Morth Circular Reg. 40 MM BC
Morth Circular Reg. 40 MM BC
Morth Circular Reg. 40 MM BC
RW/NH-33044/10/2002-S&R (P&B)
Government of India
Date: August 2 1 , 2 0 1 8
To,
Departments (Dealing with National Highway, other centrally sponsored schemes and State
schemes).
3. All Engineer-in-Chief and Chief Engineers of Public Works Department of States/ Union
6. The Director General (Border Roads), Seema Sadak Bhawan, Naraina, New D e l h i - 1 1 0 0 1 0 .
Subject: Defect Liability/ Maintenance Period for the National Highways and centrally
Amendment - reg.
Sir,
maintenance period of all the National Highways and centrally sponsored Road & Bridge works
renewal etc.
2. The Ministry has already clarified vide its circular dated 23-02-2018 that all the civil
5 crore are to be classified as major works NH (M) and these are to be taken up on EPC or PPP
mode. Any relaxation for execution of NH (M) works in other than EPC or PPP mode shall be
3.1 The flexible pavement is to be designed for 1 5 / 2 0 years period and rigid pavement for
30 years design life and shall accordingly be stipulated in Schedule B of Concession Agreement.
The Defect Liability Period/Maintenance Period for the development of national highways shall
be as under:
(i) 5 years from the date of completion in case of road being constructed with Flexible
pavement;
Page 1 of 3
No. RW/NH-33044/10/2002-S&R (P&B)
Government of India
(ii) 10 years from the date of completion in case of road being constructed with Rigid
pavement;
(iii) 10 years from the date of completion for the stretches where new technology I
3.2 The civil works cost estimates for implementing the project on EPC mode shall also
include the maintenance cost to be incurred by the Contractor during the Defect Liability I
separate payment is to be made to the Contractor for carrying out maintenance works during
defect liability period/ maintenance period. The payment to be made to the Contractor during
(i) Payment during construction period - 90% of the total civil works cost.
(ii) Payment after three years of construction in case of Flexible pavements and
after 5 years in case of Rigid Pavements - 5 % of total civil works cost linking
(iii) Payment on completion of Defect Liability Period- 5% of total civil works cost
4.1 As far as possible, the National Highways shall be designed and developed for longer
design life as mentioned in para 3 . 1 above. However, the renewal works may be required due
to oxidation of the bitumen in the wearing coat of properly designed Highways after a time
gap of about 5-6 years. Depending upon the riding quality, all stretches designed with 15-20
years life and developed with flexible pavement s h a l l be renewed at intervals of every 6 or 7
years by preferably using hot-in-place recycling of the entire layer of bituminous concrete
renewal layer of 40mm BC shall be laid. The defect liability period /maintenance period in
follows:
Case 1 : In case renewal is required either due to oxidation of the bitumen or attrition
entire layer of bituminous concrete. In case hot-in-place recycling is not feasible due
Page 2 of 3
----- -- --
Government of I n d i a
thickness shall be laid. The defect liability period/maintenance period in such cases
Case 2: Where the stretch requires improvement to riding quality in cases other than
cases also, the defect liability period/maintenance period shall be three years.
Yours faithfully,
(Raj Kumar)