Date: 1-11-2022
Potential
Location Action required /
S.no Issues Photograph Risk Rectification Close Out Photo
Recommendations
Level
Contractor need to
Light stand was Non-Life
ensure that all materials
found kept at the Critical
kept near the edge of the
Level-1, edge of building, 1>3
8 building must be working
A05 Potential risk of
removed or protect day
falling object &
properly to prevent to
materials
fall/drop from height
HSE Observation Report
Contractor need to
ensure that all materials Non-Life
Poor storage of stored properly at Critical
1>3
9 Basement- material was designated storage area, working
1 observed or barricaded with day
temporary storage
signage’s
HSE personnel’s
Contractor must comply Non-Life
ratio is less on site
project HSE Staff Critical
asper the Manpower
requirement ( ratio of 1>3
10 C22 (As of today working
Health and Safety staff
manpower 454 and day
to workforce shall be no
only 6 HSE
less than 1:50 )
personnel’s)
Prepared by:
Mohammed Vajid Ali
HSE Observation Report
Life Critical Major failure e.g. fatality, LTI, major injury, or Immediate> 1 Working day (if not temporary suspended)
dangerous occurrence
Non-Life Critical Potential Minor injury Incident, Environmental or 1 > 3 working day
Welfare Issue.
Good Practice N/A None however look to share good practice