SECTION 16312 Unit Substation, Secondary
SECTION 16312 Unit Substation, Secondary
SECTION 16312 Unit Substation, Secondary
SECTION 16312
UNIT SUBSTATION, SECONDARY
PART 1 - GENERAL
1.1 DESCRIPTION:
This section specifies the furnishing, installation, and connection of
the secondary unit substation, complete and ready for operation.
1.2 RELATED WORK:
A. Section 16050, BASIC METHODS AND REQUIREMENTS (ELECTRICAL): General
electrical requirements and items that are common to more than one
section of Division 16.
B. Section 16051, ELECTRICAL SYSTEM PROTECTION DEVICE STUDY: Electrical
coordination study of overcurrent protection devices.
C. Section 16111, CONDUITS SYSTEMS: Conduits and outlet boxes.
D. Section 16112, BUSWAYS: Feeder busways and fittings.
E. Section 16126, CABLES, HIGH VOLTAGE (ABOVE 600 VOLTS): High voltage
cables.
F. Section 16127, CABLES, LOW VOLTAGE (600 VOLTS AND BELOW): Cable and
wiring.
G. Section 16450, GROUNDING: Requirements for personnel safety and to
provide a low impedance path for possible ground fault currents.
H. Section 16462, DISTRIBUTION SWITCHBOARDS: Secondary distribution
switchboards.
I. Section 16464, SWITCHGEAR, LOW VOLTAGE (600 VOLTS AND BELOW): Secondary
distribution switchgear.
1.3 FACTORY TESTING:
Substations shall be thoroughly tested at the factory to assure that
there are no electrical or mechanical defects. Tests shall be conducted
as per UL and ANSI Standards. Factory tests shall be certified.
1.4 SUBMITTALS:
Submit in accordance with Section 16050, BASIC METHODS AND REQUIREMENTS
(ELECTRICAL):
A. Shop Drawings:
1. Include sufficient information, clearly presented, to determine
compliance with drawings and specifications.
16312-1
07-04M
16312-2
07-04M
16312-3
07-04M
16312-4
07-04M
16312-5
07-04M
16312-6
07-04M
kVA (%)
500 99.1
750 99.2
1000 99.2
1500 99.3
2000 99.4
2500 99.4
16312-7
07-04M
16312-8
07-04M
B. Foundations:
1. Provide foundations of reinforced concrete, Type C (3000 psi minimum,
28 day compressive strength), and comply with the ACI 318.
2. Locate the top of the foundation pad 152.4 mm (6 inches) above the
adjacent finished grade unless otherwise shown on the drawings.
Refer to drawings for size, location, and structural steel
reinforcing required.
3. Grade the adjacent terrain so that surface water will flow away from
the foundation.
4. Anchor the unit with rustproofed bolts not less than 12.5 mm (1/2
inch). // In seismic areas, substation shall be adequately anchored
and braced to withstand the seismic forces at the location where
installed. //
3.2 INSTRUCTIONS:
Furnish the services of a competent instructor for two, 4 hour periods
for instructing personnel in the operation and maintenance of the
substation, on the date requested by the Resident Engineer.
- - - E N D - - -