Professional Documents
Culture Documents
Rev.d-Ssr1 220kv Gis Fat Procedure
Rev.d-Ssr1 220kv Gis Fat Procedure
CONTRACTOR
PROJECT NAME:
COLOMBO PORT CITY DEVELOPMENT PROJECT-PHASE-I
CONTRACT No.:
CHEC/CPC/428
DOCUMENT TITLE:
FAT Procedure
THI-PLS-SK01-HT19-002
SALES
PROJECT: Sri Lanka Colombo 220kV GIS 502534229
ORDER :
CLIENT: Tellhow International engineering &contracting DOC. NO.: 20210727
Co., ltd
VENDOR: ABB HIGH VOLTAGE SWITCHGEAR (XIAMEN) VERSION: D
CO.LTD
LOCATION: 883# fangshan west 2nd road, 361101, FAT DATE: 9th-11th Aug 2021
Xiamen, Fujian, CN
EXW DATE: 30th Aug 2021
The inspection tests will be carried out in sections for FAT, if possible on different, typical
bays due to a reasonable operating sequence as a witness with the client. The units have
already passed all the routine tests based on the relevant international standards.
Single line of project as follow:
SD10105 was selected to carry out RFAT test in GIS factory, detailed program as following.
Based on Beijing CN Time
1.3 Reference:
(Sri) IEC 62271-
13:00- 203 Cl. 7.3
Measurement of the resistance of
15:00p
the main circuit According Bay configuration
m Test Result:
Test equipment:
(CN)
15:30- KOCOS: Promet 600
17:30pm
1.4 Reference:
(Sri) IEC 62271-
13:00- 203 Cl. 7.2
Dielectric test on aux.+ control
15:00p
circuits of drives 2kV/ 1min
m Test Result:
Test equipment:
(CN)
15:30- Dielectric tester: CC2671A 0-10kV
17:30pm
1.5 Reference:
(Sri) Regarding CT, VT more IEC 61869-1
13:00- Test on current transformers test on
details please reviewing on IEC 61869-2
15:00pm current transformers:
the
(CN) Visual check for terminal marking
test reports from the Test Result:
15:30- polarity and nameplates.
manufacturer.
17:30pm
3.9
FAT closure minute and delivery Not
13:30 Conclusion with Mom
notice. Applicable
-14:30