TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C Nil 0 Nil 0 0 0
2C 15.97 15.741 747 4,696 18.047 17.797 32.61 205 4,490 31.3 88.3 44.6 0.98588 4,427 11.068 4,416 0.12544
3C 6.35 6.121 4,727 29,730 Nil 29,730 31.0 87.8 44.6 0.98613 29,318 73.294 29,244 0.12544
4C 17.94 17.694 78 489 Nil 489 30.6 87.1 44.6 0.98648 482 1.205 481 0.12544
5C Nil 0 Nil 0 0 0
6C 11.24 11.017 2,769 17,418 17.933 17.707 73.01 459 16,959 31.3 88.3 44.6 0.98588 16,720 41.80 16,678 0.12544
7C 3.90 3.675 5,727 36,020 Nil 36,020 30.3 86.5 44.5 0.98680 35,544 88.861 35,455 0.12551
8C 3.78 3.557 5,151 32,398 17.640 17.414 209 1,316 31,082 30.2 86.4 44.6 0.98683 30,672 76.680 30,595 0.12544
SL.P 8.89 8.615 308 1,939 9.200 8.930 298 1,875 64 36.0 96.8 44.6 0.98159 63 0.156 62 0.12544
SL.S 8.87 8.578 306 1,924 11.220 10.933 231 1,451 473 36.0 96.8 44.6 0.98159 464 1.161 463 0.12544
TOTAL
TOTAL 19,812 124,613 844 5,307 119,306 117,690 117,396
REMARKS: 860 56 804 793 792
PRODUCTION LOADING IN TO 2C
Gross Volume :(T.O.V.) 124,613 Oil Volume @ 60 F :(N.S.V.) 117,396 DRAFT FWD 7.70 m AFT
Less Free Water : 5,307 Less OBQ/ROB :
Oil Volume :(G.O.V.) 119,306 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 117,690 Long tons/Metric tons :
Long Tons/Metric Tons : 14,765 15,002 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 8-Apr-17
0 0
555 0.12745 564.222
3,677.591 0.12745 3736.519
60.484 0.12745 61.453
0 0
2,097.323 0.12745 2130.929
4,461.155 0.12752 4532.599
3,847.517 0.12745 3909.168
7.845 0.12745 7.971
58.255 0.12745 59.189
14,765 15,002
Staff
Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Juanda Parde
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
Drills
Type Time Comment
S.T.O.P. Audit program
19-Dec-16
141,460
deg C
deg C
NTO COT 2C
&5C
4504 / 117425
e Vessel
Comment
ss
DSS equipment
uipment test
ainer at laydown
door
pt. activity
ss
crew
SPKK
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
Bunkering/Debunkering :
ENGINE :
1. Continued overhauled auxiliary engine no.1
2. Continued overhauled main air compressor no.2
3. Continued repair dryer machine at laundry room
4. Collected engine room garbage into garbage container at laydown
5. House keeping engine room floor & steering gear room
6. Weekly tested safety device and emergency machinery
7. Workplace inspection at engine room area
8. Running up A/E No. 2 & 3 :
08.00 - 09.00 : - Opened and closed garbage container
9. EHS AUDIT/INSPECTION
TOTAL
4009
4007
TRANS ROB
0 200.37
0 32.95
ROB `
81
277
ROB
200
POB
40
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
11
12
13
14
15
16
17
18
19
Date
20
21
22
23
24
25
26
27
28
29
30
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Average/
Day 4,970 4,973 4,966 1,327 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
2 IYYANG C/O Main deck Renewed foam monitor valve on deck Done Positive 1
5 JULY MANGIRI C/E Engine Room Overhauled no.1 auxiliary engine Done Positive 1
6 ACO AKBAR 2/E Engine Room Continued overhauled main compressore no.2 Done Positive 1
7 RATNO SITUMORANG 3/E Engine Room Overhauled no.1 auxiliary engine Done Positive 1
8 LILIK WAHYUWANTO 4/E Lifeboat P/S Weekly running tested lifeboat engine Done Positive 1
9 NIKO ARIYO E/E Laundry area Repaired laundry dryer machine at laundry area Done Positive 1
11 UDIYANTO AB Pump Room Assisted bosunrenewed valve in pump room Done Positive 1
12 BAYU SEGARA AB Pump Room Assisted bosunrenewed valve in pump room Done Positive 1
15 ELIK BUDIANTO FTR Engine Room Assisted overhauled no.1 auxiliary engine Done Positive 1
16 NUR ALI MTM RO room Cleaned sea water inlet strainer RO no.1 Done Positive 1
17 SUAIB MTM Engine Room House keeping at steering gear room Done Positive 1
18 UMAR SAID MTM Engine Room Collected engine room garbage Done Positive 1
19 SUMARDI WIPER Engine Room Assisted overhauled main compressore no.2 Done Positive 1
21 ROHIM 2ND/Cook Galley Clean up all cooking equipment in galley Done Positive 1
22 RANGGUN JAWI STWD Laundry area House keeping at laudry area Done Positive 1
23 BOBBY MANGONTO STWD Provision store House keeping in provision store Done Positive 1
TOTAL 24
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C
COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
12
10
10
40
OUTH AREA
11
11
61
22
22
22
22
22
22
193
MAINING SLUDGE IN TAN
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C
COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17
NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
TTL HRS
24
10
10
10
46
UTH
5
8
59
8
4
%
21
0
8
5
%
21
15
15
15
112