Pre-Start Up Safety Review (PSSR) : Akamigas Balongan Indramayu
Pre-Start Up Safety Review (PSSR) : Akamigas Balongan Indramayu
Pre-Start Up Safety Review (PSSR) : Akamigas Balongan Indramayu
REVIEW (PSSR)
• Toxicity information;
• Permissible exposure limits;
• Physical data;
• Reactivity data:
• Corrosivity data;
• Thermal and chemical stability data; and
• Hazardous effects of inadvertent mixing of different materials that
could foreseeably occur.
Informasi Terkait Proses Teknologi Yang
Digunakan
• A block flow diagram or simplified process flow diagram;
• Process chemistry;
• Maximum intended inventory;
• Safe upper and lower limits for such items as temperatures,
pressures, flows or compositions; and,
• An evaluation of the consequences of deviations.
Informasi Terkait Peralatan Proses
• Materials of construction;
• Piping and instrument diagrams (P& l Ds);
• Electrical classification;
• Relief system design and design basis;
• Ventilation system design;
• Design codes and standards employed;
• Material and energy balances for processes; and
• Safety systems (for example, interlocks, detection, or suppression
systems).