PSSR Flow Diagram
PSSR Flow Diagram
PSSR Flow Diagram
(Stage 1)
PSSR Document
Preparation
(Stage 2)
Preparation N
Complete?
N
N
Approved?
N
Passed?
Y
Y
Handover to
Managers for
approval/signature
(Stage 4)
PSSR Training (Stage 1)
Basis of Selection:
• Engineers involved with Expansion Project which will later on
prepare and check all documents based on PSSR checklist
• As much as possible, following disciplines to be represented per
Package: Operations, Electrical, Mechanical, Safety, Process Safety,
Instrumentation, Process, and Process Automation