Old Fee Structure
Old Fee Structure
Old Fee Structure
166/E&F (EC-1)
Dept/Dated: 30.07.1996-Air Act.
Amount of Consent fee under each Act from 1996-97 to 2008-2009.
23 Above Rs.50 crores and upto Rs. 1,74,000- Rs. 1,25,000- Rs. 62,000-
Rs. 100 crores plus Rs. 15 plus Rs. 10 plus Rs. 8
per lakh per lakh per lakh
24 Above Rs. 100 crores and upto Rs. 2,49,000- Rs. 1,75,000- Rs. 94,000-plus
Rs. 1000 crores plus Rs. 3.50 plus Rs. 2.50 Rs. 2
per lakh per lakh per lakh
25 Above Rs. 1000 crores Rs. 5,64,000- Rs. 4,00,000- Rs. 2,74,000-
plus Rs. 1.75 plus Rs. 1 plus Rs. 1
per lakh per lakh per lakh
(Rs.20,00,000- (Rs.15,00,000- (Rs. 5,75,000-
maximum). maximum). maximum).
G.O. Ms.No.40/E&F (EC-1) Dept/Dated: 09.04.2018-Water Act and G.O. Ms.No.41/E&F (EC-1)
Dept/Dated: 09.04.2018-Air Act.
Amount of Consent fee under each Act for the Year 2018-19 onwards