Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Do Mt. Navigator Global 291222

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT.

PERTAMINA PATRA NIAGA


INTEGRATED TERMINAL BALONGAN

DISCHARGE ORDER

Number : 178/DO/LPG/XII/2022
Date: 29 Desember 2022

Dear Sir,
After mooring are : Island Berth Jetty Balongan
Discharge To : Integrated Terminal LPG Balongan

NOTE :
Name of Vessel : MT. NAVIGATOR GLOBAL
Cargo Grade : LPG
Quantity ( BL Figure ) : 5,000 MT
ADD : 29 Desember 2022
BL No. :
Berthing : - Berthing after Result Lab. Analysis Report
Destination

Yours faithfully,
PT. Pertamina Patra Niaga
Integrated Terminal Manager Balongan
Pjs.

Widhi Purbo Nugroho


Ratno Rohanda

You might also like