Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Mahmoud Mekky

Subject: NEW CHAIRMAN&MANAGING DIRECTOR- Nasr Mining Co.

Dear Eng. Hassan

Please be informing that the chairman and director former (Eng. Nagh ) was retired and new chairman &director
assigned on the first of October 2016 (Ge. Abd El Nasr Ahmed Sallam)

Once he assigned some decisions was taken

Before mention these decision we will shows how the Nasr mining company dealing with the contractors (Mantrac
Customers too)

There are 2 Systems Nasr mining dealing with contractors

1- Completing system

In these system the contractor start digging until reach to the clear phosphate material then send these material to
Nasr company after that he take his money ,the following advantage and disadvantage this system
- The price of phosphate very high
- Long time taken to reach to the phosphate layers may be extend to one year without take any money from
Nasr mining
- The quantity of these layers sometimes less than expecting target
- The quality of these layers sometimes less than the quality needs or Nasr mining not needed it in the specific
time so customer can’t send it and he stopped
- Little contracts have these system

2- Engineering System

In these system in the day one the contractors start transferee any material and send it to Nasr mining and take his
money , the following advantage and disadvantage this system
- Almost the customer have deal with Nasr company by this system
- The contracts take his money every 2 weeks according to how volume material were send to Nasr Co.
- Not important the quality or quantity which send
- Low price of these material

The new decision was taken as the following

1- Stopped all contract with the contractors which working by Engineering System
2- Encourage the contractors which work by completing system
3- Stopped provide the contractors by fuel for credit
4- Decrease the phosphate price for export from 44$ to 35$
5- Take new contracts for exporting cause he decrease the price in international market and become
competitive with Phosphate Misr Company again

According to the new decision the

1
Depend on Nasr com mpany facilitiies they will work
w by engiineering systeem instead th
he contractorrs that mean
the Nasrr mining will buy new machines and reepair his macchines , that will be new o opportunity for our
companyy

Our plan product support teaam ( Mekky + Tamer)

Be cllose with cusstomer

Increease customeer site visits

Free inspection

 
 
Best Rega
ards,o.  
Mahmoud
d Mekky | Aswan
n & Toushka  Service Supervisorr | Mantrac‐Egyppt. 
Tel.: +20972
2450178 Ext. 28055 | Mob: 01222291
1659 I Fax: +209722450177 
Aswan‐Khazzan st. Behind T.V Building 
www.mantrracegypt.com 
Stay in contact with us……. 

             

You might also like