Engineer Procedure
Engineer Procedure
Engineer Procedure
Page 1 of 7
ENGINEERING WORK SE-TDR-013
PROCEDURE REV. A
Page 2 of 7
ENGINEERING WORK SE-TDR-013
PROCEDURE REV. A
Pt. Shaftindo Energi will develop detailed engineering of construction, Fabrication and
installation to the extent necessary concept and all pertinent details to fully support detail
Engineering, Construction, Fabrication & installation this project
PT. SHAFTINDO ENERGI shall demonstrate compliance of its design with the overall
requirement. The PTLM engineering shall include issue of key document to company,
addressing and / or incorporating Company comment and reissue as necessary for
approval.
2. Scope of Work
Include but not limited to planning, detail drawing, CAD Drawing, Scheduling, Process
Analys, Fabrication, construction & Commissioning.
3. Responsibility
3.4. Drafter/Designer
Prepare AutoCAD drawing as per field sketch and engineering design
Prepared for construction drawing and survey to field as required.
4. PROCEDURE
4.1. DESIGN PROCEDURE
4.1.1. Base on contract from client, engineering ready for collect basic document
and Survey to field.
4.1.2. Engineering prepare sketch on isometric drawing. Result of the sketch
especially for design dimension, & specification will be reviewed by engineer
client.
Page 3 of 7
ENGINEERING WORK SE-TDR-013
PROCEDURE REV. A
4.1.3. If any revision related with change of drawing, Engineer will forward to drafter
to redraw on AutoCAD Drawing.
4.1.4. Engineer submits analysis stamped by “For Review” to the client. Once they
found any un-conformance, engineer will discuss to the client related the
matters.
4.1.5. Engineer will be submit Bill Of Quantity actual site.
4.1.6. Engineer will follow-up the meeting by revised the drawing as per client
requirements
4.1.7. Engineer will resubmit the drawing stamped by “ For Approval”
Page 4 of 7
ENGINEERING WORK SE-TDR-013
PROCEDURE REV. A
Page 5 of 7
ENGINEERING WORK SE-TDR-013
PROCEDURE REV. A
Page 6 of 7
ENGINEERING WORK SE-TDR-013
PROCEDURE REV. A
Page 7 of 7