# FROM TO
Place ALGEC, ZAW PP Site GECOL ZAW PP
Department Projects Dept. Managemenet
Name Abdul Hadi Ben Amer Mohammed Al Khboli
Function Project Manager Plant Manager

Project ZAW GT11 C-Inspection #05 Project: 719-E & 749-L


Subject ALGEC Site Report No.01
From 21/09/2022 TO 06/10/2022

1. SUMMARY FOR THIS WEEK’S ACTIVITIES:

OH 174115
EOH 294675
OH after last C-Insp. 2013 99696

• Mechanical
a) Remove GT Burners and Burners Pipes Connections.
b) Remove CC Enclosure.
c) Removal Air Intake Expansion joint.
d) Remove Air intake intermediate pieces.
e) Took QA and required measurements and before lifting Turbine Casing Upper Part.
f) Blow off valves removed.
g) Took QA and required measurements and after lifting Turbine Casing Upper Part.
h) GT and Comp. Casing Removed
i) Remove GT Combustion Champer Upper Zone.
j) Remove GT Hot Parts Upper casing and Equipment.
k) Remove Vane carrier upper half.
l) Comp. Diffuser upper half Removed.
m) Take bearings Measurements.
n) Bearing 1-2 and thrust upper and Lower halves Removed.
o) Lift GT Rotor and put at stands as normal.
p) Remove GT Hot Parts Lower parts (CC, Comp, Diffuser. Bearings& Vane Carrier).
q) Remove all Air Intake Filter Elements , and Prepair to Change.
r) Clean and Repair welding for some defects at Air Intake Filter House.
s) NDT Test Supplier started Preparation for the Requested Parts to Inspect.
t) An Assessment Guy from ALGEC arrived to The site and started inspect and assist the hot
Parts.
u) Disconnect Gas Fuel Valves and cut the Gas Pipe.
v) Start Cleaning work and prepair for Rotor, GT Hot Parts, GT Casings, Compressore
Casings, Combustion Chamber Parts, Compressore Row 13- 21 and GT Fuel Nozzles, Fuel
Oil, Gas Fuel Parts, and Generator Electric Parts ( Gen Rotor, Gen Stator and Other Parts)
Inspection.

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 2 of 11

• Blading
w) Remove Five Stages of GT Turbine Blades completely.
x) Continuo to Remove Five Stages of GT Turbine Vanes completely.
y) Continuo to Remove GT Compressore Blades of Compressore Rotor.
z) Remove Compressore Blades from Row 12 to 21 , Completed.
aa) Check and review Gecol delivered Compressor Blades & Vanes Spare Parts and Hardware.
bb) Conti. Prepair all Compressore Vanes with hardware and ready to start installation.
cc) Conti. Prepair all Compressore Blade with hardware and ready to start installation

• Generator
dd) Open Generator Two side for Inspection and Start Preparation of Gen Rotor Removing out.
ee) Install Req Tools for Gen Remove tool to Be Ready for the scope.
ff) Remove Gen Rotor out, Completely.
gg) Start Cleaning work and prepair for Rotor & Stator Inspection.

• Comb.Chamber
hh) Take set of Reading before dismantle C.C.
ii) Remove Fuel pipes from C.C .
jj) Dismantling CC Upper Zone.
kk) Comb.chamber Upper Zone and Lower Zone were Removed.
ll) Start Repair and Inspection for themal parts of CC.
mm)
2. ACTIVITIES- ERECTION & COMMISSIONING HISTORY:

Activities Date Start Date Finish Remarks


Shutdown 17/09/2022 17/09/2022

GT Enclosure Removed 19/09/2022 21/09/2022


Comb. Chamber upper half Removed 27/09/2022 27/09/2022
Air Intake filter Removal 29/09/2022 01/10/2022
GT Casing upper half Removed 29/09/2022 29/09/2022
Vane carrier upper half removed 27/09/2022 27/09/2022
Comp. Diffuser upper half casing removed 28/09/2022 28/09/2022
Lift GT Rotor 29/09/2022 29/09/2022 Night shift
Vane carrier lower half removed 29/09/2022 29/09/2022
Comp. Diffuser lower half casing removed 29/09/2022 29/09/2022
Comb. Chamber lower half Removed 29/09/2022 29/09/2022
De-blading turbine vanes. 01/10/2022 04/10/2022
De-blading turbine blades 01/10/2022 03/10/2022
Disassembly of Combustion Chamber 06/10/2022 06/10/2022
Completed

2.2 Commissioning:
Activities Date Start Date Finish Remarks
Nothing to Report

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 3 of 11

3. HIGHLIGHTS / PROBLEMS:

- Zaw 11 CVC New Parts Complete Set Two Halves) Was Sent To KHPp By Mistake, it
was brought to the ZAW Pp on 02/10/2022

4. MANPOWER:
(ALGEC Personal / Visitors)
Accommo
# Name Dept Function d per Check in Check out
day/EUR
1 Mohamed Oulhadj ALGEC Mechanical lead 252 18/09/2022
2 Thomas Weber ALGEC Assessment Eng 252 17/09/2022
3 Hatem Zeghmar ALGEC Mechanical lead 252 18/09/2022
4 Mohamed Aliouat ALGEC Mechanical lead 252 18/09/2022
5 Djamal Mouloua ALGEC Generator Lead 252 19//09/2022
6 Othmane Chennafj ALGEC Generator 252 26/06/2022
7 Mehdi Djefal ALGEC Insulation specialist 252 18/09/2022
8 Lyes Ahmad ALGEC Insulation specialist 252 18/09/2022
9 Taha Reffoufe ALGEC I&C Engineer 252 18/09/2022
10 Djafer Bahri ALGEC Bladder 252 02/10/2022
11 Omer Elachi ALGEC Bladder 252 30/09/2022
12 Ahamed Boutaleb ALGEC GT Comm Eng 252 04/10/2022

5. EHS
Item Nos. Description
Accidents 6 Various injuries according to the reports sent
Incident / Dangerous Occurrence Nothing to report
Near Miss Nothing to report
Damages Nothing to report

6. TOOLS
Item Nos. Description Date

ITH Tool Diff pec


- Some of it delivered by ALGEC from KH 20//09/2022
as GECOL-Rent.
Delivered by ALGEC from KH as 05/10/2022
BLADE TOOL BOX 1
GECOL-Rent.

7. CONSUMABLES & PERSONNEL PROTECTION EQUIB


8.
Item Nos. Description Date
PPE Set - ALGEC SCOPE
Consumables LS - ALGEC SCOPE.

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 4 of 11

PROJECT PIC

- Dismantling Activities.

AIR Intake Dismantling Preparation AIR Intake Filter Elements Dismantling

Turbine Upper Casing Removed out Turbine Upper Casing Lifting-up

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 5 of 11

C C inspection Process in Progress. Comp Rotor Blades Removing Row 21

C C Lower Part Removed out C C Zones under inspection setup.

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 6 of 11

Comp Blades Removing Row 12 to 21 Comp. Blades 13-21 Inspection &


Cleaning work

Vane Carrier Removing & Lifting out GT Vane Carrier , Vanes 1,2 & 3Removed

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 7 of 11

GT Vane Carrier Row 5 Removing. Vanes 1, 2, 4, 4 & 5 Removed

Vane Carrier Corrugate Tube Repair work Vane Carrier Support Checkup & Inspection

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 8 of 11

GT Turb Rotor Blades R 5 Removing GT Turb. Blade Row 5 under Removing

GT Turb. Blade Row 1, 2 & 5 Complete Turb. GT Rotor all Blades Removed
Removed

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 9 of 11

GT Journal Bearing Dim Check Turb Vib Bolts Check-up

Generator Front Face, Cooling Vane Generator Air - Water Coolers

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 10 of 11

GEN Rotor Pads and layout & pull Tools GEN Rotor Tool insert to pullout Gen Rotor

Generator Rotor Pulling Out Generator Rotor Pulled Out completely

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬
ALGEC FOR ENERGY
Page 11 of 11

Gen Stator after Remove Gen Rotor out Gen-Comp Coupling disconnect

Gas Fuel Valve Pipe cutting Gas Fuel Valve Pipe cutting after
disconnect

ALGEC For Energy ‫الجيك للطاقة‬


Swani Main Road Next to World Islamic Call Society ‫ بجوار جمعية الدعوة اإلسالمية‬, ‫الجبس –طريق السواني‬
Tripoli - Libya P.O.Box 91810 Dat El imad ‫ ذات العماد‬91810 : ‫طرابلس – ليبيا ص ب‬
Tel:+218 (0) 21 4842980 +218 (0) 21 4842980 :‫هاتف‬
Fax:+218 (0) 21 4842981 +218 (0) 21 4842981 :‫فاكس‬
Email:Info@algec.com info@algec.com : ‫اإللكتروني‬ ‫البريد‬

You might also like