocomposite drain
(Vertical) as per RDSO Specification No. RDSO/2018/GE:IRS-0006
latest version with all material, labour, equipment, tools and plants,
lead, lift etc. complete in all respects as per the direction of Engineer-
in-Charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
7
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
021040 Erection of temporary working platform to drill bore hole through Cum 2,264.01
flowing/standing water through river bed up to water depth of 1.5m,
and dismantling after completing work and removing from the site to
clear the water way.
021050 Drilling of NX size borehole (75mm dia.) in all types of hard rock and
collection of rock core samples from boreholes and preserving in
boxes.
021051 0m to 10m Metre 3,055.85
021052 10m to 20m Metre 3,209.71
021053 20m to 30m Metre 3,422.44
021054 30m to 40m Metre 3,667.29
021055 40m to 50m Metre 3,793.05
021056 50m to 60m Metre 4,088.74
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
8
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
021110 Taking out 100mm dia. & 450mm long undisturbed samples of soil Each 137.81
from bore holes, including provision of air tight containers for packing
and, labeling incl. transporting the samples to laboratory. Piston
sampler shall be used for extracting undisturbed samples where
necessary. Samples shall be collected as per IS:2720.
021120 Taking out 100mm dia. & 450mm long disturbed samples of soil from Each 147.17
bore holes, including provision of air tight containers for packing,
labeling and transporting the samples to laboratory. Samples shall be
collected as per IS:2720.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
9
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
022031 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone Cum 2,448.15
aggregate 20 mm nominal size)
022032 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate Cum 2,529.25
20 mm nominal size)
022033 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate Cum 2,497.44
40 mm nominal size)
022034 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate Cum 2,599.67
20 mm nominal size)
022035 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate Cum 2,529.65
40 mm nominal size).
022036 1:4:8 (1 Cement : 4coarse sand (zone-III): 8 graded stone aggregate Cum 2,558.78
40 mm nominal size).
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
10
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
022050 Providing and laying in position machine batched, machine mixed and
machine vibrated Cement Concrete of specified grade as per
approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant
at site or RMC from approved plants) using 20mm graded crushed
stone aggregate and coarse sand of approved quality for the following
Reinforced cement concrete structural elements up to height of 9.0 m
from foundation top level, including finishing, using Plasticiser in
approved proportions (as per IS:9103), to modify workability without
impairing strength and durability complete as per specifications and
direction of the Engineer in charge.
Note:
1. Payment for cement, reinforcement and shuttering shall be made
extra under relevant item.
2. Plasticiser shall invariably be used in approved proportion to
increase workability with minimum possible quantity of cement for all
grade of Design Mix Concrete unless it is specifically approved citing
reasons for not using plasticiser at the stage of Mix Design and in that
case deduction shall be made as per relevant item.
022051 Abutment & Pier Cum 2,664.23
022052 Wing wall and Return wall Cum 2,664.23
022053 Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier Cum 2,699.92
cap, Fender wall, Diaphragm wall etc.
022054 Approach slab at formation level, Dirt wall/ ballast wall at formation Cum 2,628.53
level
022055 Extra for every increase of 1m or part thereof in the height above 9.0 Cum 71.39
m
022060 Providing and laying Plain Cement Concrete 1:3:6 with graded stone Cum 2,559.13
aggregate of 40mm nominal size, in foundation and floors, retaining
walls of bridges including mechanical mixing, vibrating, pumping and
bailing out water where ever required with all materials and labour
complete but excluding the cost of cement and shuttering as per
drawings and technical specifications as directed by Engineer.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
11
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
12
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
13
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
022127 Routine Load Test above 100 ton capacity up to 250 ton capacity pile Each 41,531.58
022130 Lateral load testing of single pile in accordance with "IS Code of
practice IS:2911 (Part-IV) for determining safe allowable lateral load of
pile” with all labour, material, tool & plants, equipment, machinery, etc
complete as per drawing and specification as directed by the
Engineer.
022131 Piles with lateral load capacity of up to 50 ton Each 19,186.03
022132 Piles with lateral load capacity of above 50 ton and up to 100 ton Each 29,086.76
022140 Pulse Echo Test (PET) for integrity testing of piles with contractor’s Each 2,809.67
men, materials and machines. The rate includes cost of Inspection of
site, preparation of pile head and any other unforeseen cost required
for the test, submission of reports in triplicate as per satisfaction of the
Engineer in Charge.
023000 Well Foundation
023010 Earth work in OPEN excavation in foundation of bridges, for placing of
well curbs of all shapes and designs in all kinds of soil including taking
out the excavated soil, levelling, ramming of bottom of excavation and
trimming of sides, returning the soil in layers, consolidation, disposal of
surplus soil within a lead of 300m, including all lift, dewatering, shoring
and strutting complete as per technical specification and as directed
by Engineer in charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
14
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
15
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
023101 Using Sand from River Bed if suitable for filling Cum 279.87
023102 Using sand from other than River bed (This item is to be operated if Cum 1,787.78
suitable sand is not available in River Bed for filling
024000 RCC Box
024010 Providing and casting machine batched, machine mixed and machine Cum 2,852.12
vibrated Cement Concrete of specified grade as per approved
Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or
RMC from approved plants, (Cast in-Situ/Pre-cast) in bottom/top slab,
side walls, toe wall and sumps haunch filling head walls, thrust bed or
any other component using 20mm graded crushed stone aggregate
and coarse sand of approved quality of RCC box of any size including
finishing, Plasticiser in approved proportions (as per IS:9103), to
modify workability without impairing strength and durability, complete
as per drawings and technical specifications as directed by Engineer
in charge.
Note:
1. Payment for cement, reinforcement and shuttering shall be made
extra under relevant item.
2. Plasticiser shall invariably be used in approved proportion to
increase workability with minimum possible quantity of cement for all
grade of Design Mix Concrete unless it is specifically approved citing
reasons at the stage of Mix Design and in that case deduction shall
be made as per relevant item.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
16
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
17
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
025033 Extra for additional height over item no. 025031 & 025032 wherever Sqm 96.86
required with adequate bracing, propping etc. over initial height of 5
metres for every additional height of 1 metre or part thereof.
025040 Providing and laying in position machine batched, machine mixed and machine Cum 4,421.68
vibrated Cement Concrete of specified grade as per approved Design Mix
(mixed in Mobile Concrete Batching/Mixing Plant at site using 20mm graded
crushed stone aggregate and coarse sand of approved quality in jacketing of
piers and abutments from bottom of foundation up to a height of 10m for
designed thickness of jacketing including finishing, using Plasticiser in
approved proportions (as per IS:9103), to modify workability without impairing
strength and durability complete as per specifications and direction of the
Engineer in charge.
Note:
1. Payment for cement, reinforcement and shuttering shall be paid extra under
relevant item.
2. Plasticizer shall invariably be used in approved proportion to increase
workability with minimum possible quantity of cement for all grade of Design
Mix Concrete unless it is specifically approved citing reasons for not using
plasticisers at the stage of Mix Design and in that case deduction shall be
made as per relevant item.
025050 Extra over 025040 for drilling of holes and insertion of dowel bars in
case of Jacketing
025051 Extra for drilling 32mm dia. holes for jacketing / anchoring Metre 114.90
025052 Extra for inserting of dowel bars of specified dia. (cost of rods to be Metre 12.83
paid extra)
025060 Supplying, spreading and compacting well graded hard stone of 63mm Cum 1,329.27
average size (maximum up to 80mm size) in the bottom of foundation
of box culverts, bridges etc. including all lead, lift, ascent, descent etc.
complete job as per directions of Engineer In-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
18
IR Unified Standard Schedule of Rates -2021 Chapter -2: Bridge Works - Substructure
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
19
IR Unified Standard SOR -2021 Chapter -3: Bridge Works - Super Structure (RCC)
031013 With Soffit level From 12m above Bed Level to 15m above Bed Level Cum 3,021.17
031014 Extra over USSOR Item no. 031013 for Soffit level beyond 15m above Cum 71.39
Bed Level for every 1m or part thereof
031020 Providing and launching in position machine batched, machine mixed Cum 2,592.84
and machine vibrated Cement Concrete of specified grade as per
approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant
at site or RMC from approved plants) using 20mm graded crushed
stone aggregate and coarse sand of approved quality for the Precast
Prestressed (Post-tensioned) Concrete Girder/Box Girders/Slabs in
contactor’s casting yard in the vicinity of worksite, including finishing,
using Plasticiser in approved proportions (as per IS:9103), to modify
workability without impairing strength and durability, complete as per
drawings, specifications and direction of the Engineer.
Note:
1. Payment for Shuttering, Cement, Reinforcement, HTS cables,
Sheathing, Anchorage Cones, stressing of cables, grouting of the
ducts and launching of girder/slab in position shall be made extra
under relevant items. However, deduction shall be made in case of
slab as per relevant item.
2. For pre-cast item, loading in transport vehicle in casting yard is
included and shall not be paid extra.
3. Plasticiser shall invariably be used in approved proportion to
increase workability with minimum possible quantity of cement for all
grade of Design Mix Concrete unless it is specifically approved citing
reasons at the stage of Mix Design and in that case deduction shall
be made as per relevant item.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
20
IR Unified Standard SOR -2021 Chapter -3: Bridge Works - Super Structure (RCC)
031050 Providing, fabricating & fixing in position to exact design profiles, MT 110,537.21
H.T.S. cables of all classification made from Low Relaxation strands
conforming to IS:14268– latest version in Pretensioned Prestressed
Concrete girders/slabs etc. including supplying, cutting, making into
cables with necessary spacers, colour coding, protecting with water
soluble oil at all time, placing, bending, routing, fixing, stressing
including all lead and lift with contractor’s own materials, labour,
equipments etc. complete as per drawings & specifications. Payment
shall be made in terms of weight of HTS cables as per drawing.
031060 Extra for using HDPE sheathing in place of CRCA sheathing Metre 147.17
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
21
IR Unified Standard SOR -2021 Chapter -3: Bridge Works - Super Structure (RCC)
031080 Supplying and laying in position specified grade precast prestressed Cum 2,592.84
cement concrete ballast retainers of size, as directed by Engineer In-
charge. Payment for Shuttering, Cement, reinforcement, HTS cables,
anchorage cones, stressing of cables and grouting of the ducts will be
done extra.
031090 Design, manufacturing, supplying and fixing in position elastomeric Cu Cm 1.20
bearing true to line and level conforming to IS:3400, IS:226, BS-5400
under prestressed concrete girders/ Steel Girders, for Pre-cast as well
as cast-in-situ girders as per approved drawing. The rate shall include
cost of load test of one no. bearing from Railway approved firms and
all fixing materials, equipments, machineries, labour, taxes, loading,
unloading, leading, lifting etc. complete. Rates include getting the
drawing approved from Railway and cost of inspection during
manufacturing from railway approved organization.
Note : 1. The rate is for finished item complete and paid only after
fixing in position below the girder. 2. The volume shall be as given in
the drawing and no deduction shall be made for inserted steel plates
etc.
031100 Providing and fixing in position of standard preformed sealed and slab
type or strip seal elastomeric type expansion joints for Railway bridge
or Road Over Bridges as per approved drawings and latest
MORTH/IRC specifications complete in all respect as directed by
Engineer in-charge.
031101 For 40mm expansion Metre 6,147.81
031102 For 80mm expansion Metre 8,448.03
031103 For 120mm expansion Metre 10,053.77
031104 For 160mm expansion Metre 12,391.32
031110 Load testing of one or more spans of bridge as selected by the
Engineer as per approved load test procedure following relevant
IS/IRC/Railway codes with contractor’s labour, deflection measuring
instruments, loading materials, recording and analyzing the load
testing results including all lead & lift, etc. complete as required. The
rates are all inclusive and will be paid after load test is finished and
girder is cleared of the kentledges/loading material etc. The load shall
be 1.25 times the stipulated design load.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
22
IR Unified Standard SOR -2021 Chapter -3: Bridge Works - Super Structure (RCC)
031121 Extra for using GI Drag Sheet, 1.50 mm thick, for protection of track Cum 907.93
from subsidence while pushing the box as per design over item no.
031120.
Note: The payment for this item shall be made for the clear inner cross
section area of the parent RCC Box/Boxes and barrel length i.e. clear
inner volume of parent RCC Box/Boxes.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
23
IR Unified Standard SOR -2021 Chapter -3: Bridge Works - Super Structure (RCC)
031140 Fabrication, insertion and removal of rail cluster below the running MT 6,257.18
track to ensure safety of track during box pushing in correct position
and alignment with Railway rails and contractors MS flats, wooden
blocks, and 12 mm dia bolts etc., as per approved drawing including
removing and filling back of ballast below track under traffic conditions
of Electrified/Non-Electrified section with all contractors, labour, tools,
tackles, consumables plants, and 50MT capacity crane and any other
material required for execution of work in all respect with all lead and
lift, transportation and as directed by Engineer in-charge. Payment
quantity shall be as per the weight of rail in rail cluster used at site or
as per approved drawing, whichever is minimum.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
24
IR Unified Standard SOR -2021 Chapter -3: Bridge Works - Super Structure (RCC)
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
25
IR Unified Standard SOR -2021 Chapter -3: Bridge Works - Super Structure (RCC)
031210 Supplying and laying 160mm dia. PVC Pipes Class-I, capable for a Metre 524.84
pressure of 2.5 kg/sqm in footpath of ROB for laying cable with all
contractor’s materials labour, tools, plant, machinery, vehicles,
consumables, lead, lift etc. complete as per specifications and as
directed by Engineer in-charge.
031220 Deduction in rate of 031010, 031020 and 031030 for casting of slab in Cum -35.69
place of Girder for any height
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
26
IR Unified Standard SOR -2021 Chapter -4: Bridge Works - Super Structure (Steel)
041014 Deduct for using steel conforming to Quality "BR" instead of Quality MT -3,077.26
"B0" of Grade designation E250 as per IS:2062.
041015 Extra for using steel conforming to Quality "C" Grade Designation MT 1,739.32
E250 instead of Quality "B0" Grade Designation E250 as per IS:
2062
041020 Supplying and fixing HSFG bolts of any dia and any length with Kg 150.57
suitable nuts including DTI washers conforming to IRS-B1-2001 for
bridges and steel structures with contractors labour, tools and plants
and lead and lift etc., complete.
041030 Assembling and erection of fabricated Steel girders on bearings at
site with crane/derrick / any other approved means at site on sub
structure with labour, equipment, T&P including site bolting with all
temporary arrangements, scaffolding etc. with contractors design and
scheme for longitudinal launching/side slewing (not requiring traffic
block) approved by Railway. Rate includes drifts, service bolts,
Holding down bolts etc. as per drawings.
Note: Payment for HSFG bolts used if any will be made separately
under relevant item.
041031 Plate Girder/Semi Through Girder /Composite Girder more than 12.2 MT 12,439.52
m span
041032 Open web Girder MT 18,727.15
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
27
IR Unified Standard SOR -2021 Chapter -4: Bridge Works - Super Structure (Steel)
041060 Supplying and fixing M.S. Angles 65mmx 65mmx 8mm or any other Kg 87.78
size conforming to IS:2062 in the nosing of steps of stair cases of Foot
Over Bridges including provision of 10mm dia, anchor bar 600mm c/c
and fixing with main girder with M.S. flat, making anti-slip
arrangements over the top of nosing as per approved scheme given
by Engineer in charge with all material, labour, T&P as a complete job.
041070 Providing and fixing various size HTS holding down bolts conforming
to relevant Codes/Specification in concrete column or in other
structures with proper nuts, bolts, washers/plates, grouting of holes
with cement or epoxy concrete with all material, labour, T&P as a
complete job.
041071 With Cement Grout. Cost of cement shall be paid extra. Kg 115.12
041072 With epoxy concrete grouting. Kg 122.81
041080 Supplying, Fabricating and fixing access ladders, inspection platforms, MT 87,841.30
Trolley refuges etc., on bridges with structural steel conforming to
IS:2062 including welding / bolting, priming painting with one coat of
ready mixed paint of Zinc Chromate (IS:104) with DFT of 25-30
microns followed by one coat of Zinc Chrome Red Oxide (IS:2074)
with DFT of 25 microns with all material, labour, T&P as a complete
job.
Note: Painting shall be paid separately under relevant item.
041090 Supplying, fitting and fixing in position true to line and level cast steel MT 566.09
rocker/roller bearing of different load bearing capacity conforming to IS
:7666, IS:9565, IS:1030, IS:919, IS:3073 and IRS Bridge Code
including all accessories as per drawing and Technical Specifications
with all material, labour, T&P as a complete job. The payment shall be
made for the load bearing capacity in Metric Tonne as per approved
drawing.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
28
IR Unified Standard SOR -2021 Chapter -4: Bridge Works - Super Structure (Steel)
041120 Design, supply, fitting and fixing in position true to line and level POT-
PTFE bearing of 300MT Capacity, consisting of a metal piston
supported by a disc or un reinforced elastomer confined within a metal
cylinder, sealing rings, dust seals, PTFE surface sliding against
stainless steel mating surface, complete assembly to be of cast steel /
fabricated structural steel, metal and elastomer elements complete as
per IS:2062, IS:1030, AISI:304, AISI:316, IS:6911, BS:3784, IS:3400,
IS:226, BS-5400, Bridge Code and as per approved drawing and
Technical Specifications. The design of the bearings shall be
submitted by the manufacturers / contractor and got approved from
Railway before fixing. Test report after inspection of the bearings shall
be submitted and got approved before the materials are lifted from the
manufacturer premises.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
29
IR Unified Standard SOR -2021 Chapter -4: Bridge Works - Super Structure (Steel)
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
30
IR Unified Standard SOR -2021 Chapter -4: Bridge Works - Super Structure (Steel)
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
31
IR Unified Standard SOR -2021 Chapter -4: Bridge Works - Super Structure (Steel)
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
32
IR Unified Standard SOR -2021 Chapter -4: Bridge Works - Super Structure (Steel)
041290 Removing of existing bed plate from existing bed block, supply,
fabrication and erection of new bed plate of approved sizes in exact
position over bed block of pier/abutments by giving full and even
bearing, setting them on the layer of free flow non-shrinkable grouting
compound, scrapping or chipping of bed block, if required, fabrication
and fixing of holding down HTS bolts of suitable sizes along with nuts,
washers etc., drilling holes of required size, grouting of holes by epoxy
mortar after fixing holding down bolts. Total work to be done during
traffic block. Cost of holding down HTS bolts shall be paid extra under
relevant item for supply of HTS holding down bolts.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
33
IR Unified Standard SOR -2021 Chapter -4: Bridge Works - Super Structure (Steel)
041341 Delaunching of existing PSC girders / slabs and Launching New PSC MT 1,030.69
girders / slabs
041342 Delaunching of existing PSC girders / slabs and Launching New MT 1,005.62
Structural steel plate girders.
041343 Delaunching of existing Structural steel plate girders / slabs and MT 991.03
Launching New Structural steel plate girders
041344 Delaunching of existing Structural steel plate girders / slabs and MT 1,016.11
Launching New PSC girders / slabs
041350 Longitudinally slewing of steel plate girders of span 12.2m to 24.4m
under traffic block at locations where it is found short / excessive
expansion gap beyond the bearing to locking strip or the center of the
bearing stiffener not in line with the center of the bed plate or where
the girders ends are butting each other as directed by the Engineer in
charge at site using contractor's own hydraulic jacks of 100 tons
capacity for lifting and slewing of girder separately on both ends to
suit as per site conditions, consumables and wooden cut blocks
including transportation, with all contractors labour, materials,
scaffolding/staging arrangements etc complete without damaging the
girder and track alignment and cross levels.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
34
IR Unified Standard SOR -2021 Chapter -4: Bridge Works - Super Structure (Steel)
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
35
IR Unified Standard Schedule of Rates -2021 Chapter -5: Bridge Works - Misc.
051070 Providing and laying Pitching with Stone Boulders, weighing not less Cum 2,482.78
than 35kg each with voids filled with cement sand mortar 1:4 on slopes
laid over prepared filter media including boulder apron laid dry in front
of toe of embankment complete as per drawing and Technical
Specifications (filter media to be paid separately under the relevant
item). Rate is excluding cost of cement which shall be paid extra under
relevant item.
051080 Providing and laying Filter Material as per RDSO Specifications Cum 2,756.95
underneath pitching in slopes complete as per drawing and Technical
Specification.
051090 Laying Boulder Apron on river bed for protection against scour with Cum 373.90
stone boulders supplied by Railway with voids filled with spalls
complete as per drawings and Technical Specifications.
051100 Laying Pitching with Stone Boulders supplied by Railway with voids Cum 400.82
filled with spalls on slopes, laid over prepared filter media including
boulder apron laid dry in front of toe of embankment as per drawings
and technical specifications.
Note: Filter media to be paid under relevant item.
051110 Stenciling of Girders with black / blue lettering over yellow background Each 38.95
with ready mix paint w.r.t. details of executed inspection, greasing and
painting, other details as directed by Engineer in-charge
Note: Payment will be per cm height of each letter
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
36
IR Unified Standard Schedule of Rates -2021 Chapter -5: Bridge Works - Misc.
052030 Supply and laying of quarry dust including consolidation, supply of all Cum 1,019.20
materials, labour, lead, lift, tools, plants, crossing of tracks as per
drawing and technical specification as directed by the Engineer in
charge in case loose slush is encountered at site of foundation before
casting the foundation or laying the filtering media.
052040 Supply and laying of coarse sand including consolidation with all Cum 1,983.85
labour, lead, lift, tools, plants, crossing of tracks as per drawing and
technical specification as directed by the Engineer in charge in case
loose slush is encountered at site of foundation before casting the
foundation or laying the filtering media.
052050 Guniting concrete surface with cement mortar of average thickness Sqm 567.79
25mm along with wire mesh 50x50x3mm, applied with compressor
after cleaning surface and spraying complete including curing as per
procedure and technical specifications given under Para 209.3 of
IRBM. Rate is excluding the cost of cement which shall be paid extra.
052060 Providing and inserting nipples of size 12 to 20 mm dia. with approved Each 61.02
fixing compound after drilling holes for grouting as per Technical
Specifications including subsequent cutting/removal and sealing of the
hole as necessary after completion of grouting.
052070 Grouting of masonry/concrete by injection process duly Sealing of
cracks, through nipples complete as per Technical Specification and
procedure given in IRBM Para No 209 including necessary admixture.
Payment shall be as per use of cement by weight in case of neat
cement/cement mortar grouting and weight of Epoxy in case of Epoxy
Grouting. (Cement will be paid extra).
052071 Neat Cement Grout with 20% anti shrinkage compound w.r.t. cement. Kg 296.57
052072 Cement Sand Mortar (1:1) Grout with 20% anti-shrinkage compound Kg 111.15
w.r.t. cement.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
37
IR Unified Standard Schedule of Rates -2021 Chapter -5: Bridge Works - Misc.
052110 Providing & applying epoxy with pot life not less than 60-90 minutes Sqm 795.20
for bonding of new concrete with old concrete @ 0.80 kg/sqm and as
per specifications including cleaning the surfaces complete as per
approved procedure.
052120 Providing & fixing 12 mm rabbit wire mesh at the junction of RCC Sqm 130.61
where specifically ordered or as shown in the drawing
052130 Providing weep holes by making suitable opening or drilling in existing Metre 401.40
Brick Masonry / Plain / Reinforced Concrete abutment, wing
wall/return wall with 110 mm dia UPVC pipe (working pressure
4kg/sqcm) extending through the full width of the structure complete
and repairing the same with cement mortar 1:2 (1 cement : 2 coarse
sand). Rate is excluding the cost of cement which shall be paid extra.
052140 Providing and fixing of Drainage Spouts of 110mm UPVC Type A ISI Metre 337.09
marked (Working pressure 4 kg/sqcm) using suitable clamps and
adhesive etc., complete.
052150 Providing and laying of filter media consisting of granular materials of Cum 2,351.27
GW, GP, SW groups as per IS:1498 (latest) in required profile behind
boulder filling of abutments, wing walls / return walls etc. above bed
level with all labour and material complete job as per drawing and
technical specification of RDSO Guidelines.
052160 Removing all loose concrete, cleaning rust with dusting compound &
water jet, drying, replacing worn out reinforcements by welding new
reinforcement for making up lost steel section, applying approved anti-
corrosive polymer coating over the damaged area to proper profile,
providing polymer mortar (up to 20mm thickness) or polymer concrete
(more than 20mm thickness) consisting of cement, sand, 6mm down
chips where required and polymer as per manufacturers' specification.
The rate includes curing for 14 days, all materials, consumables,
labours, tools and plants, scaffolding/staging with all lead and lift.
Note: Cost of reinforcement, if used, to be paid separately.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
38
IR Unified Standard Schedule of Rates -2021 Chapter -5: Bridge Works - Misc.
052180 Supplying and changing of corroded worn-out and loose rivets of any
size at any location of the bridges with or without traffic blocks
including all tools, plants, machinery complete in all respects.
052210 Providing cast in situ bridge number plaques as per Railway drawing Each 739.88
in cement concrete 1:2:4 mix using 20mm hard stone aggregate
embedded in 30mm notch in Bridge parapet coping duly engraving the
letter and figures and an arrow indicating the direction of flow and
finishing the top exposed surface with cement mortar 1:3, painting
letters and figures with two coats of black enamel paint on two coats of
white background with all labour, tools, cement, paint etc. with all
leads and lifts.
052220 Providing cast in-situ plaques for bridge foundations details of size Each 1,142.87
45cmx45cmx5cm in cement concrete 1:2:4 mix using 20mm hard
stone aggregate embedded in 30mm deep notch over abutment &
piers, engraving the letters & figures with CM 1:3 and finished smooth
including painting letters and figures with 2 coats of black enamel and
plaque with white enamel with all labour, tools, cement, paint, curing
etc. as a complete job.
052230 Providing & laying non pressure NP-4 Class RCC pipe with collars,
jointing with 1:2 cement and ordinary sand mortar including testing of
joints, but excluding earthwork with all labour and material as a
complete job. Cement for mortar will be paid separately.(Pipes of
600mm dia and above will be laid using crane/hydra).
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
39
IR Unified Standard Schedule of Rates -2021 Chapter -5: Bridge Works - Misc.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
40
IR Unified Standard Schedule of Rates -2021 Chapter -5: Bridge Works - Misc.
052290 Supplying & placing partly or fully underwater of Polypropylene Tarred Cum 3,028.50
Rope Gabion, fabricated from 9mm dia. rope, 100mm x 100mm Mesh
with partitions at every 1m interval and properly packed with
approximately 150mm size boulders including transportation and
placing at indicated places as per direction of engineer-in-charge with
contractor's tools, plants, labour etc. including royalty charges
complete in all respect and stitching with polypropylene lacing rope of
minimum dia. 4mm; carrying the material by head load from nearest
approach with all safety precautions and all leads and lifts.
053000 Miscellaneous
053010 Designing and developing Detailed structural and working Drawings
for following items for ROB/RUB/Bridge based on Railway's approved
GADs, duly collecting necessary data from Railways and R&B
authorities, duly designing members and submission of check plot duly
getting proof-checked by Railway approved institutes, submitting for
Railway's verification and approval, making corrections duly
incorporating suggestions in drawings/designs, further submission of
original in transparent film paper and soft copy (CD) for Railways
approval etc. with contractor's technical expertise and instruments,
labour, consumables, repeatedly attending till final approval etc.,
complete as directed by Engineer in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
41
IR Unified Standard SOR -2021 Chapter -6:Rails, Sleepers and Fittings Renewal
062011 For location of work not involving deep screening Each 289.38
062012 For location of work involving deep screening (deep screening to be Each 161.29
paid separately).
062013 For PSC wider base sleepers - For location of work not involving deep Each 303.85
screening
062014 For PSC wider base sleepers - For location of work involving deep Each 169.35
screening. (deep screening to be paid separately)
062015 Extra to item no. 062011, 062012, 062013 and 062014 for sleepers Each 35.08
lying on slope / toe of bank beyond initial height of 5 metres.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
42
IR Unified Standard SOR -2021 Chapter -6:Rails, Sleepers and Fittings Renewal
062021 For location of work not involving deep screening TRM 140.95
062022 For location of work involving deep screening (deep screening to be TRM 50.85
paid separately).
062030 Replacement of any type of sleepers in track with PSC sleepers lying
on cess or at Bridge Approaches for casual renewal at isolated
locations with all fittings complete to specified gauge & cross level with
contractor’s tools including packing and dressing of ballast, as directed
by Engineer in-charge. Released materials shall be neatly stacked and
handed over at specified location within an average lead of 250 m or
near either side of Bridge approaches as directed.
063030 Through Fitting Renewal (TFR) on PSC track, comprising of renewal Sleeper 30.22
of Grooved Rubber Pads, Liners and ERCs without damaging PSC
sleepers. Scope includes removal of all fittings, cleaning of rail seat,
rail flange at liner seats, and eye of Inserts with wire brushes and
applying Grease Graphite Grade "O" (IS:408) to eye of insert and
central leg of ERC with contractor's grease of Railway’s specification,
fixing all fittings in correct position and sealing liner edges with grease
all complete including collection and stacking of released materials at
nominated locations within SSE Jurisdiction as directed by Engineer-in-
Charge.
Note: All the fittings will be supplied at SSE/Stores/Depot.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
43
IR Unified Standard SOR -2021 Chapter -6:Rails, Sleepers and Fittings Renewal
063050 Lubrication of fish plated rail joints under traffic, by using Grease
Graphite Grade 'O' (IS:408) and Black oil supplied by contractor, for all
types of rail sections as per procedure laid down in latest version of
IRPWM and as directed by Engineer In charge.
Note: Release U/S bolt & nuts is to be deposited back. If any fish bolts
is jammed it should be cut with chisel and hammer and replaced with
fresh fish bolt supplied.
063070 Lubrication of Elastic Rail Clips on PSC sleepers with contractor’s ERC 3.85
grease, conforming to Railway’s specifications, labour etc. complete
as per procedure prescribed in latest edition of IRPWM.
063080 Lubrication of Elastic Rail Clips on PSC sleepers as per procedure ERC 1.92
prescribed in latest edition of IRPWM with Railway’s grease.
063090 Lubrication of ERCs and its liner contact area by removal of ERCs and ERC 5.41
Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal /
GFN liners & SGCI insert by using wire brush, scrapper / sand emery
paper etc supply and application of graphite grease, as prescribed by
Railway for under side of liners & corresponding area of rail foot &
SGCI insert with ERCs and re-fixing the same as per procedure
prescribed in latest edition of IRPWM with contractors grease and all
other tools & plants complete and as directed.
Note: Each ERC in this item shall constitute 1 ERC and its Liner
Contact area.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
44
IR Unified Standard SOR -2021 Chapter -6:Rails, Sleepers and Fittings Renewal
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
45
IR Unified Standard SOR -2021 Chapter -6:Rails, Sleepers and Fittings Renewal
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
46
IR Unified Standard SOR -2021 Chapter -6:Rails, Sleepers and Fittings Renewal
065020 Renewal of existing SEJ with improved SEJ with PSC sleepers under Set 7,463.15
traffic block conditions as per approved drawing including fixing of
special size bearing plate, rubber pad and other sleeper / rail fittings,
greasing to the fittings, leading rails, sleepers & fittings to site, leading
and stacking of released materials within a lead of 250m, cutting of
Rails, drilling of holes, fixing of related fittings, providing temporary
connection with fishplates till welding of SEJ is done and sleepers
shall be given initial packing to make track fit for 20KMPH speed.
Note:
(1) Rail cutting and hole drilling shall be paid separately.
(2) One set comprise complete SEJ on both rails at SEJ.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
47
IR Unified Standard Schedule of Rates -2021 Chapter -7: Turnouts and Renewals
071021 1 in 8½ Turnout (Under conditions not requiring Traffic Block). Set 21,004.28
071022 1 in 12 Turnout (Under conditions not requiring Traffic Block). Set 22,769.02
071023 1 in 16 Turnout (Under conditions not requiring Traffic Block). Set 25,708.47
071024 1 in 20 Turnout (Under conditions not requiring Traffic Block). Set 28,645.25
071025 Diamond Crossing (Under conditions not requiring Traffic Block). Set 36,042.70
071026 Derailing Switch (Under conditions not requiring Traffic Block). Set 4,805.20
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
48
IR Unified Standard Schedule of Rates -2021 Chapter -7: Turnouts and Renewals
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
49
IR Unified Standard Schedule of Rates -2021 Chapter -7: Turnouts and Renewals
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
50
IR Unified Standard Schedule of Rates -2021 Chapter -7: Turnouts and Renewals
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
51
IR Unified Standard Schedule of Rates -2021 Chapter -7: Turnouts and Renewals
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
52
IR Unified Standard Schedule of Rates -2021 Chapter -7: Turnouts and Renewals
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
53
IR Unified Standard Schedule of Rates -2021 Chapter -7: Turnouts and Renewals
074072 For 1 in 8.5 Turnouts & Derailing switches (Sleeper No 1 to 22 and 5 Set 1,220.09
approach sleepers)
074073 For 1 in 16 Turnouts (Sleeper No 1 to 31and 5 approach sleepers) Set 1,830.14
074081 For 1 in 12 Lead portion (Sleeper Nos 26 to 64 & 74 to 83 and 8 Set 3,989.28
approach sleepers) :
074082 For 1 in 8.5 Turnouts (Sleeper No 23 to 42&59 to 54 and 8 approach Set 3,191.43
sleepers)
074083 For 1 in 16 Turnouts (Sleeper No 32 to 76 & 87 to 101 and 8 approach Set 4,787.14
sleepers)
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
54
IR Unified Standard Schedule of Rates -2021 Chapter -7: Turnouts and Renewals
074110 Fabrication, supply and fixing of hand operated lever boxes with pull Set 16,540.25
rod of 33mm dia to Drg.No. MA3040 including lead, lift, loading,
unloading, tools and plants, transportation, crossing of track wherever
necessary as directed by Engineer-in-charge at site.
Note:
1. Rate including Fabrication, Supply and Fixing of hand operated
boxes.
2. Spring point lever (Self reversing type) as per drawing no. TMC-12
(Sheet 1,2,3).
074120 Fabrication, supply and fixing of MS lock pins/bolts for stock and Set 1,175.51
tongue rails made out of MS 40mm dia of length 200mm with head
cutting, lathe machining, milling, drilling, welding the rod with MS flat of
6mm thick of suitable size as required at site with MS split pins/bolts
and supplying of remaining ancillary materials required at for locking,
including all taxes, lead, lift, loading and un loading , tools and plants,
transportation, crossing of track whenever necessary etc., complete
and as directed by Engineer-in-charge at site.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
55
IR Unified Standard Schedule of Rates -2021 Chapter -7: Turnouts and Renewals
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
56
IR Unified Standard SOR -2021 Chapter -8: Deep Screening and Ballast Related Activities
081011 Depth of 150 mm below bottom of sleeper of Plain Track TRM 299.36
081012 Depth of 200 mm below bottom of sleeper of Plain Track TRM 326.12
081013 Depth of 250 mm below bottom of sleeper of Plain Track TRM 352.29
081014 Depth of 300 mm below bottom of sleeper of Plain Track TRM 387.33
081015 Depth of 150 mm below bottom of sleeper for Turnouts TRM 478.98
081016 Depth of 200 mm below bottom of sleeper for Turnouts TRM 521.79
081017 Depth of 250 mm below bottom of sleeper for Turnouts TRM 563.67
081018 Depth of 300 mm below bottom of sleeper for Turnouts TRM 619.73
081020 Manual deep screening of Plain track/ turnouts as per procedure
prescribed in IRPWM, June 2020 or latest, on PSC sleepers of any
density and throwing away screened muck arising out of screening on
toe of bank or on cess, if low or on spoil banks above top of cutting
(including throwing and leveling, if required beyond minimum 5m from
the edge of cutting which are up to 3m deep or alternatively carting it
up to 50m for disposing it off beyond cutting or platforms) as per
direction of Engineer in-charge, including cutting cess for effective
drainage on both sides, one round of kutcha packing with screened
ballast and further attending to track parameter to make track fit for 20
kmph speed complete in all respect.
Note : Payment shall be made for length along main line only for
turnouts.
081021 Depth of 150 mm below bottom of sleeper - For Plain Track : TRM 362.05
081022 Depth of 200 mm below bottom of sleeper - For Plain Track : TRM 397.47
081023 Depth of 250 mm below bottom of sleeper - For Plain Track : TRM 438.56
081024 Depth of 300 mm below bottom of sleeper - For Plain Track : TRM 494.18
081025 Depth of 150 mm below bottom of sleeper for Turnouts TRM 579.27
081026 Depth of 200 mm below bottom of sleeper for Turnouts TRM 635.96
081027 Depth of 250 mm below bottom of sleeper for Turnouts TRM 701.70
081028 Depth of 300 mm below bottom of sleeper for Turnouts TRM 790.69
081030 Extra to item nos. from 081011 to 081018 and from 081021 to 081028 Each 4.70
for disposal of muck at a distance beyond 50m for every additional
lead of 50 metres or part thereof up to 500 metres for 1 TRM in
station yard / cutting.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
57
IR Unified Standard SOR -2021 Chapter -8: Deep Screening and Ballast Related Activities
081050 Deep screening of turnout under line block within stipulated time by
way of removing the Points and Crossing assembly by using T-28
cranes, removing the entire stone ballast bed by excavators up to
shoulders to depth of 200/250/300 mm, limiting the digging up to
original formation level only, screening the ballast so removed and
stacking, spreading ballast on the formation in uniform layer from
stack of new/screened ballast, placing the points and crossing
assembly in designed position, dumping and spreading ballast in cribs
and shoulders, lifting of track as required so as to get a clean cushion
of 300mm, shifting of sleepers to correct spacing including removal
and re-fixing of fittings wherever necessary, aligning of sleepers as per
prescribed layout, initial packing, aligning, dressing/ lowering the cess
to deep screened depth up to the edge of bank with a slope of 1 in 30,
boxing of ballast to profile and making fit to run the trains at a speed of
non stop 20 KMPH as specified in IRPWM - June 2020 or latest
complete in all respect as directed by the Engineer - in - charge.
Note:
1. Rail cutting and Rail hole drilling shall be paid under relevant items.
2. Scooped ballast shall be screened and the unused quantity of
screened ballast shall be stacked for use in future.
082013 Extra to item no. 082011 for each additional average lift of 1m or part Each 10.82
thereof when total average lift exceeds 5m.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
58
IR Unified Standard SOR -2021 Chapter -8: Deep Screening and Ballast Related Activities
083011 Extra for additional lift over 75mm for every 50mm lift or part thereof TRM 23.49
up to 275mm for item nos. 083010 for each TRM.
083020 Regrading the existing track by lowering up to required depth in stages TRM 526.18
by cutting the formation top maintaining the depth of existing cushion
finally, not exceeding 75mm in one stage including one round of
through packing and making track fit for 30kmph speed at each stage
of lowering as per procedure prescribed in latest edition of IRPWM
and subsequent picking up of sags / slacks and attending to
misalignment / cross level defects during train operation, providing
required ramp-in and ramp-out for safe passage of trains, including
cutting trenches across track at every 30m interval to the required final
formation level complete, and fixing, marking, painting rail level posts,
tie bars at every 30m interval as directed by engineer in-charge.
Note: The item shall be only operated only when formation is required
to be cut for lowering of existing track.
083030 Boxing and profiling of ballast as per procedure prescribed in latest TRM 22.36
edition of IRPWM including cess dressing on both sides of track. The
work will include removing excess ballast from track and putting the
same in crib and shoulder by leading to a maximum of 50m including
crossing of track, deweeding on ballast section etc and as directed by
Engineer-In charge.
083040 Removing, screening and salvaging ballast from track, duly digging / Cum 263.15
scarifying ballast by beaters / wire brushes or any mechanical means,
leveling and dressing formation with specified cross slope after
salvaging ballast, separating muck by screening the salvaged ballast
with contractor's 20mm size sieve, stacking of screened ballast for
measurement, disposing off muck at specified locations with all lead &
lifts as directed by Engineer in-charge.
Note: Payment shall be made for quantity of ballast stacked after
screening of retrieved ballast from track.
084000 Loading & Unloading of Ballast
084010 Loading Railway's ballast, collected at yard / depot into Railway's Cum 39.64
BOB / BKH / any other type of open wagon, using Mechanical Loader
or any other method with all lead and lifts, as directed by Engineer in-
charge.
084020 Leading and loading Railway's Ballast collected at yard / depot into Cum 99.80
Railway's covered wagon using any approved method with lead up to
250m & all lifts as directed by Engineer in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
59
IR Unified Standard SOR -2021 Chapter -8: Deep Screening and Ballast Related Activities
085013 When distance of nearest quarry is more than 20 km and up to 30 km Cum 962.94
085014 When distance of nearest quarry is more than 30 km and up to 40 km Cum 998.72
085015 When distance of nearest quarry is more than 40 km and up to 50 km Cum 1,045.80
085016 When distance of nearest quarry is more than 50 km and up to 100 km Cum 1,178.99
085017 When distance of nearest quarry is more than 100 km and up to 150 Cum 1,417.48
km
085018 When distance of nearest quarry is more than 150 km and up to 200 Cum 1,666.54
km
085019 When distance of nearest quarry is more than 200 km and up to 250 Cum 1,915.59
km
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
60
IR Unified Standard Schedule of Rates -2021 Chapter -9:Welding Activities
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
61
IR Unified Standard Schedule of Rates -2021 Chapter -9:Welding Activities
092021 For 60 Kg Rail, Single shot crucible fitted with Automatic Tapping Each 1,725.84
Thimble , 3 pieces Mould (Zircon washed) and Compressed Air
Petrol/LPG pre heating technique
092022 For 60 Kg/60EI-R260 grade Rail, Single shot crucible fitted with Each 1,597.21
Automatic Tapping Thimble Technology, 3 pieces Mould (Zircon
washed) and Compressed Air Petrol heating technique.
092023 For 52 Kg - 90 UTS or 52 Kg 72UTS Rail, Single shot crucible fitted Each 1,597.21
with Automatic Tapping Thimble Technology, 3 pieces Mould (Zircon
washed) and Compressed Air Petrol heating technique.
092024 For 90R Rail, Single shot crucible fitted with Automatic Tapping Each 1,597.21
Thimble Technology, 3 pieces Mould (Zircon washed) and
Compressed Air Petrol heating technique.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
62
IR Unified Standard Schedule of Rates -2021 Chapter -9:Welding Activities
092040 25mm gap Cess Welding and finishing of weld to meet the
prescribed tolerances and pass all stipulated tests with Contractor's
labour, materials, consumables, tools, equipments etc. to complete the
work in all respect as per IR's "Manual for Fusion Welding of Rails by
Alumino - Thermic Process" with latest correction slips, including all
required handling and rehandling of rails, marking of welded joint,
painting weld collar with anticorrosive paint, as directed by Engineer
in charge.
Note:
1. Welding shall be carried out only by trained welder having valid
competency certificate using RDSO approved Alumino Thermit
Welding Portions, 3 piece prefabricated mould (Zircon washed)
manually pressed, Single shot crucible fitted with auto tapping thimble
and Compressed Air Petrol/LPG preheating technique as per RDSO
Specification No IRST/19-2020 with latest amendment.
2. Hydraulic Weld trimmer shall be used for chipping and profile
Grinder for finishing.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
63
IR Unified Standard Schedule of Rates -2021 Chapter -9:Welding Activities
092051 For 60 Kg Rail, Single shot crucible fitted with Automatic Tapping Each 975.40
Thimble, 3 pieces Mould (Zircon washed) and Compressed Air
Petrol/LPG pre heating technique
092052 For 60 Kg/60EI-R260 grade Rail, Single shot crucible fitted with Each 975.40
Automatic Tapping Thimble, 3 pieces Mould (Zircon washed) and
Compressed Air Petrol/LPG pre heating technique.
092053 For 52 Kg - 90 UTS or 52 Kg-72 UTS Rail, Single shot crucible fitted Each 975.40
with Automatic Tapping Thimble Technology, 3 pieces Mould (Zircon
washed) and Compressed Air Petrol heating technique.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
64
IR Unified Standard Schedule of Rates -2021 Chapter -9:Welding Activities
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or justifying
rate. This amount/rate has been given for illustration purpose only.
65
IR Unified Standard Schedule of Rates - 2021
Annexure - I
The accessories, meeting applicable RDSO Specification No IRST/19-2020 with latest amendment, are considered
integral part of AT welding portions of respective Rail section and shall be supplied free of cost as per following
yardstick.
Sl.No Description of Item Qty to be Supplied Remarks
**110 Units complete with every 1. The quantity to be
1 Pre-fabricated 3 piece moulds with cake piece
100 Portions supplied shall be in
3.5 Kg per portion in individual whole Nos in the
2 Dry Luting Sand
packets specified ratio or part
3 Single Shot crucible charge 1 No for each portion thereof.
4 Auto tapping thimble 1 No for each portion 2.**Extra quantity
**105 Units complete with every towards damages/
5 Ignition Matches
100 Portions breakages etc., and the
6 Mould shoe 1 Set per 50 Nos of Portions rates quoted are
7 Mould pressure clamp 1 Set per 500 Nos of Portions inclusive of this extra
8 Torch burner complete 1 Set per 200 Nos of Portions quantity and no extra
9 Torch burner Keys 1 per 500 Nos of Portions payment will be there
10 Goose neck arrangement for vaporization 1 per 500 Nos of Portions
11 Connecting Hose pipe 1 per 1000 Nos of Portions
12 Torch burner stand 1 per 1000 Nos of Portions
13 Aluminium / Steel rod for thermal plugging 1 per 800 Nos of Portions
14 Stop Watch 1 per 800 Nos of Portions
15 Adjustment spanner 1 per 800 Nos of Portions
16 Hot sets Chisels for emergency use 1 per 500 Nos of Portions
17 Pliers 1 per 800 Nos of Portions
18 Steel Wire brush 1 per 400 Nos of Portions
19 Slag Container Bowl 1 per 500 Nos of Portions
Weld Grinding Stone (Top Flexible High speed)
20 1 per 10 Nos of Portions
(150x120x50/22.23) mm)
Trimmer cutter hydraulic pressure pipe with
21 1 pipe per 300 Portions
connecting arrangement
22 Trimmer Cutter Blade (Fixing arrangement) 1 Set per 300 portions
23 Rail cover 1 Set per 100 portions
24 Hammer 1016 2 Nos per 800 portions
25 Thermal Chalks 1 per 800 Portions
26 10 cm Long Gauge 1 per 800 Portions
27 1 m long Gauge 1 per 800 Portions
28 Filler Gauge shims 1 per 800 Portions
29 Pressure Gauge 2 Nos per 800 portions
30 Weld Cover 1 Nos per 800 portions
66
IR Unified Standard Schedule of Rates - 2021 Chapter -10: Reconditioning of Points Crossings
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
67
IR Unified Standard Schedule of Rates - 2021 Chapter -10: Reconditioning of Points Crossings
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
68
IR Unified Standard Schedule of Rates - 2021 Chapter -10: Reconditioning of Points Crossings
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
69
IR Unified Standard Schedule of Rates - 2021 Chapter -11: Formation Rehabilitation
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
70
IR Unified Standard Schedule of Rates - 2021 Chapter -11: Formation Rehabilitation
111030 Extra/Deduction in the rate of item nos. 111011 & 111012 for
increase / decrease in area of Non-woven Needle Punched and
Mechanically or Thermally bonded type Geo-textile required as per
approved design over net quantity of 4.0 Sqm per TRM considered in
above items.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
71
IR Unified Standard Schedule of Rates - 2021 Chapter -11: Formation Rehabilitation
113030 Excavation for widening of existing formation in cuttings in hard soils Cum 444.24
which require picks or crow bars for hacking including soils containing
stones or boulders of size under 0.03 cum without infringing the
nearby track, as directed by engineer-in-charge at site including
cutting of earth, loading, leading by contractor’s vehicles, unloading at
site, dumping on spoil bank by head loads and utilising same
excavated earth for widening of existing formation in embankment as
per standards, duly rolling manually at 2:1 slope and levelling bank to
the required profile including watering and compaction with
contractor's labour or mechanically operated rollers with all
contractor's labour, clearing of jungle, benching etc., tools, plants,
vehicles etc. complete with lead up to 1000m and all lifts including
crossing of track, wherever necessary.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
72
IR Unified Standard Schedule of Rates - 2021 Chapter -12: Activities at Construction Sites
122013 For rails/panels of more than 13m and up to 40m length - Under RM 25.09
Traffic Block
122014 For rails/panels of more than 13m and up to 40m length - Under RM 17.89
Conditions not requiring Traffic Block
122015 For rails/panels of more than 40m length - Under Traffic RM 36.71
122016 For rails/panels of more than 40m length - Under Conditions not RM 26.07
requiring Traffic Block
122017 Extra over item No 122011 for crossing each additional line RM 1.69
122018 Extra over item No 122013 for crossing each additional line RM 2.51
122019 Extra over item No 122015 for crossing each additional line RM 3.67
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
73
IR Unified Standard Schedule of Rates - 2021 Chapter -12: Activities at Construction Sites
123030 Spreading of ballast, from existing stacks available along formation Cum 42.38
on top or at cess, in required uniform thickness, compaction of
ballast layer laid on new formation at all the locations with smooth
wheeled power roller of 8-10 tonne capacity to sufficient number of
passes to form consolidated ballast bed of approximately 250mm
thickness to a width of 4m symmetrical to centre line of proposed
track in correct line & level with all ascents & descents, as directed by
Engineer in-charge.
Note: Item is inclusive of (a) providing ramp for taking roller to
formation and removing the same & making good formation after
completion of work; (b) redistribution & leveling of excess ballast
while rolling to obtain uniform plane cambered surface.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
74
IR Unified Standard Schedule of Rates - 2021 Chapter -12: Activities at Construction Sites
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
75
IR Unified Standard Schedule of Rates - 2021 Chapter -12: Activities at Construction Sites
123070 Linking of track on Girder Bridge with Steel Channel/H-beam sleepers TRM 501.88
as per approved drawings including leading of running and guard
rails, sleepers and fittings, bending of guard rails, notching, drilling of
holes, cutting of rails etc. as per IRPWM with latest correction slips
and making track structure fit for normal speed.
Note:
1) Rails, Steel Channel/H-beam sleeper and all fittings will be
supplied by Railways.
2)Transportation of track material if supplied beyond 250m of bridge
approaches, shall be paid separately under relevant item.
123080 Carrying out cut & connection to the existing PSC sleeper track under Each 54,926.71
line block of any rail section and sleeper density to connect the same
to newly linked track which is laid by the side, duly carrying out cutting
of rails, insertion of additional PSC sleepers, if required, providing fish
plated joints including drilling of holes, slewing required length of both
tracks to prescribed alignment, adjusting sleeper spacing, providing
continuity to track, spreading of ballast to provide cushion, shoulder
ballast to the track stretch, giving one round of initial packing to make
track fit for 20 kmph speed and boxing of ballast to profile as directed
by Engineer in charge.
123090 Shifting / Slewing the existing or newly assembled track of any rail
section with any type of sleepers and any density under line block to
correct locations & alignment and attending to one round kutcha
packing to run safely at 20KMPH speed with all contractors tools and
consumables complete and as directed by Engineer in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
76
IR Unified Standard Schedule of Rates - 2021 Chapter -12: Activities at Construction Sites
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
77
IR Unified Standard Schedule of Rates - 2021 Chapter -12: Activities at Construction Sites
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
78
IR Unified Standard Schedule of Rates - 2021 Chapter -13: Maintenance Activities
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
79
IR Unified Standard Schedule of Rates - 2021 Chapter -13: Maintenance Activities
131070 Slack picking of joint sleepers and 3 approach sleepers on either Each 480.90
sides giving required lift to make up general track level, packing and
profiling as directed.
132000 Systematic Overhauling Works
132010 Systemic overhauling of track under traffic as per procedure
prescribed in latest edition of IRPWM , including removing the crib
ballast in 50mm to 75mm depth below bottom of sleeper and
complete shoulder ballast without breaking core under the bottom of
sleeper, to recover clean ballast by screening on wire mesh and
disposing off the muck including throwing & leveling, if required
beyond minimum 5m from the edge of cutting which are up to 3m
deep or alternatively carting it up to 50m for disposing it off beyond
cutting or platforms away from the track, as directed by Engineer in-
charge including cutting & making up the cess and ensuring proper
drainage slope and then re-inserting cleaned ballast into track and
compaction of shoulder and crib ballast by wooden mallet and
dressing / profiling ballast as per railway specifications.
132011 For PSC sleeper Track with Sleeper Density of 1540 sleepers/Km or TRM 151.23
more
132012 For PSC sleeper Track with Sleeper Density less than 1540 TRM 114.74
sleepers/Km
132013 For other than PSC sleeper Track with Sleeper Density of 1540 TRM 132.33
sleepers/Km or more (M+7)
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
80
IR Unified Standard Schedule of Rates - 2021 Chapter -13: Maintenance Activities
133021 For Rail panel more than 13m and up to 40m length RM 18.48
133022 For Rail panel more than 40m length RM 21.59
134000 Re-Alignment of Curves
134010 Slewing and realigning of curves under traffic line block condition, as
directed by Engineer in-charge with contractor's labour, tools &
plants, as required with general lift up to 25mm including one round of
through packing, ballast profiling, loosening/tightening of P.Way
fittings, if required and other incidental works.
Note: Payment will be made based on average slew calculated in
each 50m length of track by averaging absolute values of positive and
negative value of slews.
134011 Other than PSC Sleeper track - Maximum slew up to 50mm TRM 90.11
134012 Other than PSC Sleeper track - Maximum slew more than 50mm and TRM 107.19
up to 100mm
134013 Other than PSC Sleeper track - Maximum slew more than 100mm TRM 119.26
and up to 150mm
134014 Other than PSC Sleeper track - Maximum slew more than 150mm TRM 133.34
134015 PSC Sleeper track - Maximum slew up to 50mm TRM 106.43
134016 PSC Sleeper track - Maximum slew more than 50mm and up to TRM 134.17
100mm
134017 PSC Sleeper track - Maximum slew more than 100mm and up to TRM 155.04
150mm
134018 PSC Sleeper track - Maximum slew more than 150mm TRM 177.79
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
81
IR Unified Standard Schedule of Rates - 2021 Chapter -13: Maintenance Activities
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
82
IR Unified Standard Schedule of Rates - 2021 Chapter -13: Maintenance Activities
136042 One Gang comprising of 20 physically fit labours plus 1 Mate. Gang Day 13,103.76
Note: In case, contractor provides less no. of Labour/Mate, payment
will be deducted for each such labour @ 10% of the accepted item
rate.
136050 Interchanging gauge face of rails of any section in traffic line block TRM 82.38
including removal of fittings and re-fixing the same after changing of
gauge face, cutting of rails, joining the rails with fish plate & drilling
holes as directed by engineer in-charge.
136060 Replacing existing glued joint rail with cut rails or with glued joint rail Each 1,546.42
or insertion of glued joint by cutting existing track under traffic
condition by cutting rails, refixing with all rail sleeper fastenings and
providing required gaps for carrying out welding as an alternative to
drilling holes or joining rails with fish plates duly drilling holes as
required including stacking of released material and as directed by
engineer in-charge.
Note:
(1) Drilling holes & rail cutting will be paid separately.
(2) Transportation of materials to the site of work from supply points,
if more than 250m, shall be paid separately.
136071 With Railway’s wooden block (by cutting Railway’s wooden sleepers Each 180.97
into blocks by sawing to size)
136072 With Contractor’s hard wood block. Each 2,237.31
136080 Drilling holes of 16mm to 22mm dia. on all types of PSC sleepers and Each 280.17
fixing the dowels with adhesive of RDSO approved quality for fixing
check rails & guard rails, as directed by Engineer in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
83
IR Unified Standard Schedule of Rates - 2021 Chapter -13: Maintenance Activities
136120 Making kutcha trapezoidal side drain of bottom width as 300mm and RM 108.52
depth of 450mm in cutting section by excavation in all types of soil
including utilising excavated muck for dressing of cess, slopes etc. in
Railway land.
136130 Providing Assistant to Patrol man for patrolling during cold / hot
weather on track for protecting track as per IRPWM.
Note:
1.The person deployed for patrolling must have the following items:
• Valid certificate of competency issued by Railways.
• Fit for A-3 medical category - certificate issued by registered
medical practitioner
2.Necessary equipments prescribed shall be supplied by Railways for
each patrolman and same to be handed over back to Railways in
good condition.
3.The following equipment to be arranged by contractor for each
patrol man:
H.S.Flags Green -1 No (Standard size), H.S Flags Red- 2 Nos.
(Standard size),Torch light 3 cell -1 no., Staff for flags -1 no., Whistle
Thunder - 1no, Protective clothing to withstand climate, Gum boots,
Haver sack.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
84
IR Unified Standard Schedule of Rates - 2021 Chapter -13: Maintenance Activities
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
85
IR Unified Standard Schedule of Rates - 2021 Chapter -13: Maintenance Activities
137070 Marking, inscribing, painting, writing, bordering etc. on new / old iron
surface at various locations of Points & Crossings with details of turn-
in / turn-out reference station mark on rail web for one set, duly
preparing surface with contractor's wire brush and applying two coats
of yellow synthetic enamel paint of approved quality as background
and stenciling the details to suitable size, as described for every
curve reference station mark / switch / crossing details with black
enamel paint of approved quality complete, as directed :
Note: Stenciling of letters is only permitted. No hand written letters
are accepted.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
86
IR Unified Standard Schedule of Rates - 2021 Chapter -13: Maintenance Activities
137110 Attending the CC apron repairs under the sleeper where there is Each 1,724.10
separation of PSC Sleeper along whole periphery and puncturing of
apron under the sleepers, chiselling as required including removal of
foreign materials from the sleeper trench and dewatering duly filling
cement concrete with CONBEXTRA-GP2 or similar, the narrow gaps
completely including pouring, finishing, curing to match with the
existing C.C.apron surface and slopes complete, labour charges in
traffic block and as per the direction of Engineer In charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
87
IR Unified Standard SOR - 2021 Chapter -14: Testing of Rails and other Components
141020 Carrying out Through USFD testing of running rails & welds
(excluding flange testing) including level crossings, lead portion of
points and crossings and scabbed rail testing of all types of rails by
NBC (Need Based Concept) method under traffic conditions as per
provisions of IR’s "USFD Manual & Specifications for Ultrasonic
Testing of Rails and Welds" with latest correction slips & related
instructions, duly marking defects, submission of daily reports and
storing back-up data, as specified & directed.
Note:
The SRT/DRT machine should have minimum of 9 probes (including
370 forward /backward probe for detecting bolt hole cracks.
142011 Track having up to 3 rail panels - With Contractor’s USFD machine : Each 168.09
142012 Track having more than 3 Rail panels - With Contractor’s USFD Each 154.09
machine.
142013 Track having up to 3 rail panels - With Railways’ USFD machine Each 148.63
including related T&P and probes :
142014 Track having more than 3 rail panels - With Railways’ USFD machine Each 134.02
including related T&P and probes :
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
88
IR Unified Standard SOR - 2021 Chapter -14: Testing of Rails and other Components
143011 Track having up to 3 rail panels - With Contractor’s USFD machine : Each 178.72
143012 Track having more than 3 rail panels - With Contractor’s USFD Each 163.83
machine :
143013 Track having up to 3 rail panels -With Railway's USFD machine Each 159.26
including related T&P and probes :
143014 Track having more than 3 rail panels - With Railway's USFD machine Each 145.99
including related T&P and probes :
144000 USFD Testing of SEJ
144010 USFD testing of Switch Expansion Joint (SEJ) by NBC (Need Based
Concept) method under traffic conditions as per provisions of "IR’s
Manual & Specifications for Ultrasonic Testing of Rails and Welds"
with latest amendments & related instructions, duly marking the
defects, submission of daily reports and storing back-up data, as
specified in the special conditions, as applicable to rail testing. The
rates are inclusive of contractor’s men, materials & machines
complete unless otherwise specified and directed.
Note: One set consists of both SEJ on left and right rail.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
89
IR Unified Standard SOR - 2021 Chapter -14: Testing of Rails and other Components
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
90
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
151020 Assembling of 13m / 12.6m long track panels in PQRS Depot by TRM 33.55
spreading PSC sleepers already unloaded and stacked, to correct
spacing as per specified sleeper density per km, using Railway's
portal crane, placing service rails on them and fixing rails to sleepers
with standard fastening properly to get correct gauge with all
contractor’s labour, tools, plants etc.
151030 Loading pre-assembled panels with PSC sleepers in layers on BFR TRM 4.91
with Railway's Portal Crane in PQRS Depot, complete in such a
manner that it may be dispatched in train formation to mid section, as
directed by engineer in-charge.
151040 PQRS: Pre Block activity: Removing of the existing ballast from crib TRM 27.50
portion of the full length of existing PSC sleeper and further up to the
bottom of sleepers to accommodate new sleeper and dumping the
ballast so removed on the shoulders/cess with contractor own labour,
tools and plants etc, complete with all lead and lift and as directed by
the Engineer-in-charge at site including crossing of track wherever
necessary.
151050 PQRS: During line block activity: Dismantling existing track, levelling TRM 34.86
disturbed and uneven surface of bed up to bottom of sleeper, Loading
the released panels in to BFR with Railway's portal cranes, Placing
new panels from BFRs on to track with Railway's portal crane, Linking
of Track with all fittings, placing ballast as required in crib and
shoulders, aligning and surfacing of track, attending track parameters
and initial packing to track to allow traffic at restricted speed of 20
kmph with contractor's labour, tools etc, complete and lead & lift as
directed by the Engineer-in-charge at site including crossing of track
wherever necessary.
Note: The PQRS cranes with fuel and operators will be provided by
Railway.
TRM in to track18.50
151060 PQRS: Post Block activity, Pulling back the left over ballast from shoulders/cess and dumping in cribs
151070 Unloading of released track panels consisting of all types of rails &
sleepers from Railway wagon at PQRS Depot, using portal cranes
including dismantling of released panels to rails, sleepers &
fastenings and stacking them material-wise and classification-wise at
nominated locations within the yard limits with all leads, lift and
crossing of tracks.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
91
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
151100 Guarding and watching the Track machine / group of machines, spare Shift 691.71
parts, oils, grease etc. of PQRS cranes (one set of 2 portals) during
day and night time in a shift of 12 hours each, at all locations
wherever necessary, as instructed by the machine in-charge.
Note: One shift comprises of 12 hours.
151110 Laying of auxiliary track with all types of rails, already available on TRM 37.50
cess, fixing rails on wooden blocks / CST-9 pots at 2m interval, true to
square, to required alignment & level, fixing with spikes / screws /
keys, linking rails with fish plates, bolts & nuts to a gauge of 3400mm
(with reference to centre line of existing BG track), levelling both the
rails to same plane as that of BG track over stone ballast by way of
removing ballast from shoulders of existing track, providing one round
of packing. Subsequently, dismantling auxiliary track after completion
of PQRS work at site by way of removing wooden blocks / CST-9 pots
and carrying same to next stretch / location, if required, where
auxiliary track has to be laid and spreading the same at required
locations and leaving rails there itself for carrying out TRR work later.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
92
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
93
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
154030 Removal of screened muck discharged by BCM, where muck TRM 25.30
disposal on side slope is restricted due to platform, cutting, OHE mast
etc. and disposing it beyond 5m from edge of cutting up to 3m deep
or alternatively carting it up to 50m for disposing off beyond the end of
cutting / platform and making up cess wherever low.
154040 Removal of screened muck discharged by FRM/SBCM where muck TRM 16.87
disposal on side slope is restricted due to platform, cutting, OHE mast
etc. and disposing it beyond 5m from edge of cutting up to 3m deep
or alternatively carting it up to 50m for disposing off beyond the end of
cutting / platform and making up cess wherever low.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
94
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
154080 Ballast equalisation & ballast profiling after completion of deep TRM 31.43
screening work by BCM and/or after unloading of ballast by DMT
(Ballast Train), as directed by Site Engineer as per IRPWM including
heaping of ballast in tamping zone keeping rails & sleeper top free
from ballast, spacing and squaring of sleeper, gauging, cleaning of
muck, proper fixing of fastening, attention during each round of
sleeper tamping in relation to pre & post working
Note:
Payment shall be made only once in irrespective of numbers of TTRM
packing round and after restoration of normal speed and restoration
of complete ballast profile and cess profile.
154090 Making cess in deep screened track by using screened muck TRM 28.12
discharged by BCM where cess is low or cutting cess to required
depth up to 4m from centre of track, where cess is high and disposing
off extra muck beyond 5m from edge of cutting which are up to 3m
deep or alternatively carting it up to 50m for disposing it off beyond
cutting or platforms, so as to make cess as per standard profile
including providing proper slope.
154100 Carrying out Through packing of sleepers to make track fit for 30 KM TRM 72.29
speed as per procedure stipulated in latest version of IRPWM, behind
BCM including filling ballast when only lifting is carried out by BCM.
154110 Pulling the left over ballast to the shoulders and dumping excess TRM 26.29
ballast in the cribs and shoulders including boxing/profiling as per
IRPWM of track together with left over stretches at fixed
structures/masts immediately after FRM work, leveling the muck for
making up cess and side slopes including removing and re-fixing of
traction bonds during line block with all contractors labour, tools,
plant, all lead, lift, crossing of track etc. complete and as directed by
the Engineer-in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
95
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
96
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
(9) Removing and re-fixing joggled fish plates & wooden blocks,
wherever necessary;
(10) Manual consolidation of ballast in crib / shoulders;
(11) Removing and refixing of traction bonds during the block in
electrified sections
(12) Dressing of ballast
Note:
1. Tamping blocks are not identical & it may be given at any time
either during day or night.
2. Stages of payment a) 30% of the rate will be paid on completion of
pre tamping attention, b) Balance 70% of the rate will be paid on
completion of post tamping.
3. Recovery at the rate of twice the above applicable rate will be
effected in case contractor fails to carry out pre/during/post operation.
4.Payment shall be made only once in irrespective of numbers of
TTRM packing round and after restoration of normal speed and
restoration of complete ballast profile.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
97
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
98
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
156021 Extra to Item no. 156011 for night block working Set 1,192.43
156022 Extra to Item no. 156012 for night block working Set 1,387.59
156023 Extra to Item no. 156013 for night block working Set 1,803.83
156024 Extra to Item no. 156014 for night block working Set 1,902.51
156025 Extra to Item no. 156015 for night block working Set 439.53
156030 Carrying out pre-tamping, during tamping and post-tamping works
prescribed in current version IRTMM/IRPWM for tamping of Turnouts
of all types Under Conditions not requiring Traffic Block.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
99
IR Unified Standard Schedule of Rates - 2021 Chapter -15: Heavy Track Machines
157020 Carrying out ancillary works required for UTV working under line block Shift 1,944.16
i.e., turning of rails/ Sleepers and keeping in position for fixing of UTV
clamps to rail, keeping rails/PSC Sleepers in position while loading
into BFR, removal of clamps on BFR for releasing loaded
rail/Sleepers, adjusting of rails/Sleepers on BFR etc. by providing
minimum of three men in a shift of 8 hours, with all contractor's tools,
all lead, lift, crossing of tracks etc., complete and as directed by the
engineer - in - charge.
Note: In case, contractor provides less no. of Labour, payment will be
deducted for each such person @ 2/3 rd of the accepted item rate.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
100
IR Unified Standard Schedule of Rates - 2021 Chapter -16: Small Track Machines
161031 Outside track - When Electricity provided by static power supply of Each 137.76
Railway :
161032 On Running track - When Electricity provided by static power supply Each 209.00
of Railway :
161040 Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine
including chamfering with appropriate chamfering tools in all types of
rail section with contractor's tools & plants, equipment, consumable
with all lead & lift etc. complete, as directed by Engineer in-charge.
Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3,
dated 24.04.1991.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
101
IR Unified Standard Schedule of Rates - 2021 Chapter -16: Small Track Machines
161060 Bending & De-kinking with Hydraulic rail bender (Jim Crow) heavy
duty in all types of rail sections of flat bottom rails maximum up to
40mm with contractor's tools & plants, equipment, consumable with
all lead & lift etc. complete, as directed by Engineer in-charge.
Hydraulic Rail Bender (Jim Crow) Heavy duty will be as per RDSO
Specification No. TM/SM/5, dated 08.05.1991.
162000 Sleepers
162010 Sleeper Spacing, Re-spacing / Squaring of sleeper by Hydraulic Each 60.43
Sleeper Spacer with contractor's tools & plants, equipment,
consumable with all lead & lift etc. complete, as directed by Engineer
in-charge. Hydraulic Sleeper Spacer shall be as per RDSO's
Specification No. TM/SM/17, dated 31.03.1992.
162020 Drilling of holes (vertically) of required size into concrete sleeper in- Each 102.00
situ for fixing guard rails and check rails on concrete sleeper track at
specified locations by concrete sleeper drilling machine with
contractor's tools & plants, equipment, consumable with all lead & lift
etc. complete, as directed by Engineer in-charge as per RDSO's
Specification.
162030 Loading / unloading of concrete sleepers from cess to BFR / BRH Each 22.22
wagons and vice-versa by jib crane attachable to BFR / BRH for
handling concrete sleepers with contractor's tools & plants,
equipment, consumable with all lead & lift etc. complete, as directed
by Engineer in-charge.
162040 Quick removal of damaged concrete sleepers and restoration of Each 127.01
railway track in case of accidents / derailments and other such
emergent situations by Concrete Sleeper Breaker & angle grinder
with contractor's tools & plants, equipments, consumable etc. with all
lead & lift complete, as directed by Engineer in-charge.
163000 Fittings
163010 Measuring of Toe Load of ERC during service in field by Toe Load Each 3.61
Measuring Device (Mechanical) with contractor's tools & plants,
equipment, consumable with all lead & lift etc. complete, as directed
by Engineer in-charge. Toe Load Measuring Device (Mechanical) will
be as per RDSO's Specification No. TM/SM/14 (Rev. 01 of 2005 with
all updation).
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
102
IR Unified Standard Schedule of Rates - 2021 Chapter -16: Small Track Machines
164000 Miscellaneous
164010 Tamping of track for picking up slacks in concrete sleeper track by Each 64.98
Hand Held Off Track Tamper (Power Pack Version) with contractor's
tools & plants, equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge. Off-track tamper (Power
Pack Version) will be as per RDSO Specification No.
TM/SM/OTT/320, dated 28.01.2009.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
103
IR Unified Standard Schedule of Rates - 2021 Chapter -17: Handling of Materials
171014 In Wagon where mechanical handling is possible and traffic block is MT 104.92
not required or in Truck/trailer.
171020 Loading of tongue rail, stock rail, switch assembly and crossings of
any section and length, SEJ, Glued joint etc. with / without P.Way
fittings and fastenings, in Wagon / Truck / trailer including lead up to
250 metre and lift up to 5 metre.
171021 In wagons during period of traffic block where handling by mechanical MT 294.98
means is not possible
171022 In wagons not involving traffic block or on lines, not opened to traffic MT 198.56
but handling by mechanical means is not possible.
171023 In Wagon where mechanical handling is possible and traffic block is MT 130.59
required.
171024 In Wagon where mechanical handling is possible and traffic block is MT 103.72
not required or in Truck/trailer.
171030 Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre
length by Railway's Rail Dolly / Dip Lorry to the nominated location
under traffic with line protection in case road carriage is not possible
with different lead with a lift up to 5 metre during block period.
171031 For lead up to 500 metre. MT 327.34
171032 For lead beyond 500 metre and up to 1 Km. MT 421.75
171033 Extra to Items no. 171032 for lead beyond 1 Km for every subsequent MT 50.12
Km or part thereof and up to 10 Km
171034 Extra to Item no. 171031 and 171032 with contractor's Rail Dolly / Dip MT 11.44
Lorry
171040 Loading, unloading and hauling of 52Kg / 60Kg rail more than 13
metre and up to 39 metre length by Railway's Rail Dolly / Dip Lorry to
the nominated location under traffic and line protection in case road
carriage is not possible for different leads and lift up to 5 metre.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
104
IR Unified Standard Schedule of Rates - 2021 Chapter -17: Handling of Materials
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
105
IR Unified Standard Schedule of Rates - 2021 Chapter -17: Handling of Materials
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
106
IR Unified Standard Schedule of Rates - 2021 Chapter -17: Handling of Materials
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
107
IR Unified Standard Schedule of Rates - 2021 Chapter -17: Handling of Materials
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
108
IR Unified Standard Schedule of Rates - 2021 Chapter -18: Level Crossings
181020 Dismantling existing check rail of Level Crossing, blocks, bolts & nuts RM 154.84
and stacking these in a countable manner near LC, free from any
infringements as directed by Engineer in-charge.
181030 Dismantling exiting Rail Height Gauge carefully and stacking the Each 3,107.36
released material in countable manner, free from any infringements
as directed by Engineer in-Charge including removal of cement
concrete foundation and making surface clean.
181040 Dismantling existing lifting barrier along with winch assembly and Set 16,380.37
other components like boom, fringes, locking arrangements, pedestal,
boom rest, locking rods/wires, pulley stakes, turn out wheels, 'A' base
and other materials connected with functioning of lifting barrier,
removing engineering indicators on track and level crossing road
signages without any damage including demolishing concrete base of
existing structures, filling, ramming and levelling the ground disturbed
during demolition, clearing debris and stacking all released material in
a neat and countable manner and clear of infringements, as directed.
Note: Barriers on both sides of level crossing constitute one set.
181050 Dismantling existing lifting barrier and other components except Set 15,204.32
winch assembly, like boom, fringes, locking arrangements, pedestal,
boom rest, locking rods/wires, pulley stakes, turn out wheels, 'A' base
and other materials connected with functioning of lifting barrier
without any damage including demolishing concrete base of existing
structures and clearing debris in a neat manner and stacking in a
countable manner and clear of infringements, as directed.
Note: Barriers on both sides of level crossing constitute one set.
181060 Deduction to item no. 181050 for not dismantling ‘A’ base and its Set -2,325.34
foundations
181070 Dismantling existing swing gate consisting of two leaves with gate MT 1,478.42
posts, meeting post and stopper post etc. without causing any
damage to material and stacking the same near LC gate as directed
by Engineer in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
109
IR Unified Standard Schedule of Rates - 2021 Chapter -18: Level Crossings
183020 Fabrication including cutting, bending/machining and fixing of check TRM 933.05
rails of all rail sections over PSC Sleepers as per Railway’s approved
drawings & specifications for level crossings / trolley paths/inspection
lines in yards duly cutting rail flanges, wherever required to correct
alignment and level, drilling of holes with machine in check rails and
fixing to Running rail and sleepers with all Railway's fittings, e.g. rail
screws / grip expansion bolts, brackets, packing pieces, bolts,
washers etc including grinding of brackets if required, fixing of
Railway's wooden blocks at flare ends duly cutting and plaining,
crossing of tracks and as directed by the engineer in-charge
Note:
1. Drilling of holes in PSC Sleeper and fixing of dowels shall be paid
under relevant item.
2. Required P.Way materials will be supplied at SSE/P.Way stores.
183030 Cutting foot of rail by gas or any other approved method for check RM 132.25
rails and grinding sharp edges into smooth profile. Payment shall be
made for length of cutting of foot.
183040 Fixing check rails to running rails on level crossings with MS brackets, Set 4,283.41
184000 MS packing
Painting plates, bolts & nuts, spring washers etc. including
Works
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
110
IR Unified Standard Schedule of Rates - 2021 Chapter -18: Level Crossings
185020 Dismantling existing whistle boards along with post including Each 157.74
demolishing base concrete and levelling of ground, stacking released
materials at the level crossing concerned including clearing of debris,
with contractor's labour, tools, vehicles, consumables, all lead and lift
etc., complete without damage as directed by the Engineer-in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
111
IR Unified Standard Schedule of Rates - 2021 Chapter -18: Level Crossings
186000 Miscellaneous
186010 Manufacturing, supplying and laying factory made CC block pavers
for road surface of level crossings to RDSO Drg. No. M.00003,
manufactured using 20mm size graded hard stone aggregates of
approved quality over a well compacted sand bedding 50 thick with all
contractor's cement, labour, tools/plant and curing with all lead & lift
as per specifications and as directed by Engineer in-charge.
186011 80mm thick blocks of M-35 grade for medium traffic. Sqm 989.71
186012 120mm thick blocks of M-40 grade for heavy traffic. Sqm 1,423.57
186020 Fixing of Railway’s existing precast concrete slabs of different sizes in Sqm 76.79
position for level crossings / trolley path and filling gap between check
rail / running rail, slabs, approaches etc. with asphalt complete and as
directed.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
112
IR Unified Standard Schedule of Rates - 2021 Chapter -18: Level Crossings
186070 Manufacture & supply of tested GI wire rope of 6mm dia. and 6 ply to Kg 468.28
suit lifting barrier gates at nearby P.Way Stores / Depot / Level
Crossing gate, as directed.
186080 Supplying and fixing of Boom Supports (stay wires) for lifting barrier Each 1,718.92
(approx. 8mm dia.) with suitable adjuster and other specials, as
directed
186090 Manufacture and supply of vertical / horizontal Turnout Wheels and Each 1,766.08
Shafts, mounted over base plate weighing not less than 6 Kg with
supporting vertical base, made of MS angle 75mm x 75mm x 10mm
as per Railway's approved drawings and specifications complete and
as directed.
186100 Manufacturing, supplying and installation of pulley with pulley stakes Each 616.66
complete, wire rope 6 x 6 x 19 with accessories as per Railway’s
approved drawings for operation of lifting barriers complete, as
directed.
186110 Fabrication, supply and fixing of Collapsible Fringes to the lifting RM 898.70
barriers of various length at level crossing as per approved drawing;
made of MS flat of size 30mm x 6mm in 2 rows, 40mm x 6mm in 1
row horizontally and MS flat of size 30mm x 6mm vertically at 500mm
centre to centre, painting iron works with two coats of synthetic
enamel paint of approved quality & colour over one coat of primer of
approved quality, as directed.
186120 Supplying and driving into ground 'C' class G.I. pipes of 20mm dia. x Set 458.31
150mm length for planting red flags and lamp at 5 metre on both
sides from the centre of road at level crossings with all leads & lifts.
Payment shall be made for complete work at one Level Crossing.
Note: Two pipes make one set.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
113
IR Unified Standard Schedule of Rates - 2021 Chapter -18: Level Crossings
186190 Erecting detonator rail posts at required locations as required Each 372.35
including cutting the rail to required length varying from 1.00M to
1.50M , leading the rail pieces from nominated station / mid section
from nearest depot to site of work, erecting the rail post by making the
pit size as required and filling with CC 1:3:6 mix with 40mm
aggregates and painting the rail post with two coats of synthetic
enamel paint of approved colour and make, marking of detonator
symbol as per site requirement, with contractor's materials, labour,
paint, all lead and lifts, etc., complete as per specifications and as
directed by the Engineer-in-charge.
Note: Excavation and concrete work for foundation will be paid under
relevant item.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
114
IR Unified Standard Schedule of Rates - 2021 Chapter -18: Level Crossings
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
115
IR Unified Standard Schedule of Rates - 2021 Chapter -19: Bridge Related Activities
191022 RH /Temporary girder of length above 16.3m and up to 26.00 using Each 113,480.43
Road crane capacity of 80 MT
191030 Manufacturing and using wooden sleepers/blocks required for matting Cum 1,690.05
and bearing as per approved design for use below and above CC
Crib for insertion of Temporary Girder etc..
Note: The item is for one time use and released wooden
sleepers/blocks shall be the property of the Contractor.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
116
IR Unified Standard Schedule of Rates - 2021 Chapter -19: Bridge Related Activities
192030 Inserting in track Steel Channel/H-beam sleepers with all Railway Each 276.74
supplied fittings complete for TBTR work to specified gauge under
traffic block with contractor’s tools including aligning, levelling to
make track fit for 20 kmph speed and as directed by Engineer in-
charge.
Note: Transportation of track material if supplied beyond 250m of
bridge approaches, shall be paid separately under relevant item.
192040 Extra to item no. 192030 for Track Circuited area including handling Each 28.08
of released PVC washers on bolts and extra rubber pads on sleepers.
192050 Complete Track Renewal on Bridge with Steel Channel/H-beam TRM 984.36
sleepers as per approved drawings including leading of running and
guard rails, sleepers and fittings, bending of guard rails, drilling of
holes, cutting of rails etc. and leading the released rails, sleepers &
fittings near bridge approaches under traffic block as directed and
making track structure fit for normal speed.
Note:
1) Rails, Steel Channel/H-beam sleeper and all fittings will be
supplied by Railways.
2)Transportation of track material if supplied beyond 250m of bridge
approaches, shall be paid separately under relevant item.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
117
IR Unified Standard Schedule of Rates - 2021 Chapter -19: Bridge Related Activities
194030 Drilling holes 25mm to 40mm dia. with drill twist in the foot of guard Each 64.13
rails for fixing guard rails on bridge as directed.
194040 Drilling of 25mm to 40mm dia. holes in PSC sleepers with suitable Each 252.94
rotary hammer / drilling machine at indicated location for fixing of
guard rails on bridges & its approaches as per approved drawing and
fixing of contractor's HDPE dowels and adhesive of approved quality
to Drawing no. RDSO/T-3002, procured from RDSO's approved
sources with contractor’s materials and consumable.
194050 Renewal of existing guard rails of all rail sections on bridge portion TRM 195.54
over wooden/PSC/steel channel sleepers excluding flared ends duly
leading new guard rails including cutting of rails, drilling holes to the
guard rails as required and as per drawings, refixing with all
fastenings, and leading back the released rail, stacking at nominated
place clear of infringements with all leads & lifts complete and as
directed.
194060 Dismantling of existing flared portion of guard rails of any rail section Set 1,760.06
over PSC sleepers
195000 Miscellaneous duly removing rails & fastenings and leading and
195010 Fabrication & supply of Galvanized Steel Channel Sleepers made MT 125,274.96
from ISMC 150mm x 75mm / 175mm x 75mm / 200mm x 75mm
standard rolled section conforming to IS:2062 as per RDSO approved
drawing No 1636/R1/R2 with latest correction slips complete and as
directed by Engineer In charge.
Note: Cost of Steel fittings and GRSP shall be paid separately
195020 Fabrication & supply of Galvanized H-beam Sleepers made out of the MT 121,775.32
materials confirming to IS 2062 of standard Rolled sections as per
approved drawing Nos RDSO/B/1636/4/R,5&9 complete and as
directed by Engineer-in charge.
Note: Cost of steel fittings and GRSP shall be paid separately.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
118
IR Unified Standard Schedule of Rates - 2021 Chapter -19: Bridge Related Activities
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
119
IR Unified Standard Schedule of Rates - 2021 Chapter -19: Bridge Related Activities
195080 Overhauling of track on ballasted deck slab bridge i.e. screening of TRM 266.58
crib ballast and shoulder ballast in between sleeper ends and ballast
retaining walls on both sides of the track without disturbing core under
the sleeper under traffic following all safety precautions and other
instructions prescribed by Engineer in-charge. Muck should be
disposed of away from bridge up to a maximum distance of 350 m
and lift up to 10m.
195090 Bending the inner and outer 52 Kg/60Kg/90R rails available at site Set 41,417.20
suitable for V portion along bulb of rerailing ramp as per RDSO Drg
No T-8259 drilling of holes and cutting to the required length and
shape all lead, lifts, labour, tools and plants machinery and all other
required materials for bending etc, and as directed by Engineer In
charge at site.
195100 Supplying providing and fixing country kali wood/hard wood (Non Cudm 47.11
teak) sleepers of various thickness and length as per the RDSO re
railing ramp Drg No T-8259 for fixing bent rails and MS plates
including cutting the wood in saw mills, transporting to site of work
with all leads and lifts, labour, tools and plant etc. as directed by
Engineer In-charge.
195110 Fixing of 60Kg/52 Kg/90R rails for Re railing ramp as per RDSO Drg Each 16,088.70
No T-8259 on bridge approaches on wooden/PSC sleepers including
fixing railways fishplates, bolts, nuts, MS bearing plates, screws,
check blocks of re-railing ramp etc, levelling after drilling of holes in
rails wherever necessary under block with contractor's labour, tools
and plants, machinery all etc, complete and as directed by Engineer
in charge at site.
195120 Tightening of steel channel sleeper fittings i.e. hook bolts, running Sleeper 40.65
rails bolts, guard rail bolts on girder bridges with contractor labour
tools, plants etc., including oiling, greasing of fittings complete and as
directed by engineer in charge.
Note: Before execution of work specific approval of ADEN to be
obtained by duly indicating the locations with specific reasons along
with date of last tightening done.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
120
IR Unified Standard Schedule of Rates - 2021 Chapter -20: Supply of P. Way Materials
201020 Manufacture & supply of 10mm thick Grooved Rubber Pads as per Set 349.72
drg. No. RDSO/T-5199 & RDSO's Spec. no. IRS-T-47-2006 (Prov.)
from RDSO approved sources with all contractor's lead, lift, labour,
tools, plant and transportation etc. complete as instructed by Engineer
in-charge.
Note: One set constitutes two nos.
201030 Manufacture & supply of Elastomeric Pads 25mm / 30mm thick as per Set 402.71
RDSO drawing No. B/1636/I/R2 to suit Insulated steel channel
sleepers from RDSO approved sources with all contractor's material,
lead, lift, labour, tools, plant and transportation etc. complete and as
instructed by Engineer in-charge.
Note: One set constitutes two nos.
201040 Manufacture & supply of a set of 2 Nos of Elastomeric Pads 25mm / Set 2,185.74
30mm thick and 4 nos of Grooved rubber pads as per RDSO drawing
No. B/1636/5 alt 2 to suit Insulated H Beam sleepers from RDSO
approved sources with all contractor's material, lead, lift, labour, tools,
plant and transportation etc. complete as per approved drawings and
as instructed by Engineer in-charge.
Note: One Set consists of 2 nos. Elastomeric Pad 25mm/30mm and 4
nos. Grooved Rubber Pad.
201050 Manufacturing and supplying Galvanised MS Inner and Outer Clips Set 574.92
for Steel Channel Sleeper (RDSO Drg. No. T-6150 & T-6151) from
RDSO approved sources.
Note: One set constitutes two inner & two outer clips.
201060 Manufacture, supply & fixing of galvanised steel fittings of insulated Set 2,649.38
galvanised steel channel sleeper for 60 Kg running rails & 52 Kg
Guard Rail as per RDSO drawing no. RDSO/T-5155 to 5164 with up-
to-date correction slips and specifications from RDSO approved
sources with all contractor's lead, lift, labour, tools, plant,
transportation etc. complete and instructions of Engineer in-charge.
201070 Manufacture, supply & fixing of galvanised steel fittings of insulated Set 2,032.08
galvanised steel channel sleeper for 52Kg running rails & 52 Kg/90R
Guard Rail as per RDSO drawing no. RDSO/T-5197 to 5200 with up-
to-date correction slips and specifications from RDSO approved
sources with all contractor's lead, lift, labour, tools, plant,
transportation etc. complete and instructions of Engineer in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
121
IR Unified Standard Schedule of Rates - 2021 Chapter -20: Supply of P. Way Materials
202011 Bilingual Whistle Boards for level crossing of size 600mm x 600mm of Set 6,558.52
each board with back support frame welded to vertical post of MS T
section of size 75mm x 75mm x 6mm x 3950mm
202012 Speed Breaker / Rumble Strips Board of size 900 mm equilateral Set 5,991.81
triangular shape and 600mmx200mm boards with back support frame
welded to vertical post of MS T section of size
80mmx80mmx8mmx3650mm
202013 Un-manned Level Crossing Danger Stop Board of size Set 3,865.71
675mmx525mm with back support frame welded to vertical post of
MS angle of size 50mmx50mmx6mmx3650mm
202014 Manned Level Crossing Indicator Board of size 900 mm equilateral Set 5,516.91
triangular shape with back support frame welded to vertical post of
MS T section of size 80mmx80mmx8mmx3650mm
202015 Single Strip / Double Strip Level Crossing Road Warning Board of Set 6,325.46
size 900 mm equilateral triangular shape and 900x300 board with
back support frame welded to vertical post of MS T section of size
80mmx80mmx8mmx3650mm
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
122
IR Unified Standard Schedule of Rates - 2021 Chapter -20: Supply of P. Way Materials
202021 Caution Indicator Board of size 1400mmx400mm with back support Each 5,456.57
frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of
3650 mm long
202022 Speed Indicator Board of equilateral triangular shape having each Each 4,675.76
side of 1000mm with back support frame fixed to vertical post of MS
angle of size 50mmx50mmx6mm of 3650 mm long
202023 Stop Indicator Board of size 1400mmx400mm with back support Each 5,456.57
frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of
3650 mm long
202024 Termination Indicator Board of Circular shape having diameter of Each 6,725.52
1000mm with back
202030 Manufacturing, supportand
supplying frame welded
fixing CurvetoIndicator
vertical post of MS
/ Point angle /
Indicator Each 990.07
SEJ Boards to be provided at various locations on formation, made
out of MS sheet 2mm thick of size 450mm x 300mm duly fixed with
MS frame of 25mm x 25mm x 3mm angle welded to 50mm x 50mm x
3mm MS angle, 1000mm long post split and bent 100mm at bottom
end with all lead & lift as per specification and including painting of
details with enamel paint, as directed by Engineer in-charge
(Earthwork & concreting will be paid separately)
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
123
IR Unified Standard Schedule of Rates - 2021 Chapter -20: Supply of P. Way Materials
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
124
IR Unified Standard Schedule of Rates - 2021 Chapter -21:Miscellaneous Items
211040 Dismantling Check Rail on curves on track of all rail sections, duly RM 54.22
removing fish plates and bolts including removing chairs from
sleepers, leading and stacking released materials away from track
clear of infringements, complete and as directed.
211050 Fixing of check rails on curves on track of all rail sections as per RM 63.86
drawing and to correct alignment and level with Railways fastenings
including leading of rails and fittings, crossing of tracks, greasing of
plate screws with approved grease etc., as per drawing and
directions of Engineer in charge with all contractors labour, tools,
plants, machinery, consumables etc., complete.
Note: Required P.Way fittings will be supplied at SSE/P.Way stores.
211060 Supply and fixing in position pre-cast cement concrete Fouling Mark Each 402.38
as per approved drawing at station yard, duly painting the top surface
and slopes with white enamel paint in two coats and inscribed letters
with black of Fouling Mark, complete in all respects with all labour,
211070 materials
Providing including cement,
and erecting watertools and
proof plantsTent
Gypsy etc.of size 3m x 3m for a Day 451.42
specific period of time and removal of the same after completion of
work or as directed by Engineer in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
125
IR Unified Standard Schedule of Rates - 2021 Chapter -21:Miscellaneous Items
211081 Office Table of size 1.2m x 0.9m per day Each 82.95
211082 Office Chairs with cushioned seat, back and arms per day Each 34.08
211100 Removing /Re-erecting existing Gradient Post / Kilometre Post, duly
demolishing concrete foundation, fixing the post in cement concrete
foundation as per drawing with 1:3:6 mix using 20mm hard aggregate,
as directed (Cost of concrete work will be paid under relevant item
separately).
211101 For Removing Each 197.12
211102 For Fixing / Re-erecting Each 197.12
211110 Breaking the damaged PSC sleepers including dragging, if required Each -60.64
duly removing inserts safely and handing over inserts to Railways at
Stores or Depot of SSE/P.Way, including disposing the broken
concrete pieces, as directed by Engineer in-charge. Released HTS
wire shall be the property of Contractor.
211120 Fixing vertically the unserviceable PSC sleepers at locations of tress- Each 128.09
passing, railway boundary or to make temporary store by excavating
trench, fixing PSC sleeper in trench and filling back open trench.
211130 Providing and fixing Trolley Refuge of size 3.0m x3.0m on cess, Each 3,428.24
placing with released unserviceable PSC sleepers and keeping them
at all four sides of refuge and also placing as matting inside the
refuge by keeping them in upside down position with a minimum of 14
sleepers including levelling with earth, excavation, all lead and lift,
crossing of tracks, leading the sleepers with in a free lead and lift,
handling etc., with all contractor's men material complete and as
directed by the Engineer-in-charge.
Note: Earth-work will to be paid separately under relevant item.
211140 Supplying and spraying in specified proportion Weedicide Chemical, Sqm 0.58
capable to kill entire weed on track / cess / embankment with all
labour, material, tools & plants etc. complete job in all respect.
Scientific name of the chemical is Isopropylamine Salt of Glyphosate,
in which active ingredient is Glyphosate (41%), colour is light amber
to brownish, very low in toxicity and has favourable environmental
characteristics. It will be ensured that no weed growth occurs up to
six months period, otherwise re-spraying shall be done by the
contractor free of cost.
211150 Supplying & applying single liquid solution in 250ml pack, having
break loose torque of 400Nm to 540Nm, as per ISO:10123 norms with
shear strength of liquid solutions as 25 to 35 N/mm2, viscosity 1500
to 3000 (Centipoise) & specific gravity of 1.1 ± 0.05. for tightening of
nuts & bolts at important locations, such as Bridges, SEJs, Turnouts,
Fish Plates, Steel Channel Sleepers etc. Work includes opening of
bolts, cleaning of bolts with suitable cleaner and tightening of bolts
after applying liquid solution as directed by Engineer in-charge.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
126
IR Unified Standard Schedule of Rates - 2021 Chapter -21:Miscellaneous Items
211200 Hiring of machinery for minor miscellaneous works for short duration
including operator/driver, fuel, lubricants and consumable. The
contractor shall arrange all statutory permits as required by rules and
regulations prevailing in the area of work. Payment shall be made for
actual working hours at site.
211201 JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum Hour 781.72
bucket capacity
211202 Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for Hour 836.21
misc. works of handling of material
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
127
IR Unified Standard Schedule of Rates - 2021 Chapter -21:Miscellaneous Items
211210 Arranging labour as and when required by the Engineer in charge, for Day 598.06
various works under SSE/P.Way, with contractor's T&P, equipments,
hand signal flags, etc. as per specifications, special conditions and
detailed scope of work as furnished in the tender and as directed by
the Engineer in charge.
Note: Item shall be operated with prior approval of concerned Sr.
DEN / DEN in charge.
211220 Supplying and filling 50 kg size empty cement polythene bags with Each 13.60
Rly. Ballast/moorum/earth/Sand/quarry dust etc. placing the filled
bags on the high banks /bridge approaches/nominated place etc.
dumping and spreading at the nominated locations to profile under
block period with all contractor's labour, tools, plants, loading,
unloading, filling, spreading including all lead/lift etc. complete and as
directed by the Engineer in charge at site including crossing of track
where necessary.
211230 Supply, filling and stacking of sand bags layer by layer filled with Each 12.58
Railway Sand/railway quarry dust in Contractor's empty polythene
cement bags of 50 kg bags with all contractors labour, tools, plants,
lead, lift etc., including stitching the same with machine using
polythene thread complete as directed by Engineer-in charge at site.
211240 Loading of sand/quarry dust filled bags from Railway stacks in to Each 11.73
Railway Wagons with all contractor's empty polythene cement bag,
tools & plants, machinery, labour, lead and lift, crossing of track
wherever necessary etc., complete as directed by the Engineer In
charge.
211250 Manufacturing and fixing buffer stop with Railway supplied rails, Each 13,962.72
cutting, including bending of rails as per plan ,with all contractor’s
labour, materials, tools, plants etc. and all lead and lift including
crossing of track where necessary and as directed by Engineer in
charge at site.
Note: Excavation, fixing rails in cement concrete, drilling of holes will
be paid separately.
211260 Manufacture and supply of Precast Kilometer Posts of size 1.15 x Each 373.42
0.50 x 0.075 m in RCC 1:2:4 mix, engraving letters and leading to
work spot, fixing in position with CC 1:3:6 concrete duly making pits of
size as required, painting the post, writing the letters on both sides of
the post with 2 coats of enamel paint of approved quality to the
Railways drawings/IRPWM with contractor's materials, cement, steel,
labour, tools, plant, with all lead and lifts etc., complete as per
specifications and as directed by the Engineer-in-charge.
Note: Excavation, Concrete and steel work will be paid under relevant
items.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
128
IR Unified Standard Schedule of Rates - 2021 Chapter -21:Miscellaneous Items
211280 Manufacture and supply of Precast Hectometer/TP Repeater posts of Each 171.91
size 0.90Mx0.30 mx0.30Mx0.30M Triangular size in RCC 1:2:4 mix,
engraving letters, leading to work spot, and fixing in position with CC
1:3:6 concrete, duly making pits of size as required, painting the post
with two coats, letters on the both sides of posts with enamel paint of
approved quality as per IRPWM/Railways drawings complete with
contractor's materials, cement, steel, labour, tools, plant, with all lead
and lifts etc., complete as per specifications and as directed by the
Engineer-in-charge.
Note: Excavation, Concrete and steel work will be paid under relevant
items.
Note: The figures given in Amount/Rate Column (Which are strikethrough) are not to be taken for estimation or
justifying rate. This amount/rate has been given for illustration purpose only.
129