TD S-10390 Eng
TD S-10390 Eng
TD S-10390 Eng
____________________________________________________________________________________________________________
Order-no.: 41151343/210
Codeword: N2S-V-So
HYDAC-Comm.-no.: 8600010390
Content:
• Operating Instructions
____________________________________________________________________________________________________________
8600010390IE.doc // 04.06.2012 // mengd englisch
Operating Instructions
______________________________________________________________________________________________________________
Portable Hand-Carried Nitrogen Charging Unit, N2S-V
Update/checklist:
This description extends to the following items in accordance with the current hydraulic circuit diagram and spare parts list:
fluid level gauge (item 020), bleed screw (item 130), electric motor (item 060), pressure relief valve (item 101), orifice (item 102), seat
valve (item 103, 140), electronic pressure switch (item 110), locking screw (item 160), piston accumulator (item 220), check valve (item
230.1, 230.2), ball valve block (item 240), connecting hose assembly (item 270, 280), pressure gauge (item 250)
Contents: Page
1 Safety Remarks ........................................................................................................................ 3
2 General Safety Precautions..................................................................................................... 4
3 Information Relating to the Product ....................................................................................... 4
3.1 Manufacturer .............................................................................................................................. 4
3.2 Technical Specification............................................................................................................... 5
3.3 Designated Use.......................................................................................................................... 6
3.4 Design Features ......................................................................................................................... 6
3.5 Recommended Oil...................................................................................................................... 6
3.6 Function of the Integrated Components ..................................................................................... 6
3.6.1 Fluid level gauge (item 20) .................................................................................................... 6
3.6.2 Bleed screw (item 130) .......................................................................................................... 6
3.6.3 Seat valve (item 140)............................................................................................................. 7
3.6.4 Seat valve (item 103)............................................................................................................. 7
3.6.5 Orifice (item 102) ................................................................................................................... 7
3.6.6 Type-tested pressure relief valve (item 101) ......................................................................... 7
3.6.7 Ball valve block (item 240)..................................................................................................... 7
3.6.8 Pressure switch (item 110) .................................................................................................... 8
3.7 Function of the Nitrogen Charging Unit ...................................................................................... 9
4 Directions for Use .................................................................................................................. 10
4.1 Checking the Oil Level ............................................................................................................. 10
4.2 Connecting the Oil Supply Unit and the Compressor............................................................... 10
4.3 Connecting the Nitrogen Bottle ................................................................................................ 11
4.4 Connecting the Pressure Accumulator to be Charged ............................................................. 11
4.5 Electrical Installation................................................................................................................. 12
4.6 Starting the Unit Up .................................................................................................................. 12
4.7 Switching the Unit Off............................................................................................................... 12
4.8 Setting the Pressure Relief Valve............................................................................................. 12
4.9 Setting the Pressure Switch ..................................................................................................... 12
4.9.1 Presettings upon Delivery.................................................................................................... 12
4.9.2 Settings to Be Made Prior to Commissioning......................................................................... 13
4.10 Charging the Pressure Accumulator ...................................................................................... 14
4.10.1 Commencing Charging ........................................................................................................ 14
4.10.2 Concluding Charging ........................................................................................................... 16
____________________________________________________________________________________________________________
Page 1 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Portable Hand-Carried Nitrogen Charging Unit, N2S-V
Update/checklist:
This description extends to the following items in accordance with the current hydraulic circuit diagram and spare parts list:
fluid level gauge (item 020), bleed screw (item 130), electric motor (item 060), pressure relief valve (item 101), orifice (item 102), seat
valve (item 103, 140), electronic pressure switch (item 110), locking screw (item 160), piston accumulator (item 220), check valve (item
230.1, 230.2), ball valve block (item 240), connecting hose assembly (item 270, 280), pressure gauge (item 250)
____________________________________________________________________________________________________________
Page 2 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
1 Safety Remarks
The unit described below has been designed and constructed in keeping with the state of the art
and is operationally reliable and safe when operated according to these operating instructions.
However, the unit may pose a hazard when not operated by properly trained or at least properly
instructed personnel, or is not properly operated or used in keeping with its designated purpose.
Consequently, anybody charged with commissioning/operating the unit in the owner’s company is
to carefully read these operating instructions, with special attention being accorded to section two
below (General Safety Precautions).
Danger/Hazard:
Non-adherence to instructions may result in an accident.
Warning:
Non-adherence to instructions may result in injury or damage to the unit.
Note:
When operating the unit, adherence is to be maintained to the rules and regulations
applicable in the country of installation.
____________________________________________________________________________________________________________
Page 3 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Danger/Hazard:
Only nitrogen may be used to charge pressure accumulators; under no condition is oxygen
to be used due to the explosion hazard posed by it.
The type-tested pressure relief valve (item 101) (accumulator safety valve) limits the
maximum pressure of the piston accumulator to the value indicated on the circuit diagram.
The pressure relief valve is fitted with a lead seal and has a permanent setting.
The pressure setting of this valve may not be changed owing to the accident hazard posed
by this.
If the charge pressure of the nitrogen bottle is higher than the permissible operating
pressure of the pressure accumulator being charged, a pressure regulator (pressure
reducing valve) has to be used. The pressure regulator is to be fitted directly to the nitrogen
bottle and set to the permissible operating pressure of the pressure accumulator being
charged.
3.1 Manufacturer
____________________________________________________________________________________________________________
Page 4 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Total weight
including oil filling 75 kg
Weight of the oil supply unit including oil 51.5 kg
filling
Weight of the compressor 23.5 kg
Ambient temperature -10°C to +50°C
Viscosity range 10 – 380 mm2/s
Operating fluid mineral hydraulic oil
Operating pressure 350 bars
Max. nitrogen charge pressure 320 bars
Pressure gauge indication range 0-400 bars,
red marking at 350 bars
Pump delivery rate 1.6 l/min at 1500 rpm
1.9 l/min at 1800 rpm
Oil tank volume ca. 9 l
Piston accumulator capacity 1.5 l
Oil drain
Push-button S1, white
(motor on) Filling branch
Warning indicator
light H1, red
(motor trouble)
____________________________________________________________________________________________________________
Page 5 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Warning:
Using other hydraulic media may result in damage to the hoses/tubing and seals, thus
rendering them useless.
____________________________________________________________________________________________________________
Page 6 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Danger/Hazard:
The pressure setting of the pressure relief valve (item 101) may not be upwardly adjusted
owing to the accident hazard posed by this.
Ball valve block open: actuator lever parallel to the longitudinal axis of the ball
valve block
Ball valve block closed: actuator lever perpendicular to the longitudinal axis of
the ball valve block
____________________________________________________________________________________________________________
Page 7 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Display window
Indicator light
Function keys
The current pressure is shown in the display window of the pressure switch.
The following messages appear in the display window, depending on the current operating status:
The two indicator lights show the respective operating condition during charging.
The charge pressure is set and charging initiated via the function keys on the pressure switch.
Normally charging is completed automatically, however it can also be discontinued manually using
the function keys.
____________________________________________________________________________________________________________
Page 8 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
____________________________________________________________________________________________________________
Page 9 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Warning:
When filling the oil tank, the nitrogen charging unit may not be in operation. Only filtered oil
may be used. Filter rating: min. 10 µm. During filling, extreme care is to be taken that no dirt
or other foreign matter enters the oil tank/hydraulic system. The nitrogen charging unit is
not to be operated unless it has a sufficient oil filling, otherwise the unit may be damaged.
Warning:
While joining the components make sure that no dirt, contaminants or other foreign matter
enter the hydraulic system. This could result in serious damage to the unit.
____________________________________________________________________________________________________________
Page 10 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Note:
After removing the connecting hose assembly (item 170) from connection fittings A of the
oil supply unit and the compressor, close off the sealing nipples of the hose ends and the
coupling sleeves of the oil supply unit and the compressor again using the dust plugs and
dust caps, etc.
Warning:
Make sure that the hose is not twisted or bent/buckled.
Standard commercial nitrogen bottles with a charge pressure of 200 bars may be used as nitrogen
reservoirs.
Danger/Hazard:
If the charge pressure of the nitrogen bottle is higher than the permissible operating
pressure of the pressure accumulator being charged, a pressure regulator (pressure
reducing valve) has to be used. The pressure regulator is to be fitted directly to the nitrogen
bottle and set to the permissible operating pressure of the pressure accumulator being
charged.
Warning:
Make sure that the hose is not twisted or bent/buckled.
____________________________________________________________________________________________________________
Page 11 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Warning:
The unit may only be operated using the voltage indicated on the rating plate.
Danger/Hazard:
The pressure setting of the pressure relief valve (item 101) may not be upwardly adjusted
owing to the accident hazard posed by this.
____________________________________________________________________________________________________________
Page 12 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Danger/Hazard:
In no event may the charge pressure set exceed
the permissible operating pressure of the
pressure accumulator being charged.
This key causes programming mode to be activated so that the charge pressure
can be set: charge pressure "Load". After pressing this key the preset pressure
value begins to blink.
1. In programming mode, i.e. while setting the charge pressure, this key
enables the pressure value to be upwardly adjusted.
2. During charging, this key enables switching so that various values are
shown in the display. Three pressure display values are possible:
P...current pump pressure
r...current reservoir pressure
L... current charge pressure
1. In programming mode, i.e. while setting the charge pressure, this key
enables the pressure value to be downwardly adjusted.
2. This key is used to initiate charging.
3. This key can also be used to interrupt/discontinue charging.
Indicator light SP1 is lit during compression and goes out during
decompression/pressure relief.
Indicator light SP2 lights up upon charging being initiated.
____________________________________________________________________________________________________________
Page 13 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Warning:
Failure to follow this may result in damage to check valves 230.1 and 230.2.
• Turn the main switch (Q1) to the O position. This causes the nitrogen charging unit to be
switched on, ready for operation.
• Pressing the white push-button (S1) causes the motor to start up.
• Pressing function key causes charging to be initiated.
Nitrogen flows into the piston accumulator and charging of the pressure accumulator takes place
automatically. (cf. Function of the Nitrogen Charging Unit, section 3.7)
If “Empt” appears in the display window of the pressure switch (item 110) during charging, this
means that the minimum reservoir pressure of the nitrogen bottle has been fallen short of.
Charging is automatically discontinued.
The nitrogen bottle, which has been emptied to below the minimum reservoir pressure, is to be
replaced with a nitrogen bottle with a higher pressure. Charging can be resumed via the
function key.
____________________________________________________________________________________________________________
Page 14 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
When the charge pressure set is reached the first time, charging is discontinued and “Chec” blinks
in the display window of the pressure switch.
Charging is continued after waiting for 20 seconds and checking the charge pressure. Charging is
discontinued automatically when the charge pressure is reached.
While the pressure accumulator is being charged, the nitrogen may increase in temperature due to
compression action.
Consequently, before concluding charging, wait until the temperature has equalized. Wait for 5
minutes, or accordingly longer when larger charge quantities are involved.
• After the waiting period has elapsed, resume charging by pressing the function key.
Charging is automatically discontinued when the charge pressure set at the pressure
switch (item 110) is reached.
Due to the pressure drop in the charging hose (item 270), the charge pressure displayed on the
pressure gauge of charging and testing unit on the pressure accumulator being charged may be
somewhat below the charge pressure set at the pressure switch.
If this happens, the charge pressure set at the pressure switch is to be increased by the differential
caused by the pressure drop (ca. 5-8 bars).
Danger/Hazard:
In no event may the charge pressure exceed the permissible operating pressure of the
pressure accumulator being charged.
• Resume charging by pressing the function key after increasing the charge pressure to
compensate for pressure loss (ca. 5-8 bar).
Charging is automatically discontinued when the charge pressure set at the pressure
switch (item 110) is reached.
____________________________________________________________________________________________________________
Page 15 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
____________________________________________________________________________________________________________
Page 16 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
Warning:
Leaks are to be tracked down and remedied immediately. Excess oil loss means damage to
the nitrogen charging unit.
When topping off to compensate for oil loss, the same oil grade used for the initial filling is to be
used.
During charging, the unit is to be monitored for noticeable (unusual) noises or abnormal heat
buildup. In cases of doubt, the nitrogen charging unit is to be switched off by turning the main
switch (Q1) to the O position, followed by having troubleshooting done by properly trained
individuals.
____________________________________________________________________________________________________________
Page 17 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Operating Instructions
______________________________________________________________________________________________________________
____________________________________________________________________________________________________________
Page 18 of 18 / Created: 25.06.2004 Balzert, HS-TBD, Modified: / N2S-VnDmÖle.doc englisch
Approved: 25.06.2004 Kroll, HS-TBK, Approved:
Pos Nr. Stück Benennung Type / Teile Nr. Bemerkung Lieferant Norm Werkst. Register
item no. quant. designation part code remarks supplier DIN material index
Destination: Peru
Stück / pcs Baugruppe / subgroup Kennwort / code word Kunde / customer Datum / date Name /name 4
1 Nitrogen Charging Unit N2S-V KHD Humboldt Wedag GmbH 14.05.12 Colin (-ba) 5
Blatt / sheet von / total HYDAC-Komm. / Hydac comm. Ident.- Nr. Kunden Best. Nr. / customer order no. Änderung / modification 6
1 1 8600010390 3740110 41151343/210 Datum / date Name /name Nr. 7
1 8
GERÄTELISTE 2 9
PARTS LIST 3 10
Pos Nr. Stück Benennung Type / Teile Nr. Bemerkung Lieferant Norm Werkst. Register
item no. quant. designation part code remarks supplier DIN material index
Hydraulic Data:
Operating Medium: mineral hydraulic oil,
HLP 32
Electric data:
Motor: 400 V - 50/60 Hz
connection: 400 V - 50/60 Hz
Solenoid: G 24 V
Design:
Pressure side: heavy duty type
Suction & return side: slight type
Stück / pcs Baugruppe / subgroup Kennwort / code word Kunde / customer Datum / date Name /name 4
1 Nitrogen Charging Unit N2S-V (new design) 05.01.12 Colin (-ba) 5
Blatt / sheet von / total HYDAC-Komm. / Hydac comm. Ident.- Nr. Kunden Best. Nr. / customer order no. Änderung / modification 6
1 6 3337729 Datum / date Name /name Nr. 7
1 8
GERÄTELISTE 2 9
PARTS LIST 3 10
Pos Nr. Stück Benennung Type / Teile Nr. Bemerkung Lieferant Norm Werkst. Register
item no. quant. designation part code remarks supplier DIN material index
Piping:
Oil side:
seamless precision steel tube EN 10305-4
with screwed fittings "Walform" acc. to. ISO 8434-4
Nitrogen side:
24° cone screwed fitting with o-ring acc. to. 8434-4
Labelling:
type label
Corrosion Protection:
oil tank including inside
and steel construction parts: mineral oil resistant zinc
dust primer after sandblasting
Stück / pcs Baugruppe / subgroup Kennwort / code word Kunde / customer Datum / date Name /name 4
1 Nitrogen Charging Unit N2S-V (new design) 05.01.12 Colin (-ba) 5
Blatt / sheet von / total HYDAC-Komm. / Hydac comm. Ident.- Nr. Kunden Best. Nr. / customer order no. Änderung / modification 6
2 6 3337729 Datum / date Name /name Nr. 7
1 8
GERÄTELISTE 2 9
PARTS LIST 3 10
Pos Nr. Stück Benennung Type / Teile Nr. Bemerkung Lieferant Norm Werkst. Register
item no. quant. designation part code remarks supplier DIN material index
Stück / pcs Baugruppe / subgroup Kennwort / code word Kunde / customer Datum / date Name /name 4
1 Nitrogen Charging Unit N2S-V (new design) 05.01.12 Colin (-ba) 5
Blatt / sheet von / total HYDAC-Komm. / Hydac comm. Ident.- Nr. Kunden Best. Nr. / customer order no. Änderung / modification 6
3 6 3337729 Datum / date Name /name Nr. 7
1 8
GERÄTELISTE 2 9
PARTS LIST 3 10
Pos Nr. Stück Benennung Type / Teile Nr. Bemerkung Lieferant Norm Werkst. Register
item no. quant. designation part code remarks supplier DIN material index
Stück / pcs Baugruppe / subgroup Kennwort / code word Kunde / customer Datum / date Name /name 4
1 Nitrogen Charging Unit N2S-V (new design) 05.01.12 Colin (-ba) 5
Blatt / sheet von / total HYDAC-Komm. / Hydac comm. Ident.- Nr. Kunden Best. Nr. / customer order no. Änderung / modification 6
4 6 3337729 Datum / date Name /name Nr. 7
1 8
GERÄTELISTE 2 9
PARTS LIST 3 10
Pos Nr. Stück Benennung Type / Teile Nr. Bemerkung Lieferant Norm Werkst. Register
item no. quant. designation part code remarks supplier DIN material index
0200 1 Compressor
Stück / pcs Baugruppe / subgroup Kennwort / code word Kunde / customer Datum / date Name /name 4
1 Nitrogen Charging Unit N2S-V (new design) 05.01.12 Colin (-ba) 5
Blatt / sheet von / total HYDAC-Komm. / Hydac comm. Ident.- Nr. Kunden Best. Nr. / customer order no. Änderung / modification 6
5 6 3337729 Datum / date Name /name Nr. 7
1 8
GERÄTELISTE 2 9
PARTS LIST 3 10
Pos Nr. Stück Benennung Type / Teile Nr. Bemerkung Lieferant Norm Werkst. Register
item no. quant. designation part code remarks supplier DIN material index
Stück / pcs Baugruppe / subgroup Kennwort / code word Kunde / customer Datum / date Name /name 4
1 Nitrogen Charging Unit N2S-V (new design) 05.01.12 Colin (-ba) 5
Blatt / sheet von / total HYDAC-Komm. / Hydac comm. Ident.- Nr. Kunden Best. Nr. / customer order no. Änderung / modification 6
6 6 3337729 Datum / date Name /name Nr. 7
1 8
GERÄTELISTE 2 9
PARTS LIST 3 10
SYSTEM Angebot-Nr.:
Pedido No.:
Kennwort:
Código:
N2S-V (neues Design)
N2S-V (nuevo diseño)
Bestell-Nr.: Schaltplan-Nr.:
Kunde: Hydac Komm.-Nr.: Ersatzteilliste
N°de pedido Esquema de 3279932
Cliente Hydac com.:
conexiones:
cliente:
Zeichnung-Nr.:
LISTA DE
Baugruppe: Stickstoffladegerät Hydac Ident-Nr.: 3186198
Grupo constructivo: Cargador de nitrógeno No. de identificación:
3337729 Disbujo de
3186199 PIEZAS
conjunto:
* 3) Eingebaute * 2)
Lfd. Nr. Pos.Nr. Menge Benennung Typ Teile Nr. * 1) Empfohlene Ges.Gewicht Stückpreis
Cons. No. Pos. Piezas Denominación Tipo Piezas No. Gruppe Menge peso total precio/pieza
montandas Grupo Recambio [kg] [EURO]
Erstellt von / Prepared by: Seite / Page * Erläuterungen /Explanations Datum / Date
Ch. Körner 1/3 auf letzer Seite / on last page 05.01.12
SYSTEM Angebot-Nr.:
Pedido No.:
Kennwort:
Código:
N2S-V (neues Design)
N2S-V (nuevo diseño)
Bestell-Nr.: Schaltplan-Nr.:
Kunde: Hydac Komm.-Nr.: Ersatzteilliste
N°de pedido Esquema de 3279932
Cliente Hydac com.:
conexiones:
cliente:
Zeichnung-Nr.:
LISTA DE
Baugruppe: Stickstoffladegerät Hydac Ident-Nr.: 3186198
Grupo constructivo: Cargador de nitrógeno No. de identificación:
3337729 Disbujo de
3186199 PIEZAS
conjunto:
* 3) Eingebaute * 2)
Lfd. Nr. Pos.Nr. Menge Benennung Typ Teile Nr. * 1) Empfohlene Ges.Gewicht Stückpreis
Cons. No. Pos. Piezas Denominación Tipo Piezas No. Gruppe Menge peso total precio/pieza
montandas Grupo Recambio [kg] [EURO]
Erstellt von / Prepared by: Seite / Page * Erläuterungen /Explanations Datum / Date
Ch. Körner 2/3 auf letzer Seite / on last page 05.01.12
SYSTEM Angebot-Nr.:
Pedido No.:
Kennwort:
Código:
N2S-V (neues Design)
N2S-V (nuevo diseño)
Bestell-Nr.: Schaltplan-Nr.:
Kunde: Hydac Komm.-Nr.: Ersatzteilliste
N°de pedido Esquema de 3279932
Cliente Hydac com.:
conexiones:
cliente:
Zeichnung-Nr.:
LISTA DE
Baugruppe: Stickstoffladegerät Hydac Ident-Nr.: 3186198
Grupo constructivo: Cargador de nitrógeno No. de identificación:
3337729 Disbujo de
3186199 PIEZAS
conjunto:
* 3) Eingebaute * 2)
Lfd. Nr. Pos.Nr. Menge Benennung Typ Teile Nr. * 1) Empfohlene Ges.Gewicht Stückpreis
Cons. No. Pos. Piezas Denominación Tipo Piezas No. Gruppe Menge peso total precio/pieza
montandas Grupo Recambio [kg] [EURO]
Erstellt von / Prepared by: Seite / Page * Erläuterungen /Explanations Datum / Date
Ch. Körner 3/3 auf letzer Seite / on last page 05.01.12
0 1 2 3 4 5 6 7 8 9
CAE-VERSION:
2
Datum
15.05.12 IDENT NR.:3018758 DECKBLATT =
Date
Bearb.
Work Penzkofer FRONT PAGE
02 310 950 4 78303 + A1
Pruefer
Schaadt N2V - SERVER 460V/60Hz PROJEKT: Pg. 1
Änderung Datum Name
Check
Norm
ENTETE KHD HUMBOLDT WEDAG
Urspr./ source Ers. f. /des.for Ers. d. /des.from 78303 7 Pg.
Change Date name standard
0 1 2 3 4 5 6 7 8 9
1 3 5
41 33
F1 F2
Q2 42 34
0,4A 0,4A
2,2-3,2A 3.8 3.1
(I=2,6A) 2 4 6
400V 0.V
T1
U1=400V-415V-460V
U2=19V 0V 19V
S=75VA
2 4 6 1 3 5 V1
Q1 K1
1 3 5 3.1 2 4 6
P=5,5kW
HAUPT-UND
NOT-AUS
MAIN AND
EMERGENCY STOP
INTERRUPT. URGENCE C1
F3
4A
PE PE
OELFLEX
1 2 3 PE
X1 L1 L2 L3 N PE 4x1,5qmm X2 1 2 X2 5 X2 6
DIREKT AN K1
DIRECT ON K1
OELFLEX DIRECT A K1
5 m. U V W
5x1,5qmm
ST2+ ST1-
L1 L2 L3 N PE +A2-M1 3.5 3.0
X3 U=400V
P=1,1kW PE ST1+ ST2-
I=2,6A 3.0 3.2
POS.:60
3x460V/60Hz/2kW
24VDC 0VDC
1 3
Datum
15.05.12 IDENT NR.:3018758 HAUPTSTROMPLAN =
Date
Bearb.
Work Penzkofer MAIN CIRCUIT DIAGRAM
02 310 950 4 78303 + A1
Pruefer
Schaadt N2V - SERVER 460V/60Hz PROJEKT: Pg. 2
Änderung Datum Name
Check
Norm
Plan de alimentación principal KHD HUMBOLDT WEDAG
Urspr./ source Ers. f. /des.for Ers. d. /des.from 78303 7 Pg.
Change Date name standard
0 1 2 3 4 5 6 7 8 9
2.7
ST1+
2.7
ST2+
33 41
Q2 Q2
2.5 34 2.5 42
11 16 18
S2 K2
PE
12 .2 15
AUS/
OFF/STOP
SCHWARZ/
BLACK/NOIRE X2 11 X2 3 PE
3 1
WS1.1 WS1.2
12 14
13
K3 +A2-S1
.5
S1
11
24VDC 3-X2 1-X1 PE-X1
WEIS K1
(0V)
WHITE .1 14
X2 10 PE X2 4 PE PE
RUHESTROMDARSTELLUNG !
!
(0bar = 3-X2 + 2-X2
1 1
WY1 ! WY2
Xbar = 3-X2 + 1-X2)
A1 PE A1 PE
2 2
WS1.1 WS1.2
+A2-Y1 A2
+A2-Y2 A2
24VDC 24VDC
POS.:103 X2 12 POS.:140
A1 A2 A1 X1
X2 7 X2 8 X2 9
K1 A2
K2 A3
K3 A2
H1 X2
24VDC 24VDC 2.9 24VDC 24V
2.8 230VAC ST2- ROT
0,5-10s.
ST1-
1 2 2.4 18 14
3 4 2.4 16 15 .3 12 11 .3
5 6 2.4
13 14 .2
2 4
Datum
15.05.12 IDENT NR.:3018758 STEUERSTROMLAUFPLAN =
Date
Bearb.
Work Penzkofer CIRCUIT DIAGRAM
02 310 950 4 78303 + A1
Pruefer
Schaadt N2V - SERVER 460V/60Hz PROJEKT: Pg. 3
Änderung Datum Name
Check
Norm
DIAGRAMA DE; CIRCUITO KHD HUMBOLDT WEDAG
Urspr./ source Ers. f. /des.for Ers. d. /des.from 78303 7 Pg.
Change Date name standard
0 1 2 3 4 5 6 7 8 9
Q1
S1 H1 S2
HYD
DA C N2S
3 5
Datum
15.05.12 IDENT NR.:3018758 SCHALTSCHRANKANSICHT =
Date
Bearb.
Work Penzkofer VIEW CONTROL DESK
02 310 950 4 78303 + A1
Pruefer
Schaadt N2V - SERVER 460V/60Hz PROJEKT: Pg. 4
Änderung Datum Name
Check
Norm
Armario de distribución eléctrica KHD HUMBOLDT WEDAG
Urspr./ source Ers. f. /des.for Ers. d. /des.from 78303 7 Pg.
Change Date name standard
0 1 2 3 4 5 6 7 8 9
W+A1-X3
Cable no. -
Cable no. -
Klemmenleistenbezeichnung
Name of terminal board
+A1-X1
cable typ-
OELFLEX
cable typ-
Connection-
Anschluss-
Number-
Connection-
Anschluss-
Linkage-
Name-
Funktionstext Zeilbezeichnung Zeilbezeichnung Seite/Pfad
designation symbol designation symbol sheet / path
function text
simbolo de designación simbolo de designación
función
POWER SUPPLY 1 +A1-X3 L1 L1 +A1-Q1 1 /2.1
EINSPEISUNG 2 +A1-X3 L2 L2 +A1-Q1 3 /2.1
= 3 +A1-X3 L3 L3 +A1-Q1 5 /2.1
= 4 +A1-X3 N N /2.2
= PE +A1-X3 PE PE PE +A1-PE /2.2
HY1057ESP/ 14.05.2007
4 6
Datum
15.05.12 IDENT NR.:3018758 KLEMMEN 400V =
Date
Bearb.
Work Penzkofer TERMINALS 400V
02 310 950 4 78303 + A1
Pruefer
Schaadt N2V - SERVER 460V/60Hz PROJEKT: Pg. 5
Änderung Datum Name
Check
Norm
BORNIER 400V KHD HUMBOLDT WEDAG
Urspr./ source Ers. f. /des.for Ers. d. /des.from 78303 7 Pg.
Change Date name standard
0 1 2 3 4 5 6 7 8 9
WS1.1
WY1
WY2
WS1.2
Cable no. -
Cable no. -
Klemmenleistenbezeichnung
Name of terminal board
+A1-X2
cable typ-
OELFLEX
OELFLEX
OELFLEX
OELFLEX
cable typ-
Connection-
Anschluss-
Number-
Connection-
Anschluss-
Linkage-
Name-
Funktionstext Zeilbezeichnung Zeilbezeichnung Seite/Pfad
designation symbol designation symbol sheet / path
function text
simbolo de designación simbolo de designación
función
STEUERSPANNUNG +A1-Q2 33 1 +A1-F3 /2.7
= 2 /2.7
DRUCKSCHALTER 1 +A2-S1 1-X1 3 /3.6
ABSPERRUNG BEFÜLUNG 1 +A2-Y2 A1 4 /3.7
STEUERSPANNUNG +A1-K1 A2 5 +A1-C1 /2.8
= 6 /2.9
UMLAUFVENTIL 2 +A2-Y1 A2 7 /3.3
DRUCKSCHALTER 2 +A2-S1 2-X1 8 /3.6
ABSPERRUNG BEFÜLUNG 2 +A2-Y2 A2 9 /3.7
UMLAUFVENTIL 1 +A2-Y1 A1 10 +A1-K3 11 /3.3
= 3 +A2-S1 3-X2 11 +A1-K3 14 /3.5
DRUCKSCHALTER 2 +A2-S1 2-X2 12 +A1-K3 A1 /3.5
UMLAUFVENTIL PE +A2-Y1 PE PE /3.4
DRUCKSCHALTER PE +A2-S1 PE-X1 PE +A1-PE /3.6
ABSPERRUNG BEFÜLUNG PE +A2-Y2 PE PE /3.8
= PE /3.8
HY1057ESP/ 14.05.2007
5 7
Datum
15.05.12 IDENT NR.:3018758 KLEMMEN 24V =
Date
Bearb.
Work Penzkofer TERMINALS 24V
02 310 950 4 78303 + A1
Pruefer
Schaadt N2V - SERVER 460V/60Hz PROJEKT: Pg. 6
Änderung Datum Name
Check
Norm
BORNIER 24V KHD HUMBOLDT WEDAG
Urspr./ source Ers. f. /des.for Ers. d. /des.from 78303 7 Pg.
Change Date name standard
0 1 2 3 4 5 6 7 8 9
- STÜCKLISTE - PARTSLIST -
Bauteilbezeichnung Menge Bezeichnung Typen Nummer Lieferant Artikelnummer
Component label Quantily Label Type Number Supplyer Article Number
+A1-Q1 1 HAUPT- UND NOT-AUS-SCHALTER 690804 KRAUSS & NAIMER KG20A -T303/0 E
6
Datum
15.05.12 =
IDENT NR.:3018758
Date
Bearb.
Work Penzkofer
02 310 950 4 78303 + A1
Pruefer
Schaadt N2V - SERVER 460V/60Hz PROJEKT: Pg. 7
Änderung Datum Name
Check
Norm 78303
KHD HUMBOLDT WEDAG
Change Date name standard
Urspr./ source Ers. f. /des.for Ers. d. /des.from 7 Pg.