VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C Nil 0 Nil 0 0 0
2C 15.97 15.741 747 4,696 18.047 17.797 32.61 205 4,490 31.3 88.3 44.6 0.98588 4,427 11.068 4,416 0.12544
3C 6.35 6.121 4,727 29,730 Nil 29,730 31.0 87.8 44.6 0.98613 29,318 73.294 29,244 0.12544
4C 17.94 17.694 78 489 Nil 489 30.6 87.1 44.6 0.98648 482 1.205 481 0.12544
5C Nil 0 Nil 0 0 0
6C 11.24 11.017 2,769 17,418 17.933 17.707 73.01 459 16,959 31.3 88.3 44.6 0.98588 16,720 41.80 16,678 0.12544
7C 3.90 3.675 5,727 36,020 Nil 36,020 30.3 86.5 44.5 0.98680 35,544 88.861 35,455 0.12551
8C 3.78 3.557 5,151 32,398 17.640 17.414 209 1,316 31,082 30.2 86.4 44.6 0.98683 30,672 76.680 30,595 0.12544
SL.P 8.89 8.615 308 1,939 9.200 8.930 298 1,875 64 36.0 96.8 44.6 0.98159 63 0.156 62 0.12544
SL.S 8.87 8.578 306 1,924 11.220 10.933 231 1,451 473 36.0 96.8 44.6 0.98159 464 1.161 463 0.12544
TOTAL
TOTAL 19,812 124,613 844 5,307 119,306 117,690 117,396
REMARKS: 860 56 804 793 792

PRODUCTION LOADING IN TO 2C

Gross Volume :(T.O.V.) 124,613 Oil Volume @ 60 F :(N.S.V.) 117,396 DRAFT FWD 7.70 m AFT
Less Free Water : 5,307 Less OBQ/ROB :
Oil Volume :(G.O.V.) 119,306 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 117,690 Long tons/Metric tons :
Long Tons/Metric Tons : 14,765 15,002 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 8-Apr-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

0 0
555 0.12745 564.222
3,677.591 0.12745 3736.519
60.484 0.12745 61.453
0 0
2,097.323 0.12745 2130.929
4,461.155 0.12752 4532.599
3,847.517 0.12745 3909.168
7.845 0.12745 7.971
58.255 0.12745 59.189

14,765 15,002

10.80 m TRIM 3.10 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 8-Apr-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Juanda Parde

Crude Storage Lifting

24 Hours Total (bbls) 860 Last Lifting 19-Dec

BS and W % 0.25 Lifting Vol (bbls) 141,46

Storage Gross (bbls) Next Lifting


119,306 -

Storage Net / G.S.V (Nbbls) 117,690 Next Lifting Vol (bbls) -

Storage Net / N.S.V (Nbbls) 117,396

Days to Tank Tops 237 Vessel ETA -

Total Crude This Month (Nbbls) 117,690

Water Offtake

Water Received 24hrs (bbls) 56 Offtake 24 Hours (bbls) -

Total Water in Cargo (bbls) 5,307 Note :

Total P/W Received (bbls) 9,679

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 31.3

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 200.27 ### 34.26 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0.00 1.31

Closing (m3) 200.27 32.95 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Reviewed previous day works


2. Gas free in COT 1C & 5C in progress
3. Weekly test LSA, FFA and Nav/GMDSS equipment
4. Weekly safety device and safety equipment test
5. Collecting garbage into waste container at laydown
Tool box meeting 06.30
6. Workplace inspection
7. Renew fire hydrant at port entrance door

1. Review deck, engine and galley dept. activity


2. Gas free in COT 1C & 5C in progress
2. EHS and Security reinduction to all crew
Supervisory Meeting 16.30 3. Review the workplace inspection / SPKK
4. Ship drill / safety learn

Incidents

Type Reference Comments


NIL

Drills
Type Time Comment
S.T.O.P. Audit program

Observation Card Report : 23


The details see SPKK sheet *)
###
Capt. Juanda Pardede

19-Dec-16

141,460

deg C

deg C

NTO COT 2C
&5C

4504 / 117425
e Vessel

Comment

ss
DSS equipment
uipment test
ainer at laydown

door

pt. activity
ss
crew
SPKK

Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 2C
11,20-11,45 lt : Checked O2 Content and LEL in COT 1C
Free Gas COT 1 C & 5C In Progress

Mooring/Unmooring :

Bunkering/Debunkering :

Personnel & Material Transfer :


05.30 : 14 Persons PKP & 2 person Mafhindo by KST. 51 ( out )
15.45 : 14 Persons PKP & 2 person Mafhindo by Friedrick ( in )
19.30 : 1 Person Santos rep by KST. 51 ( in )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assisted transfer contractor personnel
2. Continued free gas by portable fan in COT 1C & 5C
3. Weekly tested LSA, FFA and Nav/GMDSS equipment
4. Weekly tested safety device and emergency machinery
5. Collected garbage into garbage container at laydown
6. Installed new Valve fire hydrant, valve drop line slop & foam monitor valve
7. House keeping

ENGINE :
1. Continued overhauled auxiliary engine no.1
2. Continued overhauled main air compressor no.2
3. Continued repair dryer machine at laundry room
4. Collected engine room garbage into garbage container at laydown
5. House keeping engine room floor & steering gear room
6. Weekly tested safety device and emergency machinery
7. Workplace inspection at engine room area
8. Running up A/E No. 2 & 3 :
08.00 - 09.00 : - Opened and closed garbage container

2. PERMIT TO WORK PW MW HW CSE IP VAL


470 1876 384 181 8 1090
2.1 J HA 470 1876 384 181 6 1090
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1.31 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 0 19
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
17 16
MAN HOURS ( POB X 12 HRS )
Previous man hours 235224 Days W/O LTI 1227 Since 28-Nov-13
Man hours today 276
Total man hours 235500
Safe man hours 235500
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


08-Apr-17 @2400 HRS

TOTAL
4009
4007
TRANS ROB
0 200.37
0 32.95
ROB `
81
277
ROB
200
POB
40

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1790 2 1792
3673 23 3696
3 0 3
0 0 0
196 0 196

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( KL ) ( KL ) ( KL ) ( KL ) ( KL ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 43.77 0 0 1.30 0 0.0 0.0 24.0 42.47
02 42.47 0 0 1.30 0 0.0 0.0 24.0 41.17
DO Consumption for Boiler
03 41.17 0 0 1.61 0 8.0 0.0 16.0 39.56 (Burning n Before stop 0.2
KL )

04 39.56 0 0 1.37 0 5.5 0.0 18.5 38.19 Free gas COT 5C


05 38.19 0 0 1.30 0 0.0 24.0 0.0 36.89
06 36.89 0 0 1.31 0 1.0 23.0 0.0 35.58 Transferred materials
07 35.58 0 0 1.32 0 0.0 22.0 2.0 34.26 Transferred materials
Opened & closed garbage
34.26 0 0 1.31 0 0.0 23.0 1.0 32.95 container
08
09
10

11
12
13
14
15
16
17
18

19

Date

20
21

22

23

24

25

26
27
28

29

30
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14 12 13
2 13 12 13 14
3 11 14 14 13
4 12 14 13 14
5 12 13 14 12
6 14 13 14 13
7 13 12 13 14
8 12 13 12 13
9 13 14 13
10 13 14 13
11 14 12 14
12 12 12 13
13 13 13 13
14 11 13 12
15 13 12 12
16 14 13 13
17 12 14 13
18 13 14 12
19 11 12 13
20 12 12 14
21 12 13 12
22 13 14 12
23 12 14 13
24 14 13 14
25 12 13 14
26 12 14 13
27 14 12 14
28 14 12 13
29 13 14
30 14 13
31 13 13

TOTAL 393 365 405 106 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7 8 8
2 7 8 8 7
3 7 8 8 7
4 8 8 7 8
5 8 7 8 8
6 7 8 8 7
7 8 8 7 8
8 8 8 7 7
9 8 8 8
10 7 8 8
11 8 7 8
12 7 8 7
13 7 8 8
14 8 8 8
15 8 8 7
16 8 7 8
17 8 8 7
18 7 8 8
19 7 8 8
20 8 8 7
21 8 7 8
22 8 8 7
23 7 8 8
24 8 8 8
25 8 8 8
26 7 8 7
27 7 7 8
28 8 8 8
29 8 7
30 8 7
31 8 7

TOTAL 237 218 236 60 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970 4,975 4,983
2 4,951 4,968 4,971 4,991
3 4,971 4,971 4,973 4,982
4 4,954 4,970 4,972 4,965
5 4,980 4,975 4,973 4,970
6 4,969 4,969 4,974 4,952
7 4,972 4,974 4,973 4,977
8 4,957 4,972 4,930 4,984
9 4,960 4,977 4,945
10 4,987 4,978 4,961
11 4,991 4,975 4,952
12 4,984 4,971 4,960
13 4,966 4,977 4,981
14 4,958 4,975 4,972
15 4,963 4,973 4,981
16 4,974 4,969 4,941
17 4,988 4,972 4,959
18 4,964 4,974 4,981
19 4,978 4,976 4,985
20 4,971 4,971 4,994
21 4,973 4,974 4,963
22 4,970 4,975 4,952
23 4,966 4,972 4,958
24 4,960 4,977 4,949
25 4,969 4,970 4,961
26 4,972 4,969 4,983
27 4,974 4,973 4,978
28 4,975 4,970 4,966
29 4,970 4,960
30 4,973 4,959
31 4,978 4,958

TOTAL 154,082 139,237 153,940 39,804 0 0 0 0 0 0 0 0

Average/
Day 4,970 4,973 4,966 1,327 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135 55 160
2 70 120 40 155
3 135 110 95 135
4 80 90 30 140
5 120 120 95 125
6 125 90 145 110
7 130 95 135 90
8 60 110 145 95
9 40 115 145
10 110 110 140
11 100 100 150
12 105 110 130
13 100 100 50
14 55 110 65
15 85 70 140
16 90 110 60
17 90 85 80
18 95 95 70
19 55 95 70
20 75 80 125
21 90 155 115
22 80 165 145
23 80 165 120
24 80 165 140
25 95 150 130
26 150 165 135
27 110 140 90
28 150 40 65
29 125 40
30 140 100
31 90 160

TOTAL 2,990 3,195 3,205 1,010 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Apr 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Apr-2017 24 1 21 46
2-Apr-2017 24 1 21 46
3-Apr-2017 24 1 21 46
4-Apr-2017 24 0 21 45
5-Apr-2017 24 1 13 38
6-Apr-2017 24 0 13 37
7-Apr-2017 23 0 15 38
8-Apr-2017 23 1 16 40

TOTAL 190 5 141 336


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 8/Apr/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total

Prepared Safety Procedures and check list for


1 BOY RICHARD TOGAS Master Deck Office
last offtake.
in Progress P 1

2 IYYANG C/O Main deck Renewed foam monitor valve on deck Done Positive 1

Weekly Checked and maintenance


3 ANDI AHMAD UNIT 2/O Main deck
NAV/GMDSS equipment
Done Positive 1

Renewed fire hydrant at port entrance door


4 INDRA 3/O Port Quarter
near by alternatif muster station
Done / closed Positive 1

5 JULY MANGIRI C/E Engine Room Overhauled no.1 auxiliary engine Done Positive 1

6 ACO AKBAR 2/E Engine Room Continued overhauled main compressore no.2 Done Positive 1

7 RATNO SITUMORANG 3/E Engine Room Overhauled no.1 auxiliary engine Done Positive 1

8 LILIK WAHYUWANTO 4/E Lifeboat P/S Weekly running tested lifeboat engine Done Positive 1

9 NIKO ARIYO E/E Laundry area Repaired laundry dryer machine at laundry area Done Positive 1

Assist C/O Renewed foam monitor valve on


10 AANG Bosun Main deck
deck
Done Positive 1

11 UDIYANTO AB Pump Room Assisted bosunrenewed valve in pump room Done Positive 1

12 BAYU SEGARA AB Pump Room Assisted bosunrenewed valve in pump room Done Positive 1

Collected garbage in towaste container at lay


13 MOHAMMAD ANSORI AB Main deck
down
Done Positive 1

Coating new fire hydrant valve at port quarter


14 DEDI BIN WARNA OS Main deck
entrance door
Done Positive 1

15 ELIK BUDIANTO FTR Engine Room Assisted overhauled no.1 auxiliary engine Done Positive 1

16 NUR ALI MTM RO room Cleaned sea water inlet strainer RO no.1 Done Positive 1

17 SUAIB MTM Engine Room House keeping at steering gear room Done Positive 1

18 UMAR SAID MTM Engine Room Collected engine room garbage Done Positive 1

19 SUMARDI WIPER Engine Room Assisted overhauled main compressore no.2 Done Positive 1

20 HASAN C/Cook Galley House keeping in galley area Done Positive 1

21 ROHIM 2ND/Cook Galley Clean up all cooking equipment in galley Done Positive 1

22 RANGGUN JAWI STWD Laundry area House keeping at laudry area Done Positive 1

23 BOBBY MANGONTO STWD Provision store House keeping in provision store Done Positive 1

TOTAL 24
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING

6 BUTTERWORTHING COT 1C ( COP NO. 2 )


1ST STAGE ( 4 MTRS ) 17/Mar/17
2ND STAGE ( 8 MTRS ) 17/Mar/17
1ST STAGE ( 12 MTRS ) 17/Mar/17
1ST STAGE ( 16 MTRS ) 17/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 1C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING TOTAL 40 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING BY SAMPLING HOLE BY OIL GAUGING TAPE : 2 CM ( SLUDGE ) ONLY AT BELLMOUTH AREA
7 GAS FREE BY USING I.G.S FIX FAN 18/Mar/17
20/Mar/17
TOTAL TANK CLEANING AND GAS FREE : 61 HRS
8 GAS FREE BY USING 2 SETS PNEUMATIC AIR 21/Mar/17
DRIVEN FAN 22/Mar/17
23/Mar/17
24/Mar/17
25/Mar/17
26/Mar/17
COT ATM RESULTS : O²/ 21.00% - LEL/NIL - CO/NIL - HC/NIL
FREE GAS BY PORTABLE FAN : 5 Days
TANK CLEANING AND GAS FREE COMPLETED FOR COT 1 C : 8 Days
REMARKS :
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES, DUE TO REMAINING SLUDGE IN TAN
TTL HRS
24

12
10

10

40

OUTH AREA
11
11
61
22
22
22
22
22
22
193
MAINING SLUDGE IN TAN
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

7 BUTTERWORTHING COT 5C ( COP NO. 2 )


1ST STAGE ( 12 MTRS ) 25/Mar/17
1ST STAGE ( 16 MTRS ) 25/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING CLEANING TOTAL 46 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING SAMPLING HOLD BY OIL GAOUGING TAPE : 5 CM SLUDGE AREA BELLMOUTH
7 FREE GAS BY USING I.G.S FIX FAN 25/Mar/17
27/Mar/17

TOTAL TANK CLEANING AND GAS FREE : 59 HRS


27/Mar/17 18.00 pm O2 Content : 18 %, LEL : 29 %, CO : %, H2S : 5 %

ESTIMATE COMPLETED 31 MARCH 2017


8 FREE GAS BY USING I.G.S FIX FAN 28/Mar/17
17.00 pm O2 Content : 18 %, LEL : 12 %, CO : %, H2S : %
29/Mar/17
17.00 pm O2 Content : 18,5 %, LEL : 6 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 30/Mar/17
DRIVEN FAN 17.20 pm O2 Content : 20, %, LEL : 3 %, CO : 0 %, H2S : 0 %
Will be done again Cleaning for Cargo tank 5 C
Tank cleaning COT 5 C 3/Apr/17
FREE GAS BY USING I.G.S FIX FAN 4/Apr/17
15,00 pm O2 Content : 20, 9 %, LEL : 20 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 5/Apr/17
DRIVEN FAN 11,30 pm O2 Content : 20 %, LEL : 11 %, CO : 0 %, H2S : 0 %
6/Apr/17
11,30 pm O2 Content : 20 %, LEL : 10 %, CO : 0 %, H2S : 0 %
7/Apr/17
11,40 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %
8/Apr/17
11,45 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %

NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
TTL HRS
24

10
10

10

46

UTH
5
8

59

8
4
%
21

0
8
5
%
21

15

15

15

112