24 Apr 2017
24 Apr 2017
24 Apr 2017
TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C Nil 0 Nil 0 0 0
2C 15.56 15.313 901 5,669 18.019 17.761 44 279 5,390 32.3 90.1 44.6 0.98498 5,309 13.272 5,296 0.12544
3C 1.00 0.758 6,639 41,759 Nil 41,759 31.2 88.2 44.6 0.98593 41,172 102.929 41,069 0.12544
4C 17.24 16.993 343 2,160 Nil 2,160 31.4 88.5 44.6 0.98578 2,129 5.323 2,124 0.12544
5C Nil 0 Nil 0 0 0
6C 16.55 16.304 619 3,893 18.220 17.965 0 0 3,893 31.9 89.4 44.6 0.98533 3,836 9.59 3,826 0.12544
7C 1.00 0.759 6,651 41,835 Nil 41,835 30.2 86.4 44.5 0.98685 41,284 103.211 41,181 0.12551
8C 1.00 0.762 5,936 37,338 Nil 37,338 30.7 87.3 44.6 0.98638 36,829 92.073 36,737 0.12544
SL.P 5.50 5.221 417 2,625 5.535 5.256 416 2,618 7 32.0 89.6 44.6 0.98523 7 0.017 7 0.12544
SL.S 17.50 17.208 30 189 17.505 17.211 30 189 1 32.0 89.6 44.6 0.98523 1 0.001 1 0.12544
TOTAL
TOTAL 21,538 135,468 491 3,086 132,382 130,567 130,240
REMARKS: 865 44 821 809 806
PRODUCTION LOADING IN TO 2C
Gross Volume :(T.O.V.) 135,468 Oil Volume @ 60 F :(N.S.V.) 130,240 DRAFT FWD 8.00 m AFT
Less Free Water : 3,086 Less OBQ/ROB :
Oil Volume :(G.O.V.) 132,382 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 130,567 Long tons/Metric tons :
Long Tons/Metric Tons : 16,381 16,644 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 24-Apr-17
0 0
666 0.12745 676.629
5,165 0.12745 5247.330
267 0.12745 271.346
0 0
481 0.12745 488.899
5,182 0.12752 5264.587
4,620 0.12745 4693.857
0.875 0.12745 0.889
0.075 0.12745 0.076
16,381 16,644
Staff
Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Saiful Bahri
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
Drills
Type Time Comment
S.T.O.P. Audit program
19-Dec-16
141,460
deg C
deg C
NTO COT 2C
&5C
5297 / 130122
e Vessel
Comment
ss
crew mess room
crew air compressor
pt. activity
ss
A equipment
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
Bunkering/Debunkering :
9. EHS AUDIT/INSPECTION
TOTAL
4085
8383
TRANS ROB
0 186.77
0 50.41
ROB `
81
243
ROB
200
POB
24
28-Nov-13
Previous Today Total
0 0 0
0 0 0
0 0 0
0 0 0
1823 2 1825
4041 23 4064
3 0 3
0 0 0
201 0 201
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09 200.27 0 0 0 0 200.27
10 200.27 0 0 3.50 0 196.77 Heating cargo oil
11 196.77 0 0 4.00 0 192.77 Internal cargo transferred
12 192.77 0 0 0 0 192.77
13 192.77 0 0 0 0 192.77
14 192.77 0 0 0 0 192.77
15 192.77 0 0 0 0 192.77
16 192.77 0 0 0 0 192.77
17 192.77 0 0 0 0 192.77
18 192.77 0 0 3.00 0 189.77 Internal cargo transferred
19 189.77 0 0 3.00 0 186.77 Heating cargo oil
20 186.77 0 0 0 0 186.77
21 186.77 0 0 0 0 186.77
22 186.77 0 0 0 0 186.77
23 186.77 0 0 0 0 186.77
24 186.77 0 0 0 0 186.77
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Average/
Day 4,970 4,973 4,966 3,978 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
Reported to STWD
4 INDRA 3/O Deck C Deck C area passage look untidy
clean up / Closed
Negative 1
7 RATNO SITUMORANG 3/E RO Room Assisted 2/E maintenance RO No.2 Done Positive 1
Auxiliary engine
17 SUAIB MTM area
House keeping in auxiliary engine floor Done Positive 1
18 UMAR SAID MTM RO Room Assisted 2/E maintenance RO No.2 Done Positive 1
20 HASAN C/Cook Galley Cleaning galley equipment after used Done Positive 1
22 HARIANTO SULE TANAN STWD Deck C House keeping in deck C passage area Done Positive 1
23 BOBBY MANGONTO STWD Galley Daily house keeping area galley Done Positive 1
TOTAL 23
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C
COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
12
10
10
40
OUTH AREA
11
11
61
22
22
22
22
22
22
193
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C
COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17
NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24
10
10
10
46
UTH
5
8
59
8
4
%
21
0
8
5
%
21
15
15
15
112