Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
103 views19 pages

RPT6 C

Download as xls, pdf, or txt
Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1/ 19

Date Time Wellhead Choke Gas Metering Oil Metering

Tubng DS Well Mnfld Diff Static Gas Meter Orif. Meter Oil Oil Oil Line
Press Press Temp Dia Press Press Temp H2S CO2 N2 SG Run Dia Reading Temp Grav BSW
Day-Mo-Yr-Hr:Min:Sec psig psig C 64th inh2o psig C ppm % % in in m3 C API60 %
17-Jun-10 17:30:00 1360 80 50 24 5.761 1.500 4.40
17-Jun-10 18:00:00 1360 80 50 24 164 78 38 0.786 5.761 1.500 9.60 40 45.17
17-Jun-10 18:30:00 1360 80 49 24 170 78 38 0.786 5.761 1.500 15.00 40 45.17
17-Jun-10 19:00:00 1365 80 49 24 165 78 38 0.786 5.761 1.500 20.40 40 45.17
17-Jun-10 19:30:00 1360 80 49 24 168 78 38 0.786 5.761 1.500 25.80 40 45.17
17-Jun-10 20:00:00 1365 80 49 24 165 78 38 0.786 5.761 1.500 31.20 40 45.17
17-Jun-10 20:30:00 1360 80 49 24 160 78 38 0.786 5.761 1.500 36.40 40 45.17
17-Jun-10 21:00:00 1360 80 49 24 180 78 38 0.786 5.761 1.500 41.80 40 45.17
17-Jun-10 21:30:00 1365 80 49 24 184 78 38 0.786 5.761 1.500 47.20 40 45.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 ###
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

634757328.xls FieldData Halliburton Energy Services 12/22/2022 16:32:18 Pg 1 of 19


Time Static P. up Diff. P. (in H2O) Diff. P. (psi) Static P. ds

13:30 0 0

14:00 0 0

14:30 0 0

15:00 0 0

15:30 0 0

16:00 0 0

16:30 0 0

17:00 0 0

17:30 0 0

18:00 0 0

18:30 0 0

0
Heading Well Test Report
Customer Rep Mr: 3arefha
Well sss
Location CHEGUA 19
Date 17 June 2010
Type DST 3 Click on Halliburton Logo to make Report
Ticket # 002
Range for the "Report" & "Chart"
Row Date/Time
Begin 10 17-Jun-17:30
End 18 17-Jun-21:30

Report Format Order Rpt Units Chart From Sheet Column

Time Date & Time 1 FieldData 1


DTime Hr Calcs 2
Pressure CSG kg/cm2 FieldData 3
WHP 2 kg/cm2 1 FieldData 5
DSP 3 barg FieldData 6
Temps BHT C FieldData 4
WHT 4 C 2 FieldData 7
SepGas 7 C FieldData 12
Flow Rates Gas ksm3/d Calcs 3
Oil m3/d Calcs 4
Water m3/d Calcs 5
Cum Vol Gas ksm3 Calcs 6
Oil m3 Calcs 7
Water m3 Calcs 8
Ratios GOR 17 sm3/m3 Calcs 18
%WCT % Calcs 12
%BSW 15 % FieldData 22
OGR m3/ksm3 Calcs 10
WGR m3/ksm3 Calcs 11
Separator Oil Meter m3 FieldData 19
Diff 6 inh2o FieldData 10
Static 5 kg/cm2 FieldData 11
Oil Temp 10 C FieldData 20
Meter Run in FieldData 17
Orifice in FieldData 18
Gas S.G. 8 FieldData 16
H2S/CO2 CO2 % FieldData 14
N2 % FieldData 15
H2 S ppm FieldData 13
Misc. Choke 64th FieldData 8
HtrChk 64th FieldData 9
API60 14 API60 FieldData 21
Comments FieldData 2
Water Water Meter m3 FieldData 26
Salinity ppm FieldData 28
Water S.G. FieldData 29
pH FieldData 30
Burner Brnr Oil Press kg/cm2 FieldData 31
Brnr Air Press kg/cm2 FieldData 32
Tank Oil Tank Press kg/cm2 FieldData 23
Oil Tank Volume m3 FieldData 24
Oil Tank Temp C FieldData 25
Water Tank Volume m3 FieldData 27
Spares Tank Rdg 11 cm FieldData 34
Oil Tank Rate 12 m3/1/2hr Calcs 15
Oil Tank Rate 13 m3/hr Calcs 16
Gas Rate 9 ksm3/hr Calcs 14
Water Rate 16 m3/1/2hr Calcs 17

634757328.xls Setup Halliburton Energy Services 12/22/2022 16:32:18 Pg 3 of 19


Oil Metering Worksheet

API Gravity Correction to 60oF - Hydrometer Calculation per API Manual of Petroleum
46.7 API Gravity at Observed Temperature 45.267 API Gravity at 60oF Measurment Standards(MPMS), Chapters
80 Observed Temperature(oF) 1.0254 Volume Correction Factor 11.1 & 11.2.1.

Calculation per API MPMS Chapter 12, Section 2 - Calculation of Liquid


Petroleum Quantities by Turbine or Displacement Meters
Time Tank Readings

Hr:Min:Sec
10 Beginning meter reading 15:05:00 Beginning Time 10 Beginning Tank Volume
20 Ending meter reading 16:05:00 Ending Time 20.03892471 Ending Tank Volume
10 Meter indicated Volume 1.083333 Delta Time(hr) 10.03892471 Tank Indicated Volume
98.6 Oil Temperature at Meter(DegF) 98.6 Avg Oil Temperature in Tank(DegF)
41.2 API Gravity at 60oF 41.2 API Gravity at 60oF
714 Oil Pressure at Meter(Psig) 0.0 Tank Pressure(Psig)
0 Pe Equilibrium Vapor Pressure (psig) 0 Pe Equilibrium Vapor Pressure (psig)
0.00000632 F Compressibility Factor 0.00000632 F Compressibility Factor
0.980238 Ctl Correction factor for liquid temp 90 Ambient Temperature(DegF)
1.004533 Cpl Correction factor for liquid press 75 Tank Inside Diameter(In.)
0.75 Tank Wall Thickness(In)
1.000638 Cts Correction factor for steel temp
9.8468103347 Meter Volume Corrected to Std Cond 1.000000 Cps Correction factor for tank pres
9.8468103302 Tank Volume Corrected to Std Cond 0.980238 Ctl Correction factor for liquid temp
0.99999999954 Measured Correction Factor 1.000000 Cpl Correction factor for liquid press
This Measured Correction Factor Calculation is corrected to standard conditions. Every oil rate calculation
below (that uses it) uses the current temperature and pressure for calculating the current oil volume.

Oil Volume Calculation


41.8 Previous Meter Reading Notes:
47.2 Current Meter Reading Replace the formula(=A26) in Cell A37 with a manually
104 Oil Temperature at Meter(DegF) calculated correction factor if you prefer not to use the
45.2 API Gravity at 60oF MPMS Chapter 12 method for determining the meter
BS&W(%) factor.
78 Oil Pressure at Meter(Psig)
0 Pe Equilibrium Vapor Pressure (psig) The information in Column 1, Rows 30 to 35 comes from
0.99999999954 Measured Correction Factor(=A26) the "Field Data" sheet during each calculation on the
1.000000 Csw Correction factor to account for the presence of sediment and water "Calcs" sheet. Information in rows 36 and 37 come from
0.976391 Ctlm Correction Factor for temperature at meter either manual entry or the worksheet above.
1.000543 Cplm Correction Factor for pressure at meter
5.2754 Actual Metered Oil Quantity

Water Volume Calculation Water Meter Factor Calculation


0 Previous Meter Reading 0 Previous Meter Reading
Current Meter Reading 100 Current Meter Reading
0 Difference 100 Difference
1.000000 Meter Factor 0 Beginning Tank Volume
0.000 Volume adjusted by Meter Factor 100 Ending Tank Volume
0.000 Water From BS&W(in Oil Volume Calculation) 100 Tank Indicated Volume
0.000 Total Water Volume 1.000000 Meter Factor
The water meter factor calculation at the right can be used to determine the water meter factor. During each calculation on the "Calcs" sheet, the water
meter readings from the "FieldData" sheet shows up in Column 1 and the Total Water Volume in Row 51 is returned to the "Calcs" sheet.

634757328.xls Meters Halliburton Energy Services 12/22/2022 16:32:18 Pg 4 of 19


Do Not Change Anything Below This Row!
Correct API to 60oF
46.7 API Gravity at Observed Temperature
80.0 Observed Temperature
793.27 RHOt Density at Temperature t
0.999741920 Hydrometer Correction
20.0 Delta T
793.07 RHOt Density corrected f/Hydrometer
341.0957 K0
0.0000 K1
0.375503450 Term 1
0.0004133821 Term 2
0.000000000 Term 3
0.000413400 Alpha
908.369000000 RHO60 Est. Kg/M3 (Water 991.012 Kg/M3)
0.008268000 Term 1
0.006614400 Term 2
0.000054690 Term 3
-0.008322690 Term 4
0.991712 VCF Volume Correction Factor
799.697 RHO 60
45.267 API60
Volume Correction Factor at Hydrometer Conditions
799.548000 RHO60
0.426610660 a(1)
0.000533565 a(2)
0.000000000 b(1)
0.000533600 a
0.010672000 a(1)
0.008537600 a(2)
0.000091110 a(3)
-0.010763110 a(4)
0.989294600 VCF Volume Correction Factor
Volume Correction Factor at Meter Conditions
818.530000 RHO60
0.416717408 a(1)
0.000509105 a(2)
0.000000000 b(1)
0.000509100 a
0.019651260 a(1)
0.015721000 a(2)
0.000308940 a(3)
-0.019960200 a(4)
0.980237680 VCF Volume Correction Factor
Volume Correction Factor at Tank Conditions
818.530 RHO60
0.416717408 a(1)
0.000509105 a(2)
0.000000000 b(1)
0.000509100 a
0.019651260 a(1)
0.015721000 a(2)
0.000308940 a(3)
-0.019960200 a(4)
0.980237680 VCF Volume Correction Factor
Compressibility Calc at Meter
41.0 API
98.5 Temp

634757328.xls Meters Halliburton Energy Services 12/22/2022 16:32:18 Pg 5 of 19


0.81948 RHO
0.67155 RHOSQR
1 Sign
-1.994700 Term1
0.013230 Term2
1.182220 Term3
0.341170 Term4
0.632496874 F(Compressibility * 100000)
0.000006320 F(Rounded)
Compressibility Calc at Tank
41.0 API
98.5 Temp
0.81948 RHO
0.67155 RHOSQR
1 Sign
-1.994700 Term1
0.013230 Term2
1.182220 Term3
0.341170 Term4
0.632496874 F(Compressibility * 100000)
0.000006320 F(Rounded)
Volume Correction Factor at Meter Conditions
800.001000 RHO60
0.426369092 a(1)
0.000532961 a(2)
0.000000000 b(1)
0.000533000 a
0.023452000 a(1)
0.018761600 a(2)
0.000440000 a(3)
-0.023892000 a(4)
0.976391150 VCF Volume Correction Factor
Compressibility Calc at Meter
45.2 API
104.0 Temp
0.80014 RHO
0.64022 RHOSQR
1 Sign
-1.994700 Term1
0.013960 Term2
1.240070 Term3
0.377850 Term4
0.695711650 F(Compressibility * 100000)
0.000006960 F(Rounded)

634757328.xls Meters Halliburton Energy Services 12/22/2022 16:32:18 Pg 6 of 19


Calculation per API Manual of Petroleum
Measurment Standards(MPMS), Chapters

Beginning Tank Volume

Avg Oil Temperature in Tank(DegF)

Pe Equilibrium Vapor Pressure (psig)


F Compressibility Factor
Ambient Temperature(DegF)
Tank Inside Diameter(In.)
Tank Wall Thickness(In)
Cts Correction factor for steel temp
Cps Correction factor for tank pres
Ctl Correction factor for liquid temp
Cpl Correction factor for liquid press

Replace the formula(=A26) in Cell A37 with a manually


calculated correction factor if you prefer not to use the
MPMS Chapter 12 method for determining the meter

The information in Column 1, Rows 30 to 35 comes from


the "Field Data" sheet during each calculation on the
"Calcs" sheet. Information in rows 36 and 37 come from
either manual entry or the worksheet above.

sed to determine the water meter factor. During each calculation on the "Calcs" sheet, the water

634757328.xls Meters Halliburton Energy Services 12/22/2022 16:32:18 Pg 7 of 19


Do not delete or clear contents of colu

Date Time DTime Gas Oil Water Gas Oil Water GOR WCT Gas
Rate Rate Rate Volume Volume Volume Flow Rate
Day-Mo-Yr-Hr:Min Hr ksm3/d m3/d m3/d ksm3 m3 m3 ksm3/m3 % m3/hr
17-Jun-10 17:30 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
17-Jun-10 18:00 0.5 42.428 243.84 0.00 0.884 5.08 0.00 0.174 1767.833
17-Jun-10 18:30 1.0 43.217 253.22 0.00 1.784 10.36 0.00 0.171 1800.708
17-Jun-10 19:00 1.5 42.560 253.22 0.00 2.671 15.63 0.00 0.168 1773.333
17-Jun-10 19:30 2.0 42.955 253.22 0.00 3.566 20.91 0.00 0.170 1789.792
17-Jun-10 20:00 2.5 42.560 253.22 0.00 4.453 26.18 0.00 0.168 1773.333
17-Jun-10 20:30 3.0 41.895 243.84 0.00 5.325 31.26 0.00 0.172 1745.625
17-Jun-10 21:00 3.5 44.503 253.22 0.00 6.252 36.54 0.00 0.176 1854.292
17-Jun-10 21:30 4.0 45.008 253.22 0.00 7.190 41.81 0.00 0.178 1875.333
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

634757328.xls Calcs Halliburton Energy Services 12/22/2022 16:32:18 Pg 8 of 19


Do not delete or clear contents of columns 14, 15, 16, 17, 18 !!!

Date Time Oil Tank Water G.O.R.


Flow Rate Flow Rate
Day-Mo-Yr-Hr:Min m3/1/2hr m3/hr m3/1/2hr sm3/m3
17-Jun-10 17:30 0.00 0.00 0.00 0.000
17-Jun-10 18:00 5.08 10.16 0.00 173.999
17-Jun-10 18:30 5.28 10.55 0.00 170.670
17-Jun-10 19:00 5.28 10.55 0.00 168.076
17-Jun-10 19:30 5.28 10.55 0.00 169.636
17-Jun-10 20:00 5.28 10.55 0.00 168.076
17-Jun-10 20:30 5.08 10.16 0.00 171.813
17-Jun-10 21:00 5.28 10.55 0.00 175.749
17-Jun-10 21:30 5.28 10.55 0.00 177.743
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000

634757328.xls Calcs Halliburton Energy Services 12/22/2022 16:32:19 Pg 9 of 19


Well Test Report
Mr: 3arefha Date 40346
Well sss DST 3
CHEGUA 19

96.10 52

96.00
WHP (kg/cm2)

95.90

WHT (C)
95.80

50

95.70

95.60

95.50

95.40 48
17:16 17:45 18:14 18:43 19:12 19:40 20:09 20:38 21:07 21:36 22:04
17-Jun WHP 17-Jun
17:30 WHT 21:30
Gas Flow Rate Calculation
The basis for the gas flow rate calculation below is the API Manual of Petroleum Measurement Standards, Chapter 14.
The Equations Method is used for the report sheet but it and the Factors Method are both calculated below.

The compressibility calculation is based on API MPMS Chapter14.2(A.G.A. Report #8). The Gross Charachterization Method
for calculating compressibility is used for the gas flow rate calculation.

Input Parameters Reference Conditions


184 inH2O Differential Pressure Specific Gravity Reference
78 psig Downstream Pressure 60 Deg F (Tgr)
100.4 DegF Flowing Temperature 14.73 Psia (Pgr)
H2S ppm Base or Contract Reference
CO2 Mole % 60 Deg F (Tb)
N2 Mole % 14.73 Psia (Pb)
0.786 Specific Gravity Std. Condition is 60F and 14.73 psia
5.761 in Meter Run Diameter 14.73 Atmospheric Pressure
1.500 in Orifice Diameter 1.3 Isentropic Exponent(cp/cv)
0.99959 Compressibility of air at Std Cond.
Gas Flow Rate at Base Conditions - Factors Method 0.00000925 Orifice Plate Thermal Expansion Coef.(in/in-F)
66227 ft^3/hr 0.00000620 Meter Run Thermal Expansion Coef.(in/in-F)
1.589439 mmscfd 0.00000690 Dynamic Viscosity(lbm/ft-s)
Gas Flow Rate at Base Conditions - Equation Method
66227 ft^3/hr
1.589439 mmscfd
45.008 ksm3/d 1875.33333333 sm3/hr
Other Calculated Values
99.371 psia Upstream Pressure
22.699 Mw - Gas Mole Weight
0.995688 Zs Compressibility(std)
0.995688 Zb Compressibility (base)
0.977236 Zf1 Compressibility (flowing)
1.009397 Fpv
763.153592 Fn
0.597434 Fc
0.000494 Fsl
0.978840 Y1
0.963258 Ftf
1.127762 Fgr
1.000000 Ftb
1.000000 Fpb

634757328.xls GasCalc Halliburton Energy Services 12/22/2022 16:32:19 Pg 11 of 19


Equation Method
Qv = 7709.61 * Cd * Ev * Y1 * d ^ 2 * ((Pf1 * Zs * hw) / (Gr * Zf1 * Tf)) ^ 0.5
* (14.73 / Pb) * ((Tbf + 459.67) / 519.67) * (Zb / Zs)

634757328.xls GasCalc Halliburton Energy Services 12/22/2022 16:32:19 Pg 12 of 19


Well Test Report
Mr: 3arefha Date 17 June 2010
Well sss DST 3
CHEGUA 19 Ticket # 002

Date & Time WHP DSP WHT Static Diff SepGas Gas S.G. Gas Rate Oil Temp Tank Rdg Oil Tank Rate Oil Tank Rate API60 %BSW Water Rate GOR
kg/cm2 barg C kg/cm2 inh2o C ksm3/hr C cm m3/1/2hr m3/hr API60 % m3/1/2hr sm3/m3
17-Jun 17:30 95.64 5.52 50 0.00 0 22.00 0.00 0.00 0 0.000
17-Jun 18:00 95.64 5.52 50 5.49 164 38 0.786 1768 40 48.00 5.08 10.16 45.2 0 173.999
17-Jun 18:30 95.64 5.52 49 5.49 170 38 0.786 1801 40 75.00 5.28 10.55 45.2 0 170.670
17-Jun 19:00 95.99 5.52 49 5.49 165 38 0.786 1773 40 102.00 5.28 10.55 45.2 0 168.076
17-Jun 19:30 95.64 5.52 49 5.49 168 38 0.786 1790 40 129.00 5.28 10.55 45.2 0 169.636
17-Jun 20:00 95.99 5.52 49 5.49 165 38 0.786 1773 40 156.00 5.28 10.55 45.2 0 168.076
17-Jun 20:30 95.64 5.52 49 5.49 160 38 0.786 1746 40 182.00 5.08 10.16 45.2 0 171.813
17-Jun 21:00 95.64 5.52 49 5.49 180 38 0.786 1854 40 209.00 5.28 10.55 45.2 0 175.749
17-Jun 21:30 95.99 5.52 49 5.49 184 38 0.786 1875 40 236.00 5.28 10.55 45.2 0 177.743

Page 13
Test No. Well Name/Number Customer Date (day,month,year) Field

DST 2 sss Sonatrach EXP 17-Jun-2010 Ain amenas


Oil Meter Size Meter Type Orifice Plate Gas Meter Run Size Wellhead Choke Size Customer Rep. Mr: 3arefha Expro Rep.: Mohamed Lemdjadi
n/a Tank Metering 1.500 " 5.761 in. 24
Wellhead Data Gas Metering Oil Metering H2O Rate Gas Oil Ratio
Time Wellhead D/stream Wellhead Static Diff Gas Gas Gas Oil Tank Oil Oil Oil BS&W Water G.O.R.

hh:mm Pressure Pressure Temp Pressure Pressure Temp Gravity Rate Temp Readings Rate Rate Specific Gravity Rate

(24 Hr Clock) (kg/cm²) (kg/cm²) (ºC) (kg/cm²) (inH2O) (ºC) (Air=1) (sm³/hr) (ºC) (cm) (m3/½hr) (m³/hr) (uncorrected) (%) (m³/½hr) (sm³/m³)

14:30 95.30 4.20 49.00


14:50 Diverted flow through the separator.
15:00 Started flow rate calculation. 22.00
18:00 95.6 5.5 50.00 5.49 164 38 0.786 1767.833 40 48.00 5.08 10.16
18:30 95.6 5.5 49.00 5.49 170 38 0.786 1800.708 40 75.00 5.28 10.55
19:00 96.0 5.52 49.00 5.49 165 38 0.786 1773.3 40 102.00 5.275 10.55 0.784 AT 26_27 C
19:30 95.6 5.52 49.00 5.49 168 38 0.786 1789.8 40 129.00 5.275 10.55
20:00 96.0 5.52 49.00 5.49 165 38 0.786 1773.3 40 156.00 5.275 10.55
20:30 95.6 5.52 49.00 5.49 160 38 0.786 1745.6 40 182.00 5.080 10.16
21:00 95.6 5.52 49.00 5.49 180 38 0.786 1854.3 40 209.00 5.275 10.55
21:30 96.0 5.52 49.00 5.49 184 38 0.786 1875.3 40 236.00 5.275 10.55
21:00 By passed Separator
Average During 95.8 5.5 49.13 5.5 169.5 38.0 0.8 1797.5 40.0 5.227 10.453 #DIV/0! #DIV/0!
Test
INITIAL READINGS CUMULATIVES AND AVERAGES DURING TEST
WELLHEAD PRESSURE 95.3 (kg/cm²) kg/cm² CUMULATIVE OIL DURING TEST 41.812 m3
WELLHEAD TEMPERATURE 49 (ºC) ºC NUMBER OF HOURS IN TEST 4 hrs
DOWNSTREAM PRESSURE 4.20 (kg/cm²) kg/cm² AVERAGE TEMPERATURE OF TANK ºC
AVERAGE WATER PRODUCTION #DIV/0! m³/hr
AVERAGE OIL PRODUCTION 10.453 m³/hr
AVERAGE G.O.R.@15 C o
#DIV/0! sm³/m³
Sequence of Operations
Customer: Sonatrach Well No.: OMPZ 442

Date Time Comments


### 7:10:00 Arrived at well No. OMPZ 442 location.
7:15:00 Held a pre-job safety meeting prior to flowing the well.
7:20:00 Commenced rigging up surface welltest equipment.
8:15:00 Completed rigging up and pressure testing surface welltest equipment.
8:25:00 Diverted flow through test separator.
8:45:00 Installed 1.500" orifice plate in gas meter run.
8:45:00 Diverted oil flow through oil meter to tank.
8:45:00 Commenced flow rate period
11:45:00 Completed flow rate period
11:48:00 Raised orifice plate from gas meter run.
11:50:00 Bypassed test separator.
11:55:00 Diverted flow back to trunk line.
12:05:00 Commenced pumping oil from tank to trunk line.
13:55:00 Completed pumping oil from tank to trunk line.
14:00:00 Commenced rigging down surface welltest equipment.
14:30:00 Completed rigging down surface welltest equipment.
14:35:00 Left well No. OMPZ 442 location.

Company man: Mr. BENHAMZA

Expro supervisor : A.BENNACER


SONATRACH Responsable Releve des mesures Rapport jaugeage : Champ : Ain amenas
DEP/TECH PROD Mr: 3arefha au separateur BACS : 50 m3 Puits : sss
See Well testing sss Expro Rep: Mohamed Lemdjadi
Date: 17-Jun-10 Separateur 1440 psi (EXPRO)
Mesures tete puits Mesures Separateur BAC Nº : 50 m³
L.Bore : 5.761 Compartiments: A + B
Horaire Cond PRESSION Tº Diametre Pression Tº Tº Niveau DENSITE DEBIT
Debit Tete Orifice Separation Huile Gaz Huile Tank
Duse Amont Aval ºC kg/cm² ºC ºC Cm T1 T2 T3 m3/1/2hr
kg/cm² kg/cm²
14:30 24 95.30 4.20 49.00
14:50 Diverser l'ecoulement sur separateur.
15:00 Debut de comptage. 22.00
18:00 95.639944 5.52 50.00 5.49 164.000 38.00 1 1768 40.00 48 5.08 10.16

18:30 95.639944 5.52 49.00 5.49 170.000 38.00 1 1801 40.00 75 5.2754 10.5508

19:00 95.991561 5.52 49.00 5.49 165.000 38.00 1 1773 40.00 102 5.2754 10.5508

19:30 95.639944 5.52 49.00 5.49 168.000 38.00 1 1790 40.00 129 5.2754 10.5508

20:00 95.991561 5.52 49.00 5.49 165.000 38.00 1 1773 40.00 156 5.2754 10.5508
20:30 95.639944 5.52 49.00 5.49 160.000 38.00 1 1746 40.00 182 5.08 10.16
21:00 95.639944 5.52 49.00 5.49 180.000 38.00 1 1854 40.00 209 5.2754 10.5508
21:30 95.991561 5.52 49.00 5.49 184.000 38.00 1 1875 40.00 236 5.2754 10.5508
21:00 Bypassed Separator
Temps cumule volume BAC Tº BAC Horaire Eau injectee Eau recuperee Debit m³/hr
3.600 m³ 2 H n/a #DIV/0! Litres/hrs #DIV/0! m³/hr
Type de l'essai unite Coeff Mesure Pression huile Debit horaire Tonnes
Jaugeage 1440 psi + Bac
Sonatrach
Well No: OMO 48 TP 195
Well head pressure (Kg/cm2) WHP/WHT 06-01-2004
DST# 1

50 70

Temperature (ºC)
68

66

40

64

62

30 60
19:00 19:30 20:00 20:30 21:00 21:30
Time( hr)
WHP (Kg/cm2) WHT (ºC )

Prepared by Halliburton Energy Services


Hassi Messaoud, Algeria
Sonatrach
Well No: OMO 48 TP 195
Oil Rate/Gas Rate vs Time Plot 06-01-2004
DST#1

8 2000

1800
7
Oil Rate (m3/hr)

1600
6
1400

5
1200

4 1000

800
3

600
2
400

1
200

0 0
19:00 19:30 20:00 20:30 21:00 21:30
Time (hr)
Oil (m³/hr) Gas (sm³/hr)

Prepared by Halliburton Energy Services


Sonatrach
Well No: MD 224
Water Rate/Gas Rate vs Time Plot 31/03/2003
In-line Flow Test

500

0.38
450
Water Rate (m3/½hr)

0.35

Gas Rate (km3/hr)


400
0.32

350
0.29

0.26 300

0.23
250

0.2
200

0.17
150
0.14

100
0.11

50
0.08

0.05 0
11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:15
Time
Water (m³/½hr)

Prepared by Halliburton Energy Services


Hassi Messaoud, Algeria

You might also like