Quantitative Attachment For_HBH (Activities ANGLE SUPPORTS)

PROJECT: SOUTH WEST GAS FIELDS DEVELOPMENT PROJECT


ALGERIA 4/26/2022

TURBO AIR Total Qty Realised. Total Qty Realised. Cable Trays Instalation Inspections and
Sl. No. Material Specifications/description UOM EXPENDE INSTRIME PCB
MAN SUB IB SUB
STATION STATION
ZONE 2 ZONE 4 PIPE RACK
Fire Truck
parking Shelter 26/04/2022 30/12/2021
Balance UNIT WEIGHT(TON) TOTAL
With Support Acceptance This Month
R NT

VARIOUS ITEMS 80% 20%


HBH Area

CABLE TRAY ANGLE SUPPORT Length (mm)

C.13.1.1 ANGLE 50 X 50 X 5 2140 EA 1 1.00 0.00 1.00 0.009566 0.0096 0.00765264 0 0.00765264
C.13.1.1 ANGLE 50 X 50 X 5 3000 EA 6 6.00 0.00 6.00 0.013410 0.0805 0.064368 0 0.064368
C.13.1.1 ANGLE 50 X 50 X 6 150 EA 1 32 103 136.00 103.00 33.00 0.000671 0.0221 0.0177012 0 0.0177012
C.13.1.1 ANGLE 50 X 50 X 6 170 EA 3 11 52 4 70.00 63.00 7.00 0.000760 0.0053 0.00425544 0 0.00425544
C.13.1.1 ANGLE 50 X 50 X 6 200 EA 2 8 10.00 8.00 2.00 0.000894 0.0018 0.0014304 0 0.0014304
C.13.1.1 ANGLE 50 X 50 X 6 250 EA 70 70.00 0.00 70.00 0.001118 0.0782 0.06258 0 0.06258
C.13.1.1 ANGLE 50 X 50 X 6 300 EA 1 83 84.00 83.00 1.00 0.001341 0.0013 0.0010728 0 0.0010728
C.13.1.1 ANGLE 50 X 50 X 6 3500 EA 4 4.00 4.00 0.00 0.015645 0.0000 0 0 0
C.13.1.1 ANGLE 50 X 50 X 6 310 EA 6 6.00 6.00 0.00 0.001386 0.0000 0 0 0
C.13.1.1 ANGLE 50 X 50 X 6 1000 EA 6 6.00 6.00 0.00 0.004470 0.0000 0 0 0
C.13.1.1 ANGLE 50 X 50 X 6 1200 EA 4 4.00 4.00 0.00 0.005364 0.0000 0 0 0
C.13.1.1 ANGLE 50 X 50 X 6 800 EA 8 8.00 8.00 0.00 0.003576 0.0000 0 0 0
C.13.1.1 ANGLE 50 X 50 X 6 550 EA 12 12.00 12.00 0.00 0.002459 0.0000 0 0 0
C.13.1.1 ANGLE 50 X 50 X 6 600 EA 12 12.00 0.00 12.00 0.002682 0.0322 0.0257472 0 0.0257472
C.13.1.1 ANGLE 50 X 50 X 6 400 EA 9 6 2 6 23.00 8.00 15.00 0.001788 0.0268 0.021456 0 0.021456
C.13.1.1 ANGLE 50 X 50 X 6 120 EA 15 15.00 0.00 15.00 0.000536 0.0080 0.0064368 0 0.0064368
C.13.1.1 ANGLE 50 X 50 X 6 100 EA 20 23 43.00 23.00 20.00 0.000447 0.0089 0.007152 0 0.007152
C.13.1.1 ANGLE 50 X 50 X 6 80 EA 8 8.00 0.00 8.00 0.000358 0.0029 0.00228864 0 0.00228864
C.13.1.1 ANGLE 50 X 50 X 6 160 EA 6 6.00 0.00 6.00 0.000715 0.0043 0.00343296 0 0.00343296
C.13.1.1 ANGLE 50 X 50 X 6 25 EA 34 34.00 0.00 34.00 0.000112 0.0038 0.0030396 0 0.0030396
C.13.1.1 ANGLE 50 X 50 X 6 66 EA 12 12.00 0.00 12.00 0.000295 0.0035 0.002832192 0 0.002832192
C.13.1.1 ANGLE 50 X 50 X 6 50 EA 20 20.00 0.00 20.00 0.000224 0.0045 0.003576 0 0.003576

Total 0.24

Horizontal / Vertical Cross of 600 mm


(W)
EA 22.00 22.00 22.00 0 0 0

CABLE TRAY CHANNEL SUPPORTS


C.13.1.2 CHANNEL 100 X 50 X 6 9000 EA 1 1.00 0.00 1.00 0.35370 0.3537 0.28296 0 0.28296
C.13.1.2 CHANNEL 100 X 50 X 6 6000 EA 13 2 1 1 1.00 0.00 1.00 0.23580 0.2358 0.18864 0 0.18864
C.13.1.2 CHANNEL 100 X 50 X 6 1800 EA 7 7.00 0.00 7.00 0.07074 0.4952 0.396144 0 0.396144
C.13.1.2 CHANNEL 100 X 50 X 6 1500 EA 11 11.00 0.00 11.00 0.05895 0.6485 0.51876 0 0.51876
C.13.1.2 CHANNEL 100 X 50 X 6 1000 EA 1 4 4.00 0.00 4.00 0.03930 0.1572 0.12576 0 0.12576
C.13.1.2 CHANNEL 100 X 50 X 6 950 EA 12 8 8.00 0.00 8.00 0.03734 0.2987 0.238944 0 0.238944
C.13.1.2 CHANNEL 100 X 50 X 6 960 EA 22 22.00 0.00 22.00 0.03773 0.8300 0.6640128 0 0.6640128
C.13.1.2 CHANNEL 100 X 50 X 6 600 EA 9 0.00 0.00 0.00 0.02358 0.0000 0 0 0
C.13.1.2 CHANNEL 100 X 50 X 6 400 EA 2 2.00 0.00 2.00 0.01572 0.0314 0.025152 0 0.025152
C.13.1.2 CHANNEL 100 X 50 X 6 300 EA 3 1 1.00 0.00 1.00 0.01179 0.0118 0.009432 0 0.009432
C.13.1.2 CHANNEL 100 X 50 X 6 150 EA 60 60.00 0.00 60.00 0.00590 0.3537 0.28296 0 0.28296
C.13.1.2 CHANNEL 100 X 50 X 6 250 EA 7 0.00 0.00 0.00 0.00983 0.0000 0 0 0
Total 2.7327648
ETTERKIB LTHE

1/3
Attachement Electrical _HBH (Activities Lighting)
PROJECT: SOUTH WEST GAS FIELDS DEVELOPMENT PROJECT Date 4/26/2022
ALGERIA

Installation(
RAW RAW
Total Qty Turbo Fire Truck Total At Total At Pole, Lighting Inspection And
Sl. No. Material Specifications/description UOM
révisée. WATER WATER - PCB M Substation IB Substation
Expainder
Air Instrument Piperack
parking Shelter
Fence All Project
26/04/2022 01/04/2022
Balance
Fixture,JB, Termination Acceptance This Month
HBH-105 HBH-106
And Panel)

Lighting 80% 10% 10%

2 X 18 W,FLUORESCENT LIGHTING FIXTURE


SUITABLE FOR WEATHERPROOF/SAFE AREA EA 47.00 6.00 53.00 53.00 0.00 0.00 0.00 0.00 0.00
CEILING MOUNTED, NORMAL/EMERGENCY

2 X 36 W,FLUORESCENT LIGHTING FIXTURE


SUITABLE FOR WEATHERPROOF/SAFE AREA EA 4.00 11.00 8.00 23.00 23.00 0.00 0.00 0.00 0.00 0.00
CEILING MOUNTED, NORMAL/EMERGENCY

2 X 36 W,FLUORESCENT LIGHTING FIXTURE


SUITABLE FOR WEATHERPROOF/SAFE AREA EA 2.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00
BRACKET MOUNTED, NORMAL/EMERGENCY

2 x 36W FLUORESCENT LIGHTING FIXTURE WITH


1 HOUR BATTERY BACKUP SUITABLE FOR
WEATHERPROOF/SAFE AREA CEILING
EA 4.00 4.00 4.00 0.00 0.00 0.00 0.00 0.00
MOUNTED, SAFETY LIGHTING

2 x 36W FLUORESCENT LIGHTING FIXTURE WITH


1 HOUR BATTERY BACKUP SUITABLE FOR
WEATHERPROOF/SAFE AREA BRACKET
EA 2.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00
MOUNTED, SAFETY LIGHTING

16A, 230V, 50Hz, 3PIN, 1PHASE CONVENIENCE


SOCKET SUITABLE FOR WEATHERPROOF/SAFE EA 2.00 1.00 7.00 10.00 10.00 0.00 0.00 0.00 0.00 0.00
AREA

18 way, Normal lighting panel Safe EA 4.00 4.00 4.00 0.00 0.00 0.00 0.00 0.00

18 way, Receptacle panel EA 3.00 3.00 3.00 0.00 0.00 0.00 0.00 0.00

4 Way Junction Box Suitable For WeatherProof /


Safe Area
EA 22.00 22.00 22.00 0.00 0.00 0.00 0.00 0.00

Lighting Pole 245 W EA 10.00 6.00 16.00 16.00 0.00 0.00 0.00 0.00 0.00

250W MH Street light fixture Bracket Mounted EA 10.00 4 14.00 14.00 0.00 0.00 0.00 0.00 0.00

250W MH Street light fixture Ceiling Mounted EA 4 4.00 4.00 0.00 0.00 0.00 0.00 0.00

Lighting Fixture 250 W EA 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00

Lighting Pole 10 M simple EA 44.00 98.00 142.00 142.00 0.00 0.00 0.00 0.00 0.00

Lighting Pole 10 M ARM EA 2.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00

Lighting Fixture 44 W EA 3.00 3.00 6.00 6.00 0.00 0.00 0.00 0.00 0.00

400 W Street Light Fixture EA 8.00 8.00 1.00 4.00 21.00 21.00 0.00 0.00 0.00 0.00 0.00

180 W Street Light Fixture EA 4.00 9.00 5.00 44.00 94.00 156.00 156.00 0.00 0.00 0.00 0.00 0.00

18 way, Normal lighting panel 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00

18 way, Emergency panel 2.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00

10 mtrs high, Street Lighting pole with all required


accessories
EA 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 WAY JUNCTION BOX SUITABLE FOR


WEATHERPROOF/SAFE AREA
EA 22.00 2.00 24.00 24.00 0.00 0.00 0.00 0.00 0.00

For Etterkib Spa For LTHE

2/3
PROGRESS REPORT_HBH (Activities Lighting Cable Tray )
PROJECT: SOUTH WEST GAS FIELDS DEVELOPMENT PROJECT Date 31/03/2022
ALGERIA

RAW RAW Total At Cable Trays Inspections


Total Qty Turbo Fire Truck Total At Total At
Sl. No. Material Specifications/description UOM
révisée. WATER WATER - PCB M Substation IB Substation
Expainder
Air Instrument Piperack
parking Shelter 31/03/2022
Length (M) 31/03/2022
28/02/2022
Balance Instalation and This Month
HBH-105 HBH-106 (PCS) With Support Acceptance

Lighting Cable Tray 80% 20%

C.11.14.1.1.4 50mm (W) x50mm (H) M 15.00 6.00 4.80 0.00 0.00 40.20 4.80 118.50 24.00 213.30 6 35.55 2.50 33.05 26.44 26.44

C.11.14.1.1.3 100 mm (W) x 50mm (H) M 4.50 0.00 48.00 0.00 0.00 80.00 0.00 213.00 39.00 384.50 6 64.08 64.08 51.27 51.27

C.11.14.1.1.2 150 mm (W) x 50mm (H) M 24.00 35.50 8.00 7.50 75.00 6 12.50 12.50 0.00 0.00 0.00

C.11.14.1.1.1 300 mm (W) x 50mm (H) M 0.00 0.00 50.40 0.00 0.00 0.00 0.00 18.00 18.30 86.70 6 14.45 2.50 11.95 9.56 9.56