Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Sor RR 2020-21

Download as pdf or txt
Download as pdf or txt
You are on page 1of 170

 

G
GOVERNM
MENT OF ASSAM 
PU
UBLIC WORKS
W R
ROADS DEPAR
RTMENT
T
 
 
 
 
 
 
 
 
 
 
 
 
 
SC
CHEDULEE OF RATTES FOR
RURAAL ROADDS 
FOR
R ALL DIVISIONSS UNDER
R PWRD, ASSAM

FOR THE YEAR 20020‐21
 
 
 
 
 
 
 
 
PUB
BLISHED BYY: 
COMM MISSIONER
R & SPECIA
AL SECRETA
ARY 
PUBLIC W
WORKS ROAADS DEPARRTMENT, A
ASSAM 
DISPUR,, GUWAHAATI‐6 
 

CERTIFICATE

Certified that the Schedule of Rates for Rural Roads for all divisions under
Public Works Roads Department (PWRD), Assam for the year 2020-2021 has been
prepared on the basis of Standard Data Book for Analysis of Rates for Rural Roads
published by Indian Road Congress on behalf of the National Rural Development
Agency, Ministry of Rural Development (MORD), Govt. of India, New Delhi.

Chief Engineer, Roads Chief Engineer, Border Roads


Public Works Roads Deptt, Assam Public Works Roads Deptt, Assam
Chandmari, Guwahati - 781003 Chandmari, Guwahati - 781003

Chief Engineer, EAP


Public Works Roads Deptt, Assam
Fatasil Ambari, Guwahati - 781025

Addl. Chief Engineer, Western Zone Addl. Chief Engineer, Mechanical


Public Works Roads Deptt, Assam Public Works Roads Deptt, Assam
Chandmari, Guwahati - 781003 Chandmari, Guwahati - 781003


 

FOREWORD

Government of India as well as the State Government has given specific


importance for development of Rural Roads in India. Indian Road Congress on behalf
of Ministry of Rural Development, Govt. of India has published “Specifications for Rural
Roads & Cross Drainage Works” and “Standard Data book for Analysis of Rates for
Rural Roads” with a consideration for development and standardization of
specifications & rates all over the country.

On the basis of the “Standard Data book for Analysis of Rates for Rural Roads”,
the Schedule of Rates for Rural Roads for all Divisions under Public Works
Department, Assam was first published in the year 2005-06. As per guidelines for
preparation of rates using MORD’s Standard data book, the Schedule of Rates is
required to be updated every year considering the market variation of the basic rates of
labour, materials and machineries.

Accordingly this Schedule of Rates for Rural Roads has been updated for the
year 2020-21 considering the increase in the market rates for labour as well as cost of
different materials like cement, steel, Bitumen, Aggregate etc.

The Schedule of Rates for Rural Roads is as per “Specification for Rural Roads
2004” published by IRC is applicable for Rural road works funded by agencies like
World Bank, ADB etc in addition to PMGSY works, as these funding agencies insisted
upon the department to follow the referred Data Book in preparing the DPR for their
projects.

As per current revision of the specifications of Data Book in 2014 some new
items has also been incorporated in this edition alongwith Long-span Bridges as per
MORTH Guidelines.

This schedule is modeled as a schedule for finished item rates, the rates for the
basic materials, obtained from various GOVT. Agency, have been adopted for
31-12-2020
computation. This S.O.R. shall come into force w.e.f. …………………….

Utmost efforts have also been made to collect various up-to-date market inputs
from different sources, compile and study elaborately in the light of current price index
and to incorporate the same in the present schedule of rates. However, rates involving
the commodities like cement, Bitumen, Steel the competent authority as and when
ii 
 

deem necessary may review. Every endeavor has been made to make the edition of SOR
free from errors. In spite of that if any error/omission is noticed the same may kindly
be brought to the notice of the undersigned for appropriate rectification.

I am sure the edition of the SOR in its present form would prove to be very
useful to all practicing Rural Roads Engineers.

The Commissioner & Spl. Secretary to the Govt. of Assam


Public Works Roads Department, Assam
Dispur Secretariat, Guwahati-781006

iii 
 

PREFACE

The Schedule of Rates for Rural Roads for all Divisions under PWRD, Assam was
last revised in the year 2017-18. Since then the cost of all materials used in Road &
Bridge construction works have been varying considerably making the schedule of rate
practically unworkable. As such, the revision of the schedule of rates for 2020-21 has
become necessary to make the S.O.R. workable at the present stage.

Accordingly, the revision of S.O.R. was carried out considering the present prices
of construction materials during the year 2020. The wages of skilled & unskilled
labourers are based on the rates fixed by Labour Commissioner, Govt. of Assam.

The detailed analysis of rate for all items covered by this schedule of rates has
been carried out on the basis of standard Data Book published by Ministry of Rural
Development (MoRD).

The items in this S.O.R. will cover both original & repair/rehabilitation works
involved in Roads & Bridge works for Rural Roads and are likely to cover almost all
aspects of work, which may arise. The specification in this S.O.R. is prepared in
consultation with NRRDA/ MoRD specification (4th Revision).

A number of new items have been incorporated in this S.O.R. (19-20) taking into
consideration the present demand and requirements of modern construction materials
that have been introduced in the market.

Additional Chapters have been incorporated in this SOR that includes New
Innovative Technology in addition to major Road works and Bridge Works as per
MORT&H specifications.

In RCC works the reinforcement is brought in 2 categories considering


differential cost.

1) From Primary Sources: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel make

2) From Secondary Sources: Other ISI approved TMT reinforcement steel make

However, other ISI approved TMT reinforcement steel not provided for Major
Bridge works (in Chapter 17 as per MORT&H Specifications).

Every endeavor has been made to make this S.O.R. comprehensive and
expressive in all respect. If however, there is any error or omission, the same may
kindly be brought to the notice of the Chief Engineer, PWD, (Roads), Assam.

The S.O.R. (2020-21) will be effective for all Roads Divisions under Assam PWRD
from the date of its publication.

iv 
 

In this context, the valuable contribution and support extended by the following
officers deserve special thanks. I convey my thanks to:

1. Shi Chandan Sarma, Superintending Engineer, PWD, NEC (Planning) Cell,


O/o the C.E, PWD (Roads), Assam, Chandmari, Guwahati-3

2. Shi Santosh Tamuli, Executive Engineer, PWD, IBRC, O/o the C.E, PWD
(Border Roads), Assam, Chandmari, Guwahati-3

3. Shi Atul Baishya, Executive Engineer, PWD, PMGSY, O/o the C.E, PWD
(Border Roads), Assam, Chandmari, Guwahati-3

4. Sri Prahlad Ch. Kakati, Executive Engineer, West Guwahati Terr. Roads
Division, PWRD, Assam, Chandmari, Guwahati-3

5. Sri Amarjyoti Das, Assistant Executive Engineer, PWRD, NEC Bridge Design,
O/o the C.E, PWD (Border Roads), Assam, Chandmari, Guwahati-3

6. Sri Nilotpal Kalita, Assistant Executive Engineer, PWRD, O/o the C.E, PWD
(Roads), Assam, Chandmari, Guwahati-3

I am thankful to all the Officers/ Staff of the SOR Preparation Committee, who
have actively associated themselves in preparing the S.O.R. (2020-21) successfully.

The draft copy of S.O.R. (2020-21) has been approved by the Commissioner and
Special Secretary to the Govt. of Assam, PWRD, Dispur, Guwahati-6 and
communicated to this office vide _____________________ dtd. ___________.

(Bibhuti Saikia)
Chief Engineer, PWD, (Roads)
Assam, Chandmari, Guwahati-3


 

SCHEDULE OF RATES
PREPARATION COMMITTEE
Vide Office Order No. CE/SRC/1/2017/59 dated 29-04-2019

(A) S.O.R. Approval Committee:

1. Chief Engineer, PWD (Roads)


2. Chief Engineer, PWD (Border Roads & NEC Works)
3. Chief Engineer, PWD (EAP)
4. Dy. Secretary (Works) to the Govt. of Assam, PWRD
5. Addl. Chief Engineer, PWD (Planning)
6. Addl. Chief Engineer, PWD (W/Z)
7. Addl. Chief Engineer, PWD (Mechanical)
8. Superintending Engineer, PWD (Planning)
9. Superintending Engineer, PWD (Traffic Cell)
10. Addl. Director, Design, Bridge Design Branch
11. Superintending Engineer, PWD (PMGSY)
12. Director, Assam Road Research & Training Institute (ARR&TI)
13. Executive Engineer, PWD (PMGSY)

(B) Working Members:

1. Overall in-charge: Sri Chandan Sarma, Superintending Engineer, PWD


2. Asstt. in-charge: Sri Santosh Tamuly, Executive Engineer, PWD
3. Convenor: Sri Atul Baishya, Executive Engineer, PWD
4. Asstt. Convenor : Sri Sushil Das, Asstt. Executive Engineer, PWD
Mrs. Bandita Das, Asstt. Executive Engineer, PWD
Sri Paresh Ch. Haloi, Asstt. Executive Engineer, PWD

(C) Collection of Basic rates of materials, labour etc.:

1. In-charge: Sri Nilotpal kalita, Asstt. Executive Engineer, PWD


2. Members: Sri Dipak Sarma, Asstt. Engineer, PWD
Sri Gobinda Dutta, Asstt. Engineer, PWD
Sri Panchanan Baruah, Asstt. Engineer, PWD
Sri Prabin Talukdar, Junior Engineer, PWD
Sri Amol Deka, Junior Engineer, PWD
Sri Diganta Hazarika, Junior Engineer, PWD

(D) Preparation of Schedule of Rates for the year 2020-21:

1. In-charge: Sri Amarjyoti Das, Asstt. Executive Engineer, PWD


2. Members: Sri Banajit Choudhury, Asstt. Executive Engineer, PWD
Sri Ranjit Dutta, Asstt. Engineer, PWD
Ms. Bandana Saikia Kharghoria, Asstt. Engineer, PWD
Ms. Seema Pegu, Asstt. Engineer, PWD

vi 
 

(E) Printing, Scrutiny & Query reply:

1. In-charge: Sri Santosh Tamuly, Executive Engineer, PWD


2. Members: Sri Anup Kr. Das, Executive Engineer, PWD
Sri Sushil Das, Asstt. Executive Engineer, PWD
Mrs. Bandita Das, Asstt. Executive Engineer, PWD
Sri Paresh Ch. Haloi, Asstt. Executive Engineer, PWD
Sri Jyandeep Choudhury, Asstt. Executive Engineer, PWD
Sri Pranjal Bhattacharjee, Asstt. Executive Engineer, PWD
Sri Papul Saikia, Asstt. Executive Engineer, PWD
Sri Himadri Sekhar Das, Asstt. Engineer, PWD

(F) Observations of NRRDA, Comparison of SORs, Resolution, etc:

1. In-charge: Sri Parikhit Baruah, Superintending Engineer,


PWD, PMGSY Branch
2. Members: Sri Atul Baishya, Executive Engineer, PWD
Sri Pranjal Bhattacharjee, Asstt. Executive Engineer, PWD
Sri Arup Kalita, Asstt. Engineer, PWD
Sri Himadri Sekhar Das, Asstt. Engineer, PWD

vii 
 

CONTENT
Chapter Description Page No.
Basic Approach and General Conditions and Assumptions for
i ix
ix
the preparation of Standard Data Book
ii Abbreviations xiv
xv
iii Basic Rates of Labour A-1
iv Basic Rates for Usage of Plant & Machineries B-1
v Basic Rates of Materials C-1
PART-A: ROAD WORKS
1 Carriage of Materials
2 Site Clearance and Setting Out
3 Earthwork Erosion Control and Drainage
4 Sub Bases, Bases (Non-Bituminous) and Shoulders
5 Bases and Surface Courses (Bituminous)
6 Cement Concrete Pavement
7 Causeway and Submersible Bridges
8 Hill Road
9 Pipe Culverts
10 Traffic Signs, Markings & Other Road Appurtenances
PART-B: BRIDGE WORKS
11 Foundation
12 Substructure
13 Superstructure
14 Protection works
PART-C: MAINTENANCE & MISCELLENEOUS WORKS
15 Maintenance of Roads
16 Miscelleneous Works
PART-D: MAJOR ROADS & BRIDGE WORKS [MORT&H
SPECIFICATION]
17 Major Roads & Bridge Works [MORT&H Specification]
PART-E: NEW TECHNOLOGY
18 New Technology

viii 
 

BASIC APPROACH AND


GENERAL CONDITIONS AND ASSUMPTIONS FOR THE
PREPARATION OF STANDARD DATA BOOK

The basic approach for the preparation of Standard Data Book for Rural Roads is
indicated as under:

1. Description of items:

The description of items is given briefly and linked with the relevant Clauses of the
Ministry of Rural Development’s (MORD) Specifications wherever feasible, which
may be referred for detailed description, provisions and interpretation.

2. Use of Machinery:
2.1. The Standard Data Book is based on the assumption that Rural Roads in our
country are to be constructed with intermediate technology, i.e., manual
means with medium input of machinery, wherever required to ensure the
required quality of work.
2.2. For rolling, use of static roller has been generally considered. However, use of
vibratory pneumatic tyre roller has been considered wherever required as per
provisions of MORD Specifications.

3. Working Conditions:
5.1. Rates have been analysed for average working conditions prevailing in the
country.
5.2. Average achievable outputs of machines and labour have been considered
taking into account the job and management factors.
5.3. However, the output of machineries and labour reduces substantially in hilly
areas as the altitude increases. Therefore, for hilly areas reduced outputs have
been considered as indicated in the preamble of Chapter 8.

4. Overheads and contractors' profit: The overheads and contractors' profit is


considered @12.5% (per cent) for items of road works and 20% (per cent) for items of
bridge works.
4.1. The overheads are considered as per provision of Data Book considering
additional percentage as indicated in the Data Book for prevailing rate of tax in
the state, this is assumed to include interalia the following elements.
i. Site accommodation, setting up plant, access road, water supply,
electricity and general site arrangements.
ii. Site office infrastructure.
iii. Expenditure on
(a) Corporate office of the Contractor
(b) Site supervision by the Contractor
(c) Preparation of "as built" drawings

ix 
 

iv. Mobilization/demobilization of resources.


v. Labour camps with minimum amenities, required as per labour laws.
vi. Light vehicles for site supervision including administrative and
managerial requirements.
vii. Setting up of laboratories for quality control, field and laboratory testing
for control of quality of various items of work and documentation of test
results as per requirements of the MORD Specifications.
viii. Minor T&P including needle vibrators required for concrete work.
ix. Survey instruments and the task of setting out of works including
verification of line and dimensions (but excluding construction of bench
marks and reference pillars which are separate items under setting out).
x. Taking of trial pits and bore holes, where required as per the MORD
Specifications.
xi. Watch and ward.
xii. Arrangement for traffic and traffic management during construction.
xiii. Expenditure on safeguarding environment during construction.
xiv. Sundries.
xv. Financing expenditure of the Contractor.
xvi. Work insurance/compensation.

5. GST, Labour Welfare Cess, Swatch Bharat etc.:


5.1. Overall No Taxes has been considered in the analysis towards GST, Labour
Welfare Cess, Swatch Bharat etc.:
i. GST is not considered in the Analysis of Rates. GST applicable is to be
provided separately in the Estimates.
ii. Assam building and other construction workers welfare cess is not
considered in the Analysis of Rates and to be provided separately in the
Estimates wherever required if necessary.

6. General:
6.1. The section and clause numbers refer to the MORD specifications for Rural
Roads 2004.
6.2. Additional assumptions made for analysing different items have been indicated
in respective Chapters in the form of preamble and notes/footnotes wherever
required.
6.3. For some of the items, certain size/specifications have been assumed. If
size/specifications other than the same are adopted, corresponding
modifications may be made in the inputs of analysis.
6.4. The sources of all materials and samples of materials are required to be
approved by the Engineer before start of such work.
6.5. For reinforcing steel both TMT from Primary Producers and other BIS Approved
bars conforming to IS: 1786 have been considered. However, only TMT bars
from Primary Producers are considered for Major Bridge Structures (as per
MORT&H Specification).
6.6. For pipe culverts both NP3 and NP4 pipes have been considered.


 

6.7. A premium of 10% may be considered in the estimates only in emergency


works within city area and where ever required only after being duly certified
by Superintending Engineer of respective Circle Concerned.
6.8. As per latest revised version of MoRD specification for rural Roads Specific
importance to some new items like cold mix, Semi dense Bituminous concrete,
soil stabilization in subgrade and Base, use of locally available marginal
materials, Industrial wastes, provisions of proper road signs and other traffic
control devices, Geosynthetics, Jute geo textiles alongwith construction of long
span Bridges has been given and incorporated in this edition as per version of
MORTH.
6.9. Quality control of work shall be governed by the relevant MORD specifications.

7. Basic Inputs:
7.1. The Standard Data Book is based on the requirements of basic inputs of
materials, labour and machineries for various items.
7.2. The labour wages are as per rate fixed by the state government. The rates of
material are as per the prevailing market rate.
7.3. The basic rates of materials, such as, stone boulders, stone for masonry, stone
ballast (hand broken/machine broken), crushed aggregate, stone dust,
moorum, gravel, lime, manure, sludge, quarry sweep, kankar, bricks, brick
ballast, crushed slag, etc. at quarry/crusher sites shall be fixed by the
respective states for various zones from time to time.

8. Plants and Equipment:


8.1. Keeping in view the job and managerial factors and the age factor of machines,
the output of plant and equipment is taken approximately 70 per cent of the
rated capacity given by manufacturer under ideal conditions.
8.2. The requirement of machinery has been worked out assuming working period
of 6 hours per shift of 8 hours.
8.3. Certain equipment, like, road rollers, are required to be available at site for
complete period of the shift, though from the consideration of their output,
they may be required only for 3 to 4 hours. This is necessitated to match with
the output of other associate machine like HMP, Paver, etc. In such cases the
hire charges of Road rollers have been multiplied with a factor of 0.65 to
account for the idle period where ever considered appropriate.
8.4. Though electrically operated equipment, like, concrete mixers and vibrators
have been provided, diesel operated equipment can be used where electricity is
not available.
8.5. Wherever electric generator has not been provided to run a plant or equipment,
it is assumed that it is fitted with a diesel engine.
8.6. For small jobs where loading and unloading is required to be done manually,
tractor-trolley has been considered for carriage instead of tipper.
8.7. Output of plant & equipment considered for the compacted quantities.

xi 
 

8.8. A water tanker of 6 kl capacity which is commonly used at construction sites


has been considered.
8.9. The usage charges for machines include ownership charges, cost of repair and
maintenance including replacement of tyres and running and operating
charges which includes crew, fuel and lubricants.

9. Labour:
9.1. One mate has been provided for 25 labours for all items of works.
9.2. The labour wages should be as per rates fixed by State Government.

10. Materials:
10.1. Quantities of materials considered in the rate analysis are approximate for the
purpose of estimation and include normal wastages. Actual consumption
would depend on mix design.
10.2. The rates of material should include basic cost at locations of stone crushers/
factory/ rail head and cost of its carriage to the site of work/plant including
loading, unloading and stacking.
(i) A basic lead of 5 Km has been considered for the stone aggregates in order
to work out the initial finished rates of WBM and Granular Sub-
base/base items.
(ii) In case of Hot Mix plants the basic lead of the stone aggregates and an
initial lead of 10 Km. between the plant and site of work have been
considered.
10.3. The supply of materials will be taken either at the location of mixing plant or at
the work site as per requirement of use.
10.4. Contractor will make his own arrangements for borrowing earth from private
land. For borrowing Earth from Private/ Govt. land Forest Royalty is to be paid
by the contractor.
10.5. Credit for Dismantled Material: The dismantled materials should be examined
and a realistic assessment made for credit for such materials, which can be
utilized for works or auctioned.
10.6. The basic rates include all octroi charges, toll tax, municipal taxes, Forest
royalty and other local taxes, etc.

11. Items of Culverts:

Items in Chapters 11, 12 & 13 on Foundation, Substructure and Superstructure


cover both minor bridge works as well as slab culverts as per Section 1200 of MORD
Specifications. Items of pipe culverts are, however, covered separately in Chapter 9.

12. Concrete Items:


12.1. For concrete work, the grades of concrete covered by the Data Book in
accordance with MORD Specifications are:

xii 
 

i) PCC M-15 grade to M-25 for structures (For lean concrete under
foundation M-10 can be used).
ii) RCC grade M-20, M-25 and M-30 for structures
iii) Design mix concrete of grade M-25, M-30 and M40 for concrete pavement
12.2. The analysis of rates accounts for input of materials by weight and use of
ordinary mixer.
12.3. Use of vibrators for all concreting work has been included in the items.
12.4. Ten per cent extra cement may be provided for concreting under water, where
required.
12.5. Quantities of cement in various grades of cement concrete are to be as per
nominal mix/ design mix. Grade of cement may also be adopted as per mix
design.
12.6. Quantities of cement in various grades of cement concrete for structures have
been taken as per IRC:21:2000 & IRC:78:2000.
12.7. Steel reinforcement for cement concrete work is required to be provided
separately. The rate for the same has been analysed separately.
12.8. As per the MORD Specifications, the type of superstructure envisaged for rural
roads are RCC slabs and box culverts not exceeding 15 m span as well
brick/stone masonry arches and composite girder type of superstructure. RCC
arches provided for in IRC:SP:
12.9. Major RCC/ PSC Bridges are to be provided as per MORT&H Specifications; for
which separate Chapter has been provided.

13. Measurement and Rates:


13.1. Measurement of various items and their units shall be defined in the respective
clauses of MORD specification.
13.2. The rates of various items of work shall include all sub items defined in the
respective clauses of MORD specifications.

14. Privileged Document:

The Schedule of Rates is for Department use ONLY. It should not be produced in
any court of law as reference/Authority and to that extent it is a privileged
document.

xiii 
 

ABBREVIATIONS

Abbr. Detail

AC Asphaltic Concrete
BC Bituminous Concrete
BM Bituminous Macadam
BUSG Built-up Spray Grout
cfm Cubic feet per minute
CI Cast Iron
cm Centimetre
cum Cubic metre
DBM / DGBM Dense Grade Bituminous Macadam
Dia Diameter
e.g. For example
FE Loader Front End Loader
GBFS Granulated Blast Furnace Slag
GI Galvanised Iron
GL Ground Level
h Hours
HMP Hot Mix Plant
HP Hours Power
i.e. That is
IRC Indian Roads Congress
IS Indian Standards
kg Kilogram
kl Kilolitre
km Kilometre
kN Kilo Newton
lit Litre
m / RM Metre
Max Maximum
Min Minimum
mm Millimetre
MORD Ministry of Road Development
MORTH Ministry of Road Transport & Highways
Nos. Numbers
NRRDA National Rural Roads Development Agency

xiv 
 

Abbr. Detail

OMC Optimum Moisture Content


PCC Plain Cement Concrete
PQC Pavement Quality Concrete
PSC Pre-Stressed Concrete
q / qntl. Quintal
RCC Reinforced Cement Concrete
RR Road Roller
Rs. Rupees
SDBC Semi-Dense Bituminous Concrete
sqm Square metre
SWL Standing Water Level
t Tonne
T&P Tools & Plants
t.km Tonne Kilometre
WBM Water Bound Macadam
WMM Wet Mix Macadam

xv 
BASIC RATES
BASIC RATES
(A) Labour

Sl. No. Description of Labour Unit Rate (Rs.)

L-01 Bhisti day 272.02

L-02 Bitumen Sprayer day 272.02

L-03 Blacksmith day 510.03

L-04 Blaster day 396.70

L-05 Carpenter 1st Class day 510.03

L-06 Chips spreader day 272.02

L-07 Chiseller day 317.35

L-08 Dresser (Skilled) day 396.70

L-09 Driller day 396.70

L-10 Electrician day 510.03

L-11 Fitter day 510.03

L-12 Mason (1st class) day 510.03

L-13 Mason (2nd Class) day 317.35

L-14 Mate day 396.70

L-15 Mazdoor (Unskilled) day 272.02

L-16 Mazdoor (Semi skilled) day 317.35

L-17 Mazdoor (Skilled) day 396.70

L-18 Painter (Ist class) day 510.03

L-19 Plumber day 510.03

L-20 Surveyor day 510.03

L-21 White Washer day 317.35

A-1
BASIC RATES
(B) USAGE RATES OF PLANT & MACHINERY
Hire charge
per hour in Usage rate per
Description of Output of Machine Rs hour in Rs
Sr. No.
(Excluding (Including Fuel)
fuel)
Machine Activity Unit Output Unit Rate

PM-001 Air Compressor 210 cfm Supplying compressed air cfm 210.00 per hour 435.00

PM-002 Batch mix HMP 40-60 TPH BM, DBM, SDBC, PM t/h 50.00 per hour 10,091.00

PM-003 Batch type HMP 30/40 TPH BM, DBM, SDBC, PM t/h 35.00 per hour 6,584.00

Batching and mixing plant(a)30cum capacity concrete mixing cum/hour 20.00 per hour 1,670.00

Batching and mixing plant(b)15-20cum


concrete mixing cum/hour 13.00 per hour 1,260.00
capacitycapacity

Bitumen pressure distributor Applying bitumen tack coat sqm/hour 1750.00 per hour 1,274.00

PM-004 Bitumen boiler oil fired

200 litre Heating of bitumen litre / h 400.00 per hour 164.00 212.00

1000 litre litre / h 2000.00 per hour 2,120.00

PM-005 Bitumen emulsion pressure distributor Applying bitumen tack coat sqm/h 1750.00 per hour 954.00

Concrete pump of 45&30 cum capacity Pumping of concrete cum/hour 1.50 per hour 234.00

Concrete bucket For pouring concrete /cum 1.00 per hour 15.00

PM-006 Concrete mixer 0.28/0.4 cum Mixing of ingradients cum/h 2.50 per hour 162.00 188.00

Crane (a) 80 t0n Lifting purpose per hour 1,136.00

Crane(b)35 ton Lifting purpose per hour 759.00

Crane(c)3 ton Lifting purpose per hour 318.00

PM-007 Crane upto 8T Lifting of materials per hour 685.00

PM-008 cum/h 200.00 2096.00 2,103.00


Dozer D 50 Dozing cutting per hour
cum/h 100.00

D-80-A-12 Spreading/cutting/clearing cum/h 300/150/250 2,797.00

Drum mix plant for cold mixes of appropriate


per hour 1,859.00
capacity but not less than 75 tonnes/hour.

PM-009 Electric generator set, 125 KVA Electricity generation KVA 100.00 per hour 437.00 1,625.00

PM-010 Emulsion Sprayer with Tractor Spraying of Emulsion per hour 717.00

PM-011 Loading Aggregates cum/h 45.00 511.00 1,341.00


Front end-loader 1 cum bucket capacity @ 45
per hour
cum/hour
Loading Soil cum/h 100.00

Hot mix plant 120 TPH DBM/BM/SDC/Premix cum/h 40.00 16,677.00


per hour
Hot mix plant 100TPH DBM/BM/SDC/Premix cum/h 30.00 14,777.00

Hot mix plant 60 t0 90TPH DBM/BM/SDC/Premix cum/h 25.00 12,330.00


per hour
PM-012 Hydraulic broom with tractor Surface cleaning sqm/h 1250.00 337.00

Hydraulic Excavator 1 bucket Excavation hour 60/60/60 1006.00 1,500.00


per hour
PM-013 Hydraulic Excavator 0.9 cum Excavation cum/h 100.00 1,635.00

B-1
Hire charge
per hour in Usage rate per
Description of Output of Machine Rs hour in Rs
Sr. No.
(Excluding (Including Fuel)
fuel)
Machine Activity Unit Output Unit Rate

PM-014 Hydraulic self propelled chip spreader Surface Dressing sqm/h 1500.00 per hour 2,380.00

PM-015 Joint Cutting Machine with 2-3 blades Cutting of Joints h per hour 150.00

Mastic cooker Mastic wearing coat Ton 1.00 per hour 879.00

PM-016 Mixall 6-10 t capacity Mixing of bituminous materials t/h 8.00 per hour 445.00 1,686.00

PM-017 200.00 2276.00 2,498.00


Motor Grader Scarifier & levelling cum/h per hour
50.00

PM-018 Needle vibrator Vibrating cement concrete mix cum/h 3.50 per hour 101.00

Paver finisher Hydrostatic with sensor control 100 Paving of


cum/h 40.00 per hour 1,129.00
TPH DBM/BM/SDC/Premix

Pneumatic sinking plant Pneumatic sinking of wells cum/h 1.5 to 2.00 per hour 3,453.00

.75 dia to 1.2m attatchment dia


Piling rig with bantonite pump Rm/hour 2 to 3 per hour 4,665.00
boring

Prestressing Jack with access. Stressing of steel wire/strands per hour 113.00

PM-019 Paver finisher Laying/spreading t/h 75.00 per hour 883.00

PM-020 Plate compactor Compaction cum/h per hour 218.00

PM-021 Plate vibrator Compaction cum/h per hour 218.00

Rotavator Scarifying cum/h 25.00 per hour 22.00

Ripper Scarifying cum/h 60.00 per hour 31.00

Road marking machine Road marking Sqm/hr 100.00 per hour 192.00

PM-022 Screed vibrator Compaction cum/h per hour

Compaction of Sub-base/
PM-023 Smooth wheeled 80-100 kN tandem roller cum/h 30.00 per hour 1,039.00
Asphalt

PM-024 Stone crusher (Integrated) of 200 TPH Crushing of Spalls t/h 200.00 per hour 14,389.00

PM-025 Three wheel 80-100 kN Static Roller Compaction/ Rolling 652.00

Earth:- Embankment or sub-


cum/h 80/70 652.00
grade

Sub-base G-I cum/h 10.00 652.00

Sub-base G-II/G-III cum/h 8.00 652.00

WMM cum/h 16.00 652.00

BUSG cum/h 10.00 per hour 652.00

BM 50/75 mm cum/h 12.00 652.00

Premix 20 mm sqm/h 250.00 652.00

Seal Coat sqm/h 500.00 652.00

Surface Dressing 1st Coat sqm/h 400.00 652.00

Surface Dressing 2ndCoat sqm/h 500.00 652.00

B-2
Hire charge
per hour in Usage rate per
Description of Output of Machine Rs hour in Rs
Sr. No.
(Excluding (Including Fuel)
fuel)
Machine Activity Unit Output Unit Rate

PM-026 Tipper 5.5 cum/10 t Carriage cum/trip 5.50 per hour 850.00

PM-027 Tractor with Disc Harrows Pulverisation of soil cum/h 80.00 per hour

Ripping Pavements, uprooting


PM-028 Tractor with ripper @ 60 cum per hour cum/h 60.00 per hour 440.00
trees

PM-029 Tractor with trolley Transportation of materials t/trip 3 to 5 per hour 409.00

PM-030 Tractor with Rotavator Scarifier cum/h 25.00 per hour 431.00

Tractor with Grader Grading cum/h 25.00 per hour 431.00

Transit mixure 4.0/4.5cum Transportation of concrete mix cum/h 4.50 per hour 828.00

Transit mixure 4.0/4.5cum Transportation of concrete mix cum/h 4.50 Ton/km 40.00

PM-031 Truck 10 t capacity Carriage cum/trip 5.50 per hour 825.00

PM-032 Compaction of soil WMM cum/h 100.00 1,505.00


Vibratory roller 80-100 kN per hour
Compaction of BM cum/h 60.00

PM-033 Water tanker 6 kl capacity (Truck Mounted) Carriage of water litre / h 12000.00 per hour 440.00

PM-034 Wet mix plant (Pug Mill) Wet Mix cum/h 25.00 per hour 1,149.00

Tractor with trolley (with cutting, Clearing Cutting, Clearing and


t/trip 3 to 5 per hour 431.00
attachments) Transportation of materials

B-3
BASIC RATES
(C) Material

Rate at Plant
Sl. No. Description Unit
(Rs.)

M-001 AC pipe 100 mm m 60.00

M-002 Aggregate - For 37.5 mm Maximum size - 22.4 mm to 5.6 mm cum 1,440.50

M-003 Aggregate - For 37.5 mm Maximum size - 45 mm to 22.5 mm cum 1,623.00

M-004 Aggregate - For 37.5 mm Maximum size - Below 5.6 mm cum 1,104.00

M-005 Aggregate - For 53 mm Maximum size - 22.5 mm to 5.6 mm cum 1,140.50

M-006 Aggregate - For 53 mm Maximum size - 63 mm to 45 mm cum 1,936.00

M-007 Aggregate - For 53 mm Maximum size - Below 5.6 mm cum 1,104.00

M-008 Aggregate - Grading I (40 mm nominal Size) 10 mm - 5 mm cum 1,510.00

M-009 Aggregate - Grading I (40 mm nominal Size) 25 mm – 10 mm cum 1,827.00

M-010 Aggregate - Grading I (40 mm nominal Size) 37.25 mm - 25 mm cum 1,619.00

M-011 Aggregate - Grading I (40 mm nominal Size) 5 mm and below cum 1,104.00

M-012 Aggregate - Grading II (19 mm nominal Size) 10 mm - 5 mm cum 1,846.50

M-013 Aggregate - Grading II (19 mm nominal Size) 25 mm – 10 mm cum 1,827.00

M-014 Aggregate - Grading II (19 mm nominal Size) 5 mm and below cum 1,104.00

M-015 Aggregate 10 mm cum 1,916.00

M-016 Aggregate 20 mm cum 1,777.00

M-017 Aggregate 40 mm cum 1,500.00

M-018 Aggregate 10 mm (Natural Gravel) cum 1,364.00

M-019 Aggregate 20 mm (Natural Gravel) cum 1,463.00

M-020 Aggregate 40 mm (Natural Gravel) cum 1,221.00

M-021 Aggregate- Crushable type such as moorum or Gravel for Grading I cum 1,029.00

M-022 Aggregate- Crushable type such as moorum or Gravel for Grading II cum 1,029.00

M-023 Aggregate- Crushable type such as moorum or Gravel for Grading III cum 1,029.00

M-024 Aggregate-Grading I 90 mm to 45 mm cum 1,837.00

M-025 Aggregate-Grading II 63 mm to 45 mm cum 1,936.00

M-026 Aggregate-Grading III 53 mm to 22.4 mm cum 2,035.00

M-027 Aggregates 22.4 mm to 2.36 mm for wet mix macadam cum 1,440.50

M-028 Aggregates 45 mm to 22.4 mm for wet mix macadam cum 1,623.00

M-029 Aluminium sheeting (1.5 mm thick) sqm 438.00

C-1
Rate at Plant
Sl. No. Description Unit
(Rs.)

Aluminium sheeting fixed with encapsulated lens type reflective sheeting of


M-029A sqm 8,750.00
size including lettering and signs as applicable background with epoxy paint

M-030 Aluminium Studs 100 mm x 100 mm fitted with lense reflectors Nos. 438.00

M-031 Bamboo (1st Class) 85 mm - 100 mm dia, 2.0 m long No. 200.00

M-032 Bamboo (1st Class) 85 mm - 100 mm dia, 2.5 m long No. 200.00

M-033 Bamboo (1st Class) 85 mm - 100 mm dia, 3.0 m long No. 200.00

M-034 Bamboo (1st Class) 85 mm - 100 mm dia, 4.5 m - 5.5 m long No. 200.00

M-035 Bamboo (2nd Class) 75mm dia, 1.8 m - 2.5 m long No. 120.00

M-036 Bamboo (2nd Class) 75mm dia, 2.1 m - 3.0 m long No. 120.00

M-037 Barbed wire kg 78.00

M-038 Binding Material cum 220.00

M-039 Binding wire kg 80.00

M-040 Bitumen (Crumb Rubber Modified) tonne 30,850.00

M-042 Bitumen (Polymer Modified) tonne 32,880.00

M-043 Bitumen (S-65) tonne 33,050.00

M-044 Bitumen (S-90) tonne 32,250.00

M-045 Bitumen Emulsion (RS-1) tonne 33,474.00

M-046 Bitumen Emulsion (SS-1) tonne 35,169.00

M-047 Bitumen Emulsion (MS) tonne 36,016.00

M-048 Bituminous sealant litre 18.36

M-049 Blasted rubble cum 650.00

M-050 Blasting material kg 64.00

M-051 Bond stone (400 mm x 150 mm x 150 mm) No. 54.00

M-052 Brick 1st Class No. 8.00

M-053 Cement t 6,360.00

M-054 Cement Primer litre 120.00

M-055 Compensation for earth taken from private land cum

M-056 Compressible Fibre Board sqm 976.00

M-057 Copper plate kg 585.00

M-058 Corbelling Stones (300 mm x 150 mm x 150 mm) No. 30.00

M-059 Quarried Stone 150-200 mm size kg 70.00

C-2
Rate at Plant
Sl. No. Description Unit
(Rs.)

M-060 Credit for excavated rock found suitable for use cum 168.00

M-061 Crow bars 40 mm dia (hire charges) hour 10.00

M-062 Crushed Sand or Grit Passing 2.36 mm and retained on 180 micron cum 698.00

M-063 Crushed Slag cum 550.00

M-064 Crushed Stone Aggregate 26.5 mm to 75 micron cum 1,827.00

M-065 Crushed Stone Chipping 13.2mm nominal size cum 1,599.50

Crushed Stone Chipping 6.7 mm size 100% passing 11.2 mm and retained on
M-066 cum 1,510.00
2.36 mm

Crushed Stone Chipping 6.7 mm size 100% passing 9.5 mm and retained on
M-067 cum 1,807.00
2.36 mm

M-068 Crushed Stone chipping 9.5 mm nominal size cum 1,510.00

M-069 Crushed Stone Coarse Aggregate Passing 53 mm and retained on 2.8 mm cum 1,174.50

M-070 Curing compound litre 214.00

M-071 Edge Stone (450 mm x 350 mm x 100 mm) No. 80.00

M-072 Edge Stone (450 mm x 350 mm x 200 mm) No. 80.00

M-073 Electric Detonator each 21.00

M-074 Epoxy Paint litre 410.00

M-075 Epoxy Primer litre 373.00


Elastomeric bearing assembly consisting of internal layers of elastomer
M-075A bonded to internal reinforcing steel laminates by the process of vulcanisation, cu.cm. 41,490.00
complete with all components
M-075B Elastomeric slab seal expansion joint assembly m 19,000.00

M-076 Farmyard manure cum 56.00

M-077 Fevicol adhesive kg 230.00

M-078 Filter media cum 1,013.00

M-079 Fine aggregate/Crushed sand 2.36 mm to 75 micron cum 698.00

M-080 Galvanised angle kg 70.00

M-081 Galvanised angle Section 100 mm x 100 mm of 12 mm thickness kg 450.00

M-082 Gelatine 80 per cent kg 120.00

M-083 GI Pipe 100 mm dia m 900.00

M-084 GI Pipe 50 mm dia m 450.00

M-085 GI wires kg 75.00

M-086 Graded stone aggregate cum 1,554.00

C-3
Rate at Plant
Sl. No. Description Unit
(Rs.)

Granular material (Natural occuring, soil gravel mixture / quarry waste, kankar,
M-087 cum 698.00
laterite, dhandla

M-088 Hand Broken Metal 40 mm size cum 1,500.00

Indigo kg 100.00

M-089 Jute netting, open weave 25 mm square opening sqm 76.00

M-090 Jute rope 12 mm dia m 90.00

M-091 Key Aggregates passing 22.4 mm and retained on 2.8 mm cum 1,440.50

M-092 Lime t 6,608.00

M-093 Lime putty t 7,000.00

M-094 Local Wood Piles (1st Class) 150-200 mm dia ,6m long No. 7,000.00

M-095 Local Wood Piles (1st Class) 100 mm x 75 mm cum 32,400.00

M-096 Loose stone cum 1,500.00

M-097 MS clamps Nos. 19.00

M-098 MS Flat / Structural Steel t 45,000.00

M-099 MS Sheet Tube (47 mm x 47 mm x 12 SWG Sheet) kg 83.00

M-100 MS Sheet 1.5 mm thick sqm 55.00

MS Sheet 1.5 mm thick duly painted with stove enamelled paint including
M-100A sqm 6,050.00
lettering, signs, border, message with reflective tape of engineering grade

M-101 MS Sheet 2 mm thick sqm 65.00

M-102 Nuts, Bolts and Rivets t 80,000.00

M-103 Paint (Synthetic Enamel) litre 250.00

M-104 Plasticizer litre 102.00

M-105 Polythene sheet (125 micron) sqm 12.00

M-106 Polythene Sheething Nos. 12.00

Preformed continuous chloroprene elastomer/ closed cell foam sealing


M-106A m 8,150.00
element with high tear strength

M-106B Premoulded joint filler 7.5 m long, 20 mm thick and 300 mm deep sqm 742.00

M-107 Quarried Stone 150-200 mm size cum 898.00

M-108 RCC Pipe NP3 (1200 mm dia) m 8,570.00

M-109 RCC Pipe NP3 (1000 mm dia) m 6,340.00

M-110 RCC Pipe NP4 (1200 mm dia) m 10,370.00

M-111 RCC Pipe NP4 (1000 mm dia) m 8,579.00

C-4
Rate at Plant
Sl. No. Description Unit
(Rs.)

M-112 RCC Pipe NP3 (600 mm dia) m 2,618.00

M-113 Red-oxide Primer litre 165.00

M-114 Road marking paint litre 90.00

M-115 Sand (Coarse) cum 950.00

M-116 Sand (Fine) cum 850.00

M-117 Seeds kg 31.00

M-118 Steel Pipe 50 mm dia m 131.00

M-119 TMT - IS 1786 (Fe-500 D) Primary Producer t 41,500.00

M-120 MS bar - IS 1786 (Fe-500 ) Primary Producer t 41,525.00

M-121 TMT - IS 1786 (Fe-500 D) Secondary Producer t 34,492.00

M-122 Stone Boulder of size 150 mm and below cum 1,055.00

M-122A Stone boulder (25 kg minimum for pitching/ protection work) cum 868.00

M-123 Stone Chips 12 mm size cum 1,510.00

M-124 Stone Chips 6.7 mm size cum 1,807.00

M-125 Stone Chips 13.2 mm to 5.6 mm cum 1,599.50

M-126 Stone Crushed Aggregate 11.2 mm to 0.09 mm cum 1,510.00

M-127 Stone for Coarse Rubble Masonry 1st Sort cum 1,135.00

M-128 Stone for Coarse Rubble Masonry 2nd Sort cum 1,135.00

M-129 Stone for Random Rubble Masonry cum 1,135.00

M-130 Stone for Stone Set Pavement (300 mm x 200 mm x 150 mm) No. 170.00

M-131 Stone Screening - Type A 13.2 mm for Grading-1 cum 799.50

M-132 Stone Screening - Type A 13.2 mm for Grading-2 cum 799.50

M-133 Stone Screening - Type B 11.2 mm for Grading-2 cum 710.00

M-134 Stone Screening - Type B 11.2 mm for Grading-3 cum 710.00

M-135 Stone spall cum 987.00

M-136 Traffic cones No. 1,229.00

M-137 Water kl 40.00

M-138 Well graded Granular Base Material - Grading A 2.36 mm below cum 698.00

M-139 Well graded Granular Base Material - Grading A 26.5 mm to 4.75 mm cum 1,089.00

M-140 Well graded Granular Base Material - Grading A 53 mm to 26.5 mm cum 1,124.00

C-5
Rate at Plant
Sl. No. Description Unit
(Rs.)

M-141 Well graded Granular Base Material - Grading B 2.36 mm below cum 698.00

M-142 Well graded Granular Base Material - Grading B 26.5 mm to 4.75 mm cum 1,089.00

M-143 Well graded Granular Base Material - Grading C 2.36 mm below cum 698.00

M-144 Well graded Granular Base Material - Grading C 9.5 mm to 4.75 mm cum 1,084.00

M-145 Well Graded Material for Sub-Base - Grading I 2.36 mm below cum 698.00

M-146 Well Graded Material for Sub-Base - Grading I 53 mm to 9.5 mm cum 1,119.00

M-147 Well Graded Material for Sub-Base - Grading I 9.5 mm to 2.36 mm cum 1,041.50

M-148 Well Graded Material for Sub-Base - Grading II 2.36 mm below cum 698.00

M-149 Well Graded Material for Sub-Base - Grading II 26.5 mm to 9.5 mm cum 1,101.00

M-150 Well Graded Material for Sub-Base - Grading II 9.5 mm to 2.36 mm cum 1,041.50

M-151 Well Graded Material for Sub-Base - Grading III 2.36 mm below cum 698.00

M-152 Well Graded Material for Sub-Base - Grading III 4.75 mm to 2.36 mm cum 1,029.00

M-153 Well Graded Material for Sub-Base - Grading III 9.5 mm to 4.75 mm cum 1,041.50

M-154 Wooden sleepers (250 mm x 250 mm x 125 mm) (hire charges) No. 45.00

Bamboo Bholuka or Barua 55mm to 100mm dia and 6m long each 90.00

Bamboo Jati or Bethua 50mm to mm dia and 6m long each 75.00

Wood local first class piles 25cm to 30cm metre 4,200.00

Wood local first class planks 25cm to 38cm thick cum 26,500.00

Wood local first class small section cum 18,700.00

Wood local first class scantling up to 15cmx15cm cum 21,200.00

Wood local first class heavy section above 15cmx15cm cum 24,100.00

Wood sal piles 25cm to 30cm dia metre 5,000.00

Wood sal planks 25cm to 38cm dia thick cum 32,000.00

Wood sal scantling heavy section above 15cm to 15cm cum 27,000.00

Wood sal scantling upto15x15cm cum 120.00

C-6
PART-A: ROAD WORKS
CHAPTER-1

LOADING, UNLOADING, CARRIAGE, CRUSHING OF MATERIALS AND SETTING


OUT
Preamble:

1 The rates of loading and unloading of various items include stacking.

2 The rates for loading and unloading has been given both by manual and mechanical means. Means
of loading/unloading appropriate to the work and site is to be adopted

3 The rates for haulage of materials has been provided in terms of tonne-kilo metre (tkm) for ease of
adoption depending upon the lead in km and load in tonnes.

4 The cost of carriage will vary depending upon the riding surface of the road.Provision has
accordingly been made considering surfaced roads,subsurface gravel roadsand katcha tracks.

5 Rates for carriage of materials is exclusive of the loading ,unloading and stacking and this has to be
added as applicable.

6 New Item for Haulage/ Carriage of materials by boats has been included in this Chapter. However,
the item is only applicable for Site completely inaccessible by Road and the same shall be certified
by concerned Executive Engineer.

Page 1 of 138
Summary of Rate Analysis

Item Description Unit Rate


No. (Rs.)
Chapter 1 - LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND SETTING OUT

1.1 Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate,
Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual
Means

(i) Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building cum 113.80
Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a
lead upto 30 m
(ii) Loading of Earth, Sand, Moorum, Manure, Flyash by manual means including a cum 56.90
lead upto 30 m

(iii) Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building cum 56.90
Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a
lead upto 30 m
(iv) Unloading of Earth,Sand, Moorum,Manure,Fly ash, by manual means including cum 35.40
lead upto 30M

1.2 Loading and Unloading Lime, Aggregate, Stone Boulder, Brick Aggregate,
Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by
Mechanical Means
(i) Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building cum 63.40
Rubbish, Crushed Slag, Stone for Masonry Work by mechanical means including
a lead upto 30 m
((ii)) Loading
g of earth,sand,moorum,manure,fly
y ash by
y mechanical means including
ga cum 33.30
lead upto 30 M

(iii) Unloading of Earth, Sand, Lime, Moorum, Aggregate, Stone Boulder, Brick cum 13.90
Aggregate, Kankar, Building Rubbish, Manure, Crushed Slag, Flyash, Stone for
Masonry Work by mechanical means.

1.3 Loading, Unloading and Stacking of Bricks by Manual Means

(i) Loading of Bricks by manual means including a lead upto 30 m 1000 Nos. 193.60

(ii) Unloading and Stacking of Bricks by manual means including a lead upto 30 m 1000 Nos. 193.60

1.4 Loading and Unloading of Cement by Manual Means

(i) Loading of Cement by manual means including a lead upto 30 m t 707.00

(ii) Unloading of Cement by manual means including a lead upto 30 m t 141.40

1.5 Loading and Unloading of Structural Steel and Steel Bars by manual means

(i) Loading of Structural Steel, Steel Bars by manual means including a lead upto 30 t 151.00
m

(ii) Unloading of Structural Steel, Steel Bars by manual means including a lead upto t 151.00
30 m

1.6 Loading and Unloading of Bitumen Drums by Manual Means

(i) Loading of Bitumen Drums by manual means including a lead upto 30 m t 167.70

(ii) Unloading of Bitumen Drums by Manual Means including a lead upto 30 m t 155.00

1.7 Loading and Unloading of Timber by Manual Means


Item Description Unit Rate
No. (Rs.)
(i) Loading of Timber by manual means including a lead upto 30 m t 250.40

(ii) Unloading of Timber by manual means including a lead upto 30 m t 250.40

1.8 Loading and Unloading of C.C. Blocks, Kerb, etc.

(i) Loading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb, cum 370.90
Channel, Bond Stone, etc. by manual means including a lead upto 30 m

(ii) Unloading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb, cum 370.90
Channel, Bond Stone, etc. by manual means including a lead upto 30 m

1.9 Loading and Unloading of Hume Pipes

A Loading of RCC Hume pipes by mechanical means including a lead upto 30 m

(i) 1000 / 1200 mm dia Hume pipe per pipe 80.30

(ii) 750 mm dia Hume pipe per pipe 48.20

(iii) 600/450 mm dia Hume pipe per pipe 34.40

B Unloading of RCC Hume pipe by manual means including a lead upto 30 m

(i) 1000/1200 mm dia RCC Hume pipes per pipe 460.80

(ii) 750 mm dia Hume pipe per pipe 384.00

(iii) 600/450 mm dia Hume pipe per pipe 288.00

C Unloading of RCC Hume pipes by mechanical means including a lead upto 30 m

(i) 1000/1200 mm dia Hume pipe per pipe 55.70

(ii) 750 mm dia Hume pipe per pipe 33.40

(iii) 600/450 mm dia Hume pipe per pipe 23.90

1.10 Haulage excluding Loading & Unloading

A Haulage of materials by tipper excluding cost of loading, unloading and stacking.

Case-I : Surfaced Road t.km 8.20

Cum/km 14.90

Case-II: Unsurfaced Gravel Road t.km 10.20

Cum/km 18.50

Case-III: Katcha Track and Track in River Bed/Nallah Bed and Choe Bed t.km 16.00

Cum/km 29.10

1.11 Supply of Quarried stone and hand breaking

(i) Supply of quarried stone and hand breaking into coarse aggregate to Grading 1 cum 1,500.00
(90 mm to 45 mm) as per Table 400.8 of Technical Specifications.
Item Description Unit Rate
No. (Rs.)
(ii) Supply of quarried stone and hand breaking into coarse aggregate to Grading 2 cum 1,597.00
(63 mm to 45 mm) as per Table 400.8 of Technical Specifications.

(iii) Supply of quarried stone and hand breaking into coarse aggregate to Grading 3 cum 1,694.00
(53 mm to 22.4 mm) as per Table 400.8 of Technical Specifications.

1.12 Crushing of Stone Aggregates 100 per cent passing through 53 mm sieve as per
Table 500.6 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of cum 1,249.30
200 t/h capacity comprising of primary and secondary crushing units, belt
conveyor and vibrating screens to obtain stone aggregates 100 per cent passing
through 53 mm sieve as per Table 500.6 of Technical Specifications including
the cost of stone.

1.13 Crushing of Stone Aggregates 100 per cent passing through 22.4 mm sieve as
per Table 500.6 of Technical Specifications
Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of cum 1,447.70
200 t/h capacity comprising of primary and secondary crushing units, belt
conveyor and vibrating screens to obtain stone aggregates 100 per cent passing
through 22.4 mm sieve as per Table 500.6 of Technical Specifications including
the cost of stone.
1.14 Crushing of Stone Aggregates Nominal Size 13.2 mm as per Table 500.9 of
Technical Specifications
Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of cum 1,706.00
200 t/h capacity comprising of primary and secondary crushing units, belt
conveyor and vibrating screens to obtain stone aggregates of 13.2 mm nominal
size
i as per T Table
bl 500
500.9
9 off T
Technical
h i lS Specifications
ifi i iincluding
l di the
h cost off stone.

1.15 Crushing of Stone Aggregates 9.5 mm Nominal Size as per Table 500.9 of
Technical Specifications
Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of cum 1,706.00
200 t/h capacity comprising of primary and secondary crushing units, belt
conveyor and vibrating screens to obtain stone aggregates of 9.5 mm nominal
size as per Table 500.9 of Technical Specifications including the cost of stone.

1.16 Setting Out

Unit=1Km

The analysis of rate per km shall account for the following:

(i) Reference benchmark one no.

(ii) Working benchmark 4 nos. per Km and near all drainage structure and
bridges.
(iii) Reference pillars/Burjees @ 50 m interval on both sides of formation width.

(iv) The marking of centre line setting out curves and recording of levels,etc. by
the surveyor will be incidental to the work and no extra payment shall be made
for the same.
(v) Typical benchmark as per Drawing 200.1 each 7212.20

(vi) Typical reference pillar as per Drawing 200.2 each 3599.60


Chapter – 2

SITE CLEARANCE
Preamble:

1 Unless otherwise stated, the rates include sorting and disposal of unserviceable material and stacking of serviceable
material with all lifts and upto a lead of 1000 m.

2 The rates include Tools & Plants (T&P) and scaffolding required for items of dismantling.

3 Carriage of dismantled materials, bushes, branches of tree, etc. has been catered with a tractor-trolley of 3 tonnes
capacity with manual loading and unloading @ 2 trips per hour within a lead of 1000 m. This will be economical for
such works as compared with a tipper.
4 Where only grass wild growth is met with, rate of item No.2.1, i.e., clearing grass and removal of rubbish can be
applied.

5 The dismantling of structures has been catered both by manual and mechanical means. The Engineer can use his
discretion depending upon quantum of work and particular site conditions.

6 Rate analysis for removing of stumps and roots has also been provided separately.

7 Dismantling of Hume pipes has been catered manually as pipes can be easily rolled by men to a suitable stacking
place within the right-of-way.

8 For dismantling of structures, which remain submerged in water, the cost may be enhanced by 50 per cent. If site
conditions warrant lowering of water level to facilitate dismantling, the cost may be enhanced by additional 25 per
cent.

9 Dismantling of utilities, like, water supply lines, electric and telephone lines is required to be done under the
supervision of concerned departments with prior information to the user public.

10 In certain items of dismantling, like, pipe culverts, utilities, etc. excavation in earth and dismantling of masonary
works is not included in this analysis for which suitable notes have been inserted in respective Chapters. These items
are required to be priced separately based on actual quantities at site and nature of work.

11 The dismantled materials should be examined and a realistic assessment and provision should be made after due
process for the salvage value for such materials, which can be utilized for works or auctioned.

12 In case where lead for disposal is more than 1000 m, extra cost of carriage is required to be added based on tonne-
kilometerage as per Chapter 1.

13 All minor Tools & Plants (T&P) items required for dismantling have been considered to have been included in
overhead charges.
Item Description Unit Rate
No. (Rs.)
Chapter 2 - SITE CLEARANCE

2.1 Clearing Grass and Removal of Rubbish


Clearing grass and removal of rubbish up to a distance of 30 m outside the
periphery of the area as per Technical Specification Clause 201.

(i) By Manual Means hectare 12,955.00

2.2 Clearing and Grubbing Road Land


Clearing and grubbing road land including uprooting wild vegetation, grass,
bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of
such trees cut earlier and disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned, upto a lead of 1000 m including
removal and disposal of top organic soil not exceeding 150 mm in thickness as
per Technical Specification Clause 201.

(i) By Manual Means


(a) In area of non thorny jungle hectare 46,898.30
(b) In area of thorny jungle hectare 67,527.10
(ii) By Mechanical Means

(a) In area of non-thorny jungle hectare 25,414.40


(b) In area of thorny jungle hectare 31,023.90
2.3 Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps

Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots refilling,
roots, refilling compaction of backfilling and stacking of serviceable material by
manual means with all lifts as per Technical Specification Clause 201.

A Lead upto 100 m

i Girth above 300 mm to 600 mm each 226.50

ii Girth above 600 mm to 900 mm each 388.10

iii Girth above 900 mm to 1800 mm each 776.60

iv Girth above 1800 mm to 2700 mm each 1,488.70

v Girth above 2700 mm to 4500 mm each 3,051.10

vi Girth above 4500 mm each 9,017.10

B Lead upto 1000 m

i Girth above 300 mm to 600 mm each 240.30

ii Girth above 600 mm to 900 mm each 429.50

iii Girth above 900 mm to 1800 mm each 831.80

iv Girth above 1800 mm to 2700 mm each 1,571.60

v Girth above 2700 mm to 4500 mm each 3,143.10

vi Girth above 4500 mm each 9,247.20

2.4 Uprooting and Removing Stumps & Roots


Uprooting and removing stumps & roots,compaction of backfilling and staking of
servicable material by manual means as per Technical Specification clause 201.
Item Description Unit Rate
No. (Rs.)
A Lead upto 100 m

i Girth above 300 mm to 600 mm each 137.80

ii Girth above 600 mm to 900 mm each 217.30

iii Girth above 900 mm to 1800 mm each 462.90

iv Girth above 1800 mm to 2700 mm each 913.70

v Girth above 2700 mm to 4500 mm each 1,839.90

vi Girth above 4500 mm each 5,203.20

B Lead upto 1000 m

i Girth above 300 mm to 600 mm each 141.10

ii Girth above 600 mm to 900 mm each 228.80

iii Girth above 900 mm to 1800 mm each 476.70

iv Girth above 1800 mm to 2700 mm each 932.10

v Girth above 2700 mm to 4500 mm each 1,862.90

vi Girth above 4500 mm each 5,318.20

2.5 Dismantling of Structures


Dismantling of existing structures like culverts,
culverts bridges,
bridges retaining walls and other
structure comprising of masonry, cement concrete, wood work, steel work,
including T&P and scaffolding wherever necessary, sorting the dismantled
material, disposal of unserviceable material and stacking the serviceable material
with all lifts and lead of 1000 m as per Technical Specification Clause 202.

I By Manual Means
(a) Lime Concrete cum 309.50
(b) Cement Concrete cum 397.50

(c) Reinforced Cement Concrete cum 1,124.60

II By Mechanical Means
(a) Cement Concrete cum 382.60
(b) Reinforced Cement Concrete cum 627.00

2.6 Dismantling Brick/Tile Work


Dismantling of existing structures like culverts, bridges, retaining walls and other
structures comprising of brick masonry, including disposal of unserviceable
material and stacking the serviceable material with all lift and lead of 1000 m as
per Technical Specification Clause 202.

(a) Lime mortar cum 180.00


(b) Cement mortar cum 241.10
(c) Mud Morter cum 162.60
(d) Dry Brick Pitching or Brick Soling cum 149.70

2.7 Dismantling Stone Masonry as per Technical Specification Clause 202:


Item Description Unit Rate
No. (Rs.)
Dismantling of existing structures like culverts, bridges, retaining walls and other
structure comprising of stone masonry, including disposal of unserviceable
material and stacking the serviceable material with all lift and lead of 1000 m as
per Technical Specification Clause 202.

(a) Rubble Stone Masonry in Lime Mortar cum 236.40

(b) Rubble Stone Masonry in Cement Mortar cum 183.50

(c) Rubble Stone Masonry in Mud Mortar cum 180.00

(d) Dry Rubble Masonry cum 167.00

(e) Dismantling Stone Pitching / Dry Stone Spalls cum 167.50

(f) Dismantling boulders laid in wire crates including opening of crates and stacking cum 210.50
dismantled materials

2.8 Dismantling Wood Work Wrought and Planed Fixed in Frames of Trusses upto a cum 565.80
height of 5 m above Plinth Level as per Technical Specification Clause 202.

2.9 Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth
Level excluding Cutting of rivet as per Technical Specification Clause 202.

(a) Including dismembering t 1,514.60

(b) Excluding dismembering t 1,045.40

(c) Extra over Items (a) and (b) above for cutting rivets t 11.90

2.10 Scraping of bricks dismantled from brick work including stacking as per 1000 Nos. 1,133.60
Technical Specification Clause 202.

2.11 Scraping of Stone from Dismantled Stone Masonry as per Technical


Specification Clause 202.

(a) In Cement or Lime Mortar cum 455.20

2.12 Scraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as sqm 14.40
per Technical Specification Clause 202.

2.13 Removing all types of Hume pipes and stacking within a lead of 1000 m
including Earthwork and Dismantling of Masonry Works as per Technical
Specification Clause 202.
(a) Upto 600 mm dia Hume pipe m 168.10
(b) Above 600 mm to 900 mm dia Hume pipe m 227.60
(c) Above 900 mm dia Hume pipe m 389.50
Note : 1. The excavation of earth,dismantling of stone masonary work in head
walls and protection works is not included which is to be measured and paid
seperately.
2. Credit for retrives stone from masonary work may be taken as per actual
availability.
2.14 Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials upto a
lead of 100 m, stacking serviceable and unserviceable materials separately as
per Technical Specification Clause 202.
I By Manual Means
(a) Bituminous Courses cum 571.90
(b) Granular Courses cum 414.50
II By Mechanical Means
(a) Bituminous Courses cum 234.60
Item Description Unit Rate
No. (Rs.)
2.15 Dismantling of Cement Concrete Pavements as per Technical Specification
Clause 202.
Dismantling of cement concrete pavements by mechanical means using cum 1,045.20
pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of dismantled materials upto a lead of
1000 m, stacking serviceable and unserviceable materials separately

2.16 Dismantling Guard Rails


Dismantling guard rails by manual means and disposal of dismantled material running m 62.40
with all lifts and upto a lead of 1000 m, stacking serviceable materials and
unserviceable materials separately as per Technical Specification Clause 202.
2.17 Dismantling Kerb Stones
Dismantling kerb stones by manual means and disposal of dismantled material running m 11.80
with all lifts and upto a lead of 1000 m as per Technical Specification Clause 202.

2.18 Dismantling Kerb Stone Channels


Dismantling kerb stone channels by manual means and disposal of dismantled running m 18.20
material with all lifts and upto a lead of 1000 m as per Technical Specification
Clause 202.

2.19 Dismantling Kilometre Stones

Dismantling of kilometre stones including cutting of earth, foundation and


disposal of dismantled material with all lifts and lead upto 1000 m and backfilling
of pit as per Technical Specification Clause 202.
(a) 5th km Stone each 311.90
(b) Ordinary km Stones each 196.40
(c) 200 m Stones each 38.50
2.20 Dismantling of Fencing

Dismantling of barbed wire fencing / wire mesh fencing including posts, running m 49.50
foundation concrete, backfilling of pit by manual means including disposal of
dismantled material with all lifts and upto a lead of 1000 m, stacking serviceable
material and unserviceable material separately as per Technical Specification
Clause 202.
2.21 Dismantling of CI Water Pipe Line

Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and running m 119.00
lead upto 1000 m and stacking of serviceable material and unserviceable
material separately under supervision of concerned department as per Technical
Specification Clause 202.
2.22 Removal of Cement Concrete Pipe of Sewer Gutter
Removal of cement concrete pipe of sewer gutter 1500 mm dia under the running m 196.90
supervision of concerned department including disposal with all lifts and upto a
lead of 1000 m and stacking of serviceable and unserviceable material
separately but excluding earth excavation and dismantling of masonry works as
per Technical Specification Clause 202.

2.23 Removal of Telephone/Electric Poles and Lines


Removal of telephone/electric poles with wires including excavation and each 165.80
dismantling of foundation concrete and lines under the supervision of concerned
department, disposal with all lifts and upto a lead of 1000 m and stacking the
serviceable and unserviceable material separately as per Technical Specification
Clause 202.
Chapter – 3

EARTHWORK, EROSION CONTROL AND DRAINAGE


Preamble:

1 The rates have been analysed using mechanical means. Manual means for certain items have also been provided
which can be used for areas inaccessible to machines and also for small jobs.

2 In the rate analyses of earthwork, compacted volume of earth has been considered.

3 Cutting of earth by dozer has been proposed where the cut earth can be utilized for filling for embankment within a lead
upto 100 m.

4 Where lead for transporting of earth is more than 100 m, excavator and tipper have been provided.

5 The rate caters for disposal of unsuitable soil only upto a distance of 1 km. The cost of transportation beyond the initial
lead of 1 km will be paid separately based on tonne-kilometerage.

6 The replacement of unsuitable soil by suitable soil shall be provided separately in the estimate. The rate analysis for
removal of unsuitable soil does not provide for replacement by suitable soil.

7 In cases where embankment is constructed with earth taken from roadway, the cost of depositing the earth at the site of
embankment is already included in the disposal of excavated earth and, therefore, the input of dozer for spreading earth
can be deleted.

8 For narrow and restricted areas, plate compactor has been proposed for compaction to achieve the desired density.

9 In case excavated rock is found suitable for incorporation in works, suitable credit for the available rock shall be given.

10 For excavation of structures refer to Chapter 11 dealing with items of Foundation.

11 The possibility of using the blasted rock fragments for backfilling behind structures or backfilling of foundation pits or
filling in medians/separators or use in service road shall be examined before proposing disposal of excavated rock.

12 For inhabited areas, controlled blasting with limited charges of explosives has been provided. This involves smaller drill
holes and additional requirement of electric detonators. Provision has been made accordingly.

13 Any work involved for crossing of water courses for irrigation purpose, etc. will be priced under respective items, like,
excavation, grubbing, clearing, etc. for which rate analysis have separately been made.

14 Earth excavated from drains can be used in roadway berms. Hence carriage for disposal of same is not provided.

15 In case of rock fill embankment, it is assumed that material is available at site from rock cutting.

16 For widening of existing pavement less than 1.8 m, the rates for all items of this Chapter may be increased by 30 per
cent.
Item Description Unit Rate
No. (Rs.)
Chapter 3-EARTHWORK, EROSION CONTROL AND DRAINAGE
3.1 Scarifying Existing Granular Surface to a Depth of 50 mm

Scarifying existing granular surface to a depth of 50mm and disposal of scarified


material with a lift upto 3.0m and lead upto 1000m as per Technical specification
Clause 301.4

(i) Manual means sqm 19.90

(ii) Mechanical means sqm 7.20

3.2 Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical


Means
Scarifying the existing bituminous road surface to a depth of 150 mm and sqm 6.50
disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per
Technical Specification Clause 301.4.
3.3 Construction of Embankment with Material Obtained from Roadway Cutting

Construction of embankment with approved materials deposited at site from cum 150.30
roadway cutting and excavation from drain and foundation of other structures
graded and compacted to meet requirement of Tables 300.1 and 300.2 as per
Technical Specification Clause 301.5

3.4 Construction of Embankment with Material Obtained from Borrow Pits

Construction of embankment with approved material obtained from borrow pits


with a lift upto 1.5 m, transporting to site, spreading, grading to required slope
p
and compacting g to meet requirement
q of Tables 300.1 and 300.2 with a lead upto
p
1000 m as per Technical Specification Clause 301.5
(i) Private Land cum 228.50
(ii) Govt. Land cum 228.50
3.5 Excavation in Ordinary Soil
(i) Excavation in Cutting in Soil by manual means with lead upto 50 m
Excavation for roadway in soil using manual means for carrying of cut earth to cum 121.50
embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical
Specification Clause 302.3 (Manual method should be adopted where machines
can not be deployed due to site condition)

(ii) Excavation in Soil with Dozer with lead upto 100 m

Excavation for roadway in soil by mechanical means including cutting and cum 50.90
pushing the earth to site of embankment upto a distance of 100 m, including
trimming bottom and side slopes in accordance with requirements of lines,
grades and cross-sections.

(iii) Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto
1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket cum 60.00
capacity including cutting and loading in tippers, trimming bottom and side
slopes, in accordance with requirements of lines, grades and cross-sections, and
transporting to the embankment location with a lift upto 1.5 m and lead upto 1000
m as per Technical Specification Clause 302.3
3.6 Excavation in Marshy Soil
Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket cum 65.70
capacity including cutting and loading in tippers and disposal with a lift upto 1.5
m and lead upto 1000 m, trimming of bottom and side slopes in accordance with
requirements of lines, grades and cross- sections as per Technical Specification
Clause 302.3.6.
3.7 Removal of Unsuitable Soil with Disposal upto 1000 m
Item Description Unit Rate
No. (Rs.)
Removal of unsuitable soil including excavation, loading and disposal upto 1000 cum 60.00
m lead but excluding compaction ground supporting embankment subgrade
replacement by suitable soil, which shall be paid separately as per Clause
303.5.2 as per Technical Specification Clause 302.3.11
Note: This item does not include replacement of unsuitable soil by suitable soil
Replacement,Where required, is to be provided and paid seperately under
Clause 303.5.2
3.8 Excavation in ordinary Rock by manual means

(i) Excavation in ordinary rock using manual means including loading in a truck and cum 188.90
carrying of excavated material to embankment site with a lift upto 1.5 m and lead
upto 50 m as per Technical Specification Clause 302.3.5. (Manual means should
be use where machines can not be deployed due to site condition)
(ii) Excavation in Ordinary Rock with Dozer with lead upto 100 m

Excavation for roadway in ordinary rock by deploying a dozer D-50 including cum 56.30
cutting and pushing the cut earth to site of embankment upto a distance of 100 m
(average lead 50 m), trimming bottom and side slopes in accordance with the
requirements of lines, grades and cross-sections with lift upto 1.5 m.
(iii) Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with
disposal upto 1000 m
Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum cum 88.50
bucket capacity including cutting and loading in tippers, transporting to
embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom
and side slopes in accordance with requirements of lines, grades and cross-
sections as per Technical Specification Clause 302.3.5

3.9
3 9 Excavation in Hard Rock
(i) Excavation in Hard Rock (requiring blasting) with disposal upto 1000 m
Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and cum 231.00
breaking, trimming of bottom and side slopes in accordance with requirements of
lines, grades and cross-sections, loading and disposal of cut rock with a lift upto
1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5

(ii) Excavation in Hard Rock (blasting prohibited)

Excavation for roadway in hard rock (blasting prohibited) with rock breakers
including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and
lead upto 200 metres, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross- sections as per Technical Specification
Clause 302.3.5

A Manual Means cum 984.00

B Mechanical Means cum 458.90

(iii) Excavation in Hard Rock (controlled blasting) with disposal upto 1000 m

Excavation for roadway in hard rock with controlled blasting by drilling, blasting cum 330.90
and breaking, trimming of bottom and side slopes in accordance with
requirements of lines, grades and cross-sections, loading and disposal of cut
rock with a lift upto 1.5 m and leads upto 1000 m as per Technical Specification
Clause 302.3.5

3.10 Stripping, Storing and Relaying Top Soil from Right-of-Way (R.O.W)

Striping,storing and preservatio of top soil by keeping it damp in stock piles and cum 185.60
keep wet till it is used by road side at 15 M interval and reapplication on
embankment slopes,cut slopes and other areas in localities where the available
embankment mate
Item Description Unit Rate
No. (Rs.)
3.11 Stripping,Storing and Relaying Top soil from Borrow areas in Agricultural fields.
Stripping of top soil from borrow areas located in agriculture fields, storing at a cum 117.50
suitable place, spreading and relaying after taking the borrow earth to maintain
fertility of the agricultural field, finishing it to the required levels to the satisfaction
of the farmer/land owner as per Technical Specification Clause 302.3.2.

3.12 Turfing with Sods


Furnishing and laying of the live sods of perennial turf forming grass on sqm 20.70
embankment slope, verges or other locations shown on the drawing or as
directed by the Engineer including preparation of ground, fetching of sods and
watering as per Technical Specification Clause 309.
3.13 Seeding and Mulching
Preparation of seed bed on previously laid top soil, furnishing and placing of sqm 96.70
seeds, fertilizer, mulching material, applying bituminous emulsion @ 0.23 litre per
sqm and laying and fixing jute netting, including watering for 3 months all as per
Technical Specification Clause 310.
3.14 Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained
from borrow pits with all lifts and leads, transporting to site, spreading, grading to
required slope and compacted to meet requirement of Table 300.2 with lead upto
1000 m as per Technical Specification Clause 303.1.
(i) Private Land cum 300.60
(ii) Govt. land cum 300.60
3.15 Compacting Original Ground
(i) Compacting original ground supporting embankment

Loosening, Levelling and Compacting original ground supporting embankment to cum 20.30
facilitate placement of first layer of embankment, scarified to a depth of 150 mm,
mixed with water at OMC and then compacted by rolling so as to achieve
minimum dry density as given in Tables 300.1 and 300.2 for embankment
construction as per Technical Specification Clause 301.4.1.
(ii) Compacting original ground supporting subgrade

Loosening of the ground upto a level of 300 mm below the subgrade level, cum 32.00
watered, graded and compacted in layers to meet requirement of Tables 300.1
and 300.2 for subgrade construction as per Technical Specification Clause
303.5.2.

3.16 Repairs of damages caused by rain/spillage of water

Preparation and surface treatment of formation by removing mud and slurry, sqm 1.80
watering to the extent needed to maintain the desired moisture content, trimming
to the required line, grade, profile and rolling with three wheel 80-100 kN static
roller, complete as per Technical Specification Clause 301.5.5.1
3.17 Presplitting Rock Excavation Slopes

Carrying out excavation in hard rock to achive a specified slope of the rock face sqm 158.50
by controlled use of explosives and blasting accessories in properly aligned and
spaced drill holes, collection of the excavated rock by a D-50 dozer, loading in
tipper by a front end loader and disposing of the material with a lift upto 1.5 m
and lead upto 1000 m as per Technical Specification Clause 304.3
3.18 Construction of Embankment with Flyash/Pond ash available from Coal or Lignite
Burning Thermal Plants as Waste Material
Construction of embankment with flyash conforming to Table 1 of IRC:SP:58 cum 207.10
obtained from coal or lignite burning thermal power stations as waste material,
spread and compacted in layer of 200 mm thickness each at OMC, all as
specified in IRC:SP:58 and as per approved plans with lead upto 1000 m as per
Technical Specification Clause 306.
Item Description Unit Rate
No. (Rs.)
3.19 Surface Drains in Soil

(I) Construction of unlined surface drains of average cross-sectional area 0.40 sqm
in soil to specified lines, grades, levels and dimensions. Excavated material to be
used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as
per Technical Specification Clause 307.
(A) Manual Means m 64.80
(B) Mechanical Means m 26.50
(II) Surface Drains in Ordinary Rock
Construction of unlined surface drain of average cross-sectional area 0.4 sqm in
ordinary rock to specified lines, grades, levels and dimensions as per approved
design and Technical Specification Clause 307. Excavated material to be used
in embankment at site.

(A) Manual Means m 97.20

(B) Mechanical Means m 34.60

(III) Surface Drains in Hard Rock

Rate per m may be worked out based on quantity of hard rock as per design.

For rate of hard rock cutting refer relevant item in this chapter.

Note: Where lining of drain is provided,quantity shall be worked out based on


approved design and drawing and priced on rate

3.20 Chute Drains

I Providing chute drains across embankment slopes in approches of bridges and


on horizontal curves as per drawings.

(a) Earthwork in exavation for foundation of structure as per drawings and technical cum 113.00
specification clause 307 including setting out construction of shoring and bracing
deleterious matter, dressing of sides and bottom and backfilling with approved
material (Rate as per item No. 11.1 of Chapter 11).
(b) Providing and laying plain cement concrete M15 grade (Rate as per 12.5 of cum 5,516.99
Chapter 12).
(c) Brick masonry in cement morter 1:5. (Rate as per item no 12.1 (iii) of Chapter cum 7,026.21
12).
(d) Plastering with cement morter 1:4. (Rate as per item no 12.3 of Chapter 12) cum 1,295.74

(e) Providing P.C.C. M 20 coping on the top of chute walls. (Rate as per item no cum 404.84
12.13 of Chapter 12)
Chapter – 4

GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS

Preamble:
1 For construction of sub-base, one alternative as under have been provided.

a. Mix in place method


2 Construction of shoulders: - Earthen, Hard and Paved shoulders have been considered,
the rates applicable are for subgrade, sub-base and different layers of pavement
respectively.
3 In the case of improvement of subgrade with lime stabilization, soil is assumed to be
available at the site and has not been provided for. Only lime has been catered. In the
case of lime stabilization of sub-base, soil has been provided to form the sub-base

4 While providing for the rate of materials, detailed local enquires should be made and
prevailing market rates ascertained from concerned suppliers in the area keeping in view
the location of crushing plants and lead involved.

5 The quantities considered in the output are the compacted quantities.


Item Description Unit Rate
No. (Rs.)
Chapter 4 - GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS

4.1 Granular Sub-base with Well Graded Material (Table 400.1)


(Only for PMGSY work)
(A) By Mix in Place Method

Construction of granular sub-base by providing well graded material, spreading in


uniform layers with motor grader on prepared surface, mixing by mix in place
method with rotavator at OMC, and compacting with smooth wheel roller to
achieve the desired density, complete as per Technical Specification Clause
401.

(i) For Grading I Material cum 1,546.20

(ii) For Grading II Material cum 1,467.50

(iii) For Grading III Material cum 1,375.00

4.2 Gravel/Soil-Aggregate Base (Table 400.2)


(Only for PMGSY work)
i) Gravel/Soil-Aggregate Base (Table 400.2) Grading A
Construction of gravel/soil-aggregate base by providing well graded material, cum 1,609.80
spreading in uniform layers with motor grader on prepared surface, mixing by mix
in place method with rotavator at OMC, and compacting with three wheel 80-
100 kN static roller to achieve the desired density, complete as per Technical
Specifications Clause 402
ii) Gravel/Soil-Aggregate Base (Table 400.2) Grading B
Construction of granular sub-base by providing well graded material,
material spreading cum 1 564 00
1,564.00
in uniform layers with motor grader on prepared surface, mixing by mix in place
method with rotavator at OMC, and compacting with three wheel 80-100 kN
static roller capacity to achieve the desired density, complete as per Technical
Specification Clause 402
iii) Gravel/Soil-Aggregate Base (Table 400.2) Grading C

Construction of granular sub-base by providing well graded material, spreading in cum 1,510.90
uniform layers with motor grader on prepared surface,mixing by mix in place
method with rotavator at OMC, and compacting with three wheel 80-100 KN
static roller capacity to achieve the desired density,complete as per Technical
specification Clause 402.
iv) Gravel/Soil Aggeregate Base/Sub-Base Nominal Maximum size Grading 80 mm
(Table 2.3 of IRC SP 77-2008
Construction of Gravel/soil aggregate sub-base/Base by providing well graded cum 1108.40
material of nominal size grading 80 mm as per Table 2.3 of IRC SP 77-2008,
spreading in uniform layers with tractor mount appropriate grading arrangement
on prepared surface,mixing by mix in place method at OMC with tractor mount
appropriate rotavator attachment and compaction with three wheel 80-100 Kn
capacity to achieve complete as per specification contained in para 2.2,3.6,3.7 of
IRC SP 77 2008
v) Gravel/Soil Aggeregate Base/Sub-Base Nominal Maximum size Grading 40 mm
(Table 2.3 of IRC SP 77-2008
Construction of Gravel/soil aggregate sub-base/Base by providing well graded cum 1060.60
material of nominal size grading 40 mm as per Table 2.3 of IRC SP 77-2008,
spreading in uniform layers with tractor mount appropriate grading arrangement
on prepared surface,mixing by mix in place method at OMC with tractor mount
approprite rotavator attachment and compaction with three wheel 80-100 kn
static roller capacity to achieve the desired density complete as per specification
contained in para 2.2,3.6 and 3.7 of IRC SP 77-2008
vi) Gravel/Soil Aggeregate Base/Sub-Base Nominal Maximum size Grading 20 mm
(Table 2.3 of IRC SP 77-2008
Item Description Unit Rate
No. (Rs.)
Construction of Gravel/soil aggregate sub-base/Base by providing well graded cum 1018.90
material of nominal size grading 40 mm as per Table 2.3 of IRC SP 77-2008,
spreading in uniform layers with tractor mount appropriate grading arrangement
on prepared surface,mixing by mix in place method at OMC with tractor mount
approprite rotavator attachment and compaction with three wheel 80-100 kn
static roller capacity to achieve the desired density complete as per specification
contained in para 2.2,3.6 and 3.7 of IRC SP 77-2008
vii) Gravel/Soil Aggeregate Base/Sub-Base Nominal Maximum size Grading 10 mm
(Table 2.3 of IRC SP 77-2008
Construction of Gravel/Soil aggregrete Base/Surface by providing well graded cum 932.70
material of nominal maximum size grading 10 mm as per Table 2.3 of IRC SP 77-
2008,spreading in uniform layers with tractor mount appropriate grading
arrangement on prepared surface,mixing by mix in place method at OMC with
tractor mount appropriate rotavator attachment and compaction with three wheel
80-100kn static roller capacity to achieve the desired density complete as per
specifications contained in para 2.2,3.6 and 3.7 of IRC SP 77-2008.

viii) Gravel/Soil Aggeregate Base/Sub-Base Nominal Maximum size Grading 5 mm


(Table 2.3 of IRC SP 77-2008
Construction of Gravel/Soil aggregrete Base/Surface by providing well graded cum 891.00
material of nominal maximum size grading 5 mm as per Table 2.3 of IRC SP 77-
2008, spreading in uniform layers with tractor mount appropriate grading
arrangement opn prepared surface,mixing by mix in place method at OMc with
tractor mount appropriate rotavator attachment compacted with three wheel 80-
100kn static roller capacity to achieve the desired density complete asper para
2.2,3.6 and 3.7 of IRC SP 77-2008.

4.3 gg g g
Gravel/Soil-Aggregregate surface course (table
( 400.3))
(Only for PMGSY work)
Construction of granular sub-base by providing well graded material, spreading cum 1,280.00
in uniform layers with motor grader on prepared surface, mixing by mix in place
method with rotavator at OMC, and compacting with three wheel 80-100 kN
static roller capacity to achieve the desired density, complete as per Technical
Specification Clause 402

4.4 Lime Stabilisation for Improving Subgrade

Laying and spreading available soil in the subgrade on a prepared surface,


pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked
lime having minimum 70 per cent of contents of CaO, grading with motor grader
and compacting with the smooth wheel road roller at OMC to the desired
density to form a layer of improved Sub-grade as per Technical Specification
Cluase 403.

(A) By Manual Means cum 365.20

(B) By Mechanical Means cum 323.10

4.5 Lime Treated Soil for Sub-Base

Providing, laying and spreading soil on a prepared sub-grade, pulverising, mixing cum 585.90
the spread soil in place with rotavator with 4 per cent slaked lime with minimum
content of 70 per cent of CaO, grading with motor grader and compacting with
the road roller at OMC to achieve atleast 98 per cent of the max dry density to
form a layer of sub-base as per Technical Specification Clause 403.

4.6 Cement Treated Soil Sub-Base/Base


Item Description Unit Rate
No. (Rs.)
Providing, laying and spreading soil on a prepared sub-grade, pulverising, adding
the designed quantity of cement to the spread soil, mixing in place with rotavator,
grading with the motor grader and compacting with the road roller at OMC to
achieve the desired unconfined compressive strength and to form a layer of sub-
base/base as per Technical Specification Clause 404.
For 4 per cent quantity of cement by weight of soil cum 642.40

4.7 Water Bound Macadam Sub-base/base


(Only for PMGSY work)
I WBM Grading 1
Using stone screening Type-A 13.2 mm for Gr.I
Providing, laying, spreading and compacting stone aggregates of specific sizes
to water bound macadam specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, stone screening/binding materials to
fill-up the interstices of coarse aggregate, watering and compacting to the
required density Grading 1 as per Technical Specification Clause 404.

A By Manual Means cum 2,656.40

B By Mechanical Means cum 2,686.20

II WBM Grading 2
Using stone screening Type-B 11.2 mm for Gr.II
Providing, laying, spreading and compacting stone aggregates of specific sizes
to water bound macadam specification including spreading in uniform thickness,
hand packing,
packing rolling with smooth wheel roller 80-100 kN in stages to proper
grade and camber, applying and brooming, stone screening/binding materials to
fill-up the interstices of coarse aggregate, watering and compacting to the
required density grading 2 as per Technical Specification Clause 405.

A By Manual Means cum 2,823.80

B By Mechanical Means cum 2,522.30

III WBM Grading 3


Using stone screening Type-B 11.2 mm for Gr.III
Providing, laying, spreading and compacting stone aggregates of specific sizes
to water bound macadam specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper
grade and camber, applying and brooming, stone screening to fill-up the
interstices of coarse aggregate, watering and compacting to the required density
Grading 3 as per Technical Specification Clause 405.
A By Manual Means cum 2,867.80

B By Mechanical Means cum 2,662.90

4.8 Water Bound Macadam with Crushable Screenings


(Only for PMGSY work)
I WBM Grading 1
Using crushable screening such as moorum gravel for Gr.I
Providing, laying, spreading and compacting stone aggregates of specific sizes
to water bound macadam specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to the required density
Grading 1 as per Technical Specification Clause 405.

A By Manual Means cum 2,714.80


Item Description Unit Rate
No. (Rs.)
B By Mechanical Means cum 2,419.30
II WBM Grading 2
Using crushable screening such as moorum gravel for Gr.II
Providing, laying, spreading and compacting stone aggregates of specific sizes
to water bound macadam specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to the required density
Grading 2 as per Technical Specification Clause 405.

A By Manual Means cum 2,706.00

B By Mechanical Means cum 2,504.20

III WBM Grading 3

Using crushable screening such as moorum gravel for Gr.III


Providing, laying, spreading and compacting stone aggregates of specific sizes
to water bound macadam specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to the required density
Grading 3 as per Technical Specification Clause 405.

A By Manual Means cum 2,827.20

B By Mechanical Means cum 2,583.10

4.9 Wet Mix Macadam

Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the material with water at OMC in
mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in
uniform layers in sub-base/base course on a well prepared sub-base and
compacting with smooth wheel roller of 80 to 100kN weight to achieve the
desired density including lighting, barricading and maintenance of diversion, etc
as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
By Mechanical Means with 1 km lead cum 2,143.60

4.10 Construction of Shoulders as per Technical Specification Clause 407.

A Earthen Shoulders

The rate as applicable for sub-grade construction may be adopted.

B Hard Shoulders

Rate as applicable for sub-base and/or base may be adopted as per approved
design.

C Paved Shoulders

The rates may be adopted as applicable for different layers of pavement


depending upon approved design of paved shoulders.

4.11 Granular sub-base/base/surface course with local materials (Table 400.13)


by mix in place method normal Construction of granular sub-base by
providing local material spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator at once and
compacting with smooth wheel roller to achieve the desired density
complete as per Clause 401.4 as per Technical Specification Clause 408.

(i) Using naturally occuring gravel cum 631.60


Item Description Unit Rate
No. (Rs.)
(ii) Using Gravel mix soil using cum 478.70
4.12 Construction of Water Bound Macadam using locally available material
(Table 400.13)

Providing, laying spreading and compacting local material in block or large cum 1,118.60
discrete particles, such as kankar, Laterite, Dhandla etc. as per Table 400.13 to
water bound macadam specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming requisite type of screening /binding
materials to fill-up the interstices of laid material watering and compacting to the
required density as per Clause 405.3 and Technical Specification Cluase 408.
4.13 Lime-Flyash Stablised Soil Sub-base
Construction of sub-base using lime-flyash admixture with granular soil, free from
organic matter/deleterious material or clayey silts and low plasticity clays having
PI between 5 and 20 and liquid limit less than 25 and commercial dry lime, slaked
at site or pre-slaked with CaO content not less than 50 per cent, flyash to
conform to gradation as per Clause 4.3 of IRC:SP:20, lime+flyash content
ranging between 10 to 30 per cent, the minimum un-confined compressive
strength and CBR value after 28-days curing and 4-days soaking to be 0.75 MPa
and 25 per cent respectively, all as specified in IRC:88 including a lead upto
1000 m as per Technical Specification Cluase 409.

A For earth taken from Private source cum 522.00

B For earth taken from Govt.Land cum 522.00

4.14 Construction of Sub-base/Course Using Crushed Slag as per Table 400.19

Construction of Sub-base by providing crushed slag spreading in uniform layer cum 930.80
with motor grader on prepared surface mixing by mix-in-place method with
Rotavator @ OMC, and compacting with three wheel 80-100 kN static roller to
achieve the desired density complete as per Technical Specifications Cluase
402.4 and 410.3.2

4.15 Water Bound Macadam using crushed slag


Providing, laying, spreading and compacting crushed slag to water Bound cum 1,447.80
Macadam specification including spreading in uniform thickness, hand packing
rolling with smooth wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming requisite type of screening/binding materials to
fill up the interstees of crushed slag watering and compacting to the required
density as per Clause 405.3 and Technical Specification Cluase 410.3.2.

4.16 Cement Bound Granular Material sub-base/base


Providing laying and spreading granulated blast furnace slag on a prepared sub- cum 666.50
grade pulverising adding the designed quantitity of cement to the spread
granulated blast furnace slag mixing in place with rotavator grading with the
mortar grader and compacting with smooth wheel roller 80-100 kN at OMC to
achieve the desired unconfined compressive strength and to form a layer of sub-
base/base as per Technical Specification Clauses 404.3 and 410.4.2.

4.17 Crusher Run Macadam Base


Providing crushed run stone aggregate greading conforming to table 400.20
depositing on a prepared surface by hauling vehicles, spreading and mixing with
a motor grader, watering and compacting with a three wheel 80-100 kN static
roller as per Technical Specification Clause 411 to form a layer of sub-base/base

A By mix-in-place method

i With 53 mm maximum size of aggregates cum 2,190.20

ii With 37.5 mm maximum size of aggregates cum 1,981.30

B By mixing plant method


Item Description Unit Rate
No. (Rs.)
i With 53 mm maximum size of aggregates cum 2,401.60

ii With 37.5 mm maximum size of aggregates cum 2,042.40

4.18 Brick Soling


Laying brick soling layer on prepared sub-grade with brick on end edging sqm 635.10
according to lines, graded and cross-section shown on the drawing filling joints
with sand and earth, spreading 25 mm thick layer of earth over brick soling,
watering and rolliing the same with three wheel road roller 80-100 kN as per
Technical Specification Clause 412
4.19 Stone Set Pavement
Providing and laying stone set pavement on prepared surface with sub-base 100 sqm 792.70
mm thick compacted Granular Sub-base as per Clause 401.4 and base 75 mm
thick compacted water bound macadam grading 2 as per Clause 405.3. The 150
mm thick hammer desired stones are laid in the herring one or stretched bond
pattern. The stones are compacted into the bedding sand of 40 mm over the
WBM base bounded by edge stone using suitable compacting device. The gaps
are filled with fine sand stone dust as per Technical Specification Clause 413.4
Chapter – 5

BASES AND SURFACE COURSES (BITUMINOUS)

Preamble:
1 Various alternatives for machines and materials have been provided. The one that suits a
particular situation and design may be adopted.

2 The outputs considered for construction equipment are for compacted quantities of relevant
items and not for loose quantities.

3 In case of prime coat and tack coat, average quantities of binder indicated in specifications have
been taken.
4 Tack coat and prime coat, wherever provided, are required to be measured and paid separately.

5 Cleaning of surface is a part of the item of prime coat and tack coat. As such cleaning of surface
has not been provided for bituminous courses as the same is already catered in prime/tack coat.
However, for those cases where such coats are not required to be done, cleaning of surface
shall be included and paid.

6 Rolling of bituminous courses is required to be done as per Clause 504.3.6 of MORD


Specifications. Provision in the analysis has been made accordingly. It has been observed
during actual practice at work sites, that the availability of road roller is generally inadequate. As
compaction is the key to good construction, this point is being specifically highlighted to ensure
that adequate number of road rollers as per provision in the rate analysis are deployed at site.

7 Spreading of bituminous materials shall be done by mechanical means except in areas where a
mechanical paver cannot have access.

8 Hot Mazdoor is the one who work for Bitumen heating/spreading or spreading of hot bituminous
mix. He will be paid the same wages. However, he will be provided safety kits containing
normally gumboots, hand gloves, dark goggles, barnol, country soap, coconut oil, tarring outfits,
etc. For this purpose, additional 0.5 per cent sundries have been provided in the analysis of rates
in addition to the normal sundries covered by overheads.

9 Where the proposed aggregates fail to pass the stripping value test, an approved adhesion
agent shall be added to the binder as per Clause 507.2.4 with the approval of the Engineer and
cost of the adhesion agent shall be added under the subhead of materials.

10 The Factor for usage of rollers has been taken as 0.65 in case of Bituminous Macadam only.

11 Rate analysis has been given separately using various types of bitumen, i.e., penetrations grade
S90, S65, Polymer Modified Bitumen and Natural Rubber Modified Bitumen to facilitate
preparation of Standard Schedule of Rates.
Item Description Unit Rate
No. (Rs.)
Chapter 5 - BASES AND SURFACE COURSES (BITUMINOUS)

5.1 Prime Coat


i) Low porosity
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared sqm 35.20
surface of granular base including cleaning of road surface and spraying primer
at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical
Specification Clause 502

ii) Medium porosity


Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared sqm 43.30
surface of granular base including cleaning of road surface and spraying primer
at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical
Specification Clause 502.

iii) High porosity

Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared sqm 55.40
surface of granular base including cleaning of road surface and spraying primer
at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical
Specification Clause 502.

5.2 Tack Coat


i) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion sqm 9.90
distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous
surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

ii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion sqm 11.80
distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry
bit i
bituminous surface
f cleaned
l d with
ith Hydraulic
H d li broom
b as per Technical
T h i l Specification
S ifi ti
Clause 503.

iii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion sqm 11.80
distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular
surfaces treated with primer & cleaned with Hydraulic broom as per Technical
Specification Clause 503.

iv) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion sqm 13.80
pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-
bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom
as per Technical Specification Clause 503.
5.3 Bituminous Macadam

(i) Providing and laying bituminous macadam with hot mix plant using crushed cum 6,534.40
aggregates of grading as per Table 500.4 premixed with bituminous binder,
transported to site upto a lead of 1000 m laid over a previously prepared surface
with paver finisher to the required grade, level and alignment and rolled to
achieve the desired compaction as per Technical Specification Clause 504.

(ii) Providing and laying Cold Mix bituminous macadam with Drum mix plant using cum 9,095.80
crushed aggregates of grading as per Table 500.4 premixed with Cold mix
binder, transported to site upto a lead of 1000 m laid over a previously prepared
surface with paver finisher to the required grade, level and alignment and rolled
to achieve the desired compaction as per Technical Specification (IRC:SP:100-
2014).

5.4 Built-Up Spray Grout


Item Description Unit Rate
No. (Rs.)
Providing, laying and rolling of built-up spray grout layer over prepared base
consisting of a two layer composite construction of crushed coarse aggregates
using motor grader for aggregates. Key stone chips spreader may be used with
application of bituminous binder after each layer, and with key aggregates placed
on top of the second layer to serve as a base, conforming to the line, grades and
cross-section specified, the compacted layer thickness being 75 mm as per
Technical Specification Clause 505.
A By Manual Means

(i) Bitumen (S-90) sqm 343.10

(ii) Bitumen (S-65) sqm 345.80

B By Mechanical Means(S90) sqm 281.00

5.5 Modified Penetration Macadam


Construction of penetration macadam over prepared base by providing a layer of
compacted crushed coarse aggregate using chips spreader with alternate
applications of bituminous binder and key aggregates and rolling with a three
wheel 80-100 kN static roller to achieve the desired degree of compaction as per
Technical Specification Clause 506.

A 50 mm thick
(i) Bitumen (S-90) sqm 207.90

B 75 mm thick

(i) Bitumen (S-90) sqm 269.60

(ii) Bitumen (S-65) sqm 271.40

5.6 Surface Dressing using Bituminous (Penetrations grade / modified


bitumen) Binder
Providing and laying surface dressing as wearing course consisting of a layer of
bituminous binder laid on the prepared surface, followed by a cover of crushed
stone aggregates of specified size and rolling with three wheel 80-100 kN static
roller including cleaning the road surface as per Technical Specification Clause
507.

A By Manual Means

Case – I: Nominal chipping size 13.2 mm

i) Bitumen (S-90) sqm 84.90

ii) Bitumen (S-65) sqm 85.80

iii) Polymer Modified Bitumen sqm 85.60

iv) Crumb Rubber Modified Bitumen sqm 83.30

Case – II: Nominal chipping size 9.5 mm

i) Bitumen (S-90) sqm 73.80

ii) Bitumen (S-65) sqm 74.60

iii) Polymer Modified Bitumen sqm 74.20

iv) Crumb Rubber Modified Bitumen sqm 72.40

B By Mechanical Means
Item Description Unit Rate
No. (Rs.)
Case – I: Nominal chipping size 13.2 mm

i) Bitumen (S-90) sqm 61.30

ii) Bitumen (S-65) sqm 62.20

iii) Polymer Modified Bitumen sqm 62.00

iv) Crumb Rubber Modified Bitumen sqm 60.70

Case – II: Nominal chipping size 9.5 mm

i) Bitumen (S-90) sqm 53.90

ii) Bitumen (S-65) sqm 54.70

iii) Polymer Modified Bitumen sqm 54.50

iv) Crumb Rubber Modified Bitumen sqm 52.50


5.7 Surface Dressing using Bitumen Emulsion

Providing and laying surface dressing as wearing course consisting of a layer of


bitumen emulsion laid on the prepared surface, followed by a cover of crushed
stone chippings of specified size and rolling with 80-100 kN roller including
cleaning the road surface as per Technical Specification Clause 507.
A By Manual Means

Case – I: Nominal aggregate size 13.2 mm sqm 100.30

Case – II: Nominal chipping size 9.5 mm sqm 89.00

B By Mechanical Means

Case – I: Nominal chipping size 13.2 mm sqm 81.50

Case – II: Nominal chipping size 9.5 mm sqm 74.00

5.8 Pre-coating Chips


Pre-coating of chips with 1 per cent of paving bitumen by weight of chips in a
suitable mixer duly heated to 160 degree C as per Technical Specification
Clause 507.2.5

i) Bitumen (S-90) cum 1,598.80

ii) Bitumen (S-65) cum 1,613.20

5.9 20mm thick Open-Graded Premix Carpet using Bituminous (penetration


grade/modified bitumen) Binder

Providing, laying and rolling of open-graded premix carpet of 20 mm thickness


composed of 13.2 mm to 5.6 mm aggregates either using penetration grade
bitumen or emulsion to required line, grade and level to serve as wearing course
on a previously prepared base, including mixing in a suitable plant, laying and
rolling with a three wheel 80-100 kN static roller capacity, finished to required
level and grades to be followed by seal coat of either Type A or Type B or Type
C as per Technical Specification Clause 508.

Case - I: By Manual Means

i) Bitumen (S-90) sqm 156.80

ii) Bitumen (S-65) sqm 155.40


Item Description Unit Rate
No. (Rs.)
iii) Polymer Modified Bitumen sqm 161.10

iv) Crumb Rubber Modified Bitumen sqm 151.20

Case - II: By Mechanical Means

i) Bitumen (S-90) sqm 121.80

ii) Bitumen (S-65) sqm 123.10

iii) Polymer Modified Bitumen sqm 122.90

iv) Crumb Rubber Modified Bitumen sqm 119.50

5.10 20mm thick Open-Graded Premix Carpet

(i) Using Bitumen Emulsion as per Technical Specification clause 508.2

Providing, laying and rolling of open-graded premix carpet of 20 mm thickness sqm 139.00
composed of 13.2 mm to 5.6 mm aggregates either using penetration grade
bitumen or emulsion to required line, grade and level to serve as wearing course
on a previously prepared base, including mixing in a suitable plant, laying and
rolling with a three wheel 80-100 kN static roller capacity, finished to required
level and grades to be followed by seal coat of either Type A or Type B or Type
C as per Technical Specification Clause 508.

(ii) Using Cold mix Binder (Tailor made as per IRC:SP:100-2014)

Providing, laying and rolling of open-graded premix carpet of 20 mm thickness sqm 165.00
composed of 13.2 mm to 5.6 mm aggregates either using Cold Mix binder to
required line, grade and level to serve as wearing course on a previously
prepared base, including mixing in a suitable plant, laying and rolling with a three
wheel 80-100 kN static roller capacity, finished to required level and grades to be
followed by seal coat of either Type A or Type B or Type C as per Technical
Specification Clause 508.

5.11 Mix Seal Surfacing

Providing, laying and rolling of close-graded premix surfacing material of 20 mm


thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm
(Type-B) aggregates using penetration grade bitumen to required line, grade and
level to serve as wearing course on a previously prepared base, including mixing
in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and
finishing to required level and grades as per Technical Specification Clause 509

By Manual Means
Type A
i) Bitumen (S-90) sqm 205.00
ii) Bitumen (S-65) sqm 206.90
iii) Polymer Modified Bitumen sqm 206.50
iv) Crumb Rubber Modified Bitumen sqm 201.50
v) Using Cold mix Binder (Tailor made as per IRC:SP:100-2014) sqm 230.32

Type B
i) Bitumen (S-90) sqm 194.10
ii) Bitumen (S-65) sqm 195.80
iii) Polymer Modified Bitumen sqm 195.40
iv) Crumb Rubber Modified Bitumen sqm 191.10
Item Description Unit Rate
No. (Rs.)
v) Using Cold mix Binder (Tailor made as per IRC:SP:100-2014) sqm 216.00

By Mechanical Means

Type A

i) Bitumen (S-90) sqm 148.60

ii) Bitumen (S-65) sqm 150.60

iii) Polymer Modified Bitumen sqm 150.20

iv) Crumb Rubber Modified Bitumen sqm 145.10

Type B

i) Bitumen (S-90) sqm 137.80

ii) Bitumen (S-65) sqm 139.40

iii) Polymer Modified Bitumen sqm 139.10

iv) Crumb Rubber Modified Bitumen sqm 134.70

5.12 Seal Coat

Providing and laying seal coat sealing the voids in a bituminous surface laid to
the specified levels, grade and cross fall using Type A, Type B and Type C as
per Technical Specification Clause 510
A By Manual Means

Case - I : Type A

i) Bitumen (S-90) sqm 65.90

ii) Bitumen (S-65) sqm 66.80

iii) Polymer Modified Bitumen sqm 66.20

iv) Crumb Rubber Modified Bitumen sqm 64.40

Case - II : Type B

i) Bitumen (S-90) sqm 44.50

ii) Bitumen (S-65) sqm 44.60

iii) Polymer Modified Bitumen sqm 44.40

iv) Crumb Rubber Modified Bitumen sqm 47.10

Case - III : Type C

i) Bitumen (S-90) sqm 56.60

ii) Bitumen (S-65) sqm 57.20

iii) Polymer Modified Bitumen sqm 56.80

iv) Crumb Rubber Modified Bitumen sqm 55.60

B. By Mechanical Means
Item Description Unit Rate
No. (Rs.)
Case - I : Type A

i) Bitumen (S-90) sqm 57.50

ii) Bitumen (S-65) sqm 58.40

iii) Polymer Modified Bitumen sqm 58.20

iv) Crumb Rubber Modified Bitumen sqm 56.00

Case - II : Type B

i) Bitumen (S-90) sqm 37.10

ii) Bitumen (S-65) sqm 37.70

iii) Polymer Modified Bitumen sqm 37.60

iv) Crumb Rubber Modified Bitumen sqm 38.10

Case - III : Type C

i) Bitumen (S-90) sqm 48.60

ii) Bitumen (S-65) sqm 49.10

iii) Polymer Modified Bitumen sqm 49.00

iv) Crumb Rubber Modified Bitumen sqm 47.50

Competitive market rates to be ascertained. Alternatively, rates for stone


crushing given in Chapter 1 may be adopted, if found economical. In case for
supply of aggregates at site are not available, nearest crusher site may be
ascertained. Loading and unloading charges and cost of carriage may be added
to these rates to arrive at the cost at site.
Chapter-6

CEMENT CONCRETE PAVEMENT

Preamble:
1 Use of Cement concrete pavement for rural roads is likely to be limited to small stretches.These will
,therfore, have to be constructed without use of heavy equipment,like,high capacity batching/mixing
plant and slip form pavers.Accordingly,the rate analysis is based on concrete mixer of suitanle
capacity with weigh batcher,fixed side forms and screed,plate and needle vibrators.

2 Provision of plasticizer admixture to improve workability with reduced water cement ratio has been
made.
3 The rates of materials taken in the analysis are at site.The concrete mixture placement is also
assured close to the site of work so that transporting and placement of concrete can be done by
labour alone.
4 The rates of earthwork, subgrade and sub-base may be adopted from chapters-3 and 4 as
appropriate.

5 A Carriage cost of 50Km has been provided in the analysis for the items Interlocking Concrete
Block pavement and Edge Block.

6 New Item of Interlocking Concrete Block Pavement with M30 Grade of Concrete has been included
in this Chapter.
Item Description Unit Rate
No. (Rs.)
Chapter 6 - CEMENT CONCRETE PAVEMENT

6.1 Granual Sub-base with Well Graded Material (Table 400.1)

(i) For Grading I Material cum 1,546.20

(ii) For Grading II Material cum 1,467.50

(iii) For Grading III Material cum 1,375.00

6.2 Lime Treated Soil for Sub-base/ base cum 585.90

6.3 Water Bound Macadam (WBM) - Sub-base

(A) By Manual Means cum 2,656.40

(B) By Mechnical Means cum 2,686.20

6.4 Cement concrete pavement

Construction of un reinforced, dowel jointed at expansion and construction joint cum 6,719.10
only,plain cement concrete pavement, thickness as per design,over a prepared
sub base,with 43 grade cement or any other type as per clause 1501.2.2 M30
grade ,coarse and fine aggregrette conforming to is:383,maximum size of coarse
aggregate not exceeding 25 mm,mixed in a concrete mixer of not less than 0.2
cum capacity and appropriate weigh batcher using approved mix design, laid in
approved fixed side formwork (steel channel,laying and fixing of 125 micron thick
polythene film,wedges,steel plates including levelling the formwork as per
drawing) spreading the concrete with shovels,rakes,compacted using
,
needle,screed and pplate vibrator and finished in continuous operation
p including
g
provision of contraction and expansion,construction joints,applying debonding
strips,primer,sealant,dowelbars,near approaches to bridge/culverts and
construction joints,admixture as approved,curingof concrete slabs for 14 days.

6.5 Roller Compacted Concrete Pavement

Construction of Roller Compacted Concrete Pavement (RCCP) with coarse and cum 5,995.90
fine aggregates conforming to IS:383, the size of coarse aggregate not
exceeding 25 mm with minimum aggregate cement ratio of 5:1 mm and with
minimum cemnt content of 310 kg per cum, aggregate gradation to be as per
Table 602.2 after blending, mixing in concrete mixer at optimum moisture
content, transporting to site, laying with wheel barrows or steel pans or with
mechanical paver, compacting with 80-100 kN smooth wheel, tandem vibratory
roller, to achieve, the designed flexural strength, finishing and curing as per
drawings and Technical Specification Clause 1502
Note: Carraige of c.c block to site of is payable seperately as per chapter of
carriage of materials from manufacturing site to the site of work
6.6 Rectangular Concrete Block Pavement
Manufacturing, laying of cement concrete blocks of size 0.450 m x 0.300 m x sqm 2,339.20
0.15 m of Cement Concrete (C.C.) M30 garde and spreading 25 mm thick sand
under neath and filling joints with sand on existing W.B.M. base as per Technical
Specification Clause 1503.
6.7 Inter locking concrete Block pavement

(A) Interlocking pavement block

(i) Providing and laying interlocking concrete block pavement with M40 grade grade
of concrete blocks having thickness 80mm as per technical specification clause
1504 complete including carriage.
a) Including Edge block/ Edge restraints sqm 1,027.50
Item Description Unit Rate
No. (Rs.)
b) Excluding Edge block/ Edge restraints sqm 833.10

(ii) Providing and laying interlocking concrete block pavement with M40 grade grade
of concrete blocks having thickness 60mm as per technical specification clause
1504 complete including carriage.
a) Including Edge block/ Edge restraints sqm 825.50

b) Excluding Edge block/ Edge restraints sqm 631.00

(B) Interlocking Edge block/ Edge restraints

(i) Providing and laying Concrete Edge block/ Edge restraints (M40 Grade) of size no 112.20
300mm x 300mm x 150mm including carriage complete as per Technical
specification clause 1504.

Note: i. The rates for sub-grade, sub-base course to be measured and paid
separately (as per Chapter 3 & 4)
Chapter – 7

CAUSEWAY AND SUBMERSIBLE BRIDGES

Preamble:
1 The quantities of various items may be worked out from the design and drawings.

2 Rate analysis of various items involved in the construction of concrete causeway may be taken
from relevant Chapters.

3 RCC Hume Pipes of NP-3 and NP-4 (non-pressure types) have been considered in the analysis.

4 Rate analysis for items of submersible bridges may be based on the respective items of
Chapters 11, 12 and 13 dealing with bridges. Rates for guide posts may be taken from Chapter
8.

5 Rate analysis of item of river training and protection works may be based on the respective items
in Chapter 14 (Protection Works).
Item Description Unit Rate
No. (Rs.)
Chapter 7 - CAUSEWAY AND SUBMERSIBLE BRIDGES

7.1 Construction of Cut-off Walls/Head Walls

i) Earthwork in excavation for structures as per drawing and technical specification cum
Clause 305. (Rate as per item No.11.1 of Chapter 11)

ii) Plain cement concrete M15 grade (Rate as per item No.11.4 (ii) of Chapter 11) cum

iii) Brick masonry in cement mortar 1:4 (Rate as per item No.11.5 (ii) of Chapter 11) cum

iv) Stone masonry in cement mortar 1:4 (Rate as per item No.11.6 (ii) of Chapter 11) cum

v) Providing P.C.C M20 architectural coping on top of wall (Rate as per item m
No.12.13 of Chapter 12)

7.2 Preparation of Subgrade (Rate as per item No.3.15 of Chapter 3) cum

7.3 Granular Sub-base (Rate as per item No.4.1 of Chapter 4) cum

7.4 W.B.M. Base Course (Rate as per item No.4.7 of Chapter 4) cum

7.5 Cement Concrete Slab (Rate as per item No.6.4 of Chapter 6) cum 6,719.10

7.6 Apron with Stone Boulders/ CC Blocks as per Technical Specification


Clause 1301
i) Providing and Laying Apron with Stone Boulders as per Drawings & Technical cum
Specification
p Clause 1301 ((Rate as p
per item No.14.1 of Chapter
p 14))
ii) Providing and Laying Apron with Stone Boulders Laid in Wire Crates as per cum
Drawings & Technical Specification Clause 1301 (Rate as per item No.14.2 of
Chapter 14)
iii) Providing and Laying of Apron with Cement Concrete Blocks as per Drawing and cum
Technical Specification Clause 1301 (Rate as per item No.14.3 of Chapter 14)

7.7 Guide Posts

Construction of R.C.C. guide posts of 250 mm dia, M25 grade as per drawing cum
and technical specification Clause 1401.6 (Rate as per item No.8.8 of Chapter 8)

7.8 Bedding for Causeway

i) Type A (concrete cradle) Bedding Clause 1402.5 (As per item No.9.2 of Chapter cum
9)
ii) Type B (first class) Bedding Clause 1402.5 (As per item No.9.2 of Chapter 9) cum

7.9 Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical m
specification Clause 1402.6 (As per item No.9.3 of Chapter 9)

7.10 Laying Reinforced Cement Concrete Pipe NP4 as per technical specification m
Clause 1402.6 (As per item No.9.4 of Chapter 9)
Chapter – 8

HILL ROADS
Preamble:

1 The Chapter covers only the analysis of rates for items which are peculiar to hill roads. For
other items, reference may be made to relevant Chapters and analysis modified as suggested
in note 2 below.

2 Extra Provision for High Altitude Areas

Since there is no place at an altitude of 2100 m and above in Assam extra provision for man
power as well as machines are not considered.
Item Description Unit Rate
No. (Rs.)
Chapter 8 - HILL ROADS

8.1 Site Clearance


8.2 Setting Out
i) Construction of reference pillars as per Fig. 1600.1 (b) as per drawing and per Km 6,171.40
Technical Specification Clause 1602.1
ii) Construction of back piller as per Fig. 1600.1( c) as per drawing and Technical per Km 14,655.30
Specification Clause 1602.3

iii) Construction of Job pillers as per Fig. 1600.1 (d) and Technical Specification each 1,756.30
Clause 1602.4

8.3 Earthwork in Hill Road


I Excavation in Hilly Areas in Soil by manual means.
A Excavation in soil in Hilly Area by manual means including cutting and trimming cum 161.90
of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead
upto 20 m as per drawing and Technical Specification Clause 1603.1 (Manual
means should be use where machines can not be deployed due to site condition)

B Extra for Every Additional Lift of 1.5 m or Part thereof cum 16.80
II Excavation in Hilly Areas in Soil by mechanical means
A Excavation in soil in Hilly Area by mechanical means including cutting and cum 94.10
trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m
and a lead upto 20 m as per Technical Specification Clause 1603.1
B Extra for Every Additional Lift of 1.5 m or Part thereof cum 16.80
III Excavation in Hilly Area in Ordinary Rock by manual means

A Excavation in ordinary rock using manual means including loading in a truck and cum 356.30
carrying of excavated material to embankment site with a lift upto 1.5 m and lead
upto 20 m as per Clause 1603.2. (Manual means should be use where machines
can not be deployed due to site condition)
B Extra for Every Additional Lift of 1.5 m or Part thereof cum 26.30

IV Excavation in Hilly Areas in Ordinary Rock by mechanical means not requiring


blasting
A Excavation in hilly area in ordinary rock not requiring blasting by mechanical cum 147.50
means including cutting and trimming of slopes and disposal of cut material with
a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.
V Excavation in Hilly Areas in Hard Rock requiring blasting
A Excavation in hilly areas in hard rock requiring blasting, by mechanical means, lift cum 337.00
upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause
1603.2.

B Extra for Every Additional Lift of 1.5 m or Part thereof cum 33.10

VI Excavation in Hard Rock (blasting prohibited)


Excavation for roadway in hard rock (blasting prohibited) with rock breakers
including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and
lead upto 200 metres, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross- sections as per Technical Specification
Clause 302.3.5

a) Manual Means cum 923.20


b) Mechanical Means cum 515.00
8.4 Retaining Walls / Breast Walls
Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing
and technical specifications Clause 1604

i) Earthwork in excavation for structures


Item Description Unit Rate
No. (Rs.)
Rate as per item No.11.1 of Chapter 11 cum
ii) Plain cement concrete M 10 grade
Rate as per item No.11.4 of Chapter 11 cum
iii) Stone masonry in cement mortar 1:5
Rate as per item No. 12.4 (III) (iii) of Chapter 12 cum
iv) Pointing with cement mortar 1:3
Rate as per item No.12.2 of Chapter 12 sqm
v) Providing P.C.C. M 20 architectural coping on top of retaining wall/breast wall
Rate as per item No.12.13 of Chapter 12 m
vi) Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in
a width of 600 m

Rate as per item No. 12.11 of Chapter 12 cum

vii) Back filling behind retaining wall/breast wall


Rate as per item No. 12.10 of Chapter 12 cum
8.5 Construction of Hill side Drain
Construction of Hill side drain in accordance with the requrement of specification,
true to lines and grades, Dimensions and other particulars as per drawing and
technical specification Clause 1606.1
i) Earthwork in excavation for structures as per drawing and technical specification.

Rate as per item no 11.1 of chapter 11 cum

ii) Plain cement concrete M10 grade

Rate as per item no 11.4of chapter 11 cum

iii) Stone masonary in cement morter 1:5

Rate as per item no 12.4(iii) (iii) of chapter 12 cum

(iv) Plain cement concrete M15 grade

Rate as per item 11.4 of chapter 11 cum

(v) Cement plaster 15 mm thick 1:4 on stone masonary

Rate as per item no 12.3 of chapter 12 cum

(vi) Providing P.C.C. M 20 Architectural coping on top of wall


Rate as per item no.12.13 of chapter 12 cum
Rate per m length (I+II+III+IV+V+VI) m
Note:
1.Quantities of material/work shall be as per Design and Drawing.
2.Earth work in excavation may be taken as per site conditions.
It may comprise of a number of sub-items depending upon the type
typy of soil/rock.
8.6 Construction of catch water/Intercepting drain.
Construction of catch water/Intercepting drain in Random ruble masonary in 1:5
cement morter true to the specified lines grades lavel and dimensions as per the
requirements of the specification Clause 1606.2
i) Earthwork in excavation for structure as per drawing and technical specificatuion

Rate as per item no 11.2 of chapter 11 cum


0
Item Description Unit Rate
No. (Rs.)
ii) Plain cement concrete M10 grade
Rate as per 11.4 of chapter 11. cum
iii) Stone masonary in cement morter 1:5
Rateas per item no 12.4 (III) (iii) of chapter 12 cum
iv) Plain cement cioncrete M 15 grade
Rate as per 11.4 of chapter 11. cum
v) Cement plaster 15 mm thick 1:4 on stone masonary
Rate as per 12.3 of chapter 12. sqm
vi) Providing P.C.C. M20 architectural coping on top of wall
Rate as per item No. 12.3 of chapter 12 cum
0
Note: 1. Quantities of material/work shall beas per design and drawings.
2. Earth work in excavation may be taken as per site condition.It may comprise of
a number of sub-items depending upon the type of soil/rock encountered.
0
8.7 Construction of Scupper

Construction of scupper with dry stone masonry as per drawing and technical Running m 31,276.20
specifications as per Clause 1606.5.

8.8 Construction of RCC guide posts of 250 mm dia M15 grade cast-in-situ with
20 mm nominal size aggregate, true to line and grade, tolerance of vertical
RCC posts not to exceed 1 in 500 as per drawing and Technical
Specification Clause 1608.2
i) Earth work in excavation for structures

Rates as p
per item No. 11.1 of Chapter
p 11 cum

ii) RCC M15 grade


Rate as per item No. 11.4 of Chapter 11 cum
iii) HYSD steel bars

Rate as per item No. 12.6 of Chapter 12 t


iv) Painting two coats including prime coat on new concrete surface

Rate as per item No.10.5 of Chapter 10 sqm


8.9 Providing edge stones on valley side of formation as per drawing and Technical m 285.40
Specification Clause 1608.2.6

8.10 Turfing with Sods

Furnishing and laying of the live sods of perennial turf forming grass on sqm 22.20
embankment slope, verges or other locations shown on the drawing or as
directed by the Engineer including preparation of ground, stacking the sods and
8.11 t i and Mulching
Seeding Cl 309

Preparation of seed bed on previously laid top soil, furnishing and placing of sqm 171.20
seeds, fertilizer, multching material, applying bituminous emulsion at the rate of
0.23 l per sqm and laying and fixing jute netting, including watering for 3 months
all as per Clause 310.
Chapter – 9

PIPE CULVERTS
Preamble:

1 Pipe culverts of sizes 750 mm, 1000 mm and 1200 mm dia in single row and double row which are
generally used on roads, have been included. Providing and laying of pipe has been included in the
rate analysis. Items of auxiliary works such as excavation, bedding, backfilling, concrete and masonry
shall be analysed, as provided under the respective sections and paid for separately.

2 Analysis has been given separately for NP3 and NP4 pipes for ease of adoption.

3 Cost of any river training and protection work like stone pitching, apron, curtain wall etc. may be
analysed under the respective item included in Chapter 14.

4 The joining of pipes is proposed by collar joints.

5 Chain & pulley for lifting the pipes is considered part of overheads.

6 The thickness of first class bedding has been taken as 150 mm. The height of bedding has been
taken as 1 of overall height of pipe in the analysis. This may be modified as per thickness indicated in
the approved drawing.
Item Description Unit Rate
No. (Rs.)
Chapter 9 - PIPE CULVERTS

9.1 Excavation for Structures

Earthwork in excavation for foundation of structures upto 3 m depth as per


drawing and technical specification Clause 1104 includding setting out,
construction of shoring and bracing, removal of stumps and other deleterious
matter, dressing of sides and bottom and backfilling with approved material.
Rate as per item No.11.1 of Chapter 11 cum 113.00

9.2 Bedding of pipe


(A) Type A (Concrete Cradle) Bedding

i) Laying concrete cradle bedding with M15 Grade Cement Concrete as per Clause
1105 (i)

Rate as per Item No.11.4 (II)(i) of Chapter 11 cum 5,216.10

(B) Type B (First Class) Bedding

Laying (First Class) bedding on well compacted sand, moorum as per Clause
1105 (ii)

i) Laying (First Class) bedding on well compacted sand, moorum as per Clause cum 1,164.00
1105 (ii)

ii) Laying (First Class) bedding on well compacted approved granular material as cum 1,378.80
per Clause 1105 (ii)

9.3 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in
Single Row

Providing and laying reinforced cement concrete pipe NP3 for culverts on first
class bedding of granular material in single row including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and parapets Clause 1106.
1200 mm dia m 9,883.40
1000 mm dia m 6,891.90

600 mm dia m 2,895.80


9.4 Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in
Single Row

Providing and laying reinforced cement concrete pipe NP4 for culverts on first
class bedding of granular material in single row including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and parapets Clause 1106.

1200 mm dia m 11,908.40


1000 mm dia m 9,276.44
9.5 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in
Double Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first
class bedding of granular material in double row including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and parapets as per Clause 1106.

A) 1200 mm dia m 19,835.90

B) 1000 mm dia m 14,587.30


Item Description Unit Rate
No. (Rs.)
9.6 Providing and Laying Reinforced Cement Concrete Pipe NP4 as per Design in
Double Row

Providing and laying reinforced cement concrete pipe NP4 for culverts on first
class bedding of granular material in double row including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and parapets as per Clause 1106.

A) 1200 mm dia m 23,885.90

B) 1000 mm dia m 19,625.00

9.7 Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open
foundation of Head walls as per drawings & Technical Specification Clause 1109

Rate as per item No.11.4 of Chapter 11 cum

9.8 Brick Masonry Work in cement mortar in foundation of Head walls complete
exculding pointing and plastering as per drawing and technical specification
Clause 1109
A Brick Masonry in 1:4 cement mortar

Rate as per item No.11.5 (ii) Chapter 11 cum

B In cement-lime mortar (1:0.5:4.5)

Rate as per item No.11.5 (iii) Chapter 11 cum

99
9.9 St
Stone M
Masonry W k in
Work i cementt mortar t in
i foundation
f d ti off Head
H d walls
ll complete
l t as
per drawing and technical specification Clasue 1109

A In 1:4 cement mortar


Rate as per item No.11.6 (II) (ii) Chapter 11 cum
B In cement-lime mortar (1:0.5:4.5)
Rate as per item No.11.6 (II) (iii) Chapter 11 cum
9.10 Pointing with Cement Mortar (1:3) on brickwork as per technical
specification Clause 613.3

Rate as per item No.12.2 of Chapter 12 sqm


9.11 Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in
substructure as per technical specification

Rate as per item No.12.3 of Chapter 12 sqm


9.12 Backfilling in Foundation Trenches as per drawing and technical
specification Clause 1108

Rate as per Item No.11.2 of Chapter 11 cum


9.13 Providing PCC M20 Architectural Coping on the top of wing wall, return
wall etc. complete as per drawing and technical specification Clause 615

Rate as per Item No.12.13 of Chapter 12 m


Chapter–10

TRAFFIC SIGNS, MARKINGS AND OTHER APPURTENANCES


Preamble:

1 Rate analysis for fencing provides for Barbed wire fencing with R.C.C. M 15 grade concrete post.

2 Backfilling of foundation of boundary pillars has been proposed with stone spalls, tightly packed and
compacted.

3 The item pertaining to road traffic signals has not been analysed as this is a specialized work and
rates can be obtained from firms having specialisation for design and installation of this work.

4 Two supports have been provided for direction and place identification signs where size is more than
0.9 square metres. Only one support is provided for size upto 0.9 square metres.

5 The traffic signs proposed are of retro-reflectorised types made of encapsulated lens type reflective
sheeting fixed over aluminum sheeting and semi-reflective type on M.S. sheet.

6 The size and location of traffic signs shall be as per IRC:67.

7 Separate rate analysis has been made for tubular steel railing with RCC posts and MS steel posts.
Item Description Unit Rate
No. (Rs.)
Chapter 10 - TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES

10.1 Printing New Letters and Figures of any Shade

Printing new letter and figures of any shade with synthetic enamel paint black or
any other approved colour to give an even shade as per drawings and Technical
Specification Clause 1701

I Hindi (Matras commas and the like not to be measured and paid for. Half letters per cm 1.01
shall be counted as half only) height per
letter
ii English and Roman per cm 0.65
height per
letter
10.2 Traffic Signs

A Retro-reflectorised Traffic Signs

I Providing and fixing of retro-reflectorised cautionary, mandatory and informatory


sign as per IRC:67 made of encapsulated lens type reflective sheeting vide
Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a
mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by
means of properly designed foundation with M15 grade cement concrete 450 mm
x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical
Specification Clause 801

i 900mm equilateral triangle each 5 390 30


5,390.30

ii 600mm equilateral triangle each 3,480.70

iii 600mm circular each 4,730.80

iv 800mm x 600mm rectangular each 6,670.00

v 600mm x 450mm rectangular each 4,602.80

vi 600mm x 600mm square each 5,488.80

vii 900mm side octagon each 8,560.00

II Providing and fixing of retro-reflectorised cautionary, mandatory and informatory


sign as per IRC:67 made of encapsulated lens type reflective sheeting vide
Clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on GI
pipe 50 mm dia firmly fixed to the ground by means of properly designed
foundation with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600
mm below ground level as per drawings and Technical Specification Clause 1701
i 900mm equilateral triangle each 5,798.90

ii 600mm equilateral triangle each 3,889.20

iii 600mm circular each 5,139.30

iv 800mm x 600mm rectangular each 7,078.60

v 600mm x 450mm rectangular each 5,011.40

vi 600mm x 600mm square each 5,897.30


Item Description Unit Rate
No. (Rs.)
vii 900mm side octagon each 9,952.90

III Providing and fixing of retro-reflectorised cautionary, mandatory and informatory


sign as per IRC:67 made of encapsulated lens type reflective sheeting vide
Clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on RCC
Post 100 mm x 100 mm firmly fixed to the ground by means of properly designed
foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600
mm below ground level as per approved drawing Clause 1701

i 900mm equilateral triangle each 4,966.70

ii 600mm equilateral triangle each 3,057.00

iii 600mm circular each 4,307.20

iv 800mm x 600mm rectangular each 6,246.40

v 600mm x 450mm rectangular each 4,179.20

vi 600mm x 600mm square each 5,065.10

vii 900mm side octagon each 8,136.40

Please ensure that area of aluminium plate of required size is entered in the
analysis item

(B) Semi Reflective Traffic Signs


I Providing and fixing of semi reflective cautionary, mandatory and informatory
sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour
in front and gray colour on back with red reflective border of 65 mm width and
required letters and figures with reflective tape engineering grade as per Clause
1701.3.9 of MORD for Rural Roads of required shade and colour supported and
welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by
mean of properly designed foundations with M-15 grade cement concrete
450x450x600 mm, 600 mm below ground level as per approved drawing Clause
1701.2.2
i 900mm equilateral triangle each 4,281.70

ii 600mm equilateral triangle each 2,961.20

iii 600mm circular each 3,825.60

iv 800mm x 600mm rectangular each 5,166.50

v 600mm x 450mm rectangular each 3,737.20

vi 600mm x 600mm square each 4,349.70

vii 900mm side octagon each 7,153.90

10.3 Direction and Place Identification signs upto 0.9 sqm size board

A Retro-reflectorised Traffic Signs


(I) Providing and erecting direction and place identification retro-reflectorised sign sqm 12,300.20
as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding
0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly
fixed to the ground by means of properly designed foundation with M-15 grade
cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification Clause 1701
Item Description Unit Rate
No. (Rs.)
(ii) Providing and erecting direction and place identification retro-reflectorised sign sqm 12,458.80
as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding
0.9 sqm supported on 2 inch dia GI Pipe firmly fixed to the ground by means of
properly designed foundation with M-15 grade cement concrete 450 x 450 x 600
mm, 600 mm below ground level as per approved drawing and Tehnical
Specification Clause 1701.

(iii) Providing and erecting direction and place identification retro-reflectorised sign sqm 11,516.00
as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding
0.9 sqm supported on RCC Post 100 mm x 100 mm firmly fixed to the ground by
means of properly designed foundation with M-15 grade cement concrete 450 x
450 x 600 mm, 600 mm below ground level as per approved drawing and
Technical Specification Clause 1701

B Semi-Reflective Traffic signs


Direction and place indentification signs up to 0.9 sqm size board

(I) Providing and erecting direction and place identifications of semi reflective sign sqm 8,910.30
boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint
in white colour in front and grey colour on back with red reflective border of 70
mm width and required message, letters, figures with reflective engineering
grade tape as per MORD specifications of required shade and colour. Supported
and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly
strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the
ground by means of properly designed foundations with M-15 grade cement
concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification Clause 1701

10.4 Direction and Place Identification signs with size more than 0.9 sqm size board
A Retro-reflectorised Traffic Signs
(I) Providing and erecting direction and place identification retro-\reflectorised sign sqm 12,720.20
as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9
sqm supported on mild steel angle iron posts 75 mm x 75 mm x 6 mm, 2 Nos.
firmly fixed to the ground by means of properly designed foundation with M-15
grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground
level as per approved drawing and Technical Specification Clause 1701

(ii) Providing and erecting direction and place identification retro-reflectorised sign sqm 13,264.90
as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9
sqm supported on dia GI Pipe firmly fixed to the ground by means of properly
designed foundation with M-15 grade cement concrete 450 mm x 450 mm x 600
mm, 600 mm below ground level as per approved drawing and Technical
Specification Clause 1701

(iii) Providing and erecting direction and place identification retro- reflectorised sign sqm 11,835.50
as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9
sqm supported on RCC Posts 100 mm x 100 mm firmly fixed to the ground by
means of properly designed foundation with M 15 grade cement concrete 450
mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing
and Technical Specification Clause 1701
B Semi-Reflective Traffic Signs
Direction and place identification signs more than 0.90 sqm sign board
Item Description Unit Rate
No. (Rs.)
Providing and erecting direction and place identification of semi reflective sign sqm 9,804.60
boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint
white colour in front and grey colour on back with reflective border of 70 mm
width and required message, letters, figures with reflective tape of engineering
grade as per MORD specifications of required shade and colour. Supported and
welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height
duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to
the ground by means of properly designed foundations with M-15 grade cement
concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification Clause 1701

10.5 Painting Two Coats on New Concrete Surfaces

Painting two coats including primer coat after filling the surface with synthetic sqm 102.70
enamel paint in all shades on new, plastered / concrete surfaces as per drawing
and Technical Specification Clause 1701
10.6 Painting on Steel Surfaces

Providing and applying two coats of ready mix paint including primer coat of sqm 70.40
approved brand on steel surface after through cleaning of surface to give an
even shade as per drawing and Technical Specification Clause 1701
10.7 Painting on Concrete/Steel Surfaces with Epoxy
Painting two coats including prime coat with epoxy paint of approved brand on sqm 127.30
concrete/steel surfaces after through cleaning of surface to give an even shade
as per drawing and Technical Specification Clause 1701
10.8 Painting lines, Dashes, Arrows, etc. on Road in Two Coats on New Work
g lines,, dashes,, arrows,, etc. on roads in two coats on new work with
Painting sqm
q 85.60
ready mixed road marking paint conforming to IS:164 on bituminous/concrete
surface, including cleaning the surface of all dirt, dust and other foreign matter,
demarcation at site and traffic control as per drawing and Technical Specification
Clause 1702

10.9 Painting lines, Dashes, Arrows, etc. on Roads in Two Coats on Old Work

Painting lines, dashes, arrows, etc. on roads in two coats on old work with ready sqm 67.30
mixed road marking paint conforming to IS:164 on bituminous/concrete surface,
including cleaning the surface of all dirt, dust and other foreign matter,
demarcation at site and traffic control as per drawing and technical specification
Clause 1702

10.10 Kilometre Stone


Reinforced cement concrete M15 grade kilometre stone/local stone of standard
design as per IRC:8 fixing in position including painting and printing, etc as per
drawing and Technical Specification Clause 1703

I) 5th Kilometre Stone (precast) each 3,715.00

ii) Ordinary Kilometer Stone (Precast) each 2,220.50

iii) 200 m stone (precast) each 590.50

10.11 Boundary Pillar

Reinforced cement concrete M15 grade boundary pillars/local stone of standard each 624.20
design as per IRC:25, fixed in position including finishing and lettering but
excluding painting as per drawing and Technical Specification Clause 1704
10.12 G.I Barbed Wire Fencing 1.2 m high
Item Description Unit Rate
No. (Rs.)
Providing and fixing 1.2 m high GI barbed wire fencing with 1.8 m RCC posts 150 Running m 260.70
mm x 150 mm placed every 3 m centre-to-centre founded in M15 grade cement
concrete, 0.6 m below ground level, every 15th post, last but one end post and
corner post shall be strutted on both sides and end post on one side only and
provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires,
fixed with GI staples, turn buckles etc. complete as per Clause 1705.

10.13 G.I Barbed Wire Fencing 1.8 m high


Providing and fixing 1.8 m high GI barbed wire fencing with 2.4 m RCC M15 Running m 430.80
grade 150 mm x 150 mm concrete post placed every 3 m centre-to-centre
founded in M15 grade cement concrete, 0.6 m below ground level, every 15th
post, last but one end post and corner post shall be strutted on both sides and
end post on one side only and provided with 12 horizontal lines and 2 diagonals
interwoven with horizontal wires, fixed with GI staples, turn buckles etc. complete
as per Clause 1705.

10.14 Tubular Steel Railing on Medium Weight Steel Channel (ISMC series) 100 mm x
50 mm
Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted Running m 1,414.20
on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 m high
above ground, 2 m centre-to-centre, complete as per approved drawings
Clause 1706

10.15 Tubular Steel Railing on Precast RCC posts, 1.2 m high above Ground Level

Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on Running m 1,199.00
precast M-20 grade RCC vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m
above Gl) with 3 holes 50 mm dia for pipe, fixed 2 m centre-to- centre complete
as per approved drawings Clause 1706
10.16 Providing and Fixing 'Logo' of PMGSY Project

Providing and fixing of typical PMGSY informatory sign board with Logo as per each 21,987.00
MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and
middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.
The lower plate will be welded with MS angle iron frame of 25mm x 25mm x
5mm. The angle iron frame of the lower most plate and flat iron frame of middle
plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly
embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm,
600mm below ground level. The top most diamond plate will be welded to middle
plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove
enameled on both sides. Lettering and printing arrows, border etc. will be
painted with ready mixed synthetic enamel paint of superior quality in required
shade and colour. All sections of framed posts and steel tube will be painted with
primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure
1700.1

10.17 Traffic Cone

Provision of red fluorescent with white reflective sleeve traffic cone made of Low each 1,345.00
Density Polyethylene (LDPE) material with a square base of 390 x 390 x 35 mm
and a height of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as per
10.18 BS 873 Strips
Rumble

Provision of 15 n0s.rumble strips covered with premix bituminous carpet,15.2


mm high at centre,250mm wide placed at 1m centre to centre at approved
location to control speed, marked with white strips of road marking paint.

The rate per sqm of premix carpet and road marking may be adopted from
Chapters 5&10 respectively for the quantities calculated from approved drawings.
10.19 Safety Device and sign in Construction Zones
Item Description Unit Rate
No. (Rs.)
Provision and fixing of traffic sign for limited period at a suitable location in
construction zone comprising of warning zone,approach transition zone,working
zoneand terminal transition zone with a minimunm distance of 2-3 m from the
edgeof the carraige way.The bottom edge of the lowest sign plate to be not less
than 2 M above the road level, fixed on 600mx600mx6mm angle iron
post,founded and installed as per approved design and drawings,removed and
disposed ofafter completion of construction work, all as per IRC:SP 55-2001

Following types of signs are required to be fixed in construction zones for safety
of traffic.

a) Diversion one km ahead

b) Traffic sign ahead

c) Road ahead closed

d)Men at work

e)Road narrow

f)Un even road

g)slipery road

h)Loose chipping

I)Diversion

J)Do not enter

k)Road closed

l)Stop

k)Slow

Speed limit

Note: The rate for traffic signs are already worked out and given elsewhere in this
chapter.The same may be adopted

10.20 Road Markers/Road Stud with Lens Reflector


Providing and fixing of road stud 100 x 100 mm die cast in aluminium, resistant to each 548.50
corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or
asphaltic surface by drilling holes 30 mm upto a depth of 600 mm and bedded in
a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973.
PART-B: BRIDGE WORKS
Chapter – 11

FOUNDATION
Preamble:

1 Excavation for structures has been provided by and large by manual means.

2 The earth excavated from foundation has been proposed to be backfilled in the foundation trenches
except for marshy soil where disposal has been provided.

3 For excavation in marshy soil, extra provision of labour for filling with carted earth has been provided
in a separate item. Cost of carted earth may be worked out separately if the same is not available
from the adjoining area.
4 The rock surface for foundations is to be prepared which has been analysed accordingly.

5 In case of rock, excavation has been considered upto a depth of 1500 mm for rock of ultimate
crushing strength of 10 Mpa or more, which shall be reckoned as hard rock.

6 Dewatering has been provided in excavation for foundation on percentage basis. In case less
dewatering is required or is not required at all for a particular site condition, the same may be
reduced/omitted.

7 Mixing of cement concrete has been considered by using concrete mixer with weigh batching facility
fitted with water measuring device. It is preferable to use concrete mixes fitted with load cells for weigh
batching.
8 In remote areas, for isolated slab culvert/box culvert upto 2 m span, concrete can be hand mixed in
accordance with Clause 806 of MORD Specifications. Therefore, in the analysis, for items of concrete,
the alternative of hand mixing has also been considered.

9 Steel reinforcement for cement concrete work is required to be provided separately. The rate for the
same has been analysed using HYSD and TMT bars.

10 Necessary safety precautions shall be taken for excavation for open foundation for which guidance
may be taken from IS:3764. Cost of shoring and shuttering has been provided on percentage basis,
which may be adjusted according to site condition.

11 For brick masonry work, clay fly ash bricks of approved type can be used in accordance with Section
600 of MORD Specifications and rate may be adopted accordingly.
Item Description Unit Rate
No. (Rs.)
Chapter 11 - FOUNDATION

11.1 Excavation for Structures

Earthwork in excavation for structures as per drawing and technical specifications


Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with excavated suitable
material.

I Ordinary soil

Upto 3 m depth cum 113.00


3 m to 6 m depth cum 165.00
II Ordinary rock (not requiring blasting)

Upto 3 m depth cum 182.30

III Hard rock (requiring blasting) cum 429.30

IV Hard rock (blasting prohibited) cum 401.10

V Marshy soil cum 518.20

11.2 Fillling in foundation trenches as per drawing and technical specification Clause
305.3.9

I Sand filling cum 1,455.10

ii Earth filling (For marshy soil) cum 179.10

11.3 Filling annular space around footing in rock as per technical specification Clause
1203.4.3.

P.C.C grade M 15
A With crushed Stone cum 4,986.20
B With natural Gravel cum 4,704.70
11.4 Providing concrete for plain/reinforced concrete in open foundations
complete as per drawings and technical specifications Clause 802, 803,
1202 & 1203
A With crushed Stone
I P.C.C grade M 10
Nominal mix 1:3:6 cum 5,342.10
Nominal mix 1:3.6 (Hand mixing) cum 5,378.80
II P.C.C grade M 15
Nominal mix (1:2.5:5) cum 5,216.10
Nominal mix 1:2.5:5 (Hand mixing) cum 5,252.80
III P.C.C Grade M20
Nominal mix (1:2:4) cum 5,897.60
Nominal mix 1:2:4 (Hand mixed) cum 5,934.40
IV R.C.C Grade M20 cum 6,259.20
V R.C.C Grade M25 cum 6,671.30
B With natural Gravel
I P.C.C Grade M 10
Nominal mix 1:3:6 cum 4,962.50
Nominal mix 1:3:6 (Hand mixing) cum 4,999.20
Item Description Unit Rate
No. (Rs.)
II P.C.C Grade M15
Nominal mix 1:2.5:5 cum 4,899.80
Nominal mix 1:2.5:5 (Hand mixing) cum 4,936.50
III P.C.C Grade M20
Nominal mix (1:2:4) cum 5,507.20
Nominal mix 1:2:4 (Hand mixed) cum 5,543.90
IV R.C.C Grade M20 cum 5,799.30
V R.C.C Grade M25 cum 6,212.80
11.5 Brick masonry work in cement mortar in foundation complete excluding
pointing and plastering as per drawing and technical specifications
Clauses 600, 1202 & 1203
I. Brick masonry in 1:3 cement mortar cum 6,807.30

ii Brick masonry in 1:4 cement mortar cum 6,593.60

iii Brick masonry in 1:6 cement mortar cum 6,502.00

11.6 Stone masonry work in cement mortar in foundation complete as per


drawing and technical specifications Clauses 702, 704, 1202 & 1203.

I Coursed rubble masonry (1st sort)

In 1:3 cement mortar cum 4,641.60

In 1:4 cement mortar cum 4,353.10

in 1:6 Cement morter cum 4,229.40

II Coursed rubble masonry (2nd sort)

In 1:3 cement mortar cum 5,373.60

In 1:4 cement mortar cum 4,991.50

in 1:6 Cement morter cum 4,831.20

III Random Rubble Masonry

In 1:3 cement mortar cum 5,876.40

In cement mortar 1:4 cum 4,143.20

in 1:6 Cement morter cum 4,019.50

11.7 Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From t 56,239.00
Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in
foundation complete as per drawings and technical specifications Clauses
1000 and 1202

11.8 Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (Other ISI t 47,409.00
approved TMT reinforcement bar (SAI/BISCON/THERMAX or equivalent)) in
foundation complete as per drawings and technical specifications Clauses
1000 and 1202
11.9 Supplying, fitting and placing MS Bar (Fe-500 ) reinforcement bar (From t 56,270.50
Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL)
in foundation complete as per drawings and technical specifications
Clauses 1000 and 1202
Chapter – 12

SUBSTRUCTURE
Preamble:

1 The cost of formwork will vary with the height and cross-section of the substructure. Provision has
been made accordingly.

2 As the higher grade of concrete is costlier, the provision made for formwork on percentage basis has
been suitably adjusted to make it compatible with other grades.

3 Filter media and backfilling behind abutment are required to be provided as per guidelines in IRC:78-
2000.

4 Bearing shall be set truly level so as to have full and even seating.

5 The bearing should be procured only from those manufacturers who have been pre-qualified by
MORTH.

6 For spans in gradient, the soffit shall be made horizontal specially at the supports and the bearing,
where provided, shall be placed horizontally.

7 Weep holes shall be provided as per specifications.

8 For elastomeric bearings, the concrete surface shall be leveled such that the variation is not more
than 1.5 mm from a straight edge placed in any direction across the area.

9 Note Nos. 7 to 12 of Chapter 11 will hold good for this Chapter also.
Item Description Unit Rate
No. (Rs.)
Chapter 12 - SUBSTRUCTURE

12.1 Brick masonry work in cement mortar in substructure complete excepting pointing
and plastering, as per drawing and technical specification Clauses 602, 603, 604,
1202 & 1204
I In 1:3 cement mortar cum 7,277.90

ii In 1:4 Cement mortar cum 7,064.70

iii In 1:5 cement mortar cum 7,026.20

iv In 1:6 cement mortar cum 6,949.30

12.2 Pointing with cement mortar (1:3) on brickwork as per drawing and 10 sqm 637.70
technical specification Clauses 613.3 and 1204

12.3 Plastering with cement mortar (1:4), 15 mm thick on brickwork in 10 sqm 1,295.70
substructure as per technical specification Clauses 613.4 & 1204

12.4 Stone masonry in cement mortar for substructure complete as per drawing
& technical specification Clauses 702, 704, 1202 and 1204

I Coursed rubble masonry (1st sort)

In 1:3 cement mortar cum 5,088.10

In 1:4 cement mortar cum 4,785.20

In 1:5 cement mortar cum 4,579.20

In 1:6 cement mortar cum 4,492.60

II Coursed Rubble masonry (2nd sort)

In 1:3 cement mortar cum 5,344.50

In 1:4 cement mortar cum 4,639.10

In 1:5 cement mortar cum 4,578.20

In 1:6 cement mortar cum 4,456.30

III Random rubble masonry

In 1:3 cement mortar cum 5,617.70

In 1:4 cement mortar cum 5,079.20

In 1:5 cement mortar cum 5,002.20

In 1:6 cement mortar cum 4,848.40

12.5 Plain/reinforced cement concrete in substructure complete as per drawings


and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
A With Crushed Stone

I P.C.C grade M 15

i) Nominal mix (1:2.5:5) cum 5,517.00

ii) Nominal mix 1:2.5:5 (Hand mixing) cum 5,555.80

II P.C.C. grade M 20
Item Description Unit Rate
No. (Rs.)
i) Nominal mix (1:2:4) cum 6,237.90

ii) Nominal mix 1:2:4 (Hand mixed) cum 6,276.70

III RCC Grade M 20

i) For height upto 5 m cum 6,620.00

ii) For height above 5 m upto 10 m cum 6,740.20

IV RCC Grade M 25

i) For height upto 5 m cum 7,073.00

ii) For height above 5 m upto 10 m cum 7,201.80

B With Natural Gravel

I P.C.C grade M 15

i) Nominal mix (1:2.5:5) cum 5,182.40

ii) Nominal mix 1:2.5:5 (Hand mixing) cum 5,221.30

II P.C.C. grade M 20

i) Nominal mix (1:2:4) cum 5,824.90

ii) Nominal mix 1:2:4 (Hand mixed) cum 5,863.80

III RCC Grade M 20

i) For height upto 5 m cum 6,134.00

ii) For height above 5 m upto 10 m cum 6,245.20

IV RCC Grade M 25

i) For height upto 5 m cum 6,587.00

ii) For height above 5 m upto 10 m cum 6,706.80

12.6 Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From t 56,373.70
Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in
substructrue complete as per drawings and technical specification Clauses
1002, 1005, 1010 & 1202
12.7 Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (Other ISI t 47,543.60
approved TMT reinforcement bar (SAI/BISCON/THERMAX or equivalent)) in
substructrue complete as per drawings and technical specification Clauses
1002, 1005, 1010 & 1202

12.8 Supplying, fitting and placing MS Bar (Fe-500 D) reinforcement bar(From t 56,405.20
Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in
substructrue complete as per drawings and technical specification Clauses
1002, 1005, 1010 & 1202

12.9 Providing weepholes in brick masonry/stone masonry, plain/reinforced Nos. 119.20


concrete abutment, wing wall, return wall with 100 mm dia AC pipe
extending through the full width of the structures with slope of 1(V):20(H)
towards drawing face complete as per drawing and technical specification
Clauses 614, 709, 1204.3.7
12.10 Backfilling behind abutment, wing wall and return wall complete as per
drawings & technical specification Clause 1204.3.8
Item Description Unit Rate
No. (Rs.)
I Granular material cum 1,316.10

ii Sandy material cum 1,613.00

12.11 Providing and laying filter media with granular crushed aggregates as per cum 1,835.00
specification to a thickness of not less than 600 mm with smaller size
towards the soil and bigger size towards the wall and providing over the
entire surface behind abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per drawing and technical
specification Clause 1204 3 8
12.12 Supplying, fitting and fixing in position true to line and level elastomeric 3.18
bearing conforming to IRC:83 (Part-II) Section IX complete, including all
accessories as per drawings and technical specification Clause 1207.1 cu cm

12.13 Providing PCC M-20 architectural coping on the top of wing wall, return
wall etc. complete as per drawing and technical specification Clauses 615,
710 and 1204.3.11

I With Crushed stone Running m 404.80

ii With Natural Gravel Running m 378.00

12.14 Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a Nos. 634.90
filter media base of 500 mm x 500 mm as per drawing and technical
specification Clause 1205.5.7
Chapter – 13

SUPERSTRUCTURE
Preamble:

1 The rate for wearing coat has been analysed as under in accordance with the provisions of MORD
Specifications:

a. Bituminous type

b. Cement concrete

2 The rate analysis has been done for the following types of railings & parapet:

i. R.C.C. railing

ii. M.S. railing

iii. Pipe railing (suitable for submersible bridges)

iv. Brick masonry parapet

v. Stone masonry parapet

vi. P.C.C. parapet

3 As per the MORD Specifications, the type of superstructure envisaged for minor bridges and
culverts for rural roads are R.C.C. slabs and box culverts not exceeding 15 m span, rates for which
have been analysed. Stone/Brick masonry arches can be adopted where hard strata is available at
shallow depth. R.C.C. arches can also be adopted as per IRC:SP:20. Hence rates for these types
of arches for span length upto 15 m have been analysed.

4 For composite type of superstructure, comprising of steel beams/built-up sections & R.C.C. deck
slab, analysis has been done for steel section separately.

5 For slab culverts and minor bridges of spans not more than 10 m, buried joint/filler joint may be
adequate. For relatively longer spans and for highly seismic intensity areas, elastomeric slab
seal/compression seal joint may be provided as per the MORD Specifications. Rates have been
analysed accordingly.

6 In remote areas, for slab culverts and box culverts upto 2 m span, concrete used in superstructure
can be hand mixed with 10 per cent extra cement at contractor’s cost in accordance with Clause
806 of MORD Specifications. Hand mixing shall not be otherwise permitted.

7 Slab seal/compression seal expansion joints are specialised items commercially produced by a
number of firms. The rates for such items must be ascertained from firms pre-qualified by MORTH.
Overheads for the above specialized manufactured items have been considered as 30 per cent
instead of the usual 20 per cent for other items of bridge works.
Item Description Unit Rate
No. (Rs.)
Chapter 13 - SUPERSTRUCTURE

13.1 Providing and laying reinforced cement concrete in superstructure as per drawing
and technical specifications Clauses 800, 1205.4 and 1205.5

A With crushed stone

I R.C.C grade M 20

i For nominal mix 1:2:4

a) Height upto 5 M cum 7,221.63

b) Height from 5m to 10M cum 7,522.53

c) Height above 10 M cum 7,823.43

ii For nominal mix 1:2:4 (Hand mixed)

a) Height upto 5 M cum 7,210.13

b) Height 5m to 10M cum 7,510.55

c) Height above 10M cum 7,810.97

iii For design mix RCC M 20

a) Height upto 5M cum 7,038.46

b) Height 5Mto 10 M cum 7,331.73

c) Height above 10 M cum 7,625.00

II R.C.C grade M 25

a) Height upto 5M cum 7,679.55

b) Height from 5M to 10 M cum 7,999.53

c) Height above 10 M cum 8,319.51

III R.C.C grade M 30

a) Height upto 5M cum 7,954.30

b) Height from 5M to 10M cum 8,285.73

c) Height above 10M cum 8,617.16

B With Natural Gravel

I R.C.C. grade M 20

i For Nominal mix 1:2:4

a) Height upto 5M cum 6,691.31

b) Height from 5M to 10M cum 6,970.11

c) Height above 10M cum 7,248.91

ii Nominal mix 1:2:4 (Hand Mixed)

a) Height upto 5M cum 6,679.80


Item Description Unit Rate
No. (Rs.)
b) Height from 5M to 10M cum 6,958.13

c) Height above 10M cum 7,236.45

iii For Design mix RCC M 20

a) Height upto 5 M cum 6,508.14

b) Height from 5m to 10M cum 6,779.31

c) Height above 10 M cum 7,050.48

II R.C.C. grade M 25

a) Height upto 5M cum 7,149.23

b) Height from 5M to 10M cum 7,447.11

c) Height above 10M cum 7,744.99

III R.C.C. grade M 30

a) Height upto 5M cum 7,423.98

b) Height from 5M to 10 M cum 7,733.31

c) Height above 10 M cum 8,042.64

13.2 Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From t 57,715.00
Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in
superstructure complete as per drawing and technical specifications
Clauses 1002, 1010 and 1202

13.3 Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (Other ISI t 48,884.90
approved TMT reinforcement bar (SAI/BISCON/THERMAX or equivalent)) in
superstructure complete as per drawing and technical specifications
Clauses 1002, 1010 and 1202
13.4 Supplying, fitting and placing MS Bar (Fe-500) reinforcement bar (From t 57,746.50
Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL)
in superstructure complete as per drawing and technical specifications
Clauses 1002, 1010 and 1202
13.5 Providing and laying cement concrete wearing course M 30 grade including
reinforcement complete as per drawing and technical specifications
Clauses 800 and 1206.3

A With crushed stone cum 12,760.70

B With Natural Gravel cum 12,305.50

13.6 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm Running m 2,445.30


nominal size aggregate, true to line and grade, tolerance of vertical railing
post not to exceed 1 in 500, centre-to-centre spacing between vertical
posts not to exceed 2000 mm as per drawing and technical specifications
Clauses 800, 900 and 1208.3

13.7 Providing fitting and fixing mild steel railing complete as per drawing and Running m 2,864.50
technical specifications Clause 1208.2

13.8 Providing and fixing in position pipe railing consisting of IS Rolled steel Running m 1,453.90
joist posts designation IS MB 100 (100x75) at 2.5 m interval and three rows
of 50 mm dia steel pipes (light) including fixing in position on bridge deck
complete as per drawing and technical specifications Clause 1208.2
Item Description Unit Rate
No. (Rs.)
13.9 Brick masonry work in cement mortar 1:3 in parapet excluding pointing and cum 6,851.60
plastering as per drawing and technical specifications Clauses 600, 900
and 1208.4

13.10 Drainage spouts complete as per drawing and technical specifications Nos. 1,658.20
Clause 1209
13.11 P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab
complete as per drawing and technical specifications Clauses 800 and
1211
A With crushed stone

I Nominal mix (1:2.5:5) cum 5,015.40

ii Nominal mix 1:2.5:5 (Hand mixing) cum 5,012.60

B With Natural Gravel

I Mix (1:2.5:5) cum 4,711.30

ii Mix 1:2.5:5 (Hand mixed) cum 4,708.50

13.12 Reinforced Cement Concrete M 25 grade approach slab including reinforcement


and formwork complete as per drawing and technical specifications Clauses 800
and 1211

A With crushed stone cum 10,565.30

B With Natural Gravel cum 10,035.00

13.13 Providing and laying of an elastomeric slab seal expansion joint compleate Running m 24,226.40
as per approved drawing and approved specification to be installed by
manufacturer/supplier or their authorised representative ensuring
compliance to the manufacturers instructuion for instalation and as per
technical specification clause 1207.2.5

13.14 Providing and laying of a compression seal consisting of steel armoured Running m 13,219.10
nosing at two edges of the joint gap suitably anchored to the deck
concrete and a preformed chloroprene elastomer or closed cell foam joint
sealer compressed and formed intothe joint gap with special adhesive
binder as per drawing and technical specification Clause 1207.2.4

13.15 Providing and laying a buried expansion joint, covered with 12 mm thick, Running m 1,719.80
200 mm wide galvanised weldable structrual steel plate as per IS:2062,
placed symmetrical to centre line of the joint, resting freely over the top
surface of the deck concrete, welding of 8 mm dia, 100 mm long galvanised
nails spaced 300 mm c/c along the centre line of the plate, as per technical
specifications Clauses 1207.2.3

13.16 Filler Joint

I Providing and fixing 2 mm thick corrugated copper plate in expansion joint as per Running m 3,267.30
drawing and technical specifications Clause 1207.2.2

ii Providing and fixing 20 mm thick compressible fibre board in expansion joint Running m 255.30
complete as per drawing and technical specifications

iii Providing and fixing 20 mm thick premoulded joint filler in expansion joint for fixed Running m 277.90
ends of simply supported spans, covered with sealant complete as per drawing
and technical specification.
iv Providing and fillling joint sealing compound as per drawings and technical Running m 23.10
specifications with coarse sand and 6 per cent bitumen by weight.
Item Description Unit Rate
No. (Rs.)
13.17 Stone masonry in cement mortar 1:3 for parapet complete as per drawing
and technical specifications Clauses 700 and 1208.4

I Random rubble masonry cum 5,617.70

II Coursed rubble masonry (1st sort) cum 5,088.10

13.18 Pointing with cement mortar (1:3) on brickwork in parapet as per technical 10 sqm 637.70
specifications Clauses 613.3 and 1208.4

13.19 Plastering with cement mortar (1:3) 15 mm thick on brickwork in parapet as 10 sqm 1,295.70
per technical specifications Clauses 613.4 and 1208.4

13.20 Providing and laying parapet with PCC M 15 as per drawing & technical
specifications Clauses 800 and 1208.4

A With crushed stone

I Nominal mix 1:2.5:5 (Hand mixing) cum 5,517.00

ii Nominal mix (1:2.5:5) cum 5,555.80

B With Natural Gravel

I Mix 1:2.5:5(Hand mixing) cum 5,221.30

ii Mix (1:2.5:5) cum 5,182.40

13.21 Providing bituminous wearing coat comprising of 20 mm thick premix


p with 5 mm thick seal coat Type
carpet yp B for culverts as p
per drawing
g and
technical specifications Clauses 1206.2 and 500

I Rate for wearing coat as per item No. 5.9 of Chapter 5 sqm

ii Rate for seal coat Type B as per item No. 5.12 of Chapter 5 sqm

13.22 Providing bituminous wearing coat comprising of 50 mm thick bituminous


macadam overlaid by 20 mm thick premix carpet with 5 mm thick seal coat
Type B
I Rate for BM layer may be analysed as per item No 5.3 of Chapter 5 cum

ii Rate of 20 mm premix carpet wearing course as per item No.5.9 of Chapter 5 sqm

iii Rate of seal coat Type B as per item No. 5.12 of Chapter 5 sqm

13.23 Brickwork in arches in cement mortar 1:4 complete including centering and cum 15,708.40
shuttering excluding pointing and plastering as per drawing and technical
specifications Clauses 606 and 1205.1

13.24 Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:4)
complete including centering etc. complete as per drawing and technical
specifications Clauses 706 and 1205.1

i For arch above 6Mspan cum 11,257.60

ii For Arch 4 m to 6 m span cum 10,131.90

iii For Arch less than 4 m span cum 8,443.20

13.25 Providing & Laying reinforced cement concrete arch complete including
centering and shuttering excluding reinforcement as per drawings and technical
specifications Clauses 800, 900 and 1205.1

A With crushed stone


Item Description Unit Rate
No. (Rs.)
I RCC grade M20 (1:2.4) nominal mix

a) For arch above 6 m span cum 9,134.80

b) For arch 4 m to 6 m span cum 8,525.80

c) For arch less than 4 m span cum 7,916.80

II RCC Grade M 25

a) For arch above 6 m span cum 9,752.95

b) For arch 4 m to 6 m span cum 9,102.75

c) For arch less than 4 m span cum 8,452.55

B With Natural Gravel

I R.C.C.Grade M20 (1:2:4) nominal mix

a) For arch above 6 m span cum 8,471.90

b) For arch 4 m to 6 m span cum 7,907.10

c) For arch less than 4 m span cum 7,342.30

II R.C.C Grade M25

a) For arch above 6 m span cum 9,090.04

b) For arch 4 m to 6 m span cum 8,484.04

c) For arch less than 4 m span cum 7,878.04

13.26 Providing steel R.S.Jst/ built-up steel sections including cutting, welding/
rivetting, hoisting, fixing in position for composite girders with shear
connectors complete with painting as per drawing and technical
specifications Clause 1205.6
Steel section quintal 7,236.60
Chapter – 14

PROTECTION WORKS
Preamble:

1 Three types of aprons as under have been catered for:

a. Boulder apron laid dry

b. Boulder apron laid in wire crates

c. Apron laid in cement concrete blocks of M 15 grade

2 Pitching proposed is of the following types:

a. Brick pitching

b. Boulder pitching

c. CC Block pitching

3 A toe wall for toe protection of pitching can be either in random rubble masonry or in nominal mix
cement concrete M 10, or in brick masonry. Depending upon the design, the rates may be adopted.

4 Flooring has been proposed in dry rubble stone, rubble stone laid in cement mortar 1:3, cement
concrete blocks M 15 and brick on edge laid in cement mortar (CM) 1:3.

5 Curtain walls proposed are of the following types:

a. Brick masonry in CM 1:4

b. Coursed rubble stone masonry (1st sort) is CM 1:3

c. Cement concrete M-10 grade

6 Lead for stone materials from quarry to be considered in case of pitching and apron works.
Item Description Unit Rate
No. (Rs.)
Chapter 14 - PROTECTION WORKS

14.1 Providing and laying boulder apron for bed protection with stone boulders cum 1,646.80
of minimum size and weight as per Table 1300.1, no fragment weighing
less than 25 kg laid dry complete as per drawing and technical
specifications Clause 1301
14.2 Providing and laying of boulder apron laid in wire crates with 4 mm dia GI cum 2,460.70
wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven
diagonally) including 10 per cent extra for laps and joints laid with stone
boulders weighing not less than 25 kg each as per drawing and technical
specifications Clause 1301

14.3 Providing and laying of apron with cement concrete blocks of size as per cum 5,192.70
Table 1300.1 cast-in-situ and made with nominal mix of M-15 grade cement
concrete as per drawing and technical specifications Clause 1301

14.4 Single bamboo palasiding / walling of whole 2nd class bamboo (Jati or
Bethua) 75mm dia and closely packed & driven including fitting fixing with
half bamboo kamis horizontally in three rows with cane or tying with wire
complete and struts 1.5 m apart longitudinally and providing brush wood
as per drawing and technical specifications Clause 1302.5

Driven at least 900 mm below ground and 1200 mm above ground Running m 793.10

Driven at least 900 mm below ground and 900 mm above ground on average Running m 748.10
14.5 Providing and laying pitching on slopes laid over prepared filter media as
per drawing and technical specifications Clause 1302

I Stone/Boulder cum 1 646 80


1,646.80

II Cement concrete blocks of size as per Table 1300.2 cast in cement concrete of
grade M 15

a) Concrete grade M 15 cum 5,320.40

b) Brick pitchng set in cement mortar 1:4 cum 5,964.90

14.6 Providing and laying filter material underneath pitching in slopes complete cum 1,813.60
as per drawing and technical specifications Clause 1302

14.7 Providing and laying flooring laid over cement concrete bedding complete
as per drawing and technical specification Clause 1303

i Rubble stone laid in cement mortar 1:3 cum 3,847.00

ii Cement conrete blocks grade M 15 cum 5,795.00

iii Brick on edge laid in cement mortar (1:3) cum 4,978.80

Note : Cement concrete bedding to be measured and paid extra.

14.8 Providing and laying of dry rubble flooring complete as per drawings and cum 2,297.40
technical specifications Clause 1303.3

14.9 Providing and laying curtain walls complete as per drawing and technical
specification Clause 1304
I Brick masonry in cement mortar (1:4) cum 7,252.90

ii Coursed rubble masonary (2nd sort) in cement mortar (1:4) cum 4,639.10

iii Cement concrete grade M 10 cum 5,074.90


Item Description Unit Rate
No. (Rs.)
14.10 Construction of flexible apron 1 m thick comprising of loose stone cum 1,341.90
boulders weighing not less then 25 kg beyond curtain wall

14.11 Construction of toe walls for protection of slopes as per drawing and
technical specifications Clause 1302.5
I Random rubble masonry in case of stone pitching laid with cement mortar (1:5) cum 4,151.60

ii Brick masonry in cement mortar 1:4 in case of brick pitching cum 5,867.80

iii Cement concrete grade M 10 in case of concrete block pitching cum 5008.20

Nominal mix 1:3:6


14.12 Single bamboo spur and palisading of whole 2nd class bamboo (jati or
Bethua) 65 mm to 75 mm dia and closely packed & driven, including fitting,
fixing with half bamboo kamis horrizontally in three rows with cane or tying
wire complete and struts 1500 mm apart longitudinally and providing brush
wood as per drawing and technical specifications Clause 1302.5

I Driven at least 900 mm below ground and 1800 mm above ground on average Running m 928.10

ii Driven at least 900 mm below ground and 900 mm above ground on average Running m 751.80

14.13 Single bamboo spur and palisading of whole 1st class bamboo (Bholuka or
Barua) 85 mm to 100 mm dia. Closely packed & driven including fitting,
fixing with half 2nd class bamboo (jati or Bethua) horizontally in three rows
with cane or tying wire complete and struts 1500 mm apart longitudinally
and providing brush wood in the spur as per drawings and technical
specifications

A Driven at least 900 mm below ground and 1800 mm above ground Running m 1,356.80

B Driven at least 900 mm below ground and 900 mm above ground on average Running m 937.50

C Driven at least 600 mm below ground and 1200 mm above ground on average. Running m 862.50

14.14 Bamboo spur 'A' type with whole bamboo 85mm-100mm dia, placed 230
mm centre to centre driven 900 mm below ground and 1200 mm to 1500
mm above ground tied with 2nd class bamboo (jati or Bethua) on either
side at 450 mm apart horizontally with galvanised wire etc. complete as per
drawings and technical specifications
A 2nd class bamboo (jati or Bethua) 75 mm dia Running m 959.20

B 1st class bamboo (Bholuka or Barua ) 85 mm to 100 mm dia Running m 909.20

14.15 Providing 'A' type single spur with 1st class bamboo (Bholuka or Barua) 85 Running m 1,635.70
mm to 100 mm dia. Driven closely placed 3m to 4m above ground and 1200
mm to 1500 mm below ground tied with cane or coir string, half 2nd class
bamboo (jati or Bethua) horizontally on both face placed not more than one
metre apart including whole bamboo struts inside one metre apart and 2
nos. of purlin at top and bottom fitted with vertical struts at 1500 mm apart
and filling with brushwood or jungle wood inside the spur complete as per
drawing and technical specifications

14.16 Providing close bamboo toe walling consisting of 65mm to 75mm dia bamboos of Running m 1,076.90
length ranging from 1.2 m to 3m driven at 150 mm centre to centre and provided
with three horizontal split bamboo runner fixed with nails. All bamboos to be duly
protected by coal tar painting.
Item Description Unit Rate
No. (Rs.)
14.17 Double timber spur with two rows at 800 mm c/c apart of 1st class local Running m 19,114.70
wood piles with timber of Azar/Nahar/Nageswar / Zarul wood 150 mm to 200
mm dia driven 2000 mm minimum below ground and 3600 mm above
ground average placed at 800 mm belts, bracings etc. of 100 mm x 75 mm
size 1st class local wood longitudinally & crosswiswe at ends fitted with 10
mm dia bolts and nuts etc. including coaltarring of timber members and
cost of necessary bamboo stagings etc. as directed by the Engineer as per
drawing and technical specifications
14.18 Supplying and filling up hollows of the timber spur to an average height of Running m 77.60
3600 mm above ground with jungle wood branches as per drawing and
technical specifications as directed by the Engineer.
PART-C: MAINTENANCE &
MISCELLENEOUS WORKS
Chapter – 15

MAINTENANCE OF ROADS
Preamble:

1 In the case of rain cuts, it has been assumed that some material cut by rain, approximately 25 per cent will be
available at site which can be retrieved and re-used and the balance 75 per cent is required to be provided as fresh
material.
2 For making up earthen shoulders, it has been assumed that on an average 150 mm filling will be required. Similarly,
for stripping of excess soil from shoulder, an average depth of 75 mm has been assumed.

3 Pothole repairs and patchwork are provided to be done by using Mixall 6/10 M.T.

4 In case of maintenance of Gravel and W.B.M. surfaces, it has been assumed that 25 per cent material will be
available at site, which can be retrieved and re-used and the balance 75 per cent is required to be provided as fresh
material.
5 The items of periodical renewal by premix carpet and surface coating have also been included in the rate analysis for
guidance of field Engineers. The detailed analysis of various items of bituminous works is given in Chapter 5 and rates
can be taken from there as appropriate. Additional provision of patch repair and profile correction varying from 10 per
cent to 30 per cent of the material of premix carpet/surface dressing may be made in the estimate of periodical
renewal.
Item Description Unit Rate
No. (Rs.)
Chapter 15 - MAINTENANCE OF ROADS

15.1 Restoration of Rain Cuts

Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing
the loose soil, benching for 300mm width laying fresh material in layers not
exceeding 250 mm and compaction with plate compactor or power rammer to
restore the original alignment, level and slopes as per drawings and technical
specifications Clause 1902

A Manual Means cum 142.30

B Mechanical Means cum 113.70

15.2 Maintenance of Earthen shoulder (filling with fresh selected soil)

1 Making up loss of material/irregularities on shoulders to the design level by sqm 73.70


adding fresh approved selected soil and compacting it with appropriate
equipment at OMC upto a lead of 1000 m as per technical specification Clause
1903
Maintenance of Earhen shoulder (stripping of excess soil)

2 Stripping excess soil from the shoulder surface to achieve the approved level sqm 16.40
and compacting with plate compactor at OMC as per drawings and Technical
Specification Clause 1903

15.3 Maintenance of Bituminous surface road

I Repair to pot holes by removal of failed material,trimming the sides to vertical cum 7,172.40
and levelling the bottom,cleaning the same with compressed air or any
appropriate method filled with 75 mm B.M. applying bitumen emulsion prime coat
at the bottom and bitumen emulsion tack coat on sides and on bottom as per
technical specification Clause 502 and 503

ii Patch repair on already filled pot holes with 75 mm BM with 20 mm premix carpet sqm 182.30
and seal coat Type B as per drawings and technical specification Clause 1904.2

iii Repair to pot holes and removal of loose material, trimming of sides, cleaning of sqm 178.70
surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B
specification Clause 1904.2
iv Repair to pot holes and removal of loose material, trimming of sides, cleaning of sqm 192.30
surface by providing tack coat with bitumen emulsion, 20 mm thick pre-mix carpet
using catonic bitumen emulsion and seal coat type B with bitumen emulsion

15.4 Maintenance of Gravel Road

Maintenance of gravel road including making up the loss of profile, rectifying sqm 347.80
corrugated surface, filling up of depressions, pot holes and erosion gullies by
adding fresh material and compacting it with appropriate equipment or to strip
excess of material from the road surface as per drawings and technical
specification Clause 1905
15.5 Maintenance of WBM Road

Maintenance of WBM road including filling up of pot holes, ruts and rectifying sqm 298.80
corrugated surface, damaged edges and ravelling as per technical specification
Clause 1906.

15.6 Maintenance of Drains

The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, m 2.60
regrading, deepening of side drains as well as catch water drains as per technical
specification Clause 1907.

15.7 Maintenance of Culverts


Item Description Unit Rate
No. (Rs.)
I Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, One No. 1,525.50
repairs to cracks, parapet wall and protection work as per drawing and technical Hume Pipe
specification Clause 1908

ii Maintenance of Culverts Slab type

Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, Culvert 3,020.40
repairs to cracks, parapet walls and Protection works as per drawing and
technical specification Clasue 1908

15.8 Maintenance of Causeway

Maintenance of Causeway by way of minor Surface repairs, replacing Guide m 71.80


Posts, repair of flood gauges, removal of debris, providing boulders and
protection work and painting as per technical specification Clause 1909

15.9 Maintenance of Road Signs

Maintenance of road signs by way of cleaning and repainting of mandatory / km 1,173.90


requlatory / cautionary / informatory and place identifications sign board as
perdrawings and technical specification Clause 1910
15.10 Maintenance of steel and RCC Railing

I Repair of steel railing to bring it to original shape cleaning and repainting as per
drawing and technical specification Clause 1911
Steel Railing Running m 256.40
ii Repair of RCC railing to bring it to the original shape, cleaning and repainting as
per drawings and technical specification Clause 1911

RCC Railing m 141.50

15.11 Maintenance of 200 metre and km stones

Maintenance of 200 metre km stone by way of refiting of tilted stones repairing


with cement mortar, cleaning, repairing and lettering on 200 metre km stone and
5th km stone as per drawing and technical specification Clause 1912
I Painting two coats with synthetic enamel paint sqm 194.60

ii Printing letters and figures of any shade with synthtic enamel paint of any km 638.40
approved colour to give an even shade
15.12 Cutting of branches of trees shrubs and trimming of grass and weeds

I Cutting of branches of trees and shrubs from the road way or with in R.O.W one tree 111.20
including disposal of wood and leaves to suitable location as per technical
specification Clause 1914

ii Cutting of shrubs from the road way or with in R.O.W and disposal of shrubs to each 6.50
suitable locations as per technical specifications Clause 1914

iii Trimming of grass and weeds from the shoulders/berms and disposing off the sqm 2.20
same to suitable locations as per technical specifications Clause 1914
15.13 White washing of parapet walls of CD work and tree truncks

White washing two coats on parapet walls and tree trunks including preparation sqm 17.80
of surface by cleaning scraping etc. as per technical specifications Clause 1915

15.14 Periodical Renewal to existing bituminous surface

1 Open graded Premix carpet 20 mm thick


I) Tack coat
Item Description Unit Rate
No. (Rs.)
Rates as per item 5.2 (ii) sqm

ii) Pre-mix carpet using bituminous (penetration grade modified bitumen) binder
Rates as per item No. 5.9 sqm

OR
iii) Premix carpet using bitumen Emulsion

Rates as per item No. 5.10 sqm

iv) Seal coat Type A, B or C

Rates as per item No. 5.11 sqm

2 Surface dressing single coat/first coat or 2nd coat


Rates as per item No. 5.6 sqm
Chapter-16

Miscellaneous items

Preamble
1 This Chapter includes various miscellaneous items, which are not covered by
MORD specification for Rural Road 2004.

2 As per latest revised version of MoRD specification for rural RoadsSpecific


importance to some new items alongwith few new technologies like cold mix,
soil stabilization in subgrade and Base, use of locally available marginal
materials, Industrial wastes, provisions of proper road signs and other traffic
control devices, Geosynthetics, Jute geo textiles has been included in this
edition.

3 The other items includes Cold weather bridge, Bamboo bridge, Timber bridge,
etc in APWD works which are not covered by MORD and MoSRT&H Data
book.
Summa
f
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
CHAPTER-16
MISCELLENEOUS ITEMS OF WORK
Soil stabilisation using woven Jute Geo-Textiles
16.1 Wooven Jute Geo Textile for Road Construction and slope
management purpose: (Supplying, testing and installation of 100cm
wide woven jute geotextiles(JGT) 724 gm/sq.m posseing tensile
strength of 25kn/m (+10%,-5% tolerance) with a porometry around 150
to 400 microns and thickness 2 mm for application on road sub grades
and embankments. Jute fabric to be laid with overlaps of 100mm sq.m. 97.40
crosswise and 300 mm longitudinally duly secured to subgrade by U
shaped m.s staples (11 gauge)/ round head country nail of 150mm
length at an interval of 750mm as per direction of the engineer-in-
charge).(Rates F.O.R Guwahati)

16.2 Wooven Jute Geo Textile for River Bank Protection: (Supplying,
testing and installation of 100cm wide woven jute geotextiles(JGT) 627
gm/sq.m posseing tensile strength of 20kn/m (+10%,-5% tolerance)
with a porometry around 150 to 400 microns and thickness 2 mm for
application in river bank protection work. Jute fabric to be laid with
sq.m. 114.80
overlaps of 100mm crosswise and 300 mm longitudinally duly secured
by U shaped MS staples (11 gauge)/ round head country nail of 150mm
length at an interval of 750mm as per direction of the engineer-in-
charge).(Rates F.O.R Guwahati)

16.3 Open weave Jute Geo Textiles for control of surficial soil erosion:
(Supplying,testing and installation of 100cm wide woven jute
geotextiles(JGT) 500 gm/sqm posseing tensile strength of 6.5kN/m on
slopes of embankment dressed and cut to a stable gradient for control
of surface soil erosion. Jute fabric to be laid with overlaps of 100mm
sq.m. 45.70
crosswise and 300 mm longitudinally duly secured by U shaped MS
staples (11 gauge)/ round head country nail of 150mm length at an
interval of 750mm as per direction of the engineer-in-charge).(Rates
F.O.R Guwahati)

Soil/ Sub-Grade stabilisation using non-woven Geo-Textiles/ Geo-


Grids
16.4 Providing and laying one layer of Non-Woven geotextile of minimum
mass per unit area of 280gms/sqm.having minimum roll width of 5.0m
treated with carbon black with physical properties as given in clause no
702.2.3. over 25mm thick compacted sand layer on a prepared
sqm 180.70
subgrade as a filter media with necessary overlaps as per drawing and
technical specification and as directed by the Engineer in charge
complete.

16.5 Providing and laying one layer of Biaxial P.V.C.Knitted coated polyster
Geogrid of unit roll width of 5.0m having minimum tensile strength of
40KN/m in both direction at a maximum elongation of 15% in th direction
of the length of the roll and satisfying all requirements of IS Code/BIS
code of practice and tests prescribed in ASTM or British standards or sqm 314.60
ISO on prepared subgrade as a seperator cum reinforceing agent with
necessary overlaps as per drawing and technical specification and as
directed by the Executive Engineer in charge complete.

Soil/ Sub-Grade and Base course stabilisation using RBI-81


products
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.6 Providing, laying, spreading and compacting available soil (excluding
clay soil) in Sub-grade course including insitu mixing 4% of RBI 81
product, spreading in uniform layers with motor grader on a prepared
base including watering and compacting with 8 to 10 tonne vibratory cum 3607.70
power roller to achieve the desired density including all materials, labour,
HOM of machinery, etc complete as per specifications.

16.7 Providing, laying, spreading and compacting available clay soil in Sub-
grade course including in situ mixing 30% Stone Dust, 70% Soil & 4%
of RBI 81 product, spreading in uniform layers with motor grader on a
prepared base including watering and compacting with 8 to 10 tonne cum 3876.00
vibratory power roller to achieve the desired density including all
materials, labour, HOM of machinery, etc complete as per
specifications.
16.8 Providing, laying, spreading and compacting available soil (excluding
clay soil) and aggregate in base course including in situ mixing 30%
Aggregate, 70% Soil & 4% of RBI 81 product, spreading in uniform
layers with motor grader on a prepared base including watering and
cum 4438.00
compacting with 8 to 10 tonne vibratory power roller to achieve the
desired density including all materials, labour, HOM of machinery, etc
complete as per specifications.

16.9 Providing, laying, spreading and compacting available soil in base


course including in situ mixing 30% Aggregate, 20% Stone Dust, 50%
Soil & 4% of RBI 81 product, spreading in uniform layers with motor
grader on a prepared base including watering and compacting with 8 to cum 4672.60
10 tonne vibratory power roller to achieve the desired density including
all materials, labour, HOM of machinery, etc complete as per
specifications.
Misc. Base/ Sub-base Works
16.10 Construction of Base/ Sub-base of pavement with lean concrete-
Fly ash: (Construction of Base/sub-base using cement, sand, fly ash
and coarse aggregates proportioned as per table 4 of IRC: 74/1979 and
with water content ratio, slump and compressive strength as defined in
the said table, mix prepared in a batching and mixing plant and
cum 3335.00
compacted with a vibratory roller 8 to 10 tonnes capacity within the time
limit laid down vide clause 7.6.3. of I.R.C. 74-1979,construction joint
properly formed at end of the days work,cured for 14 days all specified
in IRC 74-1979.)

16.11 Cement Treated Crushed Rock or combination as per clause 403.2


and table 400.4in Sub base/ Base (Providing, laying and spreading
Material on a prepared sub grade, adding the designed quantity of
cement to the spread Material, mixing in place with rotavator grading
with motor grader and compacting with road roller at OMC to achieve
desired unconfined compressive strength and to form a layer of sub
base / base)
(i) For Sub-Base course cum 2345.00
(ii) For Base course cum 1989.00
16.12 Crushed Cement Concrete Sub-base / Base: (Breaking and crushing
of material obtained by breaking damaged cement concrete slabs to
size range not exceeding 75 mm as specified in table 400.7 transporting
the aggregates obtained from breaking of cement concre slabs at a lead cum 364.00
of 10km,laying and compacting the same as sub base/base
course,constructed as WBM to cl. 404 except the use of screening or
binding material)
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.13 Penetration Coat Over Top Layer of Crushed Cement Concrete
Base: (Spraying of bitumen over cleaned dry surface of crushed
cement concrete base at the rate of 15 kg per 10 sqm by a bitumen
sqm 58.00
pressure distributor, spreading of key aggregates at the rate of 0.13
cum per 10 sqm by a mechanical gritter and rolling the surface as per
506.3.8)
Misc. Bituminous & Cold Mix Works
16.14 20mm thick Open-Graded Premix Carpet using Bituminous
(penetration grade/ modified bitumen) Binder: Using Paver finisher
hydrostatic with sensor control @ 75 cum per hour
Providing, laying and rolling of open-graded premix carpet of 20 mm
thickness composed of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or emulsion to required line, grade and level
to serve as wearing course on a previously prepared base, including
mixing in a suitable plant, laying and rolling with a three wheel 80-100 sqm 166.27
kN static roller capacity, finished to required level and grades to be
followed by seal coat of either Type A or Type B or Type C as per
Technical Specification Clause 508.

16.15 Surface Dressing: (Providing and laying surface dressing as wearing


course in single coat using crushed stone aggregates of specified size
on a layer of bituminous binder laid on prepared surface and rolling with
510
8-10 tonne smooth wheeled steel roller) (Including cost of testing of
materials at site and laboratory as directed by the deptt.)

I Without anti stripping agent


A With Bitumen emulsion CRS-2
(i) 19 mm nominal chipping size sqm 89.80
(ii) 13 mm nominal chipping size sqm 74.50
II With anti stripping agent as per IS:14982 (Refer Appendix-5 of
MoSRT&H specification)
A With Bitumen emulsion CRS-2
(i) 19 mm nominal chipping size sqm 89.80
(ii) 13 mm nominal chipping size sqm 69.40
16.16 Slurry Seal: (Providing and laying slurry seal consisting of a mixture of
fine aggregates, portland cement filler, bituminous emulsion(CSS-2) and
516 water on a road surface including cleaning of surface, mixing of slurry
seal in a suitable mobile plant, laying and compacting to provide even
riding surface.)
(i) 5.0 mm thickness sqm 74.50
(ii) 3.0 mm thickness sqm 51.00
(iii) 1.5 mm thickness sqm 31.60
16.17 Fog Spray: (Providing and applying low viscosity bitumen emulsion
(CSS-1/CSS-1h) for sealing crack less than 3mm wide on incipient
518
frepping for dis integration in existing surfacing.)

A With Bitumen emulsion CSS-1 (IS:8887-2004)


(i) Without blinding sqm 39.80
(ii) Extra for blinding the fog spray sqm 5.10
B With Bitumen emulsion CSS-1h
(i) Without blinding sqm 41.80
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(ii) Extra for blinding the fog spray sqm 5.10
16.18 Cold Mix binder (including Gravel Emulsion) (as per IRC:SP-100-
2014): Providing, laying and rolling of bituminous cold mix on prepared
base consisting of a mixture of unheated mineral aggregate and
519
emulsified bitumen, including mixing in a plant of suitable type and
capacity, transporting, laying, compacting and finishing to specified
grades and levels.
(i) Using bitumen emulsion and 9.5 mm or 13.2 mm nominal size
cum 12381.20
aggregate
(ii) Using bitumen emulsion and 19 mm or 26.5 mm nominal size aggregate
cum 12519.10
(iii) Using bitumen emulsion and 9.5 mm or 13.2 mm nominal size
cum 8702.80
aggregate
(iv) Using bitumen emulsion and 19 mm or 26.5 mm nominal size aggregate
cum 8812.50
16.19 Crack Filling: (Filling of crack using slow - curing bitumen emulsion
3004.3.3 and applying crusher dust in case crack are wider than 3mm) Rm 4.10

16.20 Seal coat with Cold mix Binder: Providing and laying seal coat sealing
the voids in a bituminous surface laid to the specified levels grade and
cross fall using Type A,Type B and Type C as per Technical
specification clause 510.With cold mix Binder(As per IRC:SP:100-
2014)and through credible technology partners duly licensed by CRRI.

I By manual means
A Case-1: Type A (11.2mm to2.36mm)
(i) Bitumen Emulsion (RS-2) sqm 57.30
B Case-II: Type-B (2.36mm to 180 micron)
(i) Bitumen Emulsion (RS-1) sqm 42.20
C Case III:Type-C (9.5mm to 2.36mm)
(i) Bitumen Emulsion (RS-2) sqm 45.80
II By mechanical means
A Case-1: Type A (11.2mm to2.36mm)
(i) Bitumen Emulsion (RS-2) sqm 56.60
B Case-II: Type-B (2.36mm to 180 micron)
(i) Bitumen Emulsion (RS-1) sqm 45.00
C Case III:Type-C (9.5mm to 2.36mm)
(i) Bitumen Emulsion (RS-2) sqm 47.30
GEOSYNTHETICS AND REINFORCED EARTH
16.21 Sub-Surface Drain with Geotextiles: Construction of sub surface
drain 200 mm dia using geotextiles treated with carbon black with
physical properties as given in clause 702.2.3 formed in to a stable
network and a planar geocomposite structure, joints wrapped with metre 1291.00
geotextile to prevent ingress of soil all as per clause 702 and approved
drawing including excavation and back filling.
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.22 Narrow Filter Sub-Surface Drain: Construction of a narrow filter sub-
surface drain consisting of porous or perforated pipe laid in narrow
trench surrounded by a geotextile filter fabric, with a minimum of 450 metre 1022.00
mm overlap of fabric and installed as per clause 702.3 and 309.3.5
including excavation and backfilling .
16.23 Paving Fabric Beneath a Pavement Overlay: Providing and laying
paving fabric with physical requirements as per table 704-2 over a tack
coat of paving grade Bitumen 80-100 penetration, laid at the rate of 1 kg
per sqm over thoroughly cleaned and repaired surface to provide a
water resistant membrane and crack retarding layer. Paving fabric to be sqm 414.00
free of wrinkling and folding and to be laid before cooling of tack coat,
brooming and rolling of surfaces with pneumatic roller to maximise
paving fabrics contact with pavement surfaces.

16.24 Boulder Apron in Crates of Synthetic Geogrids: Providing, preparing


and laying of geogrid crated apron 1 m x 5 m, 600 mm thick including
excavation and backfilling with baffles at 1 metre interval, made with
geogrids having characteristics as per clause 704.2, joining sides with
connectors/ring staple, top corners to be tie tensioned , placing of
suitable crioss interval ties in layers of 300 mm connecting opposite side
with lateral braces and tied with polymer braids to avoid bulging ,
cum 1169.00
constructed as per clause 704.3 filled with stone with minimum size of
200mm and specific gravity not less than 2.65, packed witkh stone
spalls, keyed to the foundation recess in case of sloping ground and laid
over a layer of Geotextile to prevent migration of fines , all as per clause
704 and laid as per clause 2503.3 and approved design.

16.25 Reinforced Earth Retaining Wall: (Reinforced earth retaining walls


including four main components of (a) Excavation for foundation,
foundation concrete and cement concrete grooved seating in the
foundation for facing elements (facia material), (b) Facia material and
its placement, (c) Assembling, joining with facing elements and laying of
the reinforcing elements and (d) Earth fill with granular material which is
to be retained by the wall complete as per Technical Specification and
Drawings.
I 18mm thick, M-35 grade RCC Facing elements of shape and size as
per design and drawing with bearing pads, joint fillers, tie strips,
sqm 2476.50
fastener and all accessories and consumable complete.

II Assembling, joining and laying of reinforcing elements.


A With High Adherence Structural Reinforcing 40 x 5mm elements of
Steel / Copper / Aluminium / Polymeric strips.
(i) Type-1: Galvanised Carbon Steel Strips metre 343.00
(ii) Type-2: Copper Strips metre 1544.00
(iii) Type-3: Aluminium Strips metre 670.00
(iv) Type-4: Stainless Steel Strips metre 914.00
(v) Type-5: Glass reinforced / Fibre reinforced Polymeric strips metre 914.00
B With Reinforcing elements of Synthetic Geogrids sqm 471.00
III Earth work including excavation, backfilling, grading and compaction
with selected backfill soil in layers in Reinforced Earth works as per cu.m. 167.60
Technical specification and drawings.
IV Construction of PCC strips level footing (35cm x 15cm) in M-15 grade
concrete complete as per technical specification and drawing. meter 330.90
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
V Providing 600mm drainage bay behind RE wall with compacted granular
cum 1269.50
material as per technical specification and drawing.
VI Construction of crash barrier, parapet, coping beam with friction slab in
M-30 grade concrete complete as per technical specification and meter 1760.00
drawing.
Miscelleneous Road Pavement Works
16.26 Labour for spreading metal gravel / granular material on the road
surface as directed including dressing and cambering the formation and
Cum 192.40
utilizing the loose earth in filling the depression as directed including
carriage of gravel within 30m.
16.27 Close graded Premix Surfacing using cationic Bitumen Emulsion
SS-2 or Tailor made as per(IRC:SP:100-2014):
(Providing, laying and rolling of close-graded premix surfacing material
of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2
mm to 0.9 mm (Type-B) aggregates using Bitumen emulsion to required
line, grade and level to serve as wearing course on a previously
prepared base, including mixing in a suitable plant, laying and rolling
with a three wheel 8-10 kN static roller and finishing to required level
and grades as per Technical Specification Clause 509)

A Manual Means
(i) Type-A sqm 195.00
(ii) Type-B sqm 186.00
Miscelleneous Road Appurtenances
16.28 RCC Guard Post: Supplying, fitting and fixing RCC guard post 150cm
long erected 75cm above the ground and 75cm below the ground with
M-15 grade (nominal mix 1:2:4 with broken stone aggregate up to
20mm size) of cement concrete and required reinforcement tied in
position with annealed black wire including centering, moulding the top,
curing including painting concrete surfaces in 23cm strips upto 0.75m
from the top alternately in black and white and having 2 nos. reflective
band of desired shade etc. complete as per design and as directed.

(a) 30 cm dia. RCC guard post with reinforcement of 6nos. 12mm dia TMT
Each 2239.00
main steel bars and 6mm TMT/ MS stirrups at 15cm c/c.
(b) 15 cm dia. RCC guard post with reinforcement of 4nos. 12mm dia TMT
Each 1172.00
main steel bars and 6mm TMT/ MS stirrups at 15cm c/c.
16.29 Dressed Wood Guard Post: Supplying, fitting and fixing 20cm to
25cm diameter Jungle Wood Dressed guard post of 150cm long
erected 75cm above the ground and 75cm below the ground, fitted with
horizantal struts size 50mm x 50mm x 550mm long at bottom with
necessary nails necessary etc. including coal tarring one coat below Each 504.80
ground and painting surfaces in 23cm strips upto 0.75m from the top
alternately in black and white and having 2 nos. reflective band of
desired shade etc. complete as per design and as directed.

16.30 RCC Pipe Delineator


Providing of hume pipe delineator, 250 mm in diameter, 1250 mm high,
having 25mm skin thickness filled with earth for stability up to 5 cm
from top and remaining filled with 1:3:6 c.c.in spherical segment to
Each 2873.00
prevent percolation of water and emeded in c.c. (1:3:6) below ground
level up to a depth of 500mm, 75mm thick cc surrounding the pipe,
painted white as per approved drawing.
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.31 Drum Delineator
Providing of metal drum/empty bitumen drum delineator, 600 mm in
diameter, 800 mm high, filled with earth for stability up to 5 cm from top
and remaining filled with 1:3:6 c.c. to prevent percolation of water, Each 734.00
painted in circumferential strips of alternate black and white 120 mm
wide all as per IRC:SP:55-2001and drawing.

16.32 Pre fabricated railing:


Providing,fitting and erecting pre fabricated railing of STRUCTURA
materials having size of 2.00x0.90M in panels made of
25x25x2.6/40x40x2.6 vertical bars and 40x40x2.6/32x32x2.6 horizontal
metre 1508.20
bars.The two end posts of each panel are founded with M-15 cement
concrete up to a depth of 200mm with anti corrosive primer and paint
etc. complete as per approved drawing and technical specification as
directed..
16.33 408 Cast in Situ Cement Concrete M20 kerb (Construction of cement
concrete kerb with top and bottom width 115 and 165 mm respectively,
250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm
thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually,
all complete as per clause 408.

A Using Concrete Mixer metre 324.50


B Using Concrete Batching and Mixing Plant metre 326.50
16.34 Cast in Situ Cement Concrete M 20 Kerb with Channel (Construction of
cement concrete kerb with channel with top and bottom width 115 and
165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade
foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in
PCC M20 grade , sloped towards the kerb, kerb stone with channel laid
with kerb laying machine,foundation concrete manually all complete as
per clause 408.)

A Using Concrete Mixer metre 605.00


B Using Concrete Batching and Mixing Plant metre 606.40
16.35 Reinforced Cement Concrete Crash Barrier (Provision of an
Reinforced cement concrete crash barrier at the edges of the road,
approaches to bridge structures and medians, constructed with M-20
grade concrete with HYSD reinforcement conforming to IRC:21 and
dowel bar 25mm dia, 450mm long at expansion joints filled with pre
moulded asphalt filler board, keyed to the structure on which it is built metre 4449.50
and installed as per design given in the enclouser to MOST circular No.
RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the
approved drawing and at locations directed by the engineer, all as
specified.

16.36 810 Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash
Barrier (Providing and erecting a "W" metal beam crash barrier
comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm
above road/ground level, fixed on ISMC series channel vertical post, 150
x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below
metre 4293.90
ground/road level, all steel parts and fitments to be galvanized by hot dip
process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to
be fixedon the vertical post with a spacer of channel section 150mm x
75mm x 5mm, 330mm long complete as per clause 810.)
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.37 810 Metal Beam Crash Barrier, Type - A: "THRIE" Metal Beam Crash
Barrier (Providing and erecting a "Thrie" metal beam crash barrier
comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm
above road/ground level, fixed on ISMC series channel vertical post, 150
x 75 x 5 mm spaced 2m center to center, 12 m high, 1.15m below
ground level, all steel parts and fitments to be galvanized by hot dip metre 5968.90
process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to
be fixed on the vertical post with a spacer of channel section
150mmX75mmX5mm, 546mm long complete as per clause 810.)

16.38 803 Road Marking with Hot Applied Thermoplastic Compound with
Reflectorising Glass Beads on Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mm
thick including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass beads as per
sqm 501.00
IRC:35 .The finished surface to be level, uniform and free from streaks
and holes and conforming to the MoSrt&H specifications

16.39 Portable Barricade in Construction Zone (Installation of a steel


portable barricade with horizontal rail 300 mm wide, 2.5 m in length
fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5
m in height, horizontal rail painted (2 coats) with yellow and white each 3426.80
stripes , 150mmin width at an angle of 450, 'A' frame painted with 2
coats of yellow paint, complete as per IRC:SP:55-2001.

16.40 Permanent Type Barricade in Construction Zone with Steel


Components (Construction of a permanent type barricade made of
steel components, 1.5 m high from road level, fitted with 3 horizontal
rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle iron vertical each 5370.70
support, painted with yellow and white strips 150mm in width at an
angle of 450, complete as per IRC:SP:55-2001.
16.41 Lighting on Bridges (Providing and fixing lighting on bridges, mounted
on steel hollow circular poles of standard specifications, 5 m high fixed
on parapets with cement concrete, 20 m apart and fitted with sodium each 18526.00
vapour lamp) (cement concrete to be measured and paid separately)

16.42 Tree reflector made of high intensity grade retro-reflectorised sheeting


fixed over aluminium sheeting of 2mm/0.28mm thick firmly fixed with
necessary galvanized nail.

(a) 100mm dia/ 100mm x 100mm size each 79.60


(b) 150mm dia/ 150mm x 150mm size each 112.20
16.43 Providing reflective pavement marker with Micro prismatic lens in both
direction having thermoplastic body adhering to the specification and
guidelines of MoSRT&H’s fixed to the road surface using the adhesives
and the procedures recommended by the manufacturers with three each 254.00
months replacement warranty and free maintenance.

16.44 Providing and fixing lane divider with dimensions 220x150x285 mm


base plate 25 mm high Two- way reflective with 1 or 2x128 glass
elements rubber flag with 2 round glass reflectors each 994.50

Spurs & Palasiding Works


Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.45 Single bamboo spur and palasiding of whole 2nd class bamboo (Jati or
Bethua) 65mm to 75mm dia closely packed & driven, including fitting
and fixing with half bamboo kamis horizantally in three rows with the
cane or tieing wire complete and struts 1500 mm apart longitudinally
and providing brush wood as per drawing and technical specification
clause 1302.5 of MORD

(a) Driven at least 900mm below and 1800 mm above the ground on
meter 616.20
average.
(b) Driven at least 900mm below and 900 mm above the ground on average
meter 502.70
16.46 Single bamboo spur and palasiding of whole 1st class bamboo (Bholuka
or Barua) 85mm to 100mm dia closely packed & driven, including fitting
and fixing with half 2nd class bamboo (Jati or Bethua) bamboo kamis
horizantally in three rows with the cane or tieing wire complete and
struts 1500 mm apart longitudinally and providing brush wood as per
drawing and technical specification clause 1302.5 of MORD.

(a) Driven at least 900mm below and 1800 mm above the ground on
meter 698.90
average.
(b) Driven at least 900mm below and 900 mm above the ground on average
meter 427.40
(c) Driven at least 900mm below and 1200 mm above the ground on
meter 397.70
average
16.47 Bamboo spur 'A' type with whole bamboo placed 230mm center to
center driven 900mm below ground and 1200mm to 1500mm above the
ground tied with 2nd class bamboo (Jati or Bethua) on either side at
450mm apart horizantally with galvanized wire etc. complete as per
drawing and technical specifications.
(a) 2nd class bamboo (Jati or Bethua) 65mm to 75mm dia. meter 651.10
(b) 1st class bamboo (Bholuka or Barua) 85mm to 100mm dia. meter 532.40
16.48 Bamboo single spur 'A' type with 1st class bamboo (Bholuka or Barua)
85mm to 100mm dia, driven closely placed 3m to 4m above the ground
and 1.20m to 1.5m below the ground and tied with cane or coir string,
half 2nd class bamboo (Jati or Bethua) kamis horizontally on both face
placed not more than one meter apart including whole bamboo struts meter 914.20
inside one meter apart and 2nos. of purlin at top and bottom fitted with
vertical struts at 1500mm apart and filling with brushwood or jungle
wood inside the spur complete as per drawing and technical
specifications.
16.49 Close bamboo toe walling with 65mm to 75mm diameter bamboos of
length ranging from 1.2m to 3.0m driven at least 150mm c/c and
provided with three horizontal split bamboo runner fixed with nails meter 736.00
complete including coal tarring as directed (Rate inclusive of cost of the
required quantity of tar)
16.50 Double timber spur with two rows of 1st class local wood (Azar/ Nahar/
Nageswar/ Zarul) timber piles of 150mm to 200mm dia driven 800mm
c/c apart upto minimum 2000mm below ground and 3600mm above
ground and average placed at 800mm belt, bracing etc. of 100mm x
meter 25584.60
75mm size dia bolts and nuts etc. including coal tarring of timber
members and necessary bamboo staging etc. as directed and as per
drawing and technical specifications.

16.51 Supplying and filling up hollows of the timber spur to an average height
of 3600mm above the ground with jungle wood branches as directed meter 55.10
and as per drawing and technical specifications.
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.52 Providing split bamboo digonally wooven lining over slope of bridges,
abutement and road embakement etc. secured to the ground at least
70cm long bamboo pegs and half bamboo horizontally at 100cm center sqm 114.50
to center both ways complete as directed.

16.53 Supplying, fitting and fixing whole Bholuka or Barua bamboo pegs
85mm to 100mm dia, closely placed all round the hollows of spur fitted
with necessary nail in the horizontal timber between 90 cm below
ground and 360cm above ground on average (timber works will be paid
for separately).
(a) For 360 cm above ground on average meter 775.30
(b) For 200 cm above ground on average meter 619.30
0 Earthwork by Head Load
16.54 Earthwork in filling in the guide bund by head load up to lead of 60m
with approved quality all leads and lifts ramming and compacting with
rammer weighing not less than 10kg and falling from height of not less
than 90cm and sprinkling with water if necessary. earth is to collected
cum 90.10
after removing the 1st 20cm of top soil and should be free from grass,
shrubs and other foreign matter and rate will be including payment of
land compensation.

(a) Extra lead for each 30cm and part thereof beyond 60m up to a lead
cum 11.90
200m.
(b) Extra lift for each 1.50m or part thereof beyond the initial lift of 1.50m
cum 11.90
Miscelleneous Embankment Protection
16.55 Providing approved variety of vetiver plantation certified by The Vetiver
Network International (TVNI) or its affiliate in India including pouching of
tiller with selected soil for agricultural use mixed with farmyard manure
in 8”x 6” poly pouch, maintaining the pouched plants for at least 1(one)
month with application of growth promoter, fertilizer, watering, weeding
etc., dressing of the area of plantation, planting the pouched plants as
per design approved by The Vetiver Network International (TVNI) or its
affiliate in India. (Excluding jungle clearance, earth work in trimming,
cutting, filling etc.) and Maintenance of the vetiver plants by watering,
pruning, weeding, mulching, application of manure, fertilizer, growth
promoter etc. for 4 (four) months after completion of plantation.

(a) Part-1 Plantation Part metre 83.60


(b) Part-II Maintenance part metre 28.60
16.56 307 Spreading of Sludge Farm Yard Manure or/and good Earth (Spreading
of sludge farm yard manure or/ and good earth in required thickness
(cost of sludge, farm- yard manure or/and good earth to be paid for cum 15.30
separately))

16.57 Grassing with ' Doobs' Grass (Grassing with 'Doobs' grass including
watering and maintenance of the lawn for 30 days or more till the grass
forms a thick lawn free from weeds and fit for moving including
supplying good earth if needed)

(i) In rows 15 cm apart in either direction sqm 28.60


(ii) In rows 7.5 cm apart in either direction sqm 52.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.58 Labour for laying apron with man size boulders by hand packing the
stone with dry stone masonry template crosswalls to ensure regular and
orderly deposition of the full intended quality of stone in the apron
including labour for buildung these walls about one meter thick and to
cum 1295.40
the full height of the specific thockness of the apron at interval of 30
meters all along the length of the apron with local carriage of stone
within 60 meters complete.

16.59 Stone masonry work:


Uncoursed rubble masonry work in all retaining wall, wing wall,
abutement etc. in cement mortar 1;6 withoutside face stone roughly
hammer dressed and inside (earthen side) undressed as per drawing cum 5592.80
and technical sopecifications including racking out joints and curing ,
supplying and carriage of stone as directed.

Tree Plantation
16.60 Planting of Trees and their Maintenance for three Year (Planting of
trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep
dug in the ground, mixing the soil with decayed farm yard/sludge
each 673.20
mannure, planting the saplings, backfilling the trenches, watering ,
fixing the tree guatrd and maintaining the plants for three year.

16.61 Compensatory Afforestation (Planting trees as compensatory


afforestation at the rate of 290 trees per hectare at a spacing of 6 m by
grubbing and leveling the ground upto a depth of 150 mm, digging
hectare 102176.50
holes 0.9 m dia, 1 m deep, mixing farm yard/sludge manure with soil ,
planting of sapling 2m high with 25cm dia stem, backfilling the hole and
watering.
Geo-Bags
16.62 Supplying, filling and laying in loose with Geo-textile bags of Type-A
(1.30m x 0.70m) made of Geo textile non woven fabric sheets of 400
GSM manufactured from polyster/ polypropylene conforming to relevant
ISO standard filled with specified sand/ silt from flood plain or adjacent
char within a distance of 90 m of the work site including excavation,
filling Geo bags with sand weighing 126.00 kg after filling, stitching the
mouth of the filled bags with polypropylene or polyster complete as per
technical specifications and as directed.

(a) With Boat Bag 298.00


(b) Without Boat Bag 286.00
16.63 Supply, Stitching and Laying of Non wooven Geo textile Fabric sheet of
Sqm 210.00
400 gsm
16.64 Supplying, filling and laying in cages with Geo-textile bags of Type-A
(1.30m x 0.70m) made of Geo textile non woven fabric sheets of 400
GSM manufactured from polyster/ polypropylene conforming to relevant
ISO standard filled with specified sand/ silt from flood plain or adjacent
char within a distance of 90 m of the work site including excavation,
filling Geo bags with sand weighing 126.00 kg after filling, stitching the
mouth of the filled bags with polypropylene or polyster thread by power
driven double needle machine, stacking the same in batches of 100,
carrying the same to the dumping site including all handling charges
and local carriage within a distance of 150m and laying properly in
cages of PVC coated G.I.Gabion box of size 1.5m x 1.5m x 0.45m
complete as per technical specifications and as directed.

(a) With Boat Cage 1051.00


(b) Without Boat Cage 687.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.65 Earthwork in excavation in key cage of size 1.00m x 1.00m x 1.00m for
anchoring geo fabrics mat including supply and filling of geo bags (bags
are filled with sand/silt from flood plain or adjacent char within a
distance of 90 m of the work site), filling geo bags with sand weighing
126kg after filling, stitching mouth with polyster/ polypropylene thread by Cum 3461.00
power driven double needle machine, carrying the same to the site
including all handling charges and local carriage from a distance of
150m complete as per technical specifications and as directed.

16.66 Supplying, laying, fitting and fixing g-mat in doubled layer composite geo
textile fabricated to form a three dimensional mattresses after filling
sand by pump, the upper layer of mattress being heavily woven with
polyproplyne fabric needle punched with a mixture of U.V. stabilized
green fibres and cut tape yarns (Typical value of mass per unit area
ASTM D5261) is 650g/sqm, tensile strength (ASTMD4595)is 45kn/m,
pore size (ASTMD4751) is less than 0.35mm and UV stability (strength
retained per ASTMD4355-92 @ 500hrs is 80%) the lower layer of the
mattress being polypropyline wooven fabric, UV stabilized (Typical value
Sqm 2417.90
of mass per unit area (ASTM D 4595) is greater than 80kn/m, pore size
(ASTMD4751) is less than 0.35mm and UV stability (strength retained
per ASTM4355-92 @ 500hrs is 80%). The sewing thread being of high
tenacity polyster, continued parrell stitches positioned 350mm apart with
a stitch length not exeeding 40mm anchoring by cutting trenches of
1.5m x 1m placing the mat filling earth filled cement bags anchorage at
lower end, double locking chain stitch 3 stitch/inch including all charges
complete. (Approved rate of CWC for the FMP scheme under WRD)

Miscelleneous Bridge Works


16.67 Providing and constructing temporary island for construction of pile
foundation with depth of water upto 4.0m complete as per technical each 56383.70
specification.
16.68 Providing and constructing temporary island for construction of well
foundation complete as per technical specification.
(a) For 6m dia. Well
(i) Depth of water above 1.0 m upto 2.0 m each 115345.30
(ii) Depth of water above 2.0 m upto 3.0 m each 146526.20
(iii) Depth of water above 3.0 m upto 4.0 m each 165819.80
(b) For 7m dia. Well
(i) Depth of water above 1.0 m upto 2.0 m each 125338.40
(ii) Depth of water above 2.0 m upto 3.0 m each 161564.00
(iii) Depth of water above 3.0 m upto 4.0 m each 195643.20
(c) For 8m dia. Well
(i) Depth of water above 1.0 m upto 2.0 m each 134891.40
(ii) Depth of water above 2.0 m upto 3.0 m each 172001.50
(iii) Depth of water above 3.0 m upto 4.0 m each 209394.70
16.69 Greasing of Bearing with ULTRATACK AP3 grease including cleaeing
of bearings with steel brush, removal of dusts and dirt with necessary
each 1237.70
scaffolding etc. complete as directed by the department.

Bamboo Bridge
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.70 Construction of cold weather Bamboo bridge overall width of 3.70m and
clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In
each rows and rows being 2.1m. apart except for the navigable span
which should be 3m. Post to be driven at least 180cm. or more below
ground level including providing 20cm to 25cm center to center and
placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood
bracing collar fixed by bolts and nuts, straps etc. mature bholuka
Bamboo cross groth all closely packed and tied 75cm wide track way
meter 12026.10
made from 38mm thick 1st class local plank fixed on 75mmx100mm
first class local wood battens 120cm apart and 3 lines of jati bamboo
horizantal railing fixed in bholuka bamboo post placed at 210cm apart
and white washed including all necessary nuts and bolts, coir ropes,
struts, nails etc. complete with a layer of brushwood to exposed portion
out-side trackway with earth topping complete as per direction of the
department.

16.71 Construction of temporary Bamboo bridge of 3.70m clear road way


with Bholuka or Barua Bamboo post 5nos. in each rows driven at
least180cm. below ground level and rows not more than 150cm apart
from center to center Bholuka or Barua Bamboo dham longitudinal groth
both closely placed and tied with half bamboo 90cm to 120cm apart in
both layers and ttwo layers of jati bamboo chattais ( top layer should be
digonally woven), 70 mm to 100 mm thick brushwood in between meter 3073.60
chattias should be tied with half jati bamboo on both ends, bamboo
railing with bholuka or barua bamboo post placed at150cm apart jati or
betua bamboo hand rails of two lines both side of every alternate
rows.All tying must be done with cane or coir string and only mature
bamboo should be used in work.

16.72 Making 120mm wide bamboo foot bridge with 100mm Bholuka or Barua
bamboo posts driven 120 cm to 180 cm underground 3 Nos. in each
row and rows being 3m apart bholuka or Barua bamboo dham placed
over the posts and tied with cane or wire , Bholuka or barua bamboo
struts in each row both up and down stream, jati bamboo long gorhs meter 933.40
closely packed and tied with dham. Single layer of mat placed over
75mm thick brush wood and tied with bholuka or Barua bamboo rail
stand fixed in one side of the bridge etc. complete.

Timber Bridge
16.73 Supplying and driving timber piles of 25cm to 30cm diameter, dressed
to heart wood including making length in every 30 cm interval, coal
tarring two (2) coats with best tar applied hot (Rate inclusive of the cost
of the required quantity of tar.)
A Using Sal Timber
(a) Mechanically with Rod monkey and crab winch
(i) Portion of pile actually driven underground. meter 7526.00
(ii) Portion of pile remaining above rground. meter 7423.20
(b) Manually with labour
(i) Portion of pile actually driven underground. meter 6394.60
(ii) Portion of pile remaining above rground. meter 6287.20
B Using Azar/ Nahar/ Nageswar/ Zarul Timber
(a) Mechanically with Rod monkey and crab winch
(i) Portion of pile actually driven underground. meter 6596.00
(ii) Portion of pile remaining above ground. meter 6493.20
(b) Manually with labour
(i) Portion of pile actually driven underground. meter 5464.60
(ii) Portion of pile remaining above rground. meter 5357.20
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.74 Wood work including supplying , fitting and fixing complete with
necessary M.S. bolts, nuts, nails, screw etc. and coal tarring two (2)
coats with best tar applied hot (Rate is inclusive of the cost of the
required quantity of tar.)
A Using Sal Wood
(a) Underssed in floor planks, collars, bracing, standards, wheel guards,
cum 3596.10
struts and railings, runner belts, rail, posts etc.
(b) In track way planks (alternate nailing to be done with decking in a
cum 41130.40
seggragate way.)
B Using Azar/ Nahar/ Nageswar/ Zarul Wood
(a) Undressed in floor planks, collars, bracing, standards, wheel guards,
cum 28591.70
struts and railings, runner belts, rail, posts etc
(b) In track way planks (alternate nailing to be done with decking in a
cum 34608.80
seggragate way.)
16.75 Supplying, fitting and fixing timber beam and bearing beam rectangular
in size fitted with M.S. etc. supplying spikes etc. as necessary and coal
tarring two (2) coats with best tar applied hot as directed (Rate inclusive
of cost of the required quantity of tar)
(a) Using Sal Timber cum 3631.10
(b) Using Azar/ Nahar/ Nageswar/ Zarul Timber cum 28136.60
16.76 Supplying, fitting and fixing 25 cm to 30 cm dia. sal wood log beam
dressed to heartwood including supplying and fixing with 20mm dia
M.S. bolts and nuts etc.including coal tarring two (2) coats with best tar
applied hot as directed (Rate inclusive of cost of the required quantity of
tar)
(a) Using Sal Timber meter 6345.50
(b) Using Azar/ Nahar/ Nageswar/ Zarul Timber meter 5415.50
16.77 Scarfing and joining piles 25 cm to 30 cm diameter, dressed to
heartwood of 90 cm in length includng supplying, fitting and fixing with 2
nos. of 50mm x 10mm MS FI clamps and 16 mm dia MS bolts and nuts each Joints 1377.70
etc. complete as directed. (Timber for piles and coal tarring shall be
measured and paid separately.)
16.78 Labour for taking out old piles of timber bridge with necessary
scaffolding, jati bamboos, jumper ropes etc, complete and stacking each 1481.50
them at suitable places as directed.
16.79 Labour for dismantling all members of the timber bridge (excluding piles)
with necessary scaffolding, jati bamboos, jumper ropes etc, complete
and stacking them at suitable places as directed (all members will be meter 1186.60
under custody of the contractor till taken over by the department)

16.80 Labour for driving timber piles of 25cm to 30cm diameter, dressed to
heartwood marking length in every 30cm interval including coal tarring
two (2) coats with best tar applied hot including providing ncessary
scaffolding or staging (Rate inclusive of cost of the required quantity of
tar)
(a) With Rod monkey and crab winch
(i) Portion of pile actually driven under ground meter 617.40
(ii) Portion of pile remaining over ground meter 472.10
(b) By use of labour
(i) Portion of pile actually driven under ground meter 984.20
(ii) Portion of pile remaining over ground meter 648.60
16.81 Labour for fitting and fixing RSJ beam, CI saddle etc. in position
including necessary scaffolding, cutting them to required size, drilling
holes and supplying and fixing ncessary bolts and nuts, painting two
Quintal 793.00
coats complete (Tar-Steel paints to be supplied by the contractor at his
own costs) including all lead and lifts from PWD Godown.
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.82 Labour for fitting and fixing RSJ beam, Old CI saddle etc. in position
including necessary scaffolding and fixing necessary bolts and nuts,
Quintal 662.60
painting two coats complete as directed (Tar-Steel paints to be supplied
by the contractor at his own costs)
16.83 Labour for making and fitting MS F.I. Straps and cleats etc. in position
including drilling holes complete with all lead and lifts from PWD Quintal 3176.70
Godown.
16.84 Supplying fitting and fixing "U" shaped flat iron strap making 0.5m x
0.3m size from 150mm x 12mm size MS flat including providing 10 bolts
holes and fitting with 0.35m long 20mm dia MS bolts including fitting Each 1590.30
tightly with bearing beam, pile and RSJ beams etc. complete as
directed.
16.85 Labour for fitting woodwork including sizing, supplying and fixing with
new MS bolts, nuts, nails, spikes etc. and coal tarring with best tar
applied hot as directed (Rate inclusive of cost of the required quantity of
tar) complete with all lead and lifts from PWD Godown.

(a) Applying 2 (two) coats of Coal Tar cu.m. 2750.10


(b) Applying 1 (one) coats of Coal Tar cu.m. 2207.10
16.86 Labour for fitting and fixing 25cm to 30cm diameter Log Beam including
supplying and fixing necessary MS nuts and bolts etc. and coal tarring
with best tar applied hot as directed (Rate inclusive of cost of the
required quantity of tar)
(a) Applying 2 (two) coats of Coal Tar meter 569.10
(b) Applying 1 (one) coats of Coal Tar meter 381.40
16.87 Labour for talking out old woodworks of bridge and the refitting the
same including supplying and fixing necessary new MS bolts, nuts,
spikes, nail etc. complete and coal tarring with best tar applied hot as cum 3448.70
directed (Rate inclusive of cost of the required quantity of tar)

16.88 Labour for talking out old Log Beam of bridge and the refitting the same
including supplying and fixing necessary new MS bolts, nuts, spikes,
nail etc. complete and coal tarring with best tar applied hot as directed meter 310.40
(Rate inclusive of cost of the required quantity of tar)

16.89 Pile shoes : supplying fitting and fixing the pile shoes made of 6mm
thick mild steel plate with necessary welding joints, size of pile shoe will
be 78.54 cm (circumferential length of at top.) x 50cm(Depth) x 5cm
(circumferential length at bottom) and 25cm inside diameter at top,
including fitting and fixing 3 (Three) nos. M.S. plate of size of 6mm x
50mm, length 45cm at top of the pile shoe with necessary welding and
Each 2116.10
drilling three nos of holes in each plate including fitting and fixing the pile
shoes at the pile end with necessary patent nails etc. , complete as
directed by the Department .The pile shoe should be camphered to fit
the pile shoe properly with necessary grooving for placing the MS plates
and pile shoe.

0 Repairing of Boat
16.90 Labour for haulding up boat and refloating the same after repair
(a) Mar boat each 3595.10
(b) Single boat each 1790.10
16.91 Renewing rotton planks of boat with 25 mm to 38 mm thick timber
planks including supplying and fitting with necessary nail etc. including
coat tarring two coats applied hot.
(a) With Sal planks sq.m 2644.90
(b) With Cham or Lorul planks sq.m 2184.60
16.92 Making good cracks of the joint boat with necessary jute mixed with
putty of dhuna and flat nails including coaltarring after taking out old metre 31.80
nails, rotten jute etc.
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
16.93 Supplying, fitting and fixing kori (for boat) of wood of required sizes.

(a) With Sal timber each 2706.40


(b) With cham/sundi/nageswar/gamari timber each 1911.00
16.94 Supplying sal wood helm for marboat 18cm dia 6.10m as per direction
including fixing in position and coal tarring complete as
directed.cham/nageswar wood helm for mar boat 13cm dia. 6.10m long each 6049.10
as per direction including fixing in position and coal and coal tarring as
directed.
16.95 Supplying cham/nageswar wood helm for mar boat 13cm dia. 6.10m
long as per direction including fixing in position and coal and coal tarring each 3424.40
as directed.
16.96 Renewing oars of wood plank complete as directed.
(a) Of Sal wood each 1031.90
(b) Of Cham wood each 845.30
16.97 Supplying fitting and fixing in position koniaghosa of required size of
wood to fit exactly at boat and coal tarring etc. complete as directed.

(a) Sal wood each 296.90


(b) Cham/ Sundi/ Gamari wood each 213.20
16.98 Repariring or providing timber free board line 8cm by 5cm painted white
with two coats of approved paint complete as directed.

(a) With Sal timber metre 233.30


(b) With Cham/ Sundi/ Gamari timber metre 182.40
16.99 Refitting drop gates with necessary hinges, spikes, bolts and nuts etc.
set of two 422.10
complete up to 6 tonne mar boat.
17.00 Refitting drop gates with necessary hinges, spikes, bolts and nuts etc.
set of two 592.90
complete above 6 tonne mar boat.
PART-D: MAJOR ROADS & BRIDGE WORKS
[MORT&H SPECIFICATION]
Chapter-17
MAJOR ROADS & BRIDGE WORKS [MORT&H SPECIFICATION]
Preamble
1 This Chapter includes various Major Roads and Bridge Works, which are not covered by
MORD specification for Rural Road 2004.
2 A number of need items for Road works and Bridge work have been incorporated in this
chapter as per MoSRT&H specification for Road and Bridge works also.

3 As per latest revised version of MoRD specification for Rural Roads, Specific importance to
some new items alongwith few new technologies like Dense Bituminous macadam, Semi
dense Bituminous concrete, Bituminous concrete alongwith construction of major Bridges as
per latest version of MORT&H has been included in this edition.

General:

a) The clauses of MoSRT&H specifications for Roads and Bridge works,which have been
mentioned for each item,may be referred to detail specifications and construction
procedure.The specifications mentioned here are only brief description

b) Quality control works shall be goverened by section 900 of Mosrt&H specifications

c) The classification of of soil shall be as per clause 301.2 of MoSRT&H specifications.

d) The specification of materials shall be governed by section 1000 of MoSRT&H


specifications for Road and Bridge works.

e) Quantities of cement in various grade of cement concrete have been taken as per
IRC:21-2000 and IRC:18-2000.

f) The coarse and fine aggregate shall confirm to IS:383.

Road Works:

a) The machinary and equipment included in various analysis are as per various
specifications of MoSRT&H are mandatory.

b) Choice of grade of Bitumen shall be made as per the guidelines given in Appendix-4 of
MoSRT&H specifications.

c) The specification and requirement for modified binder with various type of modifier have
been laid down in clause 521 of MoRST&H specification and IRC:SP:53-2002 which shall be
followed.

d) The guideline given vide Annexure-A to clause 501 of MoSRT&H specification in regard
to protection of environment shall be followed for a particular situation.

e) The quantities taken as output of the item in the rate are the compacted quantities.
Bridge Works:
General:

a) The description of items is given briefly and linked with relevant clause of MoSRT&H
specification for Road&Bridge works, which may be refered for detailed description,
provisions and interpretation.

b) For concrete works admixtures has been used to provide best solution in construction of
superstructure of bridge works.Water reducing plasticizing admixture such as Master plast
PL-1 or its equivalent is used for concrete works below M-25 grade concrete @ 100ml-200ml
per bag of cement (50 kg per bag). However super plasticizer such as Master plus SPL-2 or
its equivalent has been used for concrete above M-25 Grade @0.2 to 1.2 lit per bag of
cement to improve workability of concretre.Use of admixture should be made with prior
approval of the concerned Executive Engineer.
c) Normal method of curing has been covered in the schedule.Steam curing has been
included in the items of precast concrete PSC beams
d) The items do not cover all components of bridge projects for all situations.There may be
specialised items for specific cases,which need to be analyzed keeping in view the basic
approach.
Foundation:
a) Mixing of Cement concrete has been considered both by using concrete mixure and
batching plant.

b) Concrete batching plant is considered to be placed within 10 km of the bridge site.

c) The coarse and fine aggregate for cement for cement concrete shall be as per IS:383.

d) Pneumatic sinking is a specialized job.All safety bprecaution as per IS:4138 are


required to be taken.

e) The levelling course below pile cap is proposed with M 15 grade concrete.

f) Appendix-4 of IRC:78-2000 has to be referred regarding precaution to be taken during


sinking of well.

g) The concrete mix used in boottom plug shall have minimum cenment content of
330kg/cum and a slum of vabout 150mm.

h) Necessary safety precautions shall be taken for excavation on open foundations for
which guidence may be taken from IS:3764

i) A levelling course of 100mm thickness in M10(1:3:6) shall be provided before lying open
fondations.

j) The well curb shall be in RCC of mix not leaner than M25 grade with minimum steel
reinforcement of 72kg/cum excluding bond rods.
k) The top of bottom plug shall be at least 300mm above top of curb.

l) In case of cement concrete piles, the minimum grade of concrete shall be M35 with
minimum cement content of 400kg/cum

m) The guidence for piles is to be obtained from IS:2911.32

n) In the items for well foundation, provision for normal island/temporarey protection, deep
islands/coffer-dams with wooden bellies and sheet piles have been made.

Substructure:

a) Filter media and backfilling behind abutments are required to be provided as per
guidelines given in IRC:78-2000.
b) Weep holes shall be provided as per clause 2706 of MoSRT&H specification.

c) In case of roller-cum-rocker bearings, only full circullar rollers are to be provided

d) All bearings shall be set truly level so as to have full and even seating.

e) For elastomeric bearing pads, the concrete surface shall be levelled such that the
variation is not more than 1.5mm from a straight edge placed in any direction across the
area.
f) For spans in grade, the bearing shall be placed horizontal by using sole plates for
suitably designed RCC pedestals.

Superstructure:

a) The rate for anti-corrosive treatment is ascertained from firms specilized in this work.In
this connection circular No RW/NH-34041/44/91-S&R dt.21.3.2000 of Ministry of Road
Transport and Highways may be referred for further details.

b) MoSR&TH's letter no RW/NH-34059/1/96/S&R dt 30.11.2000 and subsequent


corrigendum dt.25.1.2001 may be referred for detailed specification and provisions for
various types of expansion joints.

B)Cement concrete pavement.

a) High capacities batch mix plants of 75cum/hour (effective output) has been considered
in the rate analysis of cement concrete pavement works.

b) Super plasticizer admixture has been provided to improve workability with reduced
water cement ratio.
c) Cement 43 grades have been catered for cement concrete pavement.However for dry
lean concrete cement of 33 grade may be prefered.
C) In works where mixing plant are used rates are inclusive of an initial lead of 10km
from mixing plant to work site.

D) Overheads and contractors profit: Due to usage of higher output of plant and
machineries, Overheads are considered @10% for item of road works and 20% for items of
Bridge works. Contractors profit is considered @10% for both Road works and Bridge works.
Summa
f
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
CHAPTER-17
MAJOR ROADS & BRIDGE WORKS [MORT&H SPECIFICATION]
ROAD WORKS
BITUMINOUS BASES AND SURFACE COURSES:
17.1 Dense Graded Bituminous Macadam (Providing and laying dense
bituminous macadam with 100-120 TPH batch type HMP producing an
average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 4.0 to 4.5% by
weight of total mix and filler transporting the hot miox to work site,laying
with a hydrostatic paver finisher with sensor control to the reqd. grade,
lavel and alignment,rolling with smooth wheeled,vibratory and tandem
507 rollers to achieve the desired compaction as per MoSRT&H cl. no. 507.
complete in all respect. (including carriage of mixed materials up to 10.0
Km initial lead from mixing plant )( Including cost of testing of materials
at site and laboratory as directed by the deptt.)

I With hydrated lime/ cement as filler (refer table 500-9 of MoSRT&H


specification)

A With 60/70 or VG-30 grade bitumen


(i) for Grading I (40 mm nominal size) cum 7204.00
(ii) for Grading II (19 mm nominal size) cum 7281.00
B With Polymer modified bitumen 70
(i) for Grading I (40 mm nominal size) cum 7229.00
(ii) for Grading II (19 mm nominal size) cum 7306.00
II With rock dust as filler ( refer table 500-9 of MoSRT&H
specification)

A With 60/70 or VG-30 grade bitumen


(i) for Grading I (40 mm nominal size) cum 6952.00
(ii) for Grading II (19 mm nominal size) cum 7028.00
B With Polymer modified bitumen 70
(i) for Grading I (40 mm nominal size) cum 6977.00
(ii) for Grading II (19 mm nominal size) cum 7054.00
III With hydrated lime / cement as filler (refer table 500-9 of
MoSRT&H specification) & anti stripping agent as per IS:14982
(Refer Appendix-5 of MoSRT&H specification)

A With 60/70 or VG-30 grade bitumen


(i) for Grading I (40 mm nominal size) cum 7218.00
(ii) for Grading II (19 mm nominal size) cum 7294.00
B With Polymer modified bitumen 70
(i) for Grading I (40 mm nominal size) cum 7243.00
(ii) for Grading II (19 mm nominal size) cum 7320.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
17.2 Semi - Dense Bituminous Concrete: Providing and laying semi dense
bituminous concrete with 100-120 TPH batch type HMP producing an
average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 4.5 to 5% of mix
and filler transporting the hot mix to work site, laying with a hydrostatic
paver finisher with sensor control to the reqd. grade, lavel and
508
alignment,rolling with smooth wheeled,vibratory and tandem rollers to
achieve the desired compaction as per MoSRT&H cl. no.508. complete
in all respect. including carriage of mixed materials up to 10.0 Km initial
lead from mixing plant ) (Including cost of testing of materials at site and
laboratory as directed by the deptt.)

I With hydrated lime/ cement as filler (refer table 500-9 of MoSRT&H


specification)
A With 60/70 or VG-30 grade bitumen
(i) for Grading I (13 mm nominal size) cum 7361.00
(ii) for Grading II (10 mm nominal size) cum 7743.00
B With Polymer modified bitumen 70
(i) for Grading I (13 mm nominal size) cum 7388.00
(ii) for Grading II (10 mm nominal size) cum 7773.00
C With CRMB 55
(i) for Grading I (13 mm nominal size) cum 7103.00
(ii) for Grading II (10 mm nominal size) cum 7457.00
II With rock dust as filler ( refer table 500-9 of MoSRT&H
specification)
A With 60/70 or VG-30 grade bitumen
(i) for Grading I (13 mm nominal size) cum 7109.00
(ii) for Grading II (10 mm nominal size) cum 7491.00
B With Polymer modified bitumen 70
(i) for Grading I (13 mm nominal size) cum 7136.00
(ii) for Grading II (10 mm nominal size) cum 7521.00
C With CRMB 55
(i) for Grading I (13 mm nominal size) cum 6851.00
(ii) for Grading II (10 mm nominal size) cum 7205.00
III With hydrated lime / cement as filler (refer table 500-9 of
MoSRT&H specification) & anti stripping agent as per IS:14982
(Refer Appendix-5 of MoSRT&H specification)

A With 60/70 or VG-30 grade bitumen


(i) for Grading I (13 mm nominal size) cum 7642.00
(ii) for Grading II (10 mm nominal size) cum 8056.00
B With Polymer modified bitumen 70
(i) for Grading I (13 mm nominal size) cum 7669.00
(ii) for Grading II (10 mm nominal size) cum 8086.00
C With CRMB 55
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(i) for Grading I (13 mm nominal size) cum 7384.00
(ii) for Grading II (10 mm nominal size) cum 7770.00
IV With rock dust as filler (refer table 500-9 of MoSRT&H
specification) & anti stripping agent as per IS:14982 (Refer
Appendix-5 of MoSRT&H specification)
A With 60/70 or VG-30 grade bitumen
(i) for Grading I (13 mm nominal size) cum 7390.00
(ii) for Grading II (10 mm nominal size) cum 7804.00
B With Polymer modified bitumen 70
(i) for Grading I (13 mm nominal size) cum 7417.00
(ii) for Grading II (10 mm nominal size) cum 7834.00
C With CRMB 55
(i) for Grading I (13 mm nominal size) cum 7163.00
(ii) for Grading II (10 mm nominal size) cum 7518.00
V Using cold mix Binder SS-2 (as per IRC:SP:100-2014)

(i) for Grading I (13 mm nominal size) cum 8119.00


(ii) for Grading II (10 mm nominal size) cum 8074.00
17.3 Bituminous Concrete: Providing and laying bituminous concrete with
100-120 TPH batch type hot mix plant producing an average output of
75 tonnes per hour using crushed aggregates of specified grading,
premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler
transporting the hot mix to work site, laying with a hydrostatic paver
finisher with sensor control to the reqd. grade, lavel and
509
alignment,rolling with smooth wheeled,vibratory and tandem rollers to
achieve the desired compaction as per MoSRT&H cl. no.509. complete
in all respect. (including carriage of mixed materials up to 10.0 Km initial
lead from mixing plant )( Including cost of testing of materials at site and
laboratory as directed by the deptt.)

I With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H


specification)
A With 60/70 or VG-30 grade bitumen
(i) for Grading I (19 mm nominal size) cum 8651.00
(ii) for Grading II (13 mm nominal size) cum 8537.00
B With Polymer modified bitumen 70
(i) for Grading I (19 mm nominal size) cum 8778.00
(ii) for Grading II (13 mm nominal size) cum 8664.00
II With rock dust as filler (refer table 500-9 of MoSRT&H
specification)
A With 60/70 or VG-30 grade bitumen
(i) for Grading I (19 mm nominal size) cum 8353.00
(ii) for Grading II (13 mm nominal size) cum 8240.00
B With Polymer modified bitumen 70
(i) for Grading I (19 mm nominal size) cum 8502.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(ii) for Grading II (13 mm nominal size) cum 8389.00
III With hydrated lime / cement as filler (refer table 500-9 of
MoSRT&H specification) & anti stripping agent as per IS:14982
(Refer Appendix-5 of MoSRT&H specification)

A With 60/70 or VG-30 grade bitumen


(i) for Grading I (19 mm nominal size) cum 8967.00
(ii) for Grading II (13 mm nominal size) cum 8853.00
B With Polymer modified bitumen 70
(i) for Grading I (19 mm nominal size) cum 9116.00
(ii) for Grading II (13 mm nominal size) cum 9002.00
IV With rock dust as filler (refer table 500-9 of MoSRT&H
specification) & anti stripping agent as per IS:14982 (Refer
Appendix-5 of MoSRT&H specification)
A With 60/70 or VG-30 grade bitumen
(i) for Grading I (19 mm nominal size) cum 8691.00
(ii) for Grading II (13 mm nominal size) cum 8578.00
B With Polymer modified bitumen 70
(i) for Grading I (19 mm nominal size) cum 8841.00
(ii) for Grading II (13 mm nominal size) cum 8727.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
BRIDGE WORKS
FOUNDATIONS
17.4 Excavation for Structures (Earth work in excavation of foundation of
structures as per drawing and technical specification, including setting
out, construction of shoring and bracing, removal of stumps and other
304 deleterious matter, dressing of sides and bottom and backfilling with
approved material.

I Ordinary soil
A Manual Means
(I) Without dewatering
(i) upto 3 m depth cum 122.00
(ii) 3 m to 6 m depth cum 161.00
(iii) Above 6 m depth cum 209.00
(II) With dewatering
(i) upto 3 m depth cum 134.00
(ii) 3 m to 6 m depth cum 180.00
(iii) Above 6 m depth cum 230.00
B Mechanical Means
(I) Without dewatering
(i) Depth upto 3 m cum 67.00
(ii) Depth 3 m to 6 m cum 77.00
(iii) Depth above 6m cum 93.00
(II) With dewatering
(i) Depth upto 3 m cum 71.00
(ii) Depth 3 m to 6 m cum 82.00
(iii) Depth above 6m cum 102.00
II Ordinary rock (not requiring blasting)
A Manual Means
(I) Without dewatering
Depth upto 3 m cum 177.00
(ii)With dewatering
Depth upto 3 m cum 192.00
B Mechanical Means
(I) Without dewatering
Depth upto 3 m cum 86.00
(ii) With dewatering
Depth upto 3 m cum 94.00
III Hard rock ( requiring blasting )
A Manual Means
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(I) Without dewatering cum 425.00
(ii) With dewatering cum 462.00
IV Hard rock ( blasting prohibited )
A Mechanical Means
(I) Without dewatering cum 490.00
(ii) With dewatering cum 539.00
V Marshy soil
(i) upto 3 m depth
A Manual means
(I) Without dewatering cum 453.00
(ii) With dewatering cum 557.00
B Mechanical Means
(I) Without dewatering cum 154.00
(ii) With dewatering cum 184.00
VI Back Filling in Marshy Foundation Pits cum 304.00
17.5 Filling Annular Space Around Footing in Rock (Lean cement
304 concrete 1:3:6 nominal mix. Rate may be taken as per items 12.4.) cum 4946.00

17.6 Sand Filling in Foundation Trenches as per Drawing & Technical


304 Specification cum 1338.00

17.7 PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in
foundation with crushed stone aggregate 40 mm nominal size
2100 mechanically mixed, placed in foundation and compacted by vibration cum 4946.00
including curing for 14 days.)

17.8 Brick masonry work in cement mortar 1:3 in foundation complete


1300 excluding pointing and plastering, as per drawing and technical cum 6203.00
specifications
A Cement mortar1:3 (1cement :3 sand) cum 4502.00
B Cement mortar1:2 (1cement :2 sand) cum 5418.00
C Cement mortar1:4 (1cement :4 sand) cum 3889.00
D Cement mortar1:6 (1cement :6 sand) cum 3363.00
17.9 Stone masonry work in cement mortar 1:3 in foundation complete as
1400 drawing and Technical Specification

(a) Square Rubble Coursed rubble masonry( first sort ) cum 4073.00
(b) 1405.3 Random Rubble Masonry cum 3779.00
17.10 Plain/Reinforced cement concrete, in open foundation complete
1500,1700 as per drawing and technical specification including steel
& 2100 shuttering formwork.

I Without plasticiser
A PCC Grade M15 cum 5382.00
B PCC Grade M20 cum 6010.00
C RCC Grade M20
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(i) Using concrete mixer cum 6194.00
(ii) With Batching Plant, Transit Mixer and Concrete Pump cum 7090.00
D PCC Grade M25
(i) Using concrete Mixer cum 6437.00
(ii) With Batching Plant, Transit Mixer and Concrete Pump cum 7335.00
E RCC Grade M25
(i) Using concrete Mixer cum 6626.00
(ii) With Batching Plant, Transit Mixer and Concrete Pump cum 7520.00
F PCC Grade M30
(i) Using Concrete Mixer cum 6470.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7360.00
G RCC Grade M30
(i) Using Concrete Mixer cum 6637.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7530.00
H RCC Grade M35
(i) Using Concrete Mixer cum 6726.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7615.00
II With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air
1500,1700 entraining and water reducing plasticiser ( Masterplast PAE or
& 2100 equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.
A PCC Grade M15 cum 6087.00
B PCC Grade M20 cum 6891.00
C (I)RCC Grade M20
(i) Using concrete mixer cum 7083.00
(ii) With Batching Plant, Transit Mixer and Concrete Pump cum 7979.00
D PCC Grade M25
(i) Using concrete Mixer cum 7468.00
(ii) With Batching Plant, Transit Mixer and Concrete Pump cum 8365.00
E RCC Grade M25
(i) Using concrete Mixer cum 7666.00
(ii) With Batching Plant, Transit Mixer and Concrete Pump cum 8560.00
F PCC Grade M30
(i) Using Concrete Mixer cum 7513.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 8402.00
G RCC Grade M30
(i) Using Concrete Mixer cum 7683.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 8576.00
H RCC Grade M35
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(i) Using Concrete Mixer cum 7807.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 8696.00
17.11 Providing and constructing temporary island 16 m diameter for
1200 construction of well foundation for 8m dia. Well.
A Assuming depth of water 1.0 m and height of island to be 1.25m.
each 48507.00

B Assuming depth of water 4.0 m and height of island 4.5 m. each 691436.00
C Providing and constructing one span service road to reach island
location from one pier location to another pier location metre 3283.00

17.12 Providing and laying cutting edge of mild steel weighing 40 kg per metre
1200 & for well foundation complete as per drawing and technical specification. tonne 101742.00
1900

17.13 Plain/Reinforced cement concrete, in well foundation complete as


1200, 1500
per drawing and technical specification including steel shuttering
& 1700
formwork.
(N) Without plasticiser
A Well curb
(i) RCC M20 Grade
Case I Using concrete mixer cum 7147.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8208.00
(ii) RCC M25 Grade
Case I Using concrete mixer cum 7665.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8725.00
(iii) RCC M30 Grade
Case I Using concrete mixer cum 7696.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8757.00
(iv) RCC M35 Grade
Case I Using concrete mixer cum 7836.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8899.00
B Well steining
(I) PCC M15 Grade cum 5802.00
(ii) PCC M20 Grade cum 6357.00
(iii) RCC M20 Grade
Case I Using concrete mixer cum 6551.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7524.00
(iv) PCC M25 Grade
Case I Using concrete mixer cum 6825.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7958.00
(v) RCC M25 Grade
Case I Using concrete mixer cum 7026.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7998.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(vi) PCC M30 Grade
Case I Using concrete mixer cum 6877.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7848.00
(vii) RCC M30 Grade
Case I Using concrete mixer cum 7054.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8027.00
(viii) RCC M35 Grade
Case I Using concrete mixer cum 7183.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8158.00
(ix) RCC M40 Grade (With Batching Plant, Transit Mixer and Concrete
cum 8200.00
Pump)
C Bottom Plug
(i) PCC Grade M20
Case I Using Concrete Mixer cum 6421.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7264.00
(ii) PCC Grade M25
Case I Using Concrete Mixer cum 6658.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7499.00
(iii) PCC Grade M30
Case I Using Concrete Mixer cum 6707.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7550.00
(iv) PCC Grade M35
Case I Using Concrete Mixer cum 6820.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7660.00
D Intermediate plug
(I) Grade M20 PCC
Case I Using Concrete Mixer cum 6135.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 6994.00
(ii) Grade M25 PCC
Case I Using Concrete Mixer cum 6361.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7216.00
(iii) Grade M30 PCC
Case I Using Concrete Mixer cum 6407.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7266.00
E Top plug
(i) Grade M15 PCC
Case I Using Concrete Mixer cum 5274.00
(ii) Grade M20 PCC
Case I Using Concrete Mixer cum 5779.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(iii) Grade M25 PCC
Case I Using Concrete Mixer cum 6205.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7235.00
(iv) Grade M30 PCC
Case I Using Concrete Mixer cum 6252.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7134.00
F Well cap
(i) RCC Grade M20
Case I Using concrete Mixer cum 6146.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7040.00
(ii) RCC Grade M25
Case I Using concrete Mixer cum 6626.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7521.00
(iii) RCC Grade M30
Case I Using Concrete Mixer cum 6637.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7529.00
(iv) RCC Grade M35
Case I Using Concrete Mixer cum 6726.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7615.00
(v) RCC M40 Grade cum 7718.00
(P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air
1200, 1500 entraining and water reducing plasticiser ( Masterplast PAE or
& 1700 equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.
A Well curb
(i) RCC M20 Grade
Case I Using concrete mixer cum 8070.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9130.00
(ii) RCC M25 Grade
Case I Using concrete mixer cum 8609.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9669.00
(iii) RCC M30 Grade
Case I Using concrete mixer cum 8647.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9710.00
(iv) RCC M35 Grade
Case I Using concrete mixer cum 8824.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9887.00
B Well steining
(I) PCC M15 Grade cum 6647.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(ii) PCC M20 Grade cum 7203.00
(iii) RCC M20 Grade
Case I Using concrete mixer cum 7398.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8369.00
(iv) PCC M25 Grade
Case I Using concrete mixer cum 7683.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8658.00
(v) RCC M25 Grade
Case I Using concrete mixer cum 7891.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8863.00
(vi) PCC M30 Grade
Case I Using concrete mixer cum 7746.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8715.00
(vii) RCC M30 Grade
Case I Using concrete mixer cum 7926.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8900.00
(viii) RCC M35 Grade
Case I Using concrete mixer cum 8088.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9063.00
(ix) RCC M40 Grade cum 9376.00
C Bottom Plug
(i) PCC Grade M20
Case I Using Concrete Mixer cum 7378.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 8221.00
(ii) PCC Grade M25
Case I Using Concrete Mixer cum 7701.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 8540.00
(iii) PCC Grade M30
Case I Using Concrete Mixer cum 7765.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 8608.00
(iv) PCC Grade M35
Case I Using Concrete Mixer cum 7915.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 8754.00
D Intermediate plug
(I) Grade M20 PCC
Case I Using Concrete Mixer cum 6850.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7709.00
(ii) Grade M25 PCC
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
Case I Using Concrete Mixer cum 7139.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7994.00
(iii) Grade M30 PCC
Case I Using Concrete Mixer cum 7197.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 8077.00
E Top plug
(i) Grade M15 PCC
Case I Using Concrete Mixer cum 6043.00
(ii) Grade M20 PCC
Case I Using Concrete Mixer cum 6549.00
(iii) Grade M25 PCC
Case I Using Concrete Mixer cum 6984.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7871.00
(iv) Grade M30 PCC
Case I Using Concrete Mixer cum 7042.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7923.00
F Well cap
(i) RCC Grade M20
Case I Using concrete Mixer cum 7020.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7914.00
(ii) RCC Grade M25
Case I Using concrete Mixer cum 7666.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8562.00
(iii) RCC Grade M30
Case I Using Concrete Mixer cum 7683.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8575.00
(iv) RCC Grade M35
Case I Using Concrete Mixer cum 7807.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 8696.00
(v) RCC M40 Grade Using Batching Plant, Transit Mixer and Concrete
Pump cum 8832.00

17.14 Sinking of 6 m external diameter well ( other than pneumatic method


of sinking ) through all types of strata namely sandy soil, clayey
1200 soil and rock as shown against each case, complete as per
drawing and technical specifications. Depth of sinking is
rekonewedfrom bed level.
A Sandy soil

(i) Depth below bed level upto 3.0 M metre 4460.00


(ii) Beyond 3m upto 10m depth metre 6364.00
(iii) Beyond 10m upto 20m metre 8404.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(iv) Beyond 20m upto 30 m

a For sinking metre 15764.00


b For sinking including kentledge metre 18917.00
(v) Beyond 30m upto 40 m

a For sinking metre 37456.00


b For sinking including kentledge metre 44947.00
B Clayey soil ( 6m dia. Well )

(i) Depth below bed level upto 3.0 M metre 6388.00


(ii) Beyond 3m upto 10m depth metre 13531.00
(iii) Beyond 10 m upto 20 m

a For sinking metre 17870.00


b For sinking including kentledge metre 18764.00
(iv) Beyond 20m upto 30 m

a For sinking metre 33520.00


b For sinking including kentledge metre 41901.00
c For sinking including kentledge & dewatering if required. metre 43996.00
(v) Beyond 30m upto 40 m

a For sinking metre 79640.00


b For sinking including kentledge metre 95568.00
c For sinking including kentledge & dewatering if required. metre 100346.00
C Soft rock (6m dia well )

(i) Depth of soft rock strata upto 3m metre 18305.00


D Hard rock (6m dia well )

(i) Depth of soft rock strata upto 3m metre 19443.00


17.15 Sinking of 7 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
1200 rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 6702.00
(ii) Beyond 3m upto 10m depth metre 9056.00
(iii) Beyond 10m upto 20m metre 11959.00
(iv) Beyond 20m upto 30 m
a For sinking metre 22431.00
b For sinking including kentledge metre 26917.00
(v) Beyond 30m upto 40 m
a For sinking metre 53292.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
b For sinking including kentledge metre 63950.00
B Clayey soil ( 7m dia. Well )
(I) Depth below bed level upto 3.0 M metre 9056.00
(ii) Beyond 3m upto 10m depth metre 13313.00
(iii) Beyond 10 m upto 20 m
(a) For sinking metre 17582.00
b For sinking including dewatering, if required., if required metre 18462.00
(iv) Beyond 20m upto 30 m
a For sinking metre 32983.00
b For sinking including kentledge metre 41229.00
c For sinking including kentledge & dewatering, if required. metre 43291.00
(v) Beyond 30m upto 40 m
a For sinking metre 78365.00
b For sinking including kentledge 94038.00
c For sinking including kentledge & dewatering, if required. metre 98740.00
C Soft rock ( 7m dia well )
(i) Depth of soft rock strata upto 3m metre 15620.00
D Hard rock ( 7m dia well )
(i) Depth upto 3 m metre 22364.00
17.16 Sinking of 8 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
1200 rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil

(i) Depth below bed level upto 3.0 M metre 8267.00


(ii) Beyond 3m upto 10m depth metre 10190.00
(iii) Beyond 10m upto 20m metre 13458.00
(iv) Beyond 20m upto 30 m

a For sinking metre 25244.00


b For sinking including kentledge metre 30293.00
(v) Beyond 30m upto 40 m

a For sinking metre 59977.00


b For sinking including kentledge metre 71972.00
B Clayey soil ( 8m dia. Well )

(i) Depth upto 3.0 M metre 11084.00


(ii) Beyond 3m upto 10m depth metre 13868.00
(iii) Beyond 10 m upto 20 m

a For sinking metre 18315.00


Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
b Adding for dewatering @ 5% of cost, if required. metre 19230.00
(iv) Beyond 20m upto 30 m

a For sinking metre 34354.00


b For sinking including kentledge metre 42943.00
c For sinking including kentledge & dewatering, if required. metre 45090.00
(v) Beyond 30m upto 40 m

a For sinking metre 81622.00


b For sinking including kentledge metre 97947.00
c For sinking including kentledge & dewatering, if required. metre 102844.00
C Soft rock ( 8m dia well )

(i) Depth in soft rock strata upto 3m metre 17470.00


D Hard rock ( 8m dia well )

(i) Depth in hard rock strata upto 3 m metre 22655.00


17.17 Sinking of 9 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and
1200
technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) Depth below bed level upto 3.0 M metre 8368.00
(ii) Beyond 3m upto 10m depth metre 11180.00
(iii) Beyond 10m upto 20m metre 14765.00
(iv) Beyond 20m upto 30 m
a For sinking metre 27694.00
b Adding 20% of cost for Kentledge including supports, loading
arrangement and Labour . metre 33234.00

(v) Beyond 30m upto 40 m


a For sinking metre 65800.00
b For sinking including kentledge metre 78961.00
B Clayey soil ( 9m dia. Well )
(i) Depth below bed level upto 3.0 M metre 11704.00
(ii) Beyond 3m upto 10m depth metre 14953.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 19749.00
b For sinking including dewatering, if required metre 20736.00
(iv) Beyond 20m upto 30 m
a For sinking metre 37045.00
b For sinking including kentledge metre 46306.00
c For sinking including kentledge & dewatering, if required. metre 48621.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(v) Beyond 30m upto 40 m
a For sinking metre 88012.00
b For sinking including kentledge metre 105615.00
c For sinking including kentledge & dewatering, if required. metre 110896.00
C Soft rock ( 9m dia well )
(i) Depth upto 3m metre 21001.00
D Hard rock ( 9m dia well )
(i) Depth of hard rock strata upto 3 m metre 26013.00
17.18 Sinking of 10 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
1200 rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil

(i) Depth below bed level upto 3.0 M metre 10046.00


(ii) Beyond 3m upto 10m depth metre 11810.00
(iii) Beyond 10m upto 20m metre 15597.00
(iv) Beyond 20m upto 30 m

a For sinking metre 29256.00


b For sinking including kentledge metre 35107.00
(v) Beyond 30m upto 40 m

a For sinking metre 69507.00


b Adding 20% of cost for Kentledge including supports, loading metre 83409.00
arrangement and Labour etc
B Clayey soil (10m dia. Well )

(i) Depth below bed level upto 3.0 M metre 12895.00


(ii) Beyond 3m upto 10m depth metre 14719.00
(iii) Beyond 10 m upto 20 m

a For sinking metre 19439.00


b Adding for dewatering @ 5% of cost, if required. metre 20411.00
(iv) Beyond 20m upto 30 m

a For sinking metre 36463.00


b For sinking including kentledge metre 45578.00
c For sinking including kentledge & dewatering, if required. metre 47857.00
(v) Beyond 30m upto 40 m

a For sinking metre 86631.00


b For sinking including kentledge 103957.00
c For sinking including kentledge & dewatering, if required. metre 109155.00
C Soft rock (10m dia well )
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(i) Depth of soft rock strata upto 3m metre 22428.00
D Hard rock (10m dia well )

(i) Depth of hard rock strata upto 3 m metre 29684.00


17.19 Sinking of 11 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and
1200
technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) Depth from bed level upto 3.0 M metre 23103.00
(ii) Beyond 3m upto 10m depth metre 18301.00
(iii) Beyond 10m upto 20m metre 24170.00
(iv) Beyond 20m upto 30 m
a For sinking metre 45339.00
b For sinking including kentledge metre 54407.00
(v) Beyond 30m upto 40 m
a For sinking metre 107721.00
b For sinking including kentledge metre 129265.00
B Clayey soil (11 m dia. Well )
(i) Depth from bed level upto 3.0 M metre 21494.00
(ii) Beyond 3m upto 10m depth metre 30329.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 40053.00
b For sinking including dewatering, if required metre 42056.00
(iv) Beyond 20m upto 30 m
a For sinking metre 75129.00
b For sinking including kentledge metre 93911.00
c For sinking including kentledge & dewatering, if required. metre 98607.00
(v) Beyond 30m upto 40 m
a For sinking metre 178497.00
b For sinking including kentledge metre 214196.00
c For sinking including kentledge & dewatering, if required. metre 224906.00
C Soft rock (11m dia well )
(i) Depth of soft rock strata upto 3m metre 50326.00
D Hard rock (11m dia well )
(i) Depth of hard rock upto 3 m metre 66431.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
17.20 Sinking of 12 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and
1200
technical specifications. Depth of sinking is rekonewed from bed level.

A Sandy soil
(i) I) Depth below bed level upto 3.0 M metre 47780.00
(ii) Beyond 3m upto 10m depth metre 53814.00
(iii) Beyond 10m upto 20m metre 71071.00
(iv) Beyond 20m upto 30 m
a For sinking metre 133310.00
b For sinking including kentledge metre 159972.00
(v) Beyond 30m upto 40 m
a For sinking metre 316723.00
b For sinking including kentledge metre 380068.00
B Clayey soil (12 m dia. Well )
(i) Depth below bed level upto 3.0 M metre 52679.00
(ii) Beyond 3m upto 10m depth metre 76695.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 101290.00
b For sinking including dewatering, if required metre 106355.00
(iv) Beyond 20m upto 30 m
a For sinking metre 189994.00
b For sinking including kentledge metre 237492.00
c For sinking including kentledge & dewatering, if required. metre 249367.00
(v) Beyond 30m upto 40 m
a For sinking metre 451397.00
b For sinking including kentledge metre 541677.00
c For sinking including kentledge & dewatering metre 568761.00
C Soft rock (12m dia well )
(i) Depth of soft rock strata upto 3m metre 118540.00
D Hard rock (12m dia well )
(i) Depth of hard rock strata upto 3 m metre 150689.00
17.21 Sinking of Twin D Type well ( other than pneumatic method of sinking )
through all types of strata namely sandy soil, clayey soil and rock as
1200 shown against each case, complete as per drawing and technical
specifications. Depth of sinking is reckoned from bed level.

A Sandy soil
(i) Depth from bed level upto 3.0 M metre 10811.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(ii) Beyond 3m upto 10m depth metre 11674.00
(iii) Beyond 10m upto 20m metre 15419.00
(iv) Beyond 20m upto 30 m
a For sinking metre 28921.00
b For sinking including kentledge metre 34705.00
(v) Beyond 30m upto 40 m
a For sinking metre 68716.00
b For sinking including kentledge metre 82459.00
B Clayey soil (Twin D Type Well )
(i) Depth below bed level upto 3.0 M metre 12719.00
(ii) Beyond 3m upto 10m depth metre 16301.00
(iii) Beyond 10 m upto 20 m
a For sinking metre 21529.00
b For sinking including dewatering, if required metre 22606.00
(iv) Beyond 20m upto 30 m
a For sinking metre 40382.00
b For sinking including kentledge metre 50477.00
c For sinking including kentledge & dewatering, if required. metre 53001.00
(v) Beyond 30m upto 40 m
a For sinking metre 95942.00
b For sinking including kentledge metre 115131.00
c For sinking including kentledge & dewatering, if required. metre 120887.00
C Soft rock (Twin D Type well )
(i) Depth of soft rock strata upto 3m metre 25229.00
D Hard rock (Twin D Type well )
(i) Depth of hard rock strata upto 3 m metre 32000.00
17.22 Pneumatic sinking of wells with equipment of approved design, drawing
and specifications worked by competent and trained personnel and
comprising of compression and decompression chambers, reducers,
two air locks separately for men and plant & materials

17.23 Sand filling in wells complete as per drawing and technical


1207 specifications cum 1338.00

17.24 Providing steel liner 10 mm thick for curbs and 6mm thick for steining of
1200 & wells including fabricating and setting out as per detailed drawing
tonne 92294.00
1900

17.25 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement


1100 & complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. (Pile diameter-750 metre 6076.00
1700
mm)
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
17.26 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement
complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. including providing
1101 & plasticiser (Masterplast PL-1/SPL-2 or equivalent), air entraining and
water reducing plasticiser ( asterplast PAE or equivalent) and metre 6455.00
1700
accelerating plasticiser (Masterplast ACPL or equivalent) conforming to
IS-9103-1999 (Pile diameter-750 mm)

17.27 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement


1100,1600 complete as per drawing and technical specifications and removal of
metre 10173.00
& 1700 excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000
mm)

17.28 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement


complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. including providing
1100,1600 plasticiser (Masterplast PL-1/SPL-2 or equivalent ), air entraining and
metre 10846.00
& 1701 water reducing plasticiser ( Masterplast PAE or equivalent) and
accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to
IS-9103-1999) (Pile diameter-1000 mm)

17.29 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement


1100&170 complete as per drawing and technical specifications and removal of
metre 13383.00
0 excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200
mm)
17.30 Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement
complete as per drawing and technical specifications and removal of
excavated earth with all lifts and lead upto 1000 m. including providing
1100&170 plasticiser (Masterplast PL-1/SPL-2 or equivalent ), air entraining and
metre 14352.00
1 water reducing plasticiser ( Masterplast PAE or equivalent) and
accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to
IS-9103-1999 (Pile diameter-1200 mm)

17.31 Driven cast-in-place vertical M35 grade R.C.C. pile excluding


1100 &
reinforcement complete as per drawing and & Technical Specification metre 4293.00
1700
(Pile diameter - 750 mm)
17.32 Driven cast-in-place vertical M35 grade R.C.C. pile excluding
reinforcement complete as per drawing and & Technical Specification
including providing plasticiser ( Masterplast PL-1/SPL-2 or equivalent ),
1101 & air entraining and water reducing plasticiser ( Masterplast PAE or metre 4672.00
1700 equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999 (Pile diameter - 750 mm)

17.33 Driven cast-in-place vertical M35 grade R.C.C. piles excluding


1100 & reinforcement complete as per drawing and & Technical Specification
metre 7246.00
1700 (Pile diameter - 1000 mm)

17.34 Driven cast-in-place vertical M35 grade R.C.C. piles excluding


reinforcement complete as per drawing and & Technical Specification
including providing plasticiser ( Masterplast PL-1/SPL-2 or equivalent ),
1100 &
air entraining and water reducing plasticiser ( Masterplast PAE or metre 7920.00
1700
equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999 (Pile diameter - 1000 mm)

17.35 Driven cast-in-place vertical M35 grade R.C.C. piles excluding


1100&170 reinforcement complete as per drawing and & Technical Specification
metre 10508.00
0 (Pile diameter - 1200 mm)
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
17.36 Driven cast-in-place vertical M35 grade R.C.C. piles excluding
reinforcement complete as per drawing and & Technical Specification
including providing plasticiser ( Masterplast PL-1/SPL-2 or equivalent ),
1100&170
air entraining and water reducing plasticiser ( Masterplast PAE or metre 11478.00
1
equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999 (Pile diameter - 1200 mm)

17.37 Pile load test on single vertical pile in accordance with


1100 IS:2911(Part-IV). Ton 330.00
a). Initial and Routine load test.
b) Lateral load test Ton 5500.00
17.38 Cement concrete for reinforced concrete in pile cap complete as
1100, 1500
per drawing and Technical Specification.
& 1700
A RCC Grade M20

(i) Using Concrete Mixer cum 6146.00


(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 5972.00
B RCC Grade M25

(i) Using concrete mixer. cum 6610.00


(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 6450.00
C RCC Grade M30

(i) Using concrete mixer. cum 6669.00


(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 6495.00
D RCC Grade M35

(i) Using concrete mixer. cum 6791.00


(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 6631.00
17.39 Cement concrete for reinforced concrete in pile cap complete as per
drawing and Technical Specification including providing plasticiser (
1100, 1500 Masterplast PL-1/SPL-2 or equivalent ), air entraining and water
& 1700 reducing plasticiser ( Masterplast PAE or equivalent) and accelerating
plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-
1999.

A RCC Grade M20

(i) Using Concrete Mixer cum 6832.00


(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 6659.00
B RCC Grade M25

(i) Using concrete mixer. cum 7420.00


(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7260.00
C RCC Grade M30

(i) Using concrete mixer. cum 7493.00


(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7320.00
D RCC Grade M35

(i) Using concrete mixer. cum 7647.00


Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7487.00
17.40 1100 Levelling course for Pile cap
cum 5152.00
&1700
17.41 Reinforcement in Foundation: Supplying, fitting and placing TMT
1600 IS:1786 Fe500 D bar reinforcement in foundation complete as per
drawing and technical specifications

(a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/
Jindal panther steel/ Shyam steel or equivalent) tonne 56744.00

SUB-STRUCTURE
17.42 Brick masonry work in 1:3 in sub-structure complete excluding pointing
1300 & and plastering, as per drawing and technical specifications cum 7280.00
2200

17.43 1300 & Pointing with cement mortar (1:3 ) on brick work in substructure as per
Technical specifications sqm 66.00
2200
17.44 1300 & Plastering with cement mortar (1:3 ) on brick work in sub-structure as
per Technical specifications sqm 128.00
2200
17.45 1400 & Stone masonry work in cement mortar 1:3 for substructure complete as
2200 per drawing and Technical Specifications
A Random Rubble Masonry cum 3803.00
B Coursed rubble masonry (first sort ) cum 3999.00
C Ashlar masonry ( first sort ) cum 5380.00
17.46 Plain/Reinforced cement concrete, in sub structure complete as per
1500,1700 drawing and technical specification and steel shuttering formwork
& 2200

(N) Without plasticiser


A PCC Grade M15 cum 5802.00
Height upto 5m
B PCC Grade M20 cum 6357.00
Height upto 5m
C PCC Grade M25
a Height upto 5m
Case I Using concrete Mixer cum 6825.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7958.00
b Height 5m to 10m
Case I Using concrete Mixer cum 7074.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8247.00
c Height above 10m
Case I Using concrete Mixer cum 7384.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8609.00
D PCC Grade M30
a Height upto 5m
Case I Using concrete Mixer cum 6877.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7848.00
b Height 5m to 10m
Case I Using concrete Mixer cum 7127.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8133.00
c Height above 10m
Case I Using concrete Mixer cum 7440.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8490.00
E RCC Grade M20
a Height upto 5m
Case I Using concrete Mixer cum 6551.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7524.00
b Height 5m to 10m
Case I Using concrete Mixer cum 6789.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7798.00
c Height above 10m
Case I Using concrete Mixer cum 7087.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 6527.00
F RCC Grade M25
a Height upto 5m
Case I Using concrete Mixer cum 7026.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7998.00
b Height 5m to 10m
Case I Using concrete Mixer cum 7026.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7998.00
c Height above 10m
Case I Using concrete Mixer cum 7601.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8652.00
G RCC Grade M30
a Height upto 5m
Case I Using concrete Mixer cum 7054.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8027.00
b Height 5m to 10m
Case I Using concrete Mixer cum 7253.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8253.00
c Height above 10m
Case I Using concrete Mixer cum 7599.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8648.00
H RCC Grade M35
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
a Height upto 5m
Case I Using concrete Mixer cum 7183.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8158.00
b Height 5m to 10m
Case I Using concrete Mixer cum 7340.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8336.00
c Height above 10m
Case I Using concrete Mixer cum 7575.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8603.00
(P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air
entraining and water reducing plasticiser ( Masterplast PAE or
equivalent) and accelerating plasticiser( Masterplast ACPL or
equivalent) conforming to IS-9103-1999
A PCC Grade M15
Height upto 5m cum 6647.00
B PCC Grade M20
Height upto 5m cum 7203.00
C PCC Grade M25
a Height upto 5m
Case I Using concrete Mixer cum 7683.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8658.00
b Height 5m to 10m
Case I Using concrete Mixer cum 7962.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8247.00
c Height above 10m
Case I Using concrete Mixer cum 8311.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9367.00
D PCC Grade M30
a Height upto 5m
Case I Using concrete Mixer cum 7746.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8715.00
b Height 5m to 10m
Case I Using concrete Mixer cum 8028.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9032.00
c Height above 10m
Case I Using concrete Mixer cum 8380.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9428.00
E RCC Grade M20
a Height upto 5m
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
Case I Using concrete Mixer cum 7398.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8369.00
b Height 5m to 10m
Case I Using concrete Mixer cum 7667.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8674.00
c Height above 10m
Case I Using concrete Mixer cum 8003.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9054.00
F RCC Grade M25
a Height upto 5m
Case I Using concrete Mixer cum 7891.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8863.00
b Height 5m to 10m
Case I Using concrete Mixer cum 8150.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9153.00
c Height above 10m
Case I Using concrete Mixer cum 8537.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9588.00
G RCC Grade M30
a Height upto 5m
Case I Using concrete Mixer cum 7926.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8900.00
b Height 5m to 10m
Case I Using concrete Mixer cum 8149.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9151.00
c Height above 10m
Case I Using concrete Mixer cum 8467.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9507.00
H RCC Grade M35
a Height upto 5m
Case I Using concrete Mixer cum 8088.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9063.00
b Height 5m to 10m
Case I Using concrete Mixer cum 8265.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9261.00
c Height above 10m
Case I Using concrete Mixer cum 8530.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9557.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
17.47 Supplying, fitting and placing TMT IS:1786 (Fe 500) bar
reinforcement in sub-structure complete as per drawing and
technical specifications
(a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/
Jindal panther steel/ Shyam steel or equivalent) tonne 56880.00

17.49 Providing weep holes in Brick masonry/Plain/Reinforced concrete


abutment, wing wall/return wall with 100 mm dia AC pipe, extending
through the full width of the structure with slope of 1V :20H towards each 182.00
drawing foce. Complete as per drawing and Technical specification.

17.50 Back filling behind abutment, wing wall and return wall complete as per
drawing and Technical specification
A Granular material cum 1326.00
B Sandy material cum 1326.00
17.51 Providing and laying of Filter media with granular materials/stone
crushed aggregates satisfying the requirements laid down in clause
2504.2.2. of MoRTH specifications to a thickness of not less than 600
mm with smaller size towards the soil and bigger size toeards the wall
cum 1768.00
and provided over the entire surfaces behind the abutement, wing wall
and return wall to the full height compacted to firm condition complete
as per drawing and technical specification.

17.52 Supplying, fitting and fixing in position true to line and level cast steel
rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 tonne
666.00
of MoRTH specifications complete including all accessories as per capacity
drawing and Technical Specifications.
17.53 Supplying, fitting and fixing in position true to line and level forged steel
roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 tonne
576.00
of MoRTH specifications complete including all accessories as per capacity
drawing and Technical Specifications.
17.54 Supplying, fitting and fixing in position true to line and level sliding plate
bearing with PTFE surface sliding on stainless steel complete including
tonne
all accessories as per drawing and Technical Specifications and BS: 309.00
capacity
5400, section 9.1 & 9.2 (for PTFE) and clause 2004 of MORT&H
specification.
17.55 Supplying, fitting and fixing in position true to line and level elastomeric
bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of cubic
1.21
MoRTH specifications complete including all accessories as per drawing centimetre
and Technical Specifications.
17.56 Supplying, fitting and fixing in position true to line and level sliding plate
bearing with stainless steel plate sliding on stainless steel plate with mild tonne
174.00
steel matrix complete including all accessories as per drawing and capacity
Technical Specifications.
17.57 Supplying, fitting and fixing in position true to line and level POT-PTFE
bearing consisting of a metal piston supported by a disc or unreinforced
elastomer confined within a metal cylinder, sealing rings, dust seals,
PTFE surface sliding against stainlesssteel matting surfaces, complete
assembly to be of cast steel/fabricated structural steel, meatal and tonne
196.00
elastomer elements to be as per IRC:83 part-I &II respectively and parts capacity
conforming to BS:5400, section 9.1 & 9.2 and clause 2006 of
MORTH&S Specification complete as per drawing and approved
technical specification.

SUPER-STRUCTURE
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
17.58 Furnishing and Placing Reinforced/Prestressed cement concrete
in super-structure as per drawing and Technical Specification'
including steel shuttering formwork.
(N) Without Plasticiser
A RCC Grade M20
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 7091.00
b Height 5m to 10m cum 7387.00
c Height above 10m cum 7682.00
(ii) For T-beam & slab
a Height upto 5m cum 7387.00
b Height 5m to 10m cum 7682.00
c Height above 10m cum 7978.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 8124.00
b Height 5m to 10m cum 8462.00
c Height above 10m cum 8801.00
(ii) For T-beam & slab
a Height upto 5m cum 8462.00
b Height 5m to 10m cum 8801.00
c Height above 10m cum 9139.00
B RCC Grade M25
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 7627.00
b Height 5m to 10m cum 7945.00
c Height above 10m cum 8262.00
(ii) For T-beam & slab
a Height upto 5m cum 7945.00
b Height 5m to 10m cum 8262.00
c Height above 10m cum 8580.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 8667.00
b Height 5m to 10m cum 9028.00
c Height above 10m cum 9389.00
(ii) For T-beam & slab
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
a Height upto 5m cum 9028.00
b Height 5m to 10m cum 9389.00
c Height above 10m cum 9750.00
C RCC Grade M 30
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 7723.00
b Height 5m to 10m cum 8044.00
c Height above 10m cum 8366.00
(ii) For T-beam & slab
a Height upto 5m cum 8044.00
b Height 5m to 10m cum 8366.00
c Height above 10m cum 8688.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump.
(i) For solid slab super-structure
a Height upto 5m cum 8693.00
b Height 5m to 10m cum 9056.00
c Height above 10m cum 9418.00
(ii) For T-beam & slab
a Height upto 5m cum 9056.00
b Height 5m to 10m cum 9418.00
c Height above 10m cum 9780.00
D RCC/PSC Grade M35
Case 1 Using concrete mixer.
(i) For solid slab super-structure
a Height upto 5m cum 7733.00
b Height 5m to 10m cum 8061.00
c Height above 10m cum 8388.00
(ii) For T-beam & slab
a Height upto 5m cum 8061.00
b Height 5m to 10m cum 8388.00
c Height above 10m cum 8716.00
(iii) For box girder and balanced cantilever
a Height upto 5m cum 9044.00
b Height 5m to 10m cum 9699.00
c Height above 10m cum 10354.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
a Height upto 5m cum 8682.00
b Height 5m to 10m cum 9050.00
c Height above 10m cum 9417.00
(ii) For T-beam & slab
a Height upto 5m cum 9050.00
b Height 5m to 10m cum 9417.00
c Height above 10m cum 9785.00
(iii) For box girder and balanced cantilever
a Height upto 5m cum 10153.00
b Height 5m to 10m cum 10889.00
c Height above 10m cum 11625.00
E PSC Grade M-40
Case 1 Using concrete mixer.
(i) For solid slab super-structure
a Height upto 5m cum 7991.00
b Height 5m to 10m cum 8324.00
c Height above 10m cum 8657.00
(ii) For T-beam & slab
a Height upto 5m cum 8324.00
b Height 5m to 10m cum 8657.00
c Height above 10m cum 8990.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 8761.00
b Height 5m to 10m cum 9132.00
c Height above 10m cum 9503.00
(ii) For T-beam & slab
a Height upto 5m cum 9132.00
b Height 5m to 10m cum 9503.00
c Height above 10m cum 9875.00
(iii) For box girder and balanced cantilever
a Height upto 5m cum 10246.00
b Height 5m to 10m cum 10988.00
c Height above 10m cum 11731.00
F PSC Grade M-45
(i) For solid slab/voided slab super-structure
a Height upto 5m cum 8925.00
b Height 5m to 10m cum 9309.00
c Height above 10m cum 9694.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(ii) For I-beam & slab including launching of precast girders by
launching truss upto 40 m span
a Height upto 5m cum 9309.00
b Height 5m to 10m cum 9694.00
c Height above 10m cum 10079.00
(iii) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 10464.00
b Height 5m to 10m cum 11233.00
c Height above 10m cum 12002.00
G PSC Grade M-50
(i) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 10646.00
b Height 5m to 10m cum 11435.00
c Height above 10m cum 12224.00
H PSC Grade M- 55
(i) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 11053.00
b Height 5m to 10m cum 11872.00
c Height above 10m cum 12691.00
(P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air
entraining and water reducing plasticiser ( Masterplast PAE or
equivalent) and accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.
A RCC Grade M20
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 8100.00
b Height 5m to 10m cum 8437.00
c Height above 10m cum 8775.00
(ii) For T-beam & slab
a Height upto 5m cum 8437.00
b Height 5m to 10m cum 8775.00
c Height above 10m cum 9112.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 9035.00
b Height 5m to 10m cum 9411.00
c Height above 10m cum 9788.00
(ii) For T-beam & slab
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
a Height upto 5m cum 9411.00
b Height 5m to 10m cum 9788.00
c Height above 10m cum 10164.00
B RCC Grade M25
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 8818.00
b Height 5m to 10m cum 9186.00
c Height above 10m cum 9553.00
(ii) For T-beam & slab
a Height upto 5m cum 9186.00
b Height 5m to 10m cum 9553.00
c Height above 10m cum 9921.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 9813.00
b Height 5m to 10m cum 10222.00
c Height above 10m cum 10631.00
(ii) For T-beam & slab
a Height upto 5m cum 10222.00
b Height 5m to 10m cum 10631.00
c Height above 10m cum 11040.00
C RCC Grade M 30
Case I Using Concrete Mixer
(i) For solid slab super-structure
a Height upto 5m cum 8936.00
b Height 5m to 10m cum 9308.00
c Height above 10m cum 9681.00
(ii) For T-beam & slab
a Height upto 5m cum 9308.00
b Height 5m to 10m cum 9681.00
c Height above 10m cum 10053.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump.
(i) For solid slab super-structure
a Height upto 5m cum 9907.00
b Height 5m to 10m cum 10319.00
c Height above 10m cum 10732.00
(ii) For T-beam & slab
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
a Height upto 5m cum 10319.00
b Height 5m to 10m cum 10732.00
c Height above 10m cum 11145.00
D RCC/PSC Grade M35
Case 1 Using concrete mixer.
(i) For solid slab super-structure
a Height upto 5m cum 8971.00
b Height 5m to 10m cum 9351.00
c Height above 10m cum 9732.00
(ii) For T-beam & slab
a Height upto 5m cum 9351.00
b Height 5m to 10m cum 9732.00
c Height above 10m cum 10112.00
(iii) For box girder and balanced cantilever

a Height upto 5m cum 10492.00


b Height 5m to 10m cum 11252.00
c Height above 10m cum 12012.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 9920.00
b Height 5m to 10m cum 10340.00
c Height above 10m cum 10761.00
(ii) For T-beam & slab
a Height upto 5m cum 10340.00
b Height 5m to 10m cum 10761.00
c Height above 10m cum 11181.00
(iii) For box girder and balanced cantilever

a Height upto 5m cum 11601.00


b Height 5m to 10m cum 12442.00
c Height above 10m cum 13283.00
E PSC Grade M-40
Case 1 Using concrete mixer.
(i) For solid slab super-structure
a Height upto 5m cum 9274.00
b Height 5m to 10m cum 9661.00
c Height above 10m cum 10047.00
(ii) For T-beam & slab
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
a Height upto 5m cum 9661.00
b Height 5m to 10m cum 10047.00
c Height above 10m cum 10434.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure
a Height upto 5m cum 10023.00
b Height 5m to 10m cum 10447.00
c Height above 10m cum 10872.00
(ii) For T-beam & slab
a Height upto 5m cum 10447.00
b Height 5m to 10m cum 10872.00
c Height above 10m cum 11297.00
(iii) For box girder and balanced cantilever

a Height upto 5m cum 11721.00


b Height 5m to 10m cum 12571.00
c Height above 10m cum 13420.00
F PSC Grade M-45
(i) For solid slab/voided slab super-structure
a Height upto 5m cum 10266.00
b Height 5m to 10m cum 10709.00
c Height above 10m cum 11151.00
(ii) For I-beam & slab including launching of precast girders by
launching truss upto 40 m span
a Height upto 5m cum 10709.00
b Height 5m to 10m cum 11151.00
c Height above 10m cum 11594.00
(iii) For cast-in-situ box girder, segmental construction and balanced
cantilever
a Height upto 5m cum 12036.00
b Height 5m to 10m cum 12921.00
c Height above 10m cum 13806.00
G PSC Grade M-50
(i) For cast-in-situ box girder, segmental construction and balanced
cantilever

a Height upto 5m cum 12291.00


b Height 5m to 10m cum 13202.00
c Height above 10m cum 14112.00
H PSC Grade M- 55
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
(i) For cast-in-situ box girder, segmental construction and balanced
cantilever

a Height upto 5m cum 12830.00


b Height 5m to 10m cum 13780.00
c Height above 10m cum 14730.00
17.59 Reinforcement in Super Structure: Supplying, fitting and placing TMT
conforming to IS:1786 Fe 500 D reinforcement in super-structure
including splicing complete as per drawing and technical specifications

(a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/
Jindal panther steel/ Shyam steel or equivalent) tonne 62506.00

17.60 High tensile steel wires/strands including all accessories for stressing,
stressing operations and grouting complete as per drawing and tonne 111434.00
Technical Specifications

17.61 Providing and laying Cement concrete wearing coat M-30 grade
including reinforcement complete as per drawing and Technical cum 11822.00
Specifications
17.62 Mastic Asphalt Wearing Course: Providing and laying 12 mm thick
mastic asphalt wearing course on top of deck slab excluding prime coat
with paving grade bitumen meeting the requirements given in table 500-
29, prepared by using mastic cooker and laid to required level and
slope aftering cleaning the surface, including providing antiskid surface
with bitumen pre coated fine grained hard stone shipping of 9.5mm sqm 406.00
nominal size at the rate of .005 cum per 10sqm and at approximate
spaciong of 10cm center to center in both directions, pressed into
surfaces when temperature of the surfaces not less than 100 degC. ,
protuding 1mm to 4mm over mastic surfaces, all complete as per
clause 515.
17.63 Bituminous wearing course: Providing and laying Bituminous wearing
course comprising of tack coat with bitumen emulsion CSS-1h as per
APWD SOR item no 5.2 & MOSRT&H Specification Nos 503 0.6mm
thick mastic asphalt as per APWD SOR item no 14.5 & MOSRT&H
Specification Nos 515 & 2702 and 2 layers of 25 mm thick Asphalt
sqm 503.00
concrete including of close Graded Premix Surfacing(CGPS) materials
with Type -a aggregate as per APWD SOR tem no 5.11 & MOSRT&H
Specification Nos 512 including all lead and lift as directed.

17.64 Construction of precast RCC railing of M30 Grade, aggregate size not
exceeding 12 mm, true to line and grade, tolurence of vertical RCC
post not to exceed 1 in 500, centre to centre spacing between vertical
metre 1798.00
post not to exceed 2000 mm, leaving adequat space between vertical
posts for expansion, complete as per approved drawings and technical
specifications.
17.65 Construction of RCC railing of M30 Grade in-situ with 20 mm nominal
size aggregate, true to line and grade, tolurence of vertical RCC post
not to exceed 1 in 500, centre to centre spacing between vertical post
metre 1757.00
not to exceed 2000 mm, leaving adequat space between vertical posts
for expansion, complete as per approved drawings and technical
specifications.
17.66 Providing, fitting and fixing mild steel railing complete as per drawing
and Technical Specification metre 4109.00

17.67 Drainage Spouts complete as per drawing and Technical specification


Each 8031.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
17.68 PCC M15 Grade leveling course below approach slab complete as per
drawing and Technical specification cum 5274.00

17.69 Reinforced cement concrete approach slab including reinforcement and


formwork complete as per drawing and Technical specification

(a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/
Jindal panther steel/ Shyam steel or equivalent) cum 11165.00

(b) TMT-IS 1786 ( Fe-500 D) Secondary Producer (ISI approved)


cum 11045.00

(c) MS bar-IS 1786 ( Fe-250 ) Secondary Producer


cum 11045.00

17.70 Structural steel Built-Up-Girder (BUG) (Providing and launching Steel


Truss of Structural steel BUG Super Structure including painting
MT 123302.00
complete as per as per drawing and technical specifications under
Section 1900 of MOST.)
17.71 Painting on concrete surface (Providing and applying 2 coats of water
based cement paint to unplastered concrete surface after cleaning the
surface of dirt, dust, oil, grease, efflorescence and applying paint @
of 1 litre for 2 Sq.m. )
(A) For Plain surface sqm 50.00
(B) For RCC Railing RM 177.00
17.72 Burried Joint (Providing and laying a burried expansion joint,
expansion gap being 20 mm, covered with 12 mm thick, 200 mm wide
galvanised wieldable structural steel plate as per IS: 2062, placed
symmetrical to centre line of the joint, resting freely over the top
metre 1374.00
surfaces of the deck concrete, welding of 8mm dia, 100mm long
galvanized nails spaced 300mm C/C along the center line of the plate ,
all as specified in clause 2604.)

17.73 Filler joint


(i) Providing & fixing 2 mm thick corrugated copper plate in expansion joint
complete as per drawing & Technical Specification.
metre 3944.00

(ii) Providing & fixing 20 mm thick compressible fibre board in expansion


joint complete as per drawing & Technical Specification.
metre 333.00

(iii) Providing and fixing in position 20 mm thick premoulded joint filler in


expansion joint for fixed ends of simply supported spans not exceeding
10 m to cater for a horizontal movement upto 20 mm, covered with metre 302.00
sealant complete as per drawing and technical specification.

(iv) Providing and filling joint sealing compound as per drawings and
technical specifications with coarse sand and 6% bitumen by weight
metre 23.00
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
17.74 Asphaltic Plug joint (Providing and laying of asphaltic plug joint to
provide for horizontal movement of 25 mm and vertical movement of 2
mm, depth of joint varying from 75 mm to 100 mm, width varying from
500 mm to 750 mm (in traffic direction), covered with a closure plate
200mmX 6mm of wiedable structural steel conforming to IS:2062,
asphaltic plug consist of polymer modified bitumen binder, carefully metre 1174.00
selected singl;e size aggregate of 12.5mm nominal size and heat
resistant foam caulking/backer rod, all as per approved drawing and
specifications.)

17.75 Elastomeric Slab Seal Expansion Joint (Providing and laying of an


elastomeric slab steel expansion joint, catering to right or skew (less
than 20 deg., moderately curved with maximum horizontal movement
upto 50 mm, complete as per approved drawings and standard
metre 24189.00
specification to be installed by the manufacture/supplier or their
authorisedrepresentative ensuring compliance to the manufacturers
instructios for installation and clause 2506 of MORTS&H specification of
bridge works.)
17.76 Compression Seal Joint (Providing and laying of compression seal
joint consisting of steel armoured nosing at two edges of the joint gap
suitably anchored to the deck concrete and a preformed chloroprene
elastomer or closed cell foam joint sealer compressed and fixed into the metre 12689.00
gap with special adhesive binder to cater for a horizontal movement up
to 40mm and vertical movement of 3mm.)

17.77 Strip Seal Expansion Joint (Providing and laying of a strip seal
expansion joint catering to maximum horizontal movement upto 70 mm,
complete as per approved drawings and standard specifications to be
metre 25451.00
installed by the manufacturer/supplier or their authorised representative
ensuring compliance to the manufacturer's instruction for installation).

17.78 Modular Strip / Box Seal Joint


(Providing and laying of a modular strip Box steel expansion joint
including anchorage catering to a horizontal movement beyond 70 mm
and upto 140mm, complete as per approved drawings and standard
metre 137986.00
specifications to be installed by teh manufacture/supplier or their
authorised representative ensuring compliance to the manufacturer's
instruction for installation.)

17.79 Modular Strip / Box Seal Joint


(Providing and laying of a modular strip box seal expansion joint catering
to a horizontal movement beyond 140mm and upto 210mm, complete
as per approved drawings and standard specifications to be installed by
metre 209145.00
the manufactu/supplier or their authorised representative ensuring
compliance to the manufacturer's instruction for installation.)

17.80 Extra for providing water proofing compound


( Providing and applying cement mortar(1 cement 3 sand) with
STRUCO LATEX or its equivalent as per specification and as directed sqm 333.00
by the Department

17.81 Extra for providing water proofing compound


( Cleaning the surface and applying two coats ofARMOURCRETE or its
equivalent as per specification and as directed by the Department sqm 229.00
PART-E: NEW TECHNOLOGY
Chapter-18

New Technology

Preamble
1 This Chapter includes various innovative new Technology items, which are not
covered by MORD specification for Rural Road 2004.

2 As per latest revised version of MoRD specification for rural RoadsSpecific


importance to some new items alongwith few new technologies like Bio-
Enzyme, Roadstab, Zycosil Nano Technology, Evocrete Technology, Cell Fill
Concrete, Tenax 3D Grid Technology, Cold milling etc. has been included in
this edition.
Summa
f
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
CHAPTER-18
NEW TECHNOLOGY
18.1 Open - Graded Premix Surfacing (specially for shaded areas)
Providing, laying and rolling of open - graded premix surfacing of 20 mm
thickness composed of 13.2 mm to 5.6 mm aggregates either using
Bitumen Emulsion With cold mix Binder Ezee PC (MS) (As per IRC :
SP : 100 -2014) to required line, grade and level to serve as wearing sqm 168.00
course on a per Technical Specification and through credible technology
partners duly licensed by CRRI.

18.2 Seal coat with Cold mix Binder (specially for shaded areas) - Providing
and laying seal coat sealing the voids in a bituminous surface
laid to the specified levels grade and cross fall using Type
A,Type B and Type C as per Technical specification clause sqm 34.00
510.With cold mix Binder Ezee PC (MS) (As per IRC : SP : 100 -
2014)and through credible technology partners duly licensed by
CRRI.
18.3 Construction of Sub-Base/Base of road pavement by making use of
EVOCRETE CCL Soil Modifier (GERMAN) technology by re-
using the existing/in-situ soil. Profiling the road to the required
design standard followed by spreading of 7% of O.P.C. 43
Grade cement of stabilized soil (Variable depending upon soil
properties) , then spreading 2 % EVOCRETE additive of 7 %
OPC and pulverising the cement , additive & profiled
soil/pavment material with help of Recycler/Stabilizer including
moisturing to OMC. On completion of pulverisation re-garding,
profiling to required grade/camber with motor grader &
compacting simaltaneously with 14 tonne vibratory roller to
achieve 95% degree of compaction as directed by the Engineer-
in-charge & finally irrigating the stabilized surface for next 48
hours.
I 20.0cm thick Sub-Base & Base with Evocrete and Cement etc. cum 3105.00
18.4 Bio Enzyme Soil Stabilizer Terrazyme under IRC accredited new
Technology
I Providing of 1st layer of Bioenyme based soil stabilised layer to a
required thickness as per manufacture design with a existing soil, by
ripping open the existing road formation and treating it with TerraZyme
in the ratio 1L for 12.6 cum soil spreading in uniform layer with motor
grader on prepared surface , mixing by mix in place method with
rotavator at OMC and compacting with smooth wheel roller to achieve cum 1436.00
the desired density complete as per technical specification incl all labour
, equipments etc as per direction of the Engineer -in -charge of the
work. The soil will have PI between 7 and 18% and clay % by
hydrometry should be more than 15% and less than 40%.
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
II Providing of 2nd layer of Bioenyme based soil stabilised layer to a
required thickness as per manufacture design with local soil
material/gravel/murram, having CBR greater than 8% and treating it with
Terrazyme in the ratio 1L for 15.0 cum soil with 25% 40mm crusher
broken metal in design mix, spreading in uniform layer with tractor
grader on prepared surface, mixing by mix in place method with
rotavator at OMC and compacting with smooth wheel roller to achieve cum 1632.00
the desired densiality complete as per technical specification including
all labour, materials like soil and metal, equipments etc. complete as
per direction of the Engineer-in-charge of the work. The soil will have PI
between 7 and 13% and clay % by hydrometry should be more than
15% and less than 30%.

18.5 Soil Stablized subbase/ base using Roadstab


I Providing of soil stabilized subase/base course by providing,laying and
spreading ordinary soil on a prepared subgrade,palverising,adding the
designed quantity of Roadstab mixing compound adding 4% cement,
mixing at OMC,with rotavator grading with motor grader and compacting
cum 3662.00
with the road roller/vibratory roller at OMC to acheive the desired
unconfined compression strength and to form a layer of subbase and
necessary curing

18.6 RBI Grade 81 Treated Base Layer


A For Selected soil having CBR 5% to 6%
I Providing, laying, spreading and compacting Soil conforming to
engineering requirement and Aggregate in base layer including in situ
mixing of 30% Aggregatesof size 22.4 mm to 2.56 mm (for WMM as
per page 154 of Assam SOR 2016-17 for rural road & table 400.13 &
technical specification clause 406 of MORTH 5th Revision) + 20%
Stone dust+46% in-situ soil (CBR 5% to 6%) + 4% RBI Grade-81 (a soil
stabilizer cum pavement material) , speading in uniform layers with cum 4423.00
motor grader on prepared base including watering and compacting with
10 to 12 tonne single drum vibratory roller to achieve the required
density at OMC for preparing the base layer including all cost of
materials , labour, HOM of machinery, etc. complete as per
specifications and EIC directions.

B For Existing In-situ soil having CBR 5% to 6%


Providing, laying, spreading and compacting including mixing of In-situ
Soil (CBR 5% to 6%), Aggregate size 22.4 mm to 2.56 mm (for WMM
as per page 154 of ASSAM SOR 2016-17 for Rural Roads and Table
400.13 & Technocal Specification clause 406 of MORT&H 5th Revision)
and Stone Dust with Soil Stabiliser and Pavement Material RBI Grade
81 (SRSPL), spreading in uniform layers with motor grader on prepared
sub-base / sub-grade including watering and compacting with 10 to 12
tonne single drum vibratory roller to achieve the desired density for
preparing the Base / Sub-base layer. Including basic cost of
materials, labour, HOM of machinary, etc. as per specifications
and EIC directions. The rate mentioned here are exclusive of
carriage charge of Aggregates / Stone Dust / Selected Soil from
quarry to site. The carriage charge will be added to these rates
to arrive at final rate. Various combinations of Aggregates,
Stone Dust Insitu Soil and RBI grade 81 percentages have been
given. The optimum combination would depend upon the (1) In
Situ Soil CBR and PI. (2) Traffic Catagory. (3) Distance of
Quarry from Site For further increasing the durability of the road,
out of the combinitations as bellow the combination with higher
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
I Providing, laying, spreading and compacting Soil conforming to
engineering requirements and Aggregate in base layer including in situ
mixing of 30% Aggregate of size 22.4 mm to 2.56 mm ( for WMM as
per page 154 of ASSAM SOR 2016-17 for rural roads & Table 400.13 &
technical specification clause 406 of MORTH 5th Revision) + 30%
Stone Dust + 36% In-Situ Soil (CBR 5 % to 6 %) + 4 % RBI Grade-81
(a soil stabilizer cum pavement material), spreading in uniform layers cum 4500.00
with motor grader on a prepared base including watering and
compacting with 10 to 12 tonne single drum vibratory roller to achieve
the required density at OMC for preparing the base Layer Including all
cost of materials, labour, HOM of machinery, etc complete as per
specifications and EIC directions

II Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in base layer including in situ
mixing of 30% Aggregate of size 22.4 mm to 2.56 mm ( for WMM as
per page 154 of ASSAM SOR 2016-17 for rural roads & Table 400.13 &
technical specification clause 406 of MORTH 5th Revision) + 20%
Stone Dust + 46% In-Situ Soil (CBR 5 % to 6 %) + 4 % RBI Grade-81
(a soil stabilizer cum pavement material), spreading in uniform layers cum 4423.00
with motor grader on a prepared base including watering and
compacting with 10 to 12 tonne single drum vibratory roller to achieve
the required density at OMC for preparing the base Layer Including all
cost of materials, labour, HOM of machinery, etc complete as per
specifications and EIC directions

III Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in base layer including in situ
mixing of 30% Aggregate of size 22.4 mm to 2.56 mm ( for WMM as
per page 154 of ASSAM SOR 2016-17 for rural roads & Table 400.13 &
technical specification clause 406 of MORTH 5th Revision) + 30%
Stone Dust + 36.25 % In-Situ Soil (CBR 5 % to 6 %) + 3.75 % RBI
Grade-81 (a soil stabilizer cum pavement material), spreading in uniform cum 4293.00
layers with motor grader on a prepared base including watering and
compacting with 10 to 12 tonne single drum vibratory roller to achieve
the required density at OMC for preparing the base Layer Including all
cost of materials, labour, HOM of machinery, etc complete as per
specifications and EIC directions

IV Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in base layer including in situ
mixing of 30% Aggregate of size 22.4 mm to 2.56 mm ( for WMM as
per page 154 of ASSAM SOR 2016-17 for rural roads & Table 400.13 &
technical specification clause 406 of MORTH 5th Revision) + 20%
Stone Dust + 46.25% In-Situ Soil (CBR 5 % to 6 %) + 3.75 % RBI
Grade-81 (a soil stabilizer cum pavement material), spreading in uniform cum 4216.00
layers with motor grader on a prepared base including watering and
compacting with 10 to 12 tonne single drum vibratory roller to achieve
the required density at OMC for preparing the base Layer Including all
cost of materials, labour, HOM of machinery, etc complete as per
specifications and EIC directions
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
V Providing, laying, spreading and compacting Soil conforming to
engineering requirements and Aggregate in base layer including in situ
mixing of 30% Aggregate of size 22.4 mm to 2.56 mm ( for WMM as
per page 154 of ASSAM SOR 2016-17 for rural roads & Table 400.13 &
technical specification clause 406 of MORTH 5th Revision) + 30%
Stone Dust + 36.5 % In-Situ Soil (CBR 5 % to 6 %) + 3.5 % RBI Grade-
81 (a soil stabilizer cum pavement material), spreading in uniform layers cum 4086.00
with motor grader on a prepared base including watering and
compacting with 10 to 12 tonne single drum vibratory roller to achieve
the required density at OMC for preparing the base Layer Including all
cost of materials, labour, HOM of machinery, etc complete as per
specifications and EIC directions

VI Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in base layer including in situ
mixing of 30% Aggregate of size 22.4 mm to 2.56 mm ( for WMM as
per page 154 of ASSAM SOR 2016-17 for rural roads & Table 400.13 &
technical specification clause 406 of MORTH 5th Revision) + 20%
Stone Dust + 46.5% In-Situ Soil (CBR 5 % to 6 %) + 3.5 % RBI Grade-
81 (a soil stabilizer cum pavement material), spreading in uniform layers cum 4009.00
with motor grader on a prepared base including watering and
compacting with 10 to 12 tonne single drum vibratory roller to achieve
the required density at OMC for preparing the base Layer Including all
cost of materials, labour, HOM of machinery, etc complete as per
specifications and EIC directions

VII RBI GRADE 81 - 2%


Providing, laying, spreading and compacting Soil conforming to
engineering requirements and Aggregate in sub base layer including in
situ mixing of 30% Aggregate of size 22.4 mm to 2.56 mm (for WMM
item in ASSAM SOR 2017-18 for rural roads & Table 400.13 &
technical specification clause 406 of MORTH 5th Revision) + 20%
Stone Dust + 48% In-Situ Soil (CBR 5 % to 6 %) + 2 % RBI Grade-81
(a soil stabilizer cum pavement material), spreading in uniform layers cum 2687.00
with motor grader on a prepared base including watering and
compacting with 10 to 12 tonne single drum vibratory roller to achieve
the required density at OMC for preparing the base Layer Including all
cost of materials, labour, HOM of machinery, etc complete as per
specifications and EIC directions

C For Selected Soil Having CBR 7% to 9%


RBI GRADE-81 - 4%
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
Providing , laying spreading and compacting inncluding in situ mixing of
selected soil (CBR 7% to 9%), Aggregate of size 22.4 mm to 2.56 mm
(for WMM as per page 154 of ASSAM SOR 2016-17 for rural roads &
Table 400.13 & technical specification clause 408 of MORTH 5th
Revision) & Stone Dust with Soil Stabilizer and PavementMaterial RBI
Grade 81 (SRSPL) , spreading in uniform layers with Motor grader on a
prepared subbase including watering and compacting with 10 to 12
tonne single drum vibratory roller to achieve the desired density for
preparing the base layer including basic cost of materials, labour,HOM
of machinearyetc, complete as per specification and EIC directions.
The rates mentioned here are Exclusive of carriage charges for
Agrregate/ Stone Dust/ Setected Soil from quarry to site . The carriage
charges will be added to these rates to arrive at final rate.
Various combinations of in-situ soil/selected soil, aggregate and RBI
percentages have been given, The optimum combination would depend
upon the following factors:
1. In-situ soil/selected soil (as applicable), CBR, and PI
2. Traffic Category
3. Distance of Quarry from site

I Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in base course including in
situ mixing of 45 % Aggregate of size 22.4 mm to 2.56 mm ( for WMM
as per page 154 of ASSAM SOR 2016-17 for rural roads & Table
400.13 & technical specification clause 406 of MORTH 5th Revision) +
51 % Selected Soil (CBR 7 % to 9 %) + 4 % RBI Grade-81 (a soil
stabilizer cum pavement material), spreading in uniform layers with cum 4543.00
motor grader on a prepared base including watering and compacting
with 10 to 12 tonne single drum vibratory roller to achieve the required
density at OMC for preparing the base Layer Including all cost of
materials, labour, HOM of machinery, etc complete as per specifications
and EIC directions

II Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in base course including in
situ mixing of 30 % Aggregate of size 22.4 mm to 2.56 mm ( for WMM
as per page 154 of ASSAM SOR 2016-17 for rural roads & Table
400.13 & technical specification clause 406 of MORTH 5th Revision) +
15 % Stone Dust + 51 % Selected Soil (CBR 7 % to 9 %) + 4 % RBI
Grade-81 (a soil stabilizer cum pavement material), spreading in uniform cum 4385.00
layers with motor grader on a prepared base including watering and
compacting with 10 to 12 tonne single drum vibratory roller to achieve
the required density at OMC for preparing the base Layer Including all
cost of materials, labour, HOM of machinery, etc complete as per
specifications and EIC directions
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
III Providing, laying, spreading and compacting Soil conforming to
engineering requirements and Aggregate in base course including in
situ mixing of 45 % Aggregate of size 22.4 mm to 2.56 mm ( for WMM
as per page 154 of ASSAM SOR 2016-17 for rural roads & Table
400.13 & technical specification clause 406 of MORTH 5th Revision) +
51.25 % Selected Soil (CBR 7 % to 9 %) + 3.75 % RBI Grade-81 (a
soil stabilizer cum pavement material), spreading in uniform layers with cum 4336.00
motor grader on a prepared base including watering and compacting
with 10 to 12 tonne single drum vibratory roller to achieve the required
density at OMC for preparing the base Layer Including all cost of
materials, labour, HOM of machinery, etc complete as per specifications
and EIC directions

D RBI GRADE-81 - 3.75%


I Providing, laying, spreading and compacting Soil conforming to
engineering requirements and Aggregate in base course including in
situ mixing of 30 % Aggregate of size 22.4 mm to 2.56 mm ( for WMM
as per page 154 of ASSAM SOR 2016-17 for rural roads & Table
400.13 & technical specification clause 406 of MORTH 5th Revision) +
15 % Stone Dust + 51.25 % Selected Soil (CBR 7 % to 9 %) + 3.75 %
RBI Grade-81 (a soil stabilizer cum pavement material), spreading in cum 4178.00
uniform layers with motor grader on a prepared base including watering
and compacting with 10 to 12 tonne single drum vibratory roller to
achieve the required density at OMC for preparing the base Layer
Including all cost of materials, labour, HOM of machinery, etc complete
as per specifications and EIC directions

II Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in base course including in
situ mixing of 45 % Aggregate of size 22.4 mm to 2.56 mm ( for WMM
as per page 154 of ASSAM SOR 2016-17 for rural roads & Table
400.13 & technical specification clause 406 of MORTH 5th Revision) +
51.5 % Selected Soil (CBR 7 % to 9 %) + 3.5 % RBI Grade-81 (a soil
stabilizer cum pavement material), spreading in uniform layers with cum 4129.00
motor grader on a prepared base including watering and compacting
with 10 to 12 tonne single drum vibratory roller to achieve the required
density at OMC for preparing the base Layer Including all cost of
materials, labour, HOM of machinery, etc complete as per specifications
and EIC directions

RBI GRADE-81 - 3.5%


III Providing, laying, spreading and compacting Soil conforming to
engineering requirements and Aggregate in base course including in
situ mixing of 30 % Aggregate of size 22.4 mm to 2.56 mm ( for WMM
as per page 154 of ASSAM SOR 2016-17 for rural roads & Table
400.13 & technical specification clause 406 of MORTH 5th Revision) +
15 % Stone Dust + 51.5 % Selected Soil (CBR 7 % to 9 %) + 3.5 %
RBI Grade-81 (a soil stabilizer cum pavement material), spreading in cum 3970.00
uniform layers with motor grader on a prepared base including watering
and compacting with 10 to 12 tonne single drum vibratory roller to
achieve the required density at OMC for preparing the base Layer
Including all cost of materials, labour, HOM of machinery, etc complete
as per specifications and EIC directions

RBI GRADE-81 - 2%
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
IV Providing, laying, spreading and compacting Soil conforming to
engineering requirements and Aggregate in base course including in
situ mixing of 30 % Aggregate of size 22.4 mm to 2.56 mm ( for WMM
as per page 154 of ASSAM SOR 2016-17 for rural roads & Table
400.13 & technical specification clause 406 of MORTH 5th Revision) +
15 % Stone Dust + 53 % Selected Soil (CBR 7 % to 9 %) + 2 % RBI
Grade-81 (a soil stabilizer cum pavement material), spreading in uniform cum 2649.00
layers with motor grader on a prepared base including watering and
compacting with 10 to 12 tonne single drum vibratory roller to achieve
the required density at OMC for preparing the base Layer Including all
cost of materials, labour, HOM of machinery, etc complete as per
specifications and EIC directions

E 40% AGGREGATE 20MM + SOIL (CBR 7% TO 9%) + RBI GRADE-


81(SRSPL)
Providing,laying,spreading and compacting including in situ mixing of
selected soil aggregate of size 20mm with soil stabiliser and pavemebt
material RBI Grade-81 (SRSPL), spreading in uniform layers with Motor
grader on a prepared sub base icluding watering and compacting with
10 to 12 tonne single drum vibratory roller to achieve the desired density
for preparing the base layer. Including basic cost of materials, labour,
HOM machinery,etc complete as per specifications and EIC directions.
The rates mentioned here are exclusive of carriage charges for
aggregate/stone dust/selected soil from quarry site. Various
combinations of in-situ soil/selected soil(as applicable),aggregate and
RBI percentages have been given. The optimum combination would
depend upon the following factors :
1. In situ soil/selected soil (as applicable) CBR and PI
2. Traffic category
3. Distance of quarry from site

I Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in base course including in
situ mixing of 40% Aggregate (20 mm) + 56% Soil (CBR 7% to 9%)
with 4 % RBI Grade-81 (a soil stabilizer cum pavement material),
spreading in uniform layers with motor grader on a prepared base
cum 4679.00
including watering and compacting with 10 to 12 tonne single drum
vibratory roller to achieve the required density at OMC for preparing the
base Layer Including all cost of materials, labour, HOM of machinery,
etc complete as per specifications and EIC directions

II Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in base course including in
situ mixing of 40% Aggregate (20 mm) + 56.25% Soil (CBR 7% to 9%)
with 3.75 % RBI Grade-81 (a soil stabilizer cum pavement material),
spreading in uniform layers with motor grader on a prepared base
cum 4473.00
including watering and compacting with 10 to 12 tonne single drum
vibratory roller to achieve the required density at OMC for preparing the
base Layer Including all cost of materials, labour, HOM of machinery,
etc complete as per specifications and EIC directions
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
III Providing, laying, spreading and compacting Soil conforming to
engineering requirements and Aggregate in base course including in
situ mixing of 40% Aggregate (20 mm) + 56.5% Soil (CBR 7% to 9%)
with 3.5 % RBI Grade-81 (a soil stabilizer cum pavement material),
spreading in uniform layers with motor grader on a prepared base
cum 4266.00
including watering and compacting with 10 to 12 tonne single drum
vibratory roller to achieve the required density at OMC for preparing the
base Layer Including all cost of materials, labour, HOM of machinery,
etc complete as per specifications and EIC directions

IV Providing, laying, spreading and compacting Soil conforming to


engineering requirements and Aggregate in sub base layer including in
situ mixing of 40% Aggregate (20 mm) + 58% Soil (CBR 7% to 9%)
with 2% RBI Grade-81 (a soil stabilizer cum pavement material),
spreading in uniform layers with motor grader on a prepared base
cum 2945.00
including watering and compacting with 10 to 12 tonne single drum
vibratory roller to achieve the required density at OMC for preparing the
base Layer Including all cost of materials, labour, HOM of machinery,
etc complete as per specifications and EIC directions

18.7 Providing, laying, spreading and compacting including in situ mixing of


In-Situ 94 % Soil + 4 % PI Reducing Agent with 2 % RBI Grade-81 (a
soil stabilizer cum pavement material), spreading in uniform layers with
motor grader on a prepared including watering and compacting with 10
to 12 tonne single drum vibratory roller to achieve the desired density for cum 2464.00
preparing the Sub Base/Subgrade.
Including basic cost of materials, labour, HOM of machinery, etc
complete as per specifications and EIC directions.

18.8 Providing, laying, spreading and compacting including in situ mixing of


In-Situ 93.5 % Soil + 4 % PI Reducing Agent with 2.5 % RBI Grade-81
(a soil stabilizer cum pavement material), spreading in uniform layers
with motor grader on a prepared including watering and compacting with
10 to 12 tonne single drum vibratory roller to achieve the desired density cum 2819.00
for preparing the Sub Base/Subgrade.
Including basic cost of materials, labour, HOM of machinery, etc
complete as per specifications and EIC directions.

18.9 Providing, laying, spreading and compacting including in situ mixing of


98 % In-Situ Soil (PI < = 10) with 2 % RBI Grade-81 (Soil Stabiliser and
Pavement Material ), spreading in uniform layers with Motor grader on a
prepared surface including watering and compacting with 10 to 12 tonne
single drum vibratory roller to achieve the desired density for preparing cum 1904.00
the Subgrade.
Including basic cost of materials, labour, HOM of machinery, etc
complete as per specifications and EIC directions .

18.10 Providing, laying, spreading and compacting including in situ mixing of


97.5 % In-Situ Soil (PI < = 10) with 2.5 % RBI Grade-81 (Soil Stabiliser
and Pavement Material ), spreading in uniform layers with Motor grader
on a prepared surface including watering and compacting with 10 to 12
tonne single drum vibratory roller to achieve the desired density for cum 2258.00
preparing the Subgrade.
Including basic cost of materials, labour, HOM of machinery, etc
complete as per specifications and EIC directions .
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
18.11 Providing, laying, spreading and compacting including in situ mixing of
98 % Selected Soil (PI < = 10) with 2 % RBI Grade-81 (Soil Stabiliser
and Pavement Material ), spreading in uniform layers with Motor grader
on a prepared surface including watering and compacting with 10 to 12
tonne single drum vibratory roller to achieve the desired density for cum 1904.00
preparing the Subgrade.
Including basic cost of materials, labour, HOM of machinery, etc
complete as per specifications and EIC directions .

18.12 ZYCOSOIL NANO TECHNOLOGY


A Water Proofing
I Waterproofing on top compacted ( as per relevant MoRD specification)
sub Grade soil base, shoulders with Organosilane Nanotechnology &
nano acrylic co-polymer with water (<1000 ppm TDS) in the ratio of 1 kg
Organosilane Nanotechnology:1 kg nano acrylic co-polymer :200 liter sqm 15.00
water spray @ 3 liter /sqm in two spray applications (1.5 liter + 1.5 liter)
as per direction of the Engineer-in-charge.

II Stabilized Sub-base / Base: Providing, Laying, Spreading and


Compacting in-situ/borrow area soil of CBR >5% mixed with /
without 30% crushed aggregate / muruum / GSB Grade 1 as per
mix design.
Application:
(1) Rip and loosen soil with excavator / tractor operated ripper
and scarify with tractor operated rotavator upto depth of 200
mm. Mix aggregates as per mix design.
(2) Apply 1 kg /cum organosilane Nanotechnology mixed in
OMC water (<1000 ppm TDS) on loose soil. Scarify the treated
and allow it to dry.
(2) Spread Cement 3% by weight of soil on the silane treated
cum 2234.00
and dry soil.
(3) Apply 1 kg/cum of nano acrylic Co-Polymer mixed in OMC
water (<1000 ppm TDS), on the above treated soil mixed with
cement. Scarify and grade the soil.
(4) Spread 13.2 and down size aggregates on the graded soil
surface to form 20-25 mm thick soil-aggregate layer.
(5).Compact the stabilized soil-aggregate base with 8 to 10
tonne vibratory roller to achieve stone embedded layer with the
desired density.
(6) Waterproof the top of the compacted stabilized base with
organosilane & nano acrylic Polymer in the ratio of 1 kg
organosilane :1 kg nano acrylic Co-Polymer : 200 liter water
III Prime Coat (with silane Nanotechnology)
(i) Low porosity
Preparing and applying of water soluble organo silane
nanotechnology (for bitumen emulsion application, IRC
approved) with cationic bitumen emulsion CSS1 and water
(<1000 ppm TDS) in the ratio of 1 kg organo silane : 100 kg
cationic bitumen emulsion CSS1 : 200 liter water . Mixing &
Spraying : Take 1 kg of organo silane nanotechnology and add
sqm 21.00
in 200 liter water while filling water in tanker/drum and then add
100 kg cationic bitumen emulsion under circulation. Mix the
solution completely. Spray the solution @ 1 liter per sqm on
compacted stone base. Rates including all materials, labour,
hire Charges of machery etc. complete as per MoRD
specifications & direction of Engineer-in-Charge.
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
18.13 20mm thick Open-Graded Premix Carpet using Bituminous
(penetration grade) Binder Using Nanotechnology: (Providing,
laying and rolling of open-graded premix carpet of 20 mm
thickness composed of 13.2 mm to 5.6 mm stone aggregates
using S-65 penetration grade bitumen mixed with silane
nanotechnology @ 0.1% by weight of bitumen S-65 grade @
14.6 kg/10 sqm to required line, grade and level to serve as
wearing course on a previously prepared base, including mixing
in a suitable hot mix plant, laying and rolling with a three wheel
80-100 kN static roller capacity, finished to required level and
grades to be followed by seal coat of Type D as per Technical
Specification Clause 508 of MoRD and as per direction of
Engineer-in-Charge.)
Bitumen (S-90) sqm 128.00
18.14 Seal Coat( with Nanotechnology) (Providing and laying seal coat
sealing the voids in a bituminous surface laid to the specified
levels, grade and cross fall using Type D as per Technical
Specification Clause 510 of MORD with S-65grade bitumen
mixed with organosilane nanotechnology @ 0.1% by weight of S-
65 bitumen binder laid as per direction of Engineer-in-Charge.)

A By Mechanical Means
I Case -3 : Type C: Bitumen (S-90) sqm 48.00
18.15 EVOCRETE TECHNOLOGY
A Stabilization/soil binding of in-situ soil of sub-base/base course using
EvocreteCCL soil stabilizer (Construction of Sub-Base/Base of road
pavement by making use of EVOCRETE CCL Soil Modifier
(GERMAN) technology by re-using the existing/in-situ soil.
Profiling the road to the required design standard followed by
spreading of 7% of O.P.C. 43 Grade cement of stabilized soil
(Variable depending upon soil properties) , then spreading 2 %
EVOCRETE additive of 7 % OPC and pulverising the cement ,
additive & profiled soil/pavment material with help of
Recycler/Stabilizer including moisturing to OMC. On completion
of pulverisation re-garding, profiling to required grade/camber
with motor grader & compacting simaltaneously with 14 tonne
vibratory roller to achieve 95% degree of compaction as directed
by the Engineer-in-charge & finally irrigating the stabilized
surface for next 48 hours)

I 20.0cm thick Sub-Base & Base with Evocrete and Cement etc. cum 3118.00
18.16 Cell Filled Concrete Pavement
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
I Construction of plastic cell filled cement concrete pavement, thickness
100mm (as per design), over a prepared sub base, with 53 grade
Ordinary Portland Cement(OPC) or any other type as per Clause
1501.2.4 M30 (Grade), coarse and fine aggregates conforming to IS :
2386, mixing in a concrete mixer of not less than 0.2 cum capacity and
appropiate weigh batcher using approved mix design (As per IRC:44-
2008), laid in the cells made of high density polythyne sheets of
thickness 0.22mm to about 0.25mm,side 150mm and depth 100mm of
approximate weight of 1250 kg for a road of 3.75m wide and 1.00km ,
putting iron spike of 200mm long at the end corners of the cells and
using nylon threads passing through the cells 10 mm below the top of
the cells, in approved fixed side formwork (steel channe, wedges, steel
plates including levelling the formwork as per drawing),maitaining
camber of about 3 to3.5%, spreading the concrete with sholvels, rakes,
compacted using needle, scareed and plate vibrators and finished in
continuous operation, curing of concrete slabs for 14- days, curing
compound (where specified) and water finishing to lines and grade as
per drawing and Technical Specification of Cell filled Concrete
a Rate analysis is being carried out for Cell filled concrete pavement of
3.75m and 25m in width and length. As per the requirement of DIY on
cell filled concrete block, the following are the requirements for a
pavement of 3.75m and 25m in width and length that can be
constructed in one day:
*200 micron plastic sheet-1 kg=28 meter long of 10cm width-
(1.75 sq.m/kg-53.57 Kg for 3.75mx25m)
*Labour approximately
sqm 864.00
*Male workers 20
Female workers 7
Mason 4
1 number concrete mixer
Plate or screed vibrator - 1 no.
Mechanical trowelling - 1 no.
Max. 25meter length(of width 3.75meter) can be laid in a day
(about 10 Cum of CC)
18.17 TENAX 3D GRID TECHNOLOGY
I Supplying and laying of Polypropylene extruded Geogrid with a minimum
stiffness (modulus) at 0.5% strain according to ISO 10319 should be
350x550 Kn/m with apparaent coefficient of friction soil/geosynthetics
accroding to EN 13738 must be atleast 1.70(us/gsy) at 10 KPa load and
with a min transversal rib thickness of 2.5 mm and longitudinal rib sqm 148.00
thickness of 3.6 mm. Aperture of geogrid should be 30mm x 30 mm.
Geogrid should not be made of bonding of strands or punching and
stretched sheets

18.18 Recycling of Bituminous Pavement with Central Recycling Plant

Recycling pavement by cold milling of existing bituminous layers,


planning the surface after cold milling, reclaiming excavated material to
the extent of 30 per cent of the required quantity, hauling and stock cum 6161.00
piling the reclaimed material near the cent

18.19 Protective coatings to the structures, equipments and machine


parts with performance guarantee for 3 years.
Ref. of
Item No. Descriptions Unit Rate
MoSRT&H
I Application cost of two part highbuild 100% solid content system of
Cyclophat polyamino based KRAYON KI30021 COROGARD to give
protective coating to the substract by giving good bonding to the
intermediate coat of Krayon KI 30031 RUST CONVERTOR coat giving
the cured coat of crosslinked protective coating from rust , corrosion
and weathering effect including cost of material, labour, scafolding, sqm 780.00
cleaning over application of one part primer fron three part system and
two part primer from three part system Krayon KI 30031 RUST
CONVERTOR PRIMER and consumable complete as directed by the
Engineer-incharge and conforming quality as per IS / IRC
Specifications.
18.20 WASTE PLASTIC TECHNOLOGY
I
Semi dense bituminous concrete using Bituminous Binder mixing with
processed waste plastice (as per IRC-SP;98-20130 by replacement of 8%
Bitumen binder by weight. Providing and laying semi dense bituminous
concrete with 100-120 TPH batch type HMP producing an average output of 75
cum 6952.70
tonnes per hour using crushed aggregates of specified grading, premixed with
bituminous binder @ 4.6 per cent of mix and filler, (ic 92% of standard
Bitumen and 8% waste proccessed plastice by weight shall be used for coating
aggregate after its heating) as per IRC:SP:98-2013) for grading II.
II 20mm thick open-Graded Premix carpet using Bituminous Binder mixing
with processed waste plastice (as per IRC-SP;98-20130 by replacement of
8% Bitumen binder by weight: Providing laying and rolling of 20mm thick open -
graded premix carpet (thickness not less than 20mm at any place) composed
of 13.2mm graded aggregate size @0.18cum per 10sqm & 11.2mm graded
aggregate size @ 0.09cum per 10sqm using with bituminous binder @13.43kg
per 10sqm (ic 92% of standard Bitumen and 8% waste proccessed plastice by sqm 150.90
weight shall be used for coating aggregate after its heating) as per IRC:SP:98-
2013, laying to required line, grade and level to serve as wearing in a suitable
plant , laying and rolling with a three wheel 80-100KN static roller capacity,
finished to required level and grades as per technical specification clause 508
to be followed by seal coat of either Type-A,Type-B or Type-C as per
technical specification.