Shuttering is measured in Surface Area and in SI units it is in sq.m [ Square meters ]. The other way it is
Shuttering area and it can be calculated by measuring the area of contact of the shuttering surface with
the concrete surface.
Formwork shall be measured in square metres as the actual surfaces in contact with the concrete
The formwork or shuttering quantity for the member is measured as per the code of BIS - IS 1200:1982,
Part 5- Method of Measurement of Building and Civil Engineering Works.
4. Multiply the perimeter of base and height of column to give the shuttering area of column.
1. Take the cross-section of beam and measure the lengths of the two sides and base of beam.
4. Multiply the span length by sum of the three measurements (beam base two vertical sides) gives the
shuttering area of beam.
The top side in cross-section of beam is not considered as it will be part of beam.
Or the other way, add the beam height(2 sides) and beam base and multiply it by beam length.
Other important
Upvote · 52 factors 3 considered while Open
to ·be
Share in the
picking Appshuttering quantities.
Where formwork is required to be lined with wall board, hardboard, polythene sheet No deduction
shall be made for openings up to 0.4sqm.
No deduction shall be made for any opening/cutouts when slip form technique is used.
Raking or circular cutting and rounded or moulded edges shall be measured in running meters.
Moulded stopping shall be enumerated.
Formwork to secondary beam shall be measured up to the sides of main beams, but no
deduction shall be made from the formwork of the main beams where the secondary beam
intersects it.
Formwork to beam shall be measured up to sides of column, but no deduction shall be made
from the formwork to stanchion or column casings at intersections of beam.
shuttering quantity is calculated in sq.meters or sq. feet. it is the area of shuttering material used for form
work.
Open in App
so area = sum of 4 sides * height of column
for beam
1. if it is plinth beam or tie beam we will have base prepared and we pour concrete from top. so no
shuttering required on top and bottom shuttering required only on sides
Structural Engineers UK Geotechnical Analysis Engineer Muhammad Expats in Saudi Arabia Beauty A
UK structural Geotechnical Analysis Kamal A A space for expats Housing,
engineering resource for and Design of I'm a Hafiz e Quran and working and living in Interior
CPD or preparing for th… subsurface structures civil Engineer. Saudi Arabia to share… D
Ruchika
Upvote · 13 Share · 1
Answered May 4, 2017
Is there any thumb rule to calculate the shuttering quantities in construction when a concrete
quantity is known?
10,163 Views
How do I calculate the number of props required for a 1000 sq. ft. slab area?
20,687 Views
Other Answers
For beam Shuttering Add the beam height(2 sides) and beam base and multiply it by beam length
Example
Column Shuttering caluction for 1′*1′3″ column 10′3″ height = (2*1*1 0′3″)+(2*1′3″*10′3″)
(5″ is deducted from the beam height 1′9″ as I've assumed 5″ as the slab thickness )
32.9K views · View Upvoters
Add a comment...
The area that gets wet while pouring the concrete is the shuttering area. This is as per IS standards of
measurements for civil Engineering.
19.1K views · View Upvoters · View Sharers
Add a comment...
Open in App
Related Questions & Answers
Suppose, there is a room of size 3m x 5m. The shuttering area will be 3 mx 5m =15 sq.m If the thickness
of the slab is 100 mm, then the quantity of ‘side shuttering will be 2[ 3.23 +5.23] x 0.1 m =1.692 xsq.m total
shuttering area of the slab is 15+1.6=16.6sq.m Suppose we have the above two rooms are Read More
Is there any thumb rule to calculate the shuttering quantities in construction when a
concrete quantity is known?
Vivek Kumar, Planning Engineer Civil
Answered January 4, 2018
Yes there is a thumb rule for it. It surely depends on the structural elements to be concreted. For eg: take a
beam of size 200*300 mm and length 5m. Then the total concrete required will be l*b*h i.e .2*.3*5 = 0.3
m3. Now let's calculate it's shuttering quantity. Suppose it's not a plinth beam and Read More
How do I calculate the number of props required for a 1000 sq. ft. slab area?
Pankaj Goel
Answered July 5, 2018
Very easy steps for calculating no of props : Area of shuttering plate is = (900 X 600) mm =0.54 sq mt
1000 sq feet area = 92.94 sq mt No of sheet = (92.94/0.54) = 172 Nos Total no of MS sheet required for
1000 sq feet area is = 172 Nos Total no of span required for 1000 sq feet area is = (172 / 5) = 35Read
N More
How do I calculate steel quantity for slab, footing, column? (assume the size yourself)
Kasee Sreenivas, NICMAR Alumnus, Senior Contracts Engineer , Hindustan Construction
Company Ltd
Updated November 10, 2016
You just need to visualize the dimensions (Length, Breadth, Depth) of the structural member (Be it a beam,
slab, column or a footing) and then you need to visualize the shapes of bars that needs to be used
followed by some simple calculations. For detailed answer, go through the link below: Kasee SreeRead More
Open in App
How do I measure the shuttering of the side of a beam, whether it should be up to the
bottom or top of a slab if the slab and beam are monolithic (govt. project)?
Gobinda Burman, B.E Construction, Civil Engineering (1991)
Answered January 9, 2019
Mode of measurement for formwork items, the best practice is to follow the guidelines given in I.S -1200:
Part-5. It helps to minimize the contradiction between contractor and client, as you mentioned this is for
govt. project then it is must for you. 6. METHOD OF MEASUREMENT ( As per I.S-1200: Part- Read More
No. of beam x Length of beam (column face to face) x ( Beam width + (height of beam x 2- slab thickness
one side -slab thickness other side) or No. of beam x Length of beam (column face to face) x ( Beam width
+ (height of beam x 2- slab thickness x 2) PD Consulting Engineers Pvt. Ltd, Read More
Related Questions
Is there any thumb rule to calculate the shuttering quantities in construction when a concrete
quantity is known?
10,163 Views
How do I calculate the number of props required for a 1000 sq. ft. slab area?
20,687 Views
Open
How do I calculate steel quantity for slab, footing, in App(assume the size yourself)
column?
401 792 Views
401,792 Views
How do I measure the shuttering of the side of a beam, whether it should be up to the bottom or top
of a slab if the slab and beam are monolithic (govt. project)?
2,244 Views
How do I work out rate analysis for shuttering works for columns, beams, etc.?
9,169 Views
Open in App