JSEA - Hydro Test - 2833
JSEA - Hydro Test - 2833
JSEA - Hydro Test - 2833
Project Name: CRISP VTB SUBSEA PIPELINE PROJECT Project No.: 2833
SGVP-IM-JPJSA-OO-
Client: ExxonMobil JSEA No: 0440 Rev A
Work Activity: Pressure Testing of Pipe String Work Location: Green Field and Brown Field
Related CEP /
Employer/Contractor: IMJV SGVP-IM-KPCEP-OO-202
method statement:
JSEA Participants / Preparation (incl. workers, supervisors, foremen, HSE personnel, external parties)
Name Position Organisation Signature Date Name Position Organisation Signature Date
Amit Commissioning IMJV
engineer
RK HSE OFFICER IMJV
MANIGANDA
N
KRISHNAN HSE MANAGER IMJV
Ongoing JSEA Review: (Refer JSEA Review Checklist) Scheduled review period:
Review No 1 2 3 4 5
Date:
Approved:
(Name & Initial)
Qualifications required for activities: Specific training required for activities? (If “yes”, provide detail.)
(Specific licensing requirements e.g. crane operator, lifting supervisor, rigger etc.)
Risk Matrix – Design / Construction / Delivery / Operations / Maintenance: (Note: 020-D012-100, HSE Risk Management)
CONSEQUENCE
A - Low B - Moderate C - Serious D - Major E - Catastrophic
PEOPLE - A near miss or PEOPLE - First aid PEOPLE - Medical treatment PEOPLE - Injuries resulting in; PEOPLE – Single or multiple
Disciplines will review likelihood and consequences hazardous condition or minor treatment. required, Return to work Case. lost time, permanent disability, fatalities.
in line with their specific parameters as noted injury not requiring any amputation, or surgery.
ENVIRONMENT – Low level ENVIRONMENT – ENVIRONMENT – Severe
treatment. environmental impacts to the Environmental impacts that ENVIRONMENT – Significant environmental impacts to the local or
ENVIRONMENT – Spills of localised area. Easily affect individual protected environmental impact at the regional environment. The death of
hydrocarbons and chemicals rectified with minimal effort species or small areas of local level. Death of protected multiple protected species or the
that are contained and do not and cost. protected habitat. Impact to species of loss of habitat widespread loss of protected habitat
result in environmental impact. cultural heritage artefacts. without permission. without permission.
Company:
Inspection of hydrotest
Activity Potential Hazards / Consequences Initial Risk Control Measures Residual Hierarchy of Persons
(Basic job steps) (What can go wrong) [L x C=R] Risk Controls Responsible
[L x C=R] applied
Administratio
Substitution
Engineering
Elimination
Isolation
PPE
L C R L C R
√
Installation of testing Inexperienced personnel D Experienced 1 D 1-D Testing
Headers & water tank. incorrectly assembling high 3 D 3-D hydrotesting Supervisor/
pressure componentry. personnel engaged Lifting
Incorrectly rated fittings or for scope of work. supervisor
hoses bursting under All fittings and hoses
pressure – injuries to checked during
personnel, release of treated assembly to ensure
water to the environment that all are correctly
Manual handling and manual rated.
tasks – injuries to personnel Whip-checks/
Unauthorised personnel restraints fitted to
entering exclusion zones all high-pressure
when service testing hoses.
equipment. Equipment will be
BASED ON HSEQ-HS-FRM001-GEN-SEA 01JUN2018
FORMER ID: 020-F001-[SEA] PAGE 6 OF 13
JOB SAFETY & ENVIRONMENTAL ANALYSIS (JSEA)
Pressure to be
monitored at all time.
Whenever any
abnormal change (drop
of pressure or increase
in pressure) in
pressure is observed
the piping string shall Commissioning
Hose burst, loose fitting and be depressurized. Engineer /
Holding the test pressure 3 2 B 2-B √
connections, improper gasket / 3 B 3-B Holding period to be Testing
Can cause injury. start after conforming Supervisor
the stability of the
system in three steps.
All personnel inside the
barricade should wear
face shield at all time.
Depressurization to be
maintained at a safe
rate.
A long hose to be
connected for draining
and the discharge end
Uncontrolled depressurization rate laid away from
/ Can cause injury to worker. personnel and work Commissioning
Depressurized &
Water logging / Can cause 3 B 3-B area. 2 B 2-B √ √ √ Engineer /
Dewatering
dengue fever due to mosquito Supervisor
Draining to be started
breeding only after completion of
depressurization of the
system.
All personnel inside the
barricade should wear
face shield at all time.
lightning
protected zone. *
Wait for clearance
instructions from
lightning. *
Establish
communication
between the HSE
and workers using
walkie-talkies. *
Provide enough
rain-coat * To
make available
rest shelter for all
personnel work at
Greenfield.
Standby
supporting vehicle
to take shelter if in
open zones or to
transport people
to near-by shelter.
Emergency Response Preparedness: Identified and communicated? (Retrieval/Rescue Plan, first aid kit, fire extinguisher, spill kit, muster point etc.) Y/N
Name Position Organisation Signature Date Name Position Organisation Signature Date