TEST REPORT

IEC 62040-3
Uninterruptible power systems
Part 3: Method of specifying the performance and test requirements

Report Number. .............................. : ES160513045S-1


Date of issue ................................... : Sep. 03, 2018
Total number of pages ................... 54 pages

Applicant’s name ........................... : EAST Group Co., Ltd.


Address ........................................... : No.6 Northern Industry Road, Songshan Lake Sci. & Tech.
Industrial Park, Dongguan City, Guangdong Province, China
Test specification:
Standard .......................................... : IEC 62040-3 (Second Edition): 2011
Test procedure ............................... : Compliance with IEC 62040-3 (Second Edition): 2011
Non-standard test method………..: N/A
Test Report Form No. .................... : IEC62040_3B
Test Report Form(s) Originator .... : Electrosuisse
Master TRF...................................... : Dated 2011-08
Copyright © 2011 Worldwide System for Conformity Testing and Certification of Electrotechnical
Equipment and Components (IECEE), Geneva, Switzerland. All rights reserved.
This publication may be reproduced in whole or in part for non-commercial purposes as long as the IECEE is acknowledged as
copyright owner and source of the material. IECEE takes no responsibility for and will not assume liability for damages resulting from
the reader's interpretation of the reproduced material due to its placement and context.
If this Test Report Form is used by non-IECEE members, the IECEE/IEC logo and the reference to the CB
Scheme procedure shall be removed.
This report is not valid as a CB Test Report unless signed by an approved CB Testing Laboratory and
appended to a CB Test Certificate issued by an NCB in accordance with IECEE 02.
Test item description ..................... : Uninterruptible Power Supply

Trade Mark ...................................... : EAST

Manufacturer .................................. : EAST Group Co., Ltd.


No.6 Northern Industry Road, Songshan Lake Sci. & Tech.
Industrial Park, Dongguan City, Guangdong Province, China
Model/Type reference .................... : 50kVA, 60kVA, 80kVA,100kVA,120kVA

Ratings ............................................ : See marking plate

TRF No. IEC62040_3B Page 1 of 54 Report No.: ES160513045S-1 Ver.1.0


List of Attachments (including a total number of pages in each attachment):
Attachment No. 1: 4 pages of photograph.

Summary of testing:

Tests performed (name of test and test clause): Testing location:


The submitted samples were found to comply with EMTEK (SHENZHEN) CO., LTD.
the requirements of: Bldg 69, Majialong Industry Zone, Nanshan District,
IEC 62040-3 (Second Edition):2011 Shenzhen, Guangdong, China

Summary of compliance with National Differences


National differences and Group differences as per CB bulletin.

The product fulfils the requirements of IEC 62040-3 (Second Edition):2011

TRF No. IEC62040_3B Page 3 of 54 Report No.: ES160513045S-1 Ver.1.0


Copy of marking plate
The artwork below may be only a draft. The use of certification marks on a product must be
authorized by the respective NCBs that own these marks.

Model: 50kVA MODEL: 60kVA

MODEL: 80kVA MODEL: 100kVA

MODEL: 120kVA

TRF No. IEC62040_3B Page 4 of 54 Report No.: ES160513045S-1 Ver.1.0


Test item particulars .................................................. :
Classification of installation and use ...................... : [] movable [] hand-held [] transportable
[X] stationary [] for building-in [] direct plug-in
Supply Connection..................................................... : [] pluggable equipment [] type A [] type B
[X] permanent connection
[] detachable power supply cord
[] non-detachable power supply cord
[] not directly connected to the mains
[] built-in component, consider in end system
Operating condition ................................................... : [X] continuous
[] rated operating / resting time:
Possible test case verdicts:
- test case does not apply to the test object........... : N/A
- test object does meet the requirement ................. : P (Pass)
- test object does not meet the requirement .......... : F (Fail)
Testing ......................................................................... :
Date of receipt of test item ........................................ : N/A
Date (s) of performance of tests............................... : N/A

General remarks:
The test results presented in this report relate only to the object tested.
This report shall not be reproduced, except in full, without the written approval of the Issuing testing
laboratory.
"(see Enclosure #)" refers to additional information appended to the report.
"(see appended table)" refers to a table appended to the report.

Throughout this report a comma / point is used as the decimal separator.

Manufacturer’s Declaration per sub-clause 6.2.5 of IECEE 02:


The application for obtaining a CB Test Certificate Yes
includes more than one factory location and a Not applicable
declaration from the Manufacturer stating that the
sample(s) submitted for evaluation is (are)
representative of the products from each factory
has been provided....................................................... :

When differences exist; they shall be identified in the General product information section.
Name and address of factory (ies) .......................... : Same as manufacturer

TRF No. IEC62040_3B Page 5 of 54 Report No.: ES160513045S-1 Ver.1.0


General product information:
This report is amended from previous report ES160513045S, issued on Aug. 05, 2016, due to below
amendments.
- Updated date of issue.
No any tests need be considered.

The equipment is on-line type uninterruptible power supply with step-sinewave o/p (line mode and battery
mode) for general supply of office equipment.

Model difference:

All models have the same constructions, circuit diagram and PCB layout. Only model name, appearance
and the parameter of some parts are different. All tests were performed on model 120KVA which means
the typical model.

The maximum operating temperature is 40C, Relative humidity 5 to 95%, no condensation allowed,
ambient storage temperature range of -15 to +55C in the protective package.

Operating altitude up to 2000m above sea level.

TRF No. IEC62040_3B Page 6 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

5 ELECTRICAL SERVICE CONDITIONS AND PERFORMANCE --


5.1 General P
5.1.1 UPS configuration P
- quantity of UPS units and their topology P
- Redundancy configuration as applicable P
- Any mayor UPS switch P
- operator access or restricted access classification See separate safety report. P
in accordance with IEC 62040-1
5.1.2 Markings and Instructions P
Marked and supplied with adequate instruction for All required markings are P
the installation and operation of the UPS and its affixed on labels located on the
controls and indications enclosure of UPS.
Markings and instructions in accordance with sub- See separate safety report. P
clause 4.7 of IEC 62040-1
5.1.3 Safety complies with the safety requirements of See separate safety report. P
UPS prescribed in IEC 62040-1
5.1.4 Electromagnetic compatibility complies with the Emission and immunity comply P
requirements of IEC 62040-2 with IEC 62040-2 C3, see
separate report
5.2 UPS input specification P
5.2.1 Conditions for normal mode operation P
a) rated voltage 380/400/415V at 100% load. P
b) r.m.s. voltage variation ±25%, at 100% load P
c) rated frequency 50Hz/60Hz P
d) frequency variation ±2Hz P
e) for three phases input, voltage unbalance with an (see appended table 6.2.2.7) P
unbalance ratio of 5%
f) total harmonics distortion (THD) of voltage, P
according to IEC 61000-2-2
g) transient voltage; within the electromagnetic P
immunity levels prescribed in IEC 62040-2
5.2.2 Characteristics to be declared by the manufacturer P
a) number of phases 3 phases P
b) neutral requirements With neutral P
d) power factor at rated current 0.9pf at 100% load P
e) inrush current characteristics ≤100% of rated current for ≤1 P
cycles.
f) maximum continuous current at the worst-case Maximum 303A at Normal P
condition condition, Maximum 272.7A at
bypass condition.

TRF No. IEC62040_3B Page 7 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

g) overload current Maximum 40A at Normal P


condition, Maximum 60A at
bypass condition.
h) total harmonic distortion (THD) of current <35% P
i) minimum short current power capacity; >75A P
in compliance with:
- IEC 61000-3-2 (UPS ≤16A)
- IEC 61000-3-12 (16A < UPS ≤75A)
- IEC 61000-3-4 (UPS > 75A)
j) earth leakage current characteristics Maximum Earth leakage < 5% P
of nominal input current rating.
k) a.c. power distribution system compatibility TN, TN-S, TN-C, TN-C-S, TT P
TN, TT or IT): (Three-phase, four-wire + PE).
5.2.3 Characteristics and conditions to be identified by the purchaser P
a) pre-existing harmonic voltage distortion when of Provided P
75% of IEC 61000-2-2 compatibility level at the
intended point of coupling of the UPS
b) requirements for compatibility with the REC input switch, bypass P
characteristics of protective devices of the UPS input switch,output
input supply switch,maintenance switch
and battery switch are optional
parts.
c) requirements for all-pole isolation P
d) stand-by generator characteristics Compatible with generator of P
rating typically >2x UPS kW.
5.3 UPS output specification P
5.3.1 Conditions for the UPS to supply a load P
- the input conditions of 5.2.1 being satisfied, or P
- the energy storage system being available P
5.3.2 Characteristics to be declared by the manufacturer P
a) performance classification in accordance with P
5.3.4
b) rated voltage and steady state variation AC380/400/415V, ±1% P
Balanced static load, ±6% with
5ms recovery from 10% to
90% load step, ±5% Balanced
dynamic load for normal
mode, ±0.1Hz (single module),
±0.1Hz (Parallel system) for
Stored Energy Mode
c) rated frequency and free running variation 40-70Hz P
d) maximum frequency range 40-70Hz P
e) rate of change of frequency when synchronizing 2Hz/s P
f) number of phases available 3 phases P

TRF No. IEC62040_3B Page 8 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

g) neutral availability With neutral P


h) a.c. power distribution system compatibility: TN, TN-S, TN-C, TN-C-S, TT P
(Three-phase, four-wire + PE).
i) total harmonic distortion (THD) of voltage P
(at linear and non-linear load as specified in annex E):
- in normal mode <1% with linear load, 5% with P
non-linear load
- in stored energy mode <1% (Across a linear load); P
5% (Across a non-linear load)
j) output voltage transient deviation Vrms L-L or L-N <5% transient P
overshoot, 20ms recovery
time
k) rated active and apparent output power and rated AC380/400/415V, P
current 181.8A/173.9A/166.7A 120KW
l) overload capability 105–110% load 60 minutes, P
110–125% load 10 minute,
125–150% load 1 minute,
150–200% load 200m sec,

>200% load after 100ms,


Change to bypass
m) current limit identification 1.25X rating current P
n) fault clearing capability Through upstream breaker or P
fusing for BYPASS.
Through fusing and breaker
for Rectifier.
o) rated load power factor 0.9 P
p) permissible displacement power factor range of 0.9 lagging to 0.9 leading with P
the load (cos. Φ) de-rating.
q) voltage unbalance and phase angle displacement <2 deg. P
e) UPS efficiency at 25%, 50%, 75% and 100% 90.2% 92.5% 92.3% 90.94% P
reference test load
5.3.3 Characteristics and conditions to be identified by the purchaser P
a) loads generating harmonic currents Provided P
(max. levels permitted in IEC 61000-3-2, /-12/ -4)
b) asymmetric loads requiring circulation of a d.c. Provided P
current
c) independent earth of the neutral required Provided P
d) load distribution facilities Provided P
e) requirements of all-pole isolation Provided P
f) requirements for coordination with characteristics Provided P
of protective devices
g) future extension/expansion requirements Provided P

TRF No. IEC62040_3B Page 9 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

h) stand-by generator characteristics Compatible with generator of P


rating typically >1,5x
UPS kW.
i) functional availability and degree of redundancy Provided P
j) output overvoltage protection Provided P
5.3.4 Performance classification P
UPS complying with this standard in accordance P
with the coding: AAA BB CCC
AAA = Input dependency characteristic VFI P
BB = Voltage waveform characteristic SS P
CCC = Dynamic output performance 111 P
5.4 Stored energy specification P
5.4.1 General See technical specification P
5.4.2 Battery P
5.4.2.1 Requirements for all batteries See separate safety report. P
5.4.2.2 Characteristic to be declared by the manufacturer P
a) life 5 or 10 years(depends) P
b) quantity of blocks or cells and of paralleled 28 blocks, 168 cells per P
strings battery string or
29 blocks, 174 cells per
battery string or
30 blocks, 180 cells per
battery string (default)or
32 blocks, 192 cells per
battery string .
c) nominal voltage of total battery 336V (168 Cells) or 348V (174 P
Cells) or 360V (180 Cells,
Default)or 384V (192 Cells).
d) battery technology Boost/buck. P
e) nominal capacity of total battery Depend on battery size. N/A
f) stored energy time Depend on battery size. N/A
g) restored energy time Restored energy time to 90%: P
Maximum 10 hours
recommended (depend on
battery size).
h) ambient reference temperature Battery (installed separately): P
+5 to +25  battery life.
i) earth condition of d.c. link/isolation P
j) r.m.s. ripple current during normal mode (see appended table) P
k) nominal discharge current during stored energy DC450Vmax, 133Amax. P
mode
l) d.c. fault current rating P

TRF No. IEC62040_3B Page 10 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

m) cable voltage drop recommendation <1% of nominal DC voltage at P


rated battery current.
n) protection requirements DC input breaker or fuse. P
o) charging regime Advanced Battery P
Management (ABM®) = 90%
resting,10% floating/charging
(typical).
p) charging voltage and tolerance band Float charge voltage : P
168/174/180/192 x 1.67V =
381/395/408/435V
q) end of discharge voltage Maximum charge voltage: P
216/228/240 x 2.35V =
508/536/564V
1.67V/Cell
r) charging current limit or range Charging current (at full load) P
10A
5.4.2.3 Characteristics and conditions to be identified by the purchaser P
5.5 UPS switch specification REC input switch, bypass input P
switch, maintenance switch
and output switch are optional
parts.
5.6 Communication circuits Mini-Slot cards: Web/SNMP, P
Relay/RS232, Industrial Relay,
ModBus.

6 UPS tests --
6.1 Summary P
6.1.1 Venue, instrumentation and load P
6.1.1.1 Test venue P
A UPS shall generally be tested at the P
manufacturer’s premises and in accordance with
Table 3
6.1.1.2 Test instrumentation P
6.1.1.3 Test load P
Test load are performed as prescribed in the P
relevant test clause, with
- reference linear load P
- reference non-linear load P
6.1.2 Routine test Decided by manufacture and P
purchaser
6.1.3 Site test N/A
6.1.4 Witness test Decided by manufacture and P
purchaser

TRF No. IEC62040_3B Page 11 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.1.5 Type test P


6.1.6 Schedule of tests N/A
Tests shall be performed in accordance with Table 3 N/A
6.2 Routine test procedure P
6.2.2 Electrical P
6.2.2.1 Insulation and dielectric See separate safety report. P
6.2.2.2 Cable and interconnection check P
All a.c. and d.c. supply terminals are connected to P
the a.c. input supply, to the stored energy source
and to the load
Any communication circuit is connected as required P
6.2.2.3 Light load and functional test P
a) all control switches and other means to activate P
UPS operation
b) protective devices P
c) auxiliary devices, such as contactors, fans, P
outlets, annunciators and communication devices
d) supervisory, monitoring and remote signalling P
devices
e) auto transfer to stored energy mode and back to P
normal mode by failing and subsequently restoring
the a.c. input voltage
f) auto transfer to bypass or isolation of the inverter P
from a common a.c. output bus and back to normal
mode by failing and subsequently restoring the
inverter a.c. output voltage
g) manual transfer to bypass or isolation of the P
inverter from a common a.c. output bus and back to
normal mode by operating appropriate switches
and/or controls
6.2.2.4 No load P
6.2.2.5 Full load P
6.2.2.6 Synchronisation P

6.2.2.7 AC input failure P


6.2.2.8 AC input return (see appended table) P
6.2.2.9 Transfer to bypass P
6.3 Site test procedure N/A
Site test shall preferably occur under conditions N/A
representing those of actual service and shall use
the load available on site.

TRF No. IEC62040_3B Page 12 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

The load shall not exceed the rated continuous load N/A
of the complete UPS as configured on side, or
Test performed with reference test load as defined N/A
in 3.3.5
6.4 Type test procedure (electrical) P
6.4.1 Input – a.c. supply compatibility (see appended table) P
6.4.1.1 Steady-state input voltage tolerance (see appended table) P
6.4.1.2 Input frequency tolerance (see appended table) P
6.4.1.3 Inrush current (see appended table) P
6.4.1.4 Harmonic distortion of input current (see appended table) P
6.4.1.5 Power factor (see appended table) P
6.4.1.6 Efficiency (see appended table) P
6.4.1.7 Backfeed protection See separate report. P
6.4.1.8 Residual earth current See separate report. P
6.4.1.9 Stand-by generator compatibility test P
6.4.1.10 Electromagnetic compatibility See separate report. P
6.4.2 Output-Linear load (see appended table) P
6.4.2.1 Normal mode- No load (see appended table) P
6.4.2.2 Normal mode – Full load (see appended table) P
6.4.2.3 Stored energy mode – No load (see appended table) P
6.4.2.4 Stored energy mode – Full load (see appended table) P
6.4.2.5 3-phase unbalance (see appended table) P
6.4.2.6 DC component P
6.4.2.7 Load sharing test Provided P
6.4.2.8 Output overvoltage test (see appended table) P
6.4.2.9 Periodic output voltage variation test (see appended table) P
6.4.2.10 Overload and fault clearing capability P
6.4.2.10.1 Overload – Normal mode (see appended table) P
6.4.2.10.2 Overload – Stored energy mode (see appended table) P
6.4.2.10.3 Fault clearing capability – Normal mode (see appended table) P
6.4.2.10.4 Fault clearing capability – Stored energy mode (see appended table) P
6.4.2.11 Dynamic performance P
6.4.2.11.1 Normal to stored energy mode (see appended table) P
6.4.2.11.2 Stored energy to normal mode (see appended table) P
6.4.2.11.3 Normal to bypass mode – Overload (see appended table) P
6.4.2.11.4 Step load – Normal mode (see appended table) P
6.4.2.11.5 Step load – Stored energy mode (see appended table) P
TRF No. IEC62040_3B Page 13 of 54 Report No.: ES160513045S-1 Ver.1.0
IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.2.11.6 Test method – linear load (see appended table) P


6.4.2.12 Simulation of parallel redundant UPS fault (see appended table) P
6.4.3 Output – Non-linear load P
Tests performed with non-linear load as defined in (see appended table) P
annex E
6.4.3.1 Normal mode – Full load (see appended table) P
6.4.3.2 Stored energy mode – Full load (see appended table) P
6.4.3.3 Dynamic performance P
6.4.3.3.1 Normal to stored energy mode (see appended table) P
6.4.3.3.2 Stored energy to normal mode (see appended table) P
6.4.3.3.3 Load step – Normal mode P
a) UPS ≤ 4.0 kVA rating N/A
b) UPS > 4.0kVA rating (see appended table) P
6.4.3.3.4 Load step –stored energy mode (see appended table) P
6.4.4 Stored and restored energy P
6.4.4.1 Stored energy time N/A
6.4.4.2 Restored energy time (to 90% capacity) N/A
6.4.4.3 Battery ripple current measurement (see appended table) P
6.4.4.4 Restart test P
6.5 Type test procedure (environment) P
6.5.1 Environment and transportation test methods See separate report. P
6.5.2 Transportation P
6.5.2.1 Shock test (See separate report) P
a) initial measurement P
b) mode of operation P
c) Tests P
d) final requirements P
e) final measurements P
6.5.2.2 Free fall test See separate report. P
a) initial measurement P
b) mode of operation P
c) test P
d) measurements during testing P
e) final requirements P
f) final measurements P
6.5.3 Storage See separate report. P

TRF No. IEC62040_3B Page 14 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

a) initial measurement P
b) mode of operation P
c) tests P
d) measurements during test P
e) Final requirements P
f) Final measurements P
6.5.4 Operation See separate report. P
a) initial measurement P
b) mode of operation P
c) test P
d) measurements during testing P
e) final measurements P
f) final requirements P
6.5.5 Acoustic noise (See separate report) P
Measured when UPS operates at rated steady-state linear load under the following P
conditions:
- normal mode P
- stored energy mode P
6.6 UPS functional unit tests (where not tested as a complete UPS) N/A
6.6.1 UPS rectifier test N/A
6.6.2 UPS inverter tests N/A
6.6.3 UPS switch tests N/A
6.6.4 Stored energy / battery tests N/A

TRF No. IEC62040_3B Page 15 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

5.2.1.e TABLE: - 3-phase input, voltage unbalance P


5.3.2.q
6.4.2.5
Description of test conditions / test construction:
1) Start the UPS in normal mode at nominal input voltage and frequency (230V/50Hz), apply balance
full linear load and unbalance linear load.
2 2 2
2 2  U  U ca  U bc
U ab  U ca  2  U ab  U ca  cos(  arccos ab )
2) Voltage regulation is defined as: 3 2  U ab  U ca
YV  2 2 2
 100%
2 2  U  U ca  U bc
U ab  U ca  2  U ab  U ca  cos(  arccos ab )
3 2  U ab  U ca
2 2 2
3) Angle deviation is defined as: 1 U  Ubn  Uab
AB   arccos an  180o  120o
 2  Uan  Ubn
2 2 2 2 2 2
1 U  Ucn  Ubc 1 U  U an  U ca
BC   arccosbn  180o  120o CA   arccos cn  180o  120o
 2  Ubn  Ucn  2  U cn  U an

Measured data:
1、Balance load
Yv(%)<2 < 2.5 degree
balance load Va Vb Vc
% ᇫab ᇫbc ᇫca
Ph. a=b=c 100% 223.1
224.8V 224.1V 0.3% 0.1 0.3 0.4
Linear load V

2、Unbalance load
1) Ph. a=0,b=c=100% linear load
Yv(%)<2 < 2.5 degree
un alan e loa Va Vb Vc
% ᇫab ᇫbc ᇫca

TRF No. IEC62040_3B Page 16 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

Ph. a=0 224.9


225.9V 225.2V 0.1% 0.0 0.3 0.3
67%Linear load V

2) Ph. b=0,a=c=100% linear load


Yv(%)<2 < 2.5 degree
unbalance load Va Vb Vc
% ᇫab ᇫbc ᇫca
Ph. b=0 22 .2
226.3V 225.9V 0.1% 0.2 0.4 0.2
67%Linear loa V

TRF No. IEC62040_3B Page 17 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

3) Ph. c=0,a=b=100% linear load


Yv(%)<2 < 2.5 degree
unbalance load Va Vb Vc
% ᇫab ᇫbc ᇫca
Ph. c=0 225.4
226.4V 225.6V 0.2% 0.3 0.2 0.5
67%Linear load V

TRF No. IEC62040_3B Page 18 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.2.2.8 TABLE: - AC input return P


6.4.1.3 - Inrush current
6.4.2.11.2 - Change of operating mode – Stored energy to normal mode
Description of test conditions / test construction:
1. AC input return
1) UPS run in normal mode, applying 100% linear load. Then cut off input, UPS transfer to battery. A
few seconds later, return AC input, UPS transfer to normal again.
2) UPS run in normal mode, applying 100% linear load. Then cut off input, UPS transfer to battery.
3) A few seconds later, return AC input with improper phase rotation, UPS can't transfer to normal and
alarm "Rectifier Phase.
4) Then cut off input, and return AC input with proper phase rotation, UPS transfer to normal again.
2. Inrush current
1) Input &bypass supply at 187V/230V/264V 50Hz and battery off. analysis the inrush input current for
the following cases:
2) When Vbus didn’t drop, turn on common line &bypass and battery at the moment that the input
voltage is 0V first and Vmax , record the inrush current, and then turn on the system, record the inrush
current again.
3) Test results: inrush current ≤120% of rated current for ≤2 cycles.

Remark
Channel 1 - Output Current Phase A
Channel 2 - Input Current Phase A
Channel 3 - Output Voltage Phase A
Channel 4 - Input Voltage Phase A
Measured graph:
1) UPS run in normal mode, applying 100% linear load. Then cut off input, UPS transfer to battery. A few
seconds later, return AC input, UPS transfer to normal again.

2) UPS run in normal mode, applying 100% linear load. Then cut off input, UPS transfer to battery.
A few seconds later, return AC input with improper phase rotation, UPS can't transfer to normal and
alarm "Rectifier Phase Rotation Failed".
Then cut off input, and return AC input with proper phase rotation, UPS transfer to normal again.
2. Inrush current < 2.5X
1)Vbus=0 input voltage=187V Inrush current=23A 2)Vbus>0 input voltage=187V Inrush current=22A

TRF No. IEC62040_3B Page 19 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

3)Vbus=0 input voltage=230V Inrush current=21A 4)Vbus>0 input voltage=230V Inrush current=23A

5)Vbus=0 input voltage=272V Inrush current=20A 6)Vbus>0 input voltage=272V Inrush current=22A

TRF No. IEC62040_3B Page 20 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.1.4 TABLE: -Harmonic distortion of input current P


Description of test conditions / test construction:
1) The harmonic distortion of the input current is tested at reference test load.
2) Test result THDi < 35%
Load(%) Harmonic Phase 1 Phase 2 Phase 3 -
No. (dB) (dB) (dB)
99% 3 2 1 1 -
5 66 67 67 -
7 10 11 10 -
9 1 0 0 -
THD Distortion Distortion Distortion Expected value due to the -
at phase 1 at phase 2 at phase 3 specification of the
manufacturer
See formula to -
THD
28.8% 28.8% 29.0% 35%
below(100%
load)
2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20 
       

TRF No. IEC62040_3B Page 21 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.1.5 & TABLE: - Input power factor P


6.4.1.6 - Efficiency-Normal Mode
Description of test conditions / test construction:
1) UPS run in normal mode, charge off. The UPS efficiency shall be measured at 25%, 50%, 75% and 100%
reference load. Input power factor = 0.999
Load Efficiency Input Power Output Power Expected value due to Verdict
(%) (KW) (KW) the specification of the
manufacturer
25 90.2% 28.6K 25.8K 82.5% P
50 92.5% 55.0K 50.9K 87.5% P
75 92.3% 79.8K 73.7K 89.1% P
100 90.94% 128K 116.4K 88.8% P

6.4.2.1 TABLE: - Output – Linear load: Normal mode – No load P


- Harmonic components measurement
Description of test conditions / test construction:
1)With the UPS operating in normal mode of operation at no load and nominal input voltage and
frequency, measure the r.m.s. output voltage and its fundamental and harmonic components.
Load Harmonic Phase 1 Phase 2 Phase 3 -
(%) No. (dB) (dB) (dB)
0 3 0.1 0.2 0.1 -
5 0.2 0.3 0.3 -
7 0.1 0.1 0.1 -
9 0.0 0.0 0.1 -

THD Distortion Distortion Distortion Expected value due to the -


at phase 1 at phase 2 at phase 3 specification of the
manufacturer
see formula to -
0.3% 0.4% 0.4% < 1%
THD below

TRF No. IEC62040_3B Page 22 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20 
       

6.4.2.2 TABLE: - Output – Linear load: Normal mode – Full load P


Harmonic components measurement
Description of test conditions / test construction:
1)UPS runs in normal mode, applying 100% reference test load to the UPS output, then measure output
voltage and its fundamental and harmonic components.
Load Harmonic Phase 1 Phase 2 Phase 3 -
(%) No. (dB) (dB) (dB)
100 3 0.1 0.2 0.2 -
5 0.4 0.3 0.4 -
7 0.3 0.3 0.2 -
9 0.1 0.1 0.1 -

THD Distortion Distortion Distortion Expected value due to the -


at phase 1 at phase 2 at phase 3 specification of the
manufacturer
see formula to -
0.6% 0.5% 0.6% < 1%
THD below
2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20 
       

TRF No. IEC62040_3B Page 23 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.2.3 TABLE: - Output – Linear load: Stored energy mode – No load P


- Harmonic components measurement
Description of test conditions / test construction:
1)With the UPS operating in battery mode of operation at no load, measure the r.m.s. output voltage and
its fundamental and harmonic components.
Load Harmonic Phase 1 Phase 2 Phase 3 -
(%) No. (dB) (dB) (dB)
0 3 0.1 0.1 0.1 -
5 0.2 0.2 0.3 -
7 0.1 0.1 0.1 -
9 0.0 0.0 0.0 -

THD Distortion Distortion Distortion Expected value due to the -


at phase 1 at phase 2 at phase 3 specification of the
manufacturer
see formula to -
0.4% 0.4% 0.4% < 1%
THD below
2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20 
       

6.4.2.4 TABLE: - Output – Linear load: Stored energy mode – Full load P
Harmonic components measurement
Description of test conditions / test construction:
1)UPS runs in battery mode, applying 100 % reference test load to the UPS output, then measure output
voltage and its fundamental and harmonic components.
Load Harmonic Phase 1 Phase 2 Phase 3 -
(%) No. (dB) (dB) (dB)
100 3 0.1 0.2 0.2 -
5 0.4 0.3 0.4 -
7 0.3 0.3 0.2 -
TRF No. IEC62040_3B Page 24 of 54 Report No.: ES160513045S-1 Ver.1.0
IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

9 0.1 0.1 0.1 -

THD Distortion Distortion Distortion Expected value due to the -


at phase 1 at phase 2 at phase 3 specification of the
manufacturer
see formula to -
0.6% 0.5% 0.6% < 1%
THD below
2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20 
       

TRF No. IEC62040_3B Page 25 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.2.10.1 TABLE: Overload capability test – Normal mode P


Description of test conditions / test construction:
1) UPS in normal mode, apply below loads respectively to the output, check UPS performance
and alarms.
2) Measure the overload time duration, check UPS transfer to bypass and transfer back to
normal mode automatically if removing overload.
Specs
Condition
30C ambient, 1000m, nominal Uin
105 - 125% 10 minutes

Overloads 126-150% 1 minute

>150%, 200ms

Load/(%) Specified time interval Verdict


107% 615.17s P
128% 60.76s P
154% 238.4ms P
Measured data:
1) 107% linear load overload time=615.17s

2) 128% linear load overload time=60.76s

TRF No. IEC62040_3B Page 26 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

3) 154% linear load overload time=238.4ms

Channel 1 - Output Current Phase A


Channel 2 - Output Voltage Phase B
Channel 3 - Input Voltage Phase A
Channel 4 - Input Voltage Phase B

TRF No. IEC62040_3B Page 27 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.2.10.2 TABLE: Overload capability test – Stored energy mode P


Description of test conditions / test construction:
1) UPS in battery mode, apply below loads respectively to the output, check UPS performance and
alarms.
2) Measure the overload time duration, check UPS transfer to bypass and transfer back to battery mode
automatically if removing overload.
Specs
Condition
30C ambient, 1000m, nominal Uin

105 - 125% 10minutes


Overloads 126-150% 1minutes
>150%, 200ms

Load/(%) Specified time interval Verdict


107% 613.79s P
128% 60.96s P
154% 220.4ms P
Measured data:
1)107% linear load overload time=613.79s

2)128% linear load overload time=60.96s

TRF No. IEC62040_3B Page 28 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

3)154% linear load overload time=220.4ms

Channel 1 - Output Current Phase A


Channel 2 - Output Voltage Phase B
Channel 3 - Input Voltage Phase A
Channel 4 - Input Voltage Phase B

TRF No. IEC62040_3B Page 29 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.2.10.3 TABLE: - Fault clearing capability – Normal mode P


- Short circuit test
Description of test conditions / test construction:
1) UPS operating in normal mode, applying 50% linear load. Input and output both are 240V/50Hz.
2) Then make output shorted, check UPS response. UPS should shut down and alarm "Inverter Output
Over Current"
3) Then remove the shorted circuit; Reset alarms, "Inverter Output Over Current" will be cleared.
4) Turn UPS on, UPS run in normal mode again.
Measured graph:

1) Output shorted, UPS shut down and alarm "Inverter Output Over Current", remove shorted circuit and
reset alarm, alarm "Inverter Output Over Current" cleared, turn on UPS to normal mode.

Channel 1 - Output Current Phase A


Channel 2 - Output Voltage Phase B
Channel 3 - Input Voltage Phase A
Channel 4 - Input Voltage Phase B

TRF No. IEC62040_3B Page 30 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.2.10.4 TABLE: - Fault clearing capability – Stored energy mode P


- Short circuit test
Description of test conditions / test construction:
1) UPS operating in battery mode, applying 50% linear load. Output is 240V/50Hz.
2) Then make output shorted, check UPS response. UPS should shut down and alarm "Inverter Output
Over Current".
3) Then remove the shorted circuit; Reset alarms , "Inverter Output Over Current" will be cleared.
4) Turn UPS on, UPS run in battery mode again.
Measured graph:

Output shorted, UPS shut down and alarm "Inverter Output Over Current", remove shorted circuit and reset
alarm, alarm "Inverter Output Over Current" cleared, turn on UPS to battery mode.

Channel 1 - Output Current Phase A


Channel 2 - Output Voltage Phase B
Channel 3 - Input Voltage Phase A
Channel 4 - Input Voltage Phase B

TRF No. IEC62040_3B Page 31 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.2.11.1 TABLE: - Change of operating mode – Normal to stored energy mode P


- AC input failure test
Description of test conditions / test construction:
1) UPS initially operating at full linear load in normal mode, the input supply shall be interrupted, then
UPS transfers to battery mode.
2) Check the system when the utility failure normal operation. Measure the transient output voltage
deviation.
Power Respons Before After deviation < 5%
Type e
procedur deviati
e deviatio deviatio
on
A B C A B C n Phase n Phase
Phase
B C
A
230V/50 Normal to
220.981 219.421 219.434 220.931 219.605 219.330 0.02% 0.08% 0.05%
Hz Battery

Measured graph:
Before waveform After waveform

Channel 1 - Output Voltage Phase A


Channel 2 - Input Current Phase A
Channel 3 - Output Voltage Phase C
Channel 4 - Output Voltage Phase B

TRF No. IEC62040_3B Page 32 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.2.11.3 TABLE: - Change of operating mode – Normal to bypass mode P


- Overload test
Description of test conditions / test construction:
1) UPS has a bypass mode of operation which is automatic in operation under conditions of output
overload.
2) The input and output voltage waveforms shall be observed during transitions normal to bypass
mode.
Measured graph: Load transfer from inverter to mains

Channel 1 - Output Voltage Phase A


Channel 2 - Input Current Phase A
Channel 3 - Output Voltage Phase C
Channel 4 - Output Voltage Phase B

TRF No. IEC62040_3B Page 33 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.2.11.4 TABLE: - Step load –Normal mode P


Description of test conditions / test construction:
1) Impact linear load as defined 20% => 100 %=> 20% nominal load with 230V/50Hz in normal mode.
2) Check the transient response
Measured graph:
1) Step load from 20% to 100% linear load

Power Response Before After deviation < 5%


Type procedure

deviatio deviatio deviatio


A B C A B C n Phase n Phase n Phase
A B C

20% to
230V/50 219.56 212.22
100% 220.766 219.437 213.836 212.870 3.15% 3.34% 2.99%
Hz 7 1
load
2) Step load from100% down to 20% linear load

TRF No. IEC62040_3B Page 34 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

Power Response Before After deviation < 5%


Type procedure
deviatio deviatio deviatio
A B C A B C n Phase n Phase n Phase
A B C
230V/50 100% to 219.08 225.39
221.081 221.407 226.824 226.023 2.61% 2.88% 2.10%
Hz 20% load 7 6

Channel 1 - Output Voltage Phase A


Channel 2 - Input Current Phase A
Channel 3 - Output Voltage Phase C
Channel 4 - Output Voltage Phase B

6.4.2.11.5 TABLE: - Step load – Stored energy mode P


Description of test conditions / test construction:
1) Impact linear load as defined 20% => 100 %=> 20% nominal load with 230V/50Hz in battery mode.
2) Check the transient response
Measured graph:
1) Step load from 20% to 100% linear load

Power Response Before After deviation < 5%


Type procedure

deviatio deviatio deviatio


A B C A B C n Phase n Phase n Phase
A B C

230V/50 0 to 100% 219.64 212.99


220.732 219.456 214.148 212.975 3.00% 3.02% 2.95%
Hz load 2 3

2) Step load from100% down to 20% linear load


TRF No. IEC62040_3B Page 35 of 54 Report No.: ES160513045S-1 Ver.1.0
IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

Power Response Before After deviation < 5%


Type procedure
deviatio deviatio deviatio
A B C A B C n Phase n Phase n Phase
A B C
230V/50 100% to 0 219.54 225.53
221.095 222.272 226.652 225.865 2.53% 2.72% 1.63%
Hz load 7 4

Channel 1 - Output Voltage Phase A


Channel 2 - Input Current Phase A
Channel 3 - Output Voltage Phase C
Channel 4 - Output Voltage Phase B

6.4.3.1 TABLE: - Output – Non-linear load: Normal mode – Full load P


- Harmonic components measurement
Description of test conditions / test construction:
UPS runs in normal mode, applying 100 % non-linear load to the UPS output, then measure output
voltage and its fundamental and harmonic components.
Load Harmonic Phase 1 Phase 2 Phase 3 -
(%) No. (dB) (dB) (dB)
100 3 2.4 2.4 2.3 -
5 3.8 3.9 3.8 -
7 1.1 1.2 1.1 -
9 0.7 0.7 0.6 -

THD Distortion Distortion Distortion Expected value due to the -


at phase 1 at phase 2 at phase 3 specification of the
manufacturer
see formula to
5.0% 5.1% 4.9% < 8% -
THD below
TRF No. IEC62040_3B Page 36 of 54 Report No.: ES160513045S-1 Ver.1.0
IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20 
       

6.4.3.2 TABLE: - Output – Non-linear load: Stored energy mode – Full load P
- Harmonic components measurement
Description of test conditions / test construction:
UPS runs in battery mode, applying 100 % non-linear load to the UPS output, then measure output
voltage and its fundamental and harmonic components.

Load Harmonic Phase 1 Phase 2 Phase 3 -


(%) No. (dB) (dB) (dB)
100 3 2.5 2.4 2.2 -
5 3.8 3.8 3.9 -
7 1.1 1.1 1.1 -
9 0.7 0.7 0.6 -

THD Distortion Distortion Distortion Expected value due to -


at phase 1 at phase 2 at phase 3 the specification of the
manufacturer
see formula to 5.0% 5.0% 4.9% < 8% -
THD below

TRF No. IEC62040_3B Page 37 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

2 2 2 2
 20 3
  20 5
  20 7
  20 9

THD  100   10    10    10    10 
       
       
Measured graph:

TRF No. IEC62040_3B Page 38 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.3.3.1 TABLE: - Reference non-linear load – Normal to stored energy mode P


- AC input failure test

Description of test conditions / test construction:


1) UPS initially operating at full non-linear load in normal mode, the input supply shall be interrupted,
then UPS transfers to battery mode;
2) Check the system when the utility failure normal operation. Measure the transient output voltage
deviation.
Before waveform After waveform

Power Response Before After deviation < 5%


Type procedure
deviatio deviatio deviatio
A B C A B C n Phase n Phase n Phase
A B C
230V/ Normal to
221.026 219.557 218.738 221.100 219.317 218.740 0.03% 0.01% 0.08%
50Hz Battery

Channel 1 - Output Voltage Phase A


Channel 2 - Input Current Phase A
Channel 3 - Output Voltage Phase C
Channel 4 - Output Voltage Phase B

TRF No. IEC62040_3B Page 39 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

TRF No. IEC62040_3B Page 40 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.3.3.2 TABLE: - Reference non-linear load – Stored energy to normal mode P

Description of test conditions / test construction:


1) UPS initially operating at full non-linear load in battery mode, the input supply shall be recovery, then
UPS transfers to normal mode,
2) Check the system when the utility response normal operation. Measure the transient output voltage
deviation.
Measured graph:
Before waveform After waveform

Power Response Before After deviation < 5%


Type procedure
deviatio deviatio deviatio
A B C A B C n Phase n Phase n Phase
A B C
230V/ Normal to
221.642 219.909 218.937 221.548 219.828 218.846 0.04% 0.04% 0.04%
50Hz Battery

Channel 1 - Output Voltage Phase A


Channel 2 - Input Current Phase A
Channel 3 - Output Voltage Phase C
Channel 4 - Output Voltage Phase B

TRF No. IEC62040_3B Page 41 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.3.3.3.b TABLE: - Reference non-linear load steps – Normal mode > 4.0 kVA rating P
Description of test conditions / test construction:
1) Impact linear load as defined 33 %=> 66%=100 %=> 66 %=> 33% non-linear load with 230V/50Hz in
normal mode.
2) Check the transient response.
Measured graph:
1) Step load from 33% up to 66% non-linear load
Before waveform After waveform

Power Respon Before After deviation < 5%


Type se
deviatio deviatio deviatio
procedu
A B C A B C n Phase n Phase n Phase
re
A B C
33%=>
220V/5
66% 221.434 220.270 219.286 218.735 215.311 218.876 1.23% 2.25% 0.19%
0Hz
load

2) Step load from 66% up to 100% non-linear load


Before waveform After waveform

Power Respons Before After deviation < 5%


Type e
deviatio deviatio deviatio
procedur
A B C A B C n Phase n Phase n Phase
e
A B C

TRF No. IEC62040_3B Page 42 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

220V/5 66%=100
221.425 220.428 219.406 218.633 214.534 215.290 1.27% 2.68% 1.87%
0Hz % load
3) Step load from100% down to 66% non-linear load
Before waveform After waveform

Power Respons Before After deviation < 5%


Type e
procedur deviatio deviatio deviatio
e A B C A B C n Phase n Phase n Phase
A B C
220V/5 100%=66
221.594 220.195 219.223 223.389 221.496 220.669 0.82% 0.59% 0.66%
0Hz % load
4) Step load from 66% down to 33% non-linear load
Before waveform After waveform

Power Respons Before After deviation < 5%


Type e
procedur deviatio deviatio deviatio
e A B C A B C n Phase n Phase n Phase
A B C
220V/ 66%=33
221.660 220.140 219.032 222.477 220.820 220.086 0.37% 0.31% 0.48%
50Hz % load
Channel 1 - Output Voltage Phase A
Channel 2 - Input Current Phase A
Channel 3 - Output Voltage Phase C
Channel 4 - Output Voltage Phase B

TRF No. IEC62040_3B Page 43 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

6.4.3.3.4 TABLE: - Reference non-linear load steps – Stored energy mode > 4.0 kVA P
rating
Description of test conditions / test construction: test repeated according to sub-clause 6.4.3.3.3.b
1) Impact linear load as defined 33 %=> 66%=100 %=> 66 %=> 33% non-linear load with 230V/50Hz in
battery mode.
2) Check the transient response
Measured graph:
1) Step load from 33% up to 66% non-linear load
Before waveform After waveform

Power Respons Before After deviation < 5%


Type e
deviatio deviatio deviatio
procedur
A B C A B C n Phase n Phase n Phase
e
A B C
220V/5 33%=66
221.877 219.814 219.081 217.753 215.205 212.038 1.87% 2.10% 3.20%
0Hz % load

2)Step load from 66% up to 100% non-linear load


Before waveform After waveform

Power Respons Before After deviation < 5%

TRF No. IEC62040_3B Page 44 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

Type e deviatio deviatio deviatio


procedur A B C A B C n Phase n Phase n Phase
e A B C
220V/5 66%=100
220.484 219.230 217.893 211.551 217.846 212.653 4.1% 0.63% 2.38%
0Hz % load

3) Step load from100% down to 66% non-linear load


Before waveform After waveform

Power Respons Before After deviation < 5%


Type e
deviatio deviatio deviatio
procedur
A B C A B C n Phase n Phase n Phase
e
A B C
220V/5 100%=66
222.014 220.009 219.407 222.705 221.428 220.352 0.19% 0.65% 0.43%
0Hz % load
4) Step load from 66% downto 33% non-linear load
Before waveform After waveform

Power Respons Before After deviation < 5%


Type e
deviatio deviatio deviatio
procedur
A B C A B C n Phase n Phase n Phase
e
A B C
220V/5 100%=66
221.589 220.002 219.153 222.842 221.480 220.415 0.57% 0.67% 0.57%
0Hz % load

TRF No. IEC62040_3B Page 45 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

Channel 1 - Output Voltage Phase A


Channel 2 - Input Current Phase A
Channel 3 - Output Voltage Phase C
Channel 4 - Output Voltage Phase B

TRF No. IEC62040_3B Page 46 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

TABLE: List of critical components P

Object/part no. Manufacturer/ Type/model Technical data Standard Mark(s) of


trademark conformity 1.
Whole unit
Enclosure Various Steel/Aluminiu -- -- --
m

LCD Display SHENZHEN LM2088DFW- HB, 80℃ -- --


TOPWAY C
TECHNOLOGY
CO.,LTD.

Breaker (AC LS Industrial ABE203b,3P 415V,250A IEC 60947-2 Intertek CB


INPUT) System Co.,Ltd 250A (LS) Certif. No.:
CN10817

Breaker LS Industrial ABE203b,3P 415V,250A IEC 60898-1 Intertek CB


(OUTPUT) System Co.,Ltd 250A (LS) Certif. No.:
CN10817
Breaker LS Industrial ABE203b,3P 415V,250A IEC 60898-1 Intertek CB
System Co.,Ltd 250A (LS) Certif. No.:
(MCCB) CN10817

Internal wire Dongguan XIN RU 600227 450/750V,70℃ UL UL: E304337


(AC) Hardware IEC02(RV)25
Electronic Co. Ltd. mm2,450/750
V

Internal wire Dongguan XIN RU 600227 450/750V,70℃ UL UL: E304337


(DC) Hardware IEC02(RV)25
Electronic Co. Ltd. mm2,450/750
V

Inverter EACO SRE-300-400- 400uF±5%, -- Test with


Capacitor MSJ 400UF 300VAC,105℃ appliance
300V 65A
EACO

IGBT infineon IGBT 650V,450A -- --


module,FF450
R07ME4,650V
,450A

SCR SKKT SKKT 106A,1600V UL UL: E63532


106/16E

Input Inductor Guang hua EA89Ⅱ- 130℃ -- Test with


industrial co.,ltd 120KVA appliance
0.4mH 265A

Transformer Guang hua EA89Ⅱ-120K Class H insulation -- Test with


industrial co.,ltd 200:415 appliance
180℃
120KVA

TRF No. IEC62040_3B Page 47 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

AC fan SANJU SJ1755HA2 AC220-240V, CE CE:


ELECTRIC BAL-(WZ) N8A150268837
MACHINERY 0.18A UL 008
CO.,LTD
UL: E314698

Fuse MUSSMANN 170M5412 630A,690V IEC 60269-4 CQC CB Certif.


630A 690V No.: CN13985

Fuse HOLLYLAND CO 61NM 6A,250V UL UL: E156471


LTD
KC KC: SU05008-
4001B

Fuse HOLLYLAND CO 65NM 5A,250V UL UL: E156471


LTD
KC KC: SU05008-
4001B
SMPS(AUX-POWER-C2),
PCB Various Various V-0, 130℃ -- UL: E230225
X-Capacitor Xiamen Faratronic C42P2225KB X1, 275VAC,2.2uF IEC 60384-14 VDE:DE1-
(C17) Co., Ltd. SC400 49862
KC: SU03060-
12004
Y-Capacitor Xiamen Faratronic C43Q1224MB Y-Cap, IEC 60384-14 VDE: SE-60440
(C5, C6) Co., Ltd. 0C400 300VAC,0.22uF
KC: SU03060-
12005
Inductor JEPULS LC9-116 130℃ -- Test with
(L1) TECHNOLOGY(S appliance
HENZHEN)
CO.,LTD
Transformer SHENZHEN ER42 CLASS B -- Test with
(T1) FERROCOIL appliance
-BOBBIN CHANG CHUN T375J -- UL 94V-0 UL: E59481(S)
PLASTICS
CO.,LTD
-WIRE PACIFIC UEW-U 130℃ UL UL: E201757(S)
ELECTRIC WIRE
& CABLE CO.,LTD
-TAPE JINGJIANG PZ 130℃ UL UL: E165111(N)
PRESSURE
SENSITIVE GLUE
FIY
-VARNISH HANG CHEUNG 8562/C -- UL UL: E200154
PETROCHEMICA
L LTD

TRF No. IEC62040_3B Page 48 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

-TUBE FLUO TECH TEFLON -- UL UL: E175982(N)


INDUSTRIES TUBE
CO.,LTD
-MARGIN TAPE JINGJIANG WF 130℃ UL UL: E165111(N)
PRESSURE
SENSITIVE GLUE
FIY
Transformer SHENZHEN EEL16 CLASS B -- Test with
(T3) FERROCOIL appliance
-BOBBIN CHANG CHUN T375J -- UL 94V-0 UL: E59481(S)
PLASTICS
CO.,LTD
-WIRE PACIFIC UEW-U 130℃ UL UL: E201757(S)
ELECTRIC WIRE
& CABLE CO.,LTD
-TAPE SHENGDAFENG PZ 130℃ UL UL: E317896
ELECTRONICS
CO., LTD
-VARNISH HANG CHEUNG 8562/C -- UL UL: E200154
PETROCHEMICA
L LTD
-TUBE FLUO TECH TEFLON -- UL UL: E175982(N)
INDUSTRIES TUBE
CO.,LTD
-MARGIN TAPE JINGJIANG WF 130℃ UL UL: E165111(N)
PRESSURE
SENSITIVE GLUE
FIY
Opto-coupler TOSHIBA TLP781-BL Dti>0.4mm, 115 ℃ UL UL:E67349
(IS1) min. VDE VDE :
40021173
3PH Interface PCB(GF_INTERFACE),
Relay Xiamen Hongfa HFD27 60W,120VA UL UL: E133481
(RL1, RL2, RL3, Electronics Sales
RL4, RL5, RL6) Co.
PCB Various Various V-0, 130℃ UL UL: E230225

<Inverter Drive PCB>(EA990Ⅱ_IGBTDR_D1)

TRF No. IEC62040_3B Page 49 of 54 Report No.: ES160513045S-1 Ver.1.0


IEC 62040-3
Clause Requirement + Test Result - Remark Verdict

Transformer JEPULS Switch Power 130℃ -- --


TECHNOLOGY Transformer,E
( SHENZHENG)C 3HP-IGBT-T1-
O.,LTD 27:27:20-
0.510mH-+/-
30%-PG232
PCB Various Various V-0, 130℃ UL UL: E230225
<3PH SCR PCB>(REC-SCR-Drive)
Transformer Shenzhen Feiyue Driver 130℃ -- --
Electronic Transformer,E
Technology Co., 3HPPT2,22:22
Ltd. :22,300uH
PCB Various Various V-0, 130℃ UL UL: E230225
CNTL BOARD(Main_Control-C1)
TRANSFOMER SHENZHEN EE16 CLASS B -- Test with
FERROCOIL appliance
-BOBBIN CHANG CHUN T375J -- UL 94V-0 UL: E59481(S)
PLASTICS
CO.,LTD
-WIRE PACIFIC UEW-U 130℃ UL UL: E201757(S)
ELECTRIC WIRE
& CABLE CO.,LTD
-TAPE JINGJIANG PZ 130℃ UL UL: E165111(N)
PRESSURE
SENSITIVE GLUE
FIY
-VARNISH HANG CHEUNG 8562/C -- UL UL: E200154
PETROCHEMICA
L LTD
Opto-coupler LITE-ON LTV-816S- Dti>0.4mm, 110 ℃ UL UL:E113898
(IS1) TECHNOLOGY TA1(C) min.
CORP.
PCB Various Various V-0, 130℃ UL UL: E230225

Supplementary information:
An asterisk indicates a mark that assures the agreed level of surveillance.

TRF No. IEC62040_3B Page 50 of 54 Report No.: ES160513045S-1 Ver.1.0


Pictures

Fig. 1 –Overview I

TRF No. IEC62040_3B Page 51 of 54 Report No.: ES160513045S-1 Ver.1.0


Pictures

Fig. 2 –Overview II

TRF No. IEC62040_3B Page 52 of 54 Report No.: ES160513045S-1 Ver.1.0


Pictures

Fig. 3 –Overview III

TRF No. IEC62040_3B Page 53 of 54 Report No.: ES160513045S-1 Ver.1.0


Pictures

Fig. 4 –Overview IIII

TRF No. IEC62040_3B Page 54 of 54 Report No.: ES160513045S-1 Ver.1.0

You might also like