D 2021/07/27 Revised per CEB TR/CPCDP/MAT/460 ABB GIS Travis-Wang Masha-He

Revised per CEB Comments


C 2021/04/30 ABB GIS Travis-Wang Masha-He
TR/CPCDP/MAT/353
Revised per CEB Comments
B 2021/04/08 ABB GIS Travis-Wang Masha-He
TR/CPCDP/MAT/351
A 2020/12/15 Issued for Approval ABB GIS Travis-Wang Masha-He
Rev. Date Description By Chk`d App`d
CLIEN
CHEC PORT CITY COLOMBO (PVT) LTD.
4th & 5th Floors, Central Point Building, No.54, Chatham Street Colombo 01
Tel:+94 112 335 141/42/43 Fax:+94 112 335 140

CONTRACTOR

CHINA HARBOUR ENGINEERING COMPANY LTD.


L32 East Tower, WTC, Colombo 01, Sri Lanka
Tel:+94 112 470 998/89 Fax:+94 115288 366
DESIGNER

W.S. ATKINS INTERNATIONAL. LIMITED


Woodcote Grove, Ashley Road, Epsom Surrey, Kt18 5BW
Tel:+44 (0)1372 726140 Fax:+94(0)1372 740055
MANUFACTURE
ABB High Voltage Switchgear (Xiamen) CO. LTD.
No.883, Fangshan West 2nd Road, Xiang’an, Torch High-Tech Zone,361101, Xiamen,Fujian
Tel: +86 592 5710330

PROJECT NAME:
COLOMBO PORT CITY DEVELOPMENT PROJECT-PHASE-I

CONTRACT No.:

CHEC/CPC/428

DOCUMENT TITLE:

Rev. C-SSR1 220kV GIS FAT PROCEDURE


DOCUMENT NO.:
Rev.
CPCDP(IIB)-ABB-GIS-SS-MD-E-020 D
PACKAGE NO.:
Date:
E002. 220kV GIS 2021/07/27
 
SF6 Gas Insulated Switchgear

Type ELK-14, 220 kV

FAT Procedure
THI-PLS-SK01-HT19-002

SALES
PROJECT: Sri Lanka Colombo 220kV GIS 502534229
ORDER :
CLIENT: Tellhow International engineering &contracting DOC. NO.: 20210727
Co., ltd
VENDOR: ABB HIGH VOLTAGE SWITCHGEAR (XIAMEN) VERSION: D
CO.LTD
LOCATION: 883# fangshan west 2nd road, 361101, FAT DATE: 9th-11th Aug 2021
Xiamen, Fujian, CN
EXW DATE: 30th Aug 2021

The inspection tests will be carried out in sections for FAT, if possible on different, typical
bays due to a reasonable operating sequence as a witness with the client. The units have
already passed all the routine tests based on the relevant international standards.
Single line of project as follow:

SD10105 was selected to carry out RFAT test in GIS factory, detailed program as following.
Based on Beijing CN Time

Hitachi ABB Power Grids pg. 1


Reference
Standard
Day 1 Inspection & Testing Acceptance Criteria
And Test
Result
Bay SD10105
Note: Inspection Tests on assembling unit only

Mechanical testing for Circuit


breaker
Operation test:
Umin: 5C and 5O;
Urate: 5CO, 5O-t-C,
Umax: 5C and 5O;
1.1 Reference:
Time travel curve/graph (velocity Circuit breaker
(Sri)10: measurement) IEC62271-
Opening time: 14 ms-21 ms
30- 203, CL
Test equipment: Resistance of opening coil:
12:30a 7.102
ACTAS switchgear test System 96.5 ±10%(220VDC)Ω
m IEC62271-
c24 24.2 ±10%(110VDC)Ω
(CN): 100, CL
13:00- Closing time: 45ms-60 ms
7.101
15:00 Resistance of closing coil:
96.5 ±10(220VDC)Ω
Test Result:
24.2±10%(110VDC)Ω

Mechanical testing for


1.2 Disconnector and earthing switch/
(Sri) Fast acting earthing switch a.Disconnector and earthing
13:00- Operation test: switch Reference:
15:00pm Umin: 5C,5O; Closing time:<=2000 ms IEC 62271-
(CN) Urate: 5C, 5O; Opening time:<=1500 ms 102 CL
15:30pm- Umax: 5C,5O; b.Fast acting earthing switch 7.101
17:30pm
ACTAS Switchgear testing system Closing time:<=1400 ms
P14 Opening time:<=1000 ms Test Result:
DES:

Hitachi ABB Power Grids pg. 2


FES:

1.3 Reference:
(Sri) IEC 62271-
13:00- 203 Cl. 7.3
Measurement of the resistance of
15:00p
the main circuit According Bay configuration
m Test Result:
Test equipment:
(CN)
15:30- KOCOS: Promet 600
17:30pm
1.4 Reference:
(Sri) IEC 62271-
13:00- 203 Cl. 7.2
Dielectric test on aux.+ control
15:00p
circuits of drives 2kV/ 1min
m Test Result:
Test equipment:
(CN)
15:30- Dielectric tester: CC2671A 0-10kV
17:30pm

1.5 Reference:
(Sri) Regarding CT, VT more IEC 61869-1
13:00- Test on current transformers test on
details please reviewing on IEC 61869-2
15:00pm current transformers:
the
(CN) Visual check for terminal marking
test reports from the Test Result:
15:30- polarity and nameplates.
manufacturer.
17:30pm

Hitachi ABB Power Grids pg. 3


Reference
Standard
Day 2 Inspection & Testing Acceptance Criteria
and Test
Result
Bay SD10105
Note: Inspection Tests on assembling unit only

2.1 Gas-tightness tests on flange Reference:


(Sri)10:30- connections and other connection IEC 62271-
parts 203 Cl. 7.4
11:30
Test equipment: ≤0.1%
(CN):13:00
SF6 GASCHECK P1 Test Result:
-14:00

Power-frequency voltage test on the Note: procedure of High


main circuit phase-to-earth, between voltage testing:
phases and across open switching 1. Procedure for phase to
2.2 devices phase (and phase to earth):
(Sri) Note: procedure of High voltage A. Pre-testing voltage
13:00- testing: 330kV, 15s
14:30 1. Procedure for phase to phase B. Power frequency
(and phase to earth): withstand voltage 460 kV/1
(CN): Reference:
A. Pre-testing voltage 330kV, 15 s min
15:30- IEC 62271-
B. Power frequency withstand C. PD testing voltage
17:00 203 Cl.
voltage 302kV (=1.2 Ur/1.5 min), <
460 kV/1 min 7.1.101
5 pC.
C. PD testing voltage IEC 62271-
2.Procedure for across
302kV (=1.2 Ur/1.5 min), < 5 pC. 203 Cl.
isolating distance:
2.Procedure for across isolating 7.1.102
distance: A. Pre-testing voltage
A. Pre-testing voltage 330kV, 15 s 330kV, 15 s
Test Result:
B. Power frequency withstand B. Power frequency
voltage 460 kV/1 min withstand voltage 460 kV/1
C. PD testing voltage min
302kV (=1.2 Ur/1.5 min), < 5 pC. C. PD testing voltage
Test equipment: 302kV (=1.2 Ur/1.5 min), <
1. High voltage test system 5 pC.
WP250/750GSP
2.Partial discharge tester ICM
compact

Hitachi ABB Power Grids pg. 4


Reference
Standard
Day 3 Inspection & Testing Acceptance Criteria
And Test
Result
LCC of Bay SD10105
function test
Testing equipment: Control Cabinet function test simulator (ABB)
3.1 Function and position information of
(Sri) the switching device and on the
Approved Drawings
10:30- control panel
12:00
3.2 Function of the bay interlocking

10:30- Approved Drawings


12:00
Reference:
3.3 Function of the interlocking of the
IEC 62271-
10:30- circuit breaker during intermediate Approved Drawings
203 Cl.
12:00 position of the disconnectors
7.103
3.4 Function of the final position
interlocking of each disconnector/
10:30- Approved Drawings Test result:
earthing switch
12:00

3.5 Function of interlocking during hand-


crank operation
10:30- Approved Drawings
12:00

3.6 SF6-blockings of the circuit breaker

10:30- Approved Drawings


12:00

Hitachi ABB Power Grids pg. 5


3.7 Alarms and events present on the
control panel
10:30- Approved Drawings
12:00

3.8 Visual check of the assembly and


wiring of the local control panel
10:30- Approved Drawings
12:00

3.9
FAT closure minute and delivery Not
13:30 Conclusion with Mom
notice. Applicable
-14:30

ABB (Xiamen) High Voltage Switchgear Co., Ltd


27th July 2021

Hitachi ABB Power Grids pg. 6