VUNG ANG II POWER LLC - VAPCO Power Engineering Consulting JSC 1

Vung Ang II Thermal power plant General layout


amendment

LEGAL DOCUMENTS
List of Legal documents:
1. Decision No. 2582/QD-BCT dated September 20, 2006 of the Ministry of Industry
approving the planning on construction site of Vung Ang Power Center;
2. Feasibility study report (FS) of Vung Ang II BOT thermal power plant project
approved by the Ministry of Industry and Trade by Decision No. 0538/QD-BCT
dated 28/01/2011.
3. The project's environmental impact assessment report (EIA) was approved under
the Decision No. 3055/QD-BTNMT dated October 8, 2018 of the MONRE.
4. The adjusted feasibility study report of Vung Ang II BOT thermal power plant
project approved by the Ministry of Industry and Trade under Decision No.
664/QD-BCT dated March 21, 2019.
5. The second revised feasibility study report of Vung Ang II BOT thermal power
plant project approved by the Ministry of Industry and Trade under Decision No.
1248/QD-BCT dated May 4, 2020.
6. Technical design of Vung Ang II BOT thermal power plant project has been
appraised by the Department of Electricity and Renewable Energy - Ministry of
Industry and Trade and announced the appraisal results in writing No. 463/DL-
ND&ĐHN dated 09/04/2021
7. Official letter No. 3969/CHHVN-KHĐT dated 24/09/2021 regarding location of
intake, outfall of circulating water pipeline of VA2 and extended outfall of VA1
TPP
8. Document No. 03/KKT-QHXD dated March 4, 2022 of the Economic Zone
Authority of Ha Tinh province on introducing the location of the ash storage site
of Vung Ang II Thermal Power Plant project.
9. Document No. 350/KKT-TNMT dated 24/03/2022 of the Ha Tinh province
Economic Zone Authority on performing site clearance and lease land for the
additional area for cooling water system of Vung Ang 2 Thermal Power Plant
10. Letter No. 600/ĐL-NĐ&ĐHN dated 25/03/2022 of the Electricity and Renewable
Energy Authority on Cooling Water Intake Design
11. Document No. VAPCO-MONRE-00222 dated 06/04/2022 of VAPCO
Application letter to the decision on sea areas assignment
12. Decision No. 39/QĐ-KKT dated 20/05/2022 of Ha Tinh province Economic Zone
Authority on leasing additional land areas for CW intake
13. Document No. 3262/BCT dated 10/06/2022 of Ministry of Industry and Trade on
the execution of Prime minister’s instruction 08 to Vung Ang II BOT TPP

LEGAL DOCUMENTS
VUNG ANG II POWER LLC - VAPCO Power Engineering Consulting JSC 1
Vung Ang II Thermal power plant General layout
amendment

14. Document No. 1190/KKT-QHXD dated October 5, 2022 of the Ha Tinh province
Economic Zone Authority of approving the layout adjustment of the ash storage
area of the Vung Ang II thermal power plant project.

LEGAL DOCUMENTS