Deviz Executie Suprastructura Etaj Duplex ANDREI
Deviz Executie Suprastructura Etaj Duplex ANDREI
Deviz Executie Suprastructura Etaj Duplex ANDREI
GARD DE IMPREJMUIRE
1 Sapatura gropi stalpi mc 6 320000 1920000 58.18
2 sapatura fudatie gard mc 14 320000 4480000 135.8
3 fasonare si montare mustati kg 102 4500 459000 13.91
4 turnare beton in fundatii stalpi mc 6 190000 1140000 34.55
5 montare armatura in centura kg 232 4500 1044000 31.64
6 turnare beton in centura sub gard mc 14 190000 2660000 80.61
7 zidarie+armare zid si stalpi mc 34 260000 8840000 267.9
TOTAL GARD 20543000 622.5
TOTAL FAZA I +II (manopera la rosu) 59,652.00 12,050.91 12,050.91 pret FARA TVA
14,340.58 pret cu TVA
Page 8
TRANSE DENUMIRE ETAPA VALOARE (euro/lei)
infrastructura,zidarie parter+beton+armatura (casa si anexa)
Faza III
cofrare stalpi mansarda mp 90 30 2700
fasonare, montare armatura stalpi mansarda kg 330 2 660
betonare stalpi mansarda mc 3.3 60 198
zidarie mansarda 25cm mc 25 125 3125
zidarie mansarda 11.5cm mc 2.5 125 312.5
cofrare grinzi, buiandrugi, centuri mp 60 40 2400
armare grinzi, buiandrugi, centuri kg 768 2 1536
betonare cu CIFA grinzi, buiandrugi, centuri mc 5 60 300
TOTAL FAZA III 11231.5
Faza IV
sarpanta casa mp 180 100 18000
batut scandura pe sarpanta mp 180 5 900
batut lateti pe sarpanta mp 180 7 1260
montare folie mp 180 0.5 90
invelitoare mp 180 12 2160
TOTAL FAZA IV 22410
415.81
215.61
357.29
616.02
336.34
51.33
154.00
184.80
41.58
57.49
9.24
20.53
16.94
2,477.00 2,477.00
0.00
739.22
184.80
54.21
770.02
38.50
1,560.57
912.53
271.05
79.26
22.18
221.77 4,854.11
4,854.11
554.41
135.52
40.66
641.68
64.17
492.81
315.40
61.60
2,306.26 2,306.26
0.00
3,696.10
184.80
258.73
18.48
443.53 4,601.64
4,601.64