DON HONORIO VENTURA STATE UNIVERSITY

Villa de Bacolor, Pampanga


College of Engineering and Architecture
Department of Architecture
A.Y. 2022 – 2023 _ 1st Semester

BTECH 413 ACTIVITY/PROJECT NO.1


Building Technology 5 Cast-in-place and Pre-Cast
Alternative Building Construction System
Instructor: 3rd Week of September 2022
Teodoro L. Luzung , UAP to 5th Week of September 2022
tlluzung@dhvsu.edu.ph

A. Project Title / Subtitle

“Cast-in-place and Pre-cast Construction System”


B. Topic Description/ Brief

Cast-in-place concrete, also known as “site-cast” or “poured-in-place” concrete, is poured and cured onsite in the concrete’s
finished position. For specific applications, this type of casting can be ideal. For example, some foundations and other very
large concrete components would be difficult to transport between a concrete plant and job site, making cast-in-place concrete
more feasible. Cast-in-place concrete is also commonly used for small projects. Precast concrete pricing scales with projects,
so smaller projects can cost more. In these cases, cast-in-place concrete may be preferred. But overall, precast concrete is
the best choice for building foundations with structural integrity and dimensions built to your precise specifications.

Precast concrete, sometimes called “prefabricated” or “pre-made” concrete, is a concrete product that is created offsite, then
delivered to its project destination for final use. Precast concrete products are created by pouring a cement mixture into a mold
that can contain wire mesh, rebar, or even prestressed cable. The filled mold is then cured in a controlled environment to
ensure greater control over material quality.

C. Project Requirements
Students are required to submit illustrations showing the different parts of the specific construction system that
should reflect the connections, the materials that were used, and the purpose of each item that are mentioned
below. The outputs should be INKED and rendering of the drawings is optional but rendered outputs will have
additional points.

TOPIC: CAST-IN-PLACE AND PRE-CAST CONSTRUCTION SYSTEMS

• FLOOR SYSTEM AND ROOF SLAB SYSTEM (PICK 2)


o FLAT SLAB
o FLAT PLATE
o RIBBED FLOOR SLAB
o WAFFLE SLAB
o LIFT SLAB
o SPAN STRESS FLOOR SYSTEM
o SLIP FORM METHOD

• WALL PANEL SYSTEMS (PICK 2)


o FLAT TYPE
o RIBBED TYPE
o WINDOW TYPE
o WALL TYPE
o TILT-UP WALL PANEL SYSTEM

Remarks: [1] Each item shall be drawn on an A3 paper (Example is provided on the last page)
[2] All drawings, details, and specifications should be INKED
[3] Rendering of the outputs are not required, but may have additional points if provided

Project Goals and Objectives

• To explore the variety of materials and tools in an actual building/construction


• To introduce the details of cast-in-place and pre-cast type of construction
• To understand better the advantages of using such systems.

Page 1 of 3
BTECH 2413_ACTIVITY/PROJECT NO.1_1st Semester-A.Y. 2022-2023
D. Project Criteria / Presentation

A. PROVISION OF COMPLETE NUMBER OF OUTPUTS (4 A3) -10 PTS.


B. CLEANLINESS OF THE SUBMITTAL -15 PTS.
C. VISUAL APPEAL OF THE PRESENTATION MATERIAL -20 PTS.
D. PROVISION OF THE IMPORTANT DETAILS -25 PTS.
E. OVERALL PRESENTATION OF THE PROJECT -30 PTS.

E. Notes for submission

• After finishing your outputs, compile them all together and include 1 A3 paper that will serve as your top sheet. It shall
include the following details on the LOWER RIGHT CORNER of the sheet:

Surname, First Name, M.I.


BTECH 413-Project 001
BS Architecture 4(insert section)

• All outputs shall be submitted on the face-to-face day that will be announced by the respective course instructor.

F. Project timeline

❖ LAUNCHING DATE: September 12-16, 2022


❖ SUBMISSION DATE & TIME: September 26-30, 2022 on or before 12 noon
❖ DURATION: 10 DAYS

NOTE(s):
• “NO EXTENSION OF SUBMISSION DATE” – for strict compliance [A.1]
• The deadline for the said plate/activity/assignment is stated ABOVE, late submittals are subject to grade deduction depending on the
delay of submission. – for strict compliance. [A.1]
• Also, non-compliance with the stated requirements will be subject to grade deductions. [A.1]

Remarks: [A.1] (depending on Instructor’s directions)

PREPARED BY:

AR. TEODORO L. LUZUNG, UAP


BTECH 413 Instructor | Ar Department

Page 2 of 3
BTECH 2413_ACTIVITY/PROJECT NO.1_1st Semester-A.Y. 2022-2023
Page 3 of 3
BTECH 2413_ACTIVITY/PROJECT NO.1_1st Semester-A.Y. 2022-2023