Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Activity 5 - Linear Programming

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Republic of the Philippines

POLYTECHNIC UNIVERSITY OF PHILIPPINES


Sta. Mesa, Manila
Senior High School Department

Christal G. Falame
Name: _______________________________________ Score: _____________
BSCE 1-2
Year/Course/section: __________________________ Date: February 13,
______________ 2022
Mathematics in the Modern World

Activity 5
1. Sketch the solution sets of the following systems of linear inequalities.

(a) 2x − y ≤ 10
3x + y ≤ 5

(b) 3x + 4y ≥ 14
x-y≤5

2. Solve the linear programming problem


In a manufacturing process, the final product has a requirement that it
must weigh exactly 150 kgs. The two raw materials used are A, with cost of
Php 6 per unit and B, with a cost of Php 12 per unit. At least 15 units of B
and no more than 20 units of A must be used. Each unit A weighs 4 kgs;
each unit of b weighs 10 kgs. How much of each type of raw material should
be used for each unit of final product to minimize cost?
Name: Christal G. Falame Score:
Course/Year/Section: BSCE 1-2 Date: February 13, 2022
MATHEMATICS IN THE MODERN WORLD

Activity 5: Linear Programming

1.
(a)
2x − y ≤ 10 / TRUE

3x + y ≤ 5 / TRUE

2x − y ≤ 10

3x + y ≤ 5
(b)
3x + 4y ≥ 14 / FALSE ú

x - y ≤ 5 / TRUE

x-y≤5
3x + 4y ≥ 14
2.
SOLUTION
• Decision Variables:
Let, x = raw materials A
Y = raw materials B
• Objective Function:
Minimize: C = 6x + 12y
• Constraints:
Subject to: 4x + 10y = 150
𝑥 ≤ 20
𝑦 ≥ 15
𝑥≥0

* Pertinent region lies within 0 ≤ x ≤ 20 , y ≥ 15.


Solution 1 Solution 2
Raw Material A, (x) 0 0
Raw Material B, (y) 15 15
Total Cost, (6x + 12y) 180 180

y = 15 x = 20

4x + 10y = 150

The constraints are graphed in the figure. Since the pertinent region lies within 0 ≤
𝑥 ≤ 20 , 𝑦 ≥ 15, and on 4x + 10y = 150, two solutions can be immediately found, points a
and b, where a and b have the same value of x and y.