VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C Nil 0 Nil 0 0 0
2C 15.94 15.693 764 4,804 18.041 17.783 37 235 4,569 32.3 90.1 44.6 0.98498 4,501 11.252 4,490 0.12544
3C 1.00 0.758 6,639 41,759 Nil 41,759 31.2 88.2 44.6 0.98593 41,172 102.929 41,069 0.12544
4C 17.24 16.993 343 2,160 Nil 2,160 31.4 88.5 44.6 0.98578 2,129 5.323 2,124 0.12544
5C Nil 0 Nil 0 0 0
6C 16.55 16.304 619 3,893 18.220 17.965 0 0 3,893 31.9 89.4 44.6 0.98533 3,836 9.59 3,826 0.12544
7C 1.00 0.759 6,651 41,835 Nil 41,835 30.2 86.4 44.5 0.98685 41,284 103.211 41,181 0.12551
8C 1.00 0.762 5,936 37,338 Nil 37,338 30.7 87.3 44.6 0.98638 36,829 92.073 36,737 0.12544
SL.P 5.50 5.221 417 2,625 5.535 5.256 416 2,618 7 32.0 89.6 44.6 0.98523 7 0.017 7 0.12544
SL.S 17.50 17.208 30 189 17.505 17.211 30 189 1 32.0 89.6 44.6 0.98523 1 0.001 1 0.12544
TOTAL
TOTAL 21,400 134,603 484 3,042 131,561 129,758 129,434
REMARKS: 863 46 817 805 803

PRODUCTION LOADING IN TO 2C

Gross Volume :(T.O.V.) 134,603 Oil Volume @ 60 F :(N.S.V.) 129,434 DRAFT FWD 8.00 m AFT
Less Free Water : 3,042 Less OBQ/ROB :
Oil Volume :(G.O.V.) 131,561 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 129,758 Long tons/Metric tons :
Long Tons/Metric Tons : 16,280 16,541 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 23-Apr-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

0 0
565 0.12745 573.626
5,165 0.12745 5247.330
267 0.12745 271.346
0 0
481 0.12745 488.899
5,182 0.12752 5264.587
4,620 0.12745 4693.857
0.875 0.12745 0.889
0.075 0.12745 0.076

16,280 16,541

10.70 m TRIM 2.70 m


LIST NIL

Capt. Ihwan Asrul


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 23-Apr-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Saiful Bahri

Crude Storage Lifting

24 Hours Total (bbls) 863 Last Lifting 19-Dec

BS and W % 0.25 Lifting Vol (bbls) 141,46

Storage Gross (bbls) Next Lifting


131,561 -

Storage Net / G.S.V (Nbbls) 129,758 Next Lifting Vol (bbls) -

Storage Net / N.S.V (Nbbls) 129,434

Days to Tank Tops 218 Vessel ETA -

Total Crude This Month (Nbbls) 129,758

Water Offtake

Water Received 24hrs (bbls) 46 Offtake 24 Hours (bbls) -

Total Water in Cargo (bbls) 3,042 Note :

Total P/W Received (bbls) 10,414

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 32.3

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 186.77 ### 53.01 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1.30

Closing (m3) 186.77 51.71 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Reviewed previous day works


2. Gas free in COT 1C & 5C in progress
3. EHS and Security reinduction to all crew
4. Review the workplace inspection / SPKK
5. Table top drill confined space incident
Tool box meeting 06.30
6. Safety meeting & safety sharing at sea good

1. Review deck, engine and galley dept. activity


2. Gas free in COT 1C & 5C in progress
3. Check and maintenance LSA & FFA equipment
Supervisory Meeting 16.30

Incidents

Type Reference Comments


NIL

Drills
Type Time Comment
1. Confined space incident 07.00 - 08.00 Carried out drill with satisfact

S.T.O.P. Audit program

Observation Card Report : 23


The details see SPKK sheet *)
###
Capt. Saiful Bahri

19-Dec-16

141,460

deg C

deg C

NTO COT 2C
&5C

4492 / 129317
e Vessel

Comment

ss
crew
SPKK
ent
sea good

pt. activity
ss
A equipment

Comment
out drill with satisfactory
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 2C
17.00 - 17.30 lt : Checked O2 Content and LEL in COT 1C
Free Gas COT 1 C & 5C In Progress

Mooring/Unmooring :
18.50 : KST. 51 port alongside
21.06 : KST. 51 cast off
Bunkering/Debunkering :
19.00 : Commenced transfer fresh water to KST. 51
21.00 : Completed transfer fresh water 20T to KST. 51
Personnel & Material Transfer :
09.20 : 1 Person Nalco by KST. 51 ( in )
15.30 : 1 Person Nalco and 2 persons SPJ by KST. 51 ( out )
18.00 : 2 Persons SPJ by KST. 51 ( in )
18.45 : 2 Persons Santos, 1 person Oryx and 1 person AHT. Tegap jaya crew by KST. 51 ( in )
21.06 : 1 Person Oryx, 1 person santos & 1 person AHT. Tegap jaya crew by KST. 51 (out )
1.2 Planned/Unplanned Maintenance
DECK :
1. Assisted transfer Santos, Oryx, Nalco, SPJ & Tegap jaya crew personnel
2. Continued free gas by portable fan in COT 1C & 5C
3. EHS and Security reinduction to all crew
4. Reviewed the workplace inspection / SPKK
5. Table top drill confined space incident
6. Safety meeting & safety sharing at sea good
7. House keeping

ENGINE :
1. Weekly meeting & safety sharing in crew mess room
2. EHS and Security reinduction to all crew
3. Reviewed the workplace inspection / SPKK
4. Table top drill confined space incident
5. Safety meeting & safety sharing at sea good

2. PERMIT TO WORK PW MW HW CSE IP VAL


482 1923 385 181 8 1105
2.1 J HA 4782 1923 385 181 6 1105
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1.30 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 20 24
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
7 6
MAN HOURS ( POB X 12 HRS )
Previous man hours 239364 Days W/O LTI 1242 Since 28-Nov-13
Man hours today 276
Total man hours 239640
Safe man hours 239640
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


Video
23-Apr-17 @2400 HRS

TOTAL
4084
8382
TRANS ROB
0 186.77
0 51.71
ROB `
81
233
ROB
200
POB
24

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1821 2 1823
4018 23 4041
3 0 3
0 0 0
201 0 201

CONFINED SPACE INCIDENT

NIL

NIL

NIL

Video learn about : CONFINED SPACE INCIDENT


FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( KL ) ( KL ) ( KL ) ( KL ) ( KL ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 43.77 0 0 1.30 0 0.0 0.0 24.0 42.47
02 42.47 0 0 1.30 0 0.0 0.0 24.0 41.17
DO Consumption for Boiler
03 41.17 0 0 1.61 0 8.0 0.0 16.0 39.56 (Burning n Before stop 0.2
KL )

04 39.56 0 0 1.37 0 5.5 0.0 18.5 38.19 Free gas COT 5C


05 38.19 0 0 1.30 0 0.0 24.0 0.0 36.89
06 36.89 0 0 1.31 0 1.0 23.0 0.0 35.58 Transferred materials
07 35.58 0 0 1.32 0 0.0 22.0 2.0 34.26 Transferred materials
Opened & closed garbage
34.26 0 0 1.31 0 0.0 23.0 1.0 32.95 container
08
09 32.95 0 0 1.31 0 0.0 23.0 1.0 31.64 Transferred materials
DO Consumption for Boiler
10 31.64 0 0 1.61 0 0.0 16.0 8.0 30.03 (Burning n Before stop 0.2
KL )

DO Consumption for Boiler


11 30.03 0 0 1.62 0 9.0 0.0 15.0 28.41 (Burning n Before stop 0.2
KL )

12 28.41 0 0 1.31 0 0.0 1.0 23.0 27.10 Transferred materials


13 27.10 40 0 1.31 0 0.0 1.0 23.0 65.79 Transferred materials
14 65.79 0 0 1.31 0 1.0 0.0 23.0 64.48 Transferred materials
Opened & closed
15 64.48 0 0 1.31 0 1.0 0.0 23.0 63.17 garbage container
16 63.17 0 0 1.30 0 0.0 0.0 24.0 61.87
17 61.87 0 0 1.30 0 0.0 0.0 24.0 60.57
DO Consumption for Boiler
18 60.57 0 0 1.82 0 9.0 0.0 15.0 58.75 (Burning n Before stop 0.4
KL )

DO Consumption for Boiler


19 58.75 0 0 1.81 0 8.0 0.0 16.0 56.94 (Burning n Before stop 0.4
KL )

20 56.94 0 0 1.31 0 0.0 14.0 10.0 55.63 Transferred materials


21 55.63 0 0 1.32 0 0.0 22.0 2.0 54.31 Transferred materials

22 54.31 0 0 1.30 0 0.0 24.0 0.0 53.01


23 53.01 0 0 1.30 0 0.0 24.0 0.0 51.71
24
25
26
27
28
29
30
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09 200.27 0 0 0 0 200.27
10 200.27 0 0 3.50 0 196.77 Heating cargo oil
11 196.77 0 0 4.00 0 192.77 Internal cargo transferred
12 192.77 0 0 0 0 192.77
13 192.77 0 0 0 0 192.77
14 192.77 0 0 0 0 192.77
15 192.77 0 0 0 0 192.77
16 192.77 0 0 0 0 192.77
17 192.77 0 0 0 0 192.77
18 192.77 0 0 3.00 0 189.77 Internal cargo transferred
19 189.77 0 0 3.00 0 186.77 Heating cargo oil
20 186.77 0 0 0 0 186.77
21 186.77 0 0 0 0 186.77
22 186.77 0 0 0 0 186.77
23 186.77 0 0 0 0 186.77
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14 12 13
2 13 12 13 14
3 11 14 14 13
4 12 14 13 14
5 12 13 14 12
6 14 13 14 13
7 13 12 13 14
8 12 13 12 13
9 13 14 13 12
10 13 14 13 12
11 14 12 14 13
12 12 12 13 14
13 13 13 13 12
14 11 13 12 14
15 13 12 12 13
16 14 13 13 12
17 12 14 13 14
18 13 14 12 11
19 11 12 13 14
20 12 12 14 13
21 12 13 12 11
22 13 14 12 13
23 12 14 13 12
24 14 13 14
25 12 13 14
26 12 14 13
27 14 12 14
28 14 12 13
29 13 14
30 14 13
31 13 13

TOTAL 393 365 405 296 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7 8 8
2 7 8 8 7
3 7 8 8 7
4 8 8 7 8
5 8 7 8 8
6 7 8 8 7
7 8 8 7 8
8 8 8 7 7
9 8 8 8 7
10 7 8 8 8
11 8 7 8 7
12 7 8 7 8
13 7 8 8 7
14 8 8 8 7
15 8 8 7 8
16 8 7 8 7
17 8 8 7 8
18 7 8 8 7
19 7 8 8 7
20 8 8 7 8
21 8 7 8 7
22 8 8 7 7
23 7 8 8 7
24 8 8 8
25 8 8 8
26 7 8 7
27 7 7 8
28 8 8 8
29 8 7
30 8 7
31 8 7

TOTAL 237 218 236 170 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970 4,975 4,983
2 4,951 4,968 4,971 4,991
3 4,971 4,971 4,973 4,982
4 4,954 4,970 4,972 4,965
5 4,980 4,975 4,973 4,970
6 4,969 4,969 4,974 4,952
7 4,972 4,974 4,973 4,977
8 4,957 4,972 4,930 4,984
9 4,960 4,977 4,945 4,948
10 4,987 4,978 4,961 4,984
11 4,991 4,975 4,952 4,957
12 4,984 4,971 4,960 4,964
13 4,966 4,977 4,981 4,973
14 4,958 4,975 4,972 4,982
15 4,963 4,973 4,981 4,954
16 4,974 4,969 4,941 4,987
17 4,988 4,972 4,959 4,963
18 4,964 4,974 4,981 4,987
19 4,978 4,976 4,985 4,969
20 4,971 4,971 4,994 4,973
21 4,973 4,974 4,963 4,981
22 4,970 4,975 4,952 4,990
23 4,966 4,972 4,958 4,957
24 4,960 4,977 4,949
25 4,969 4,970 4,961
26 4,972 4,969 4,983
27 4,974 4,973 4,978
28 4,975 4,970 4,966
29 4,970 4,960
30 4,973 4,959
31 4,978 4,958

TOTAL 154,082 139,237 153,940 114,373 0 0 0 0 0 0 0 0

Average/
Day 4,970 4,973 4,966 3,812 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135 55 160
2 70 120 40 155
3 135 110 95 135
4 80 90 30 140
5 120 120 95 125
6 125 90 145 110
7 130 95 135 90
8 60 110 145 95
9 40 115 145 95
10 110 110 140 80
11 100 100 150 135
12 105 110 130 125
13 100 100 50 140
14 55 110 65 135
15 85 70 140 80
16 90 110 60 70
17 90 85 80 75
18 95 95 70 125
19 55 95 70 75
20 75 80 125 65
21 90 155 115 75
22 80 165 145 100
23 80 165 120 120
24 80 165 140
25 95 150 130
26 150 165 135
27 110 140 90
28 150 40 65
29 125 40
30 140 100
31 90 160

TOTAL 2,990 3,195 3,205 2,505 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Apr 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Apr-2017 24 1 21 46
2-Apr-2017 24 1 21 46
3-Apr-2017 24 1 21 46
4-Apr-2017 24 0 21 45
5-Apr-2017 24 1 13 38
6-Apr-2017 24 0 13 37
7-Apr-2017 23 0 15 38
8-Apr-2017 23 1 16 40
9-Apr-2017 23 1 16 40
10-Apr-2017 23 0 16 39
11-Apr-2017 23 0 16 39
12-Apr-2017 23 0 16 39
13-Apr-2017 23 0 16 39
14-Apr-2017 23 1 13 37
15-Apr-2017 23 0 13 36
16-Apr-2017 23 0 13 36
17-Apr-2017 23 0 13 36
18-Apr-2017 23 1 13 37
19-Apr-2017 23 0 0 23
20-Apr-2017 23 0 0 23
21-Apr-2017 23 0 0 23
22-Apr-2017 23 0 0 23
23-Apr-2017 23 1 0 24

TOTAL 535 9 286 830


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 23/Apr/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total
Crew mess
1 IHWAN ASRUL Master room
Safety meeting & safety sharing as adviser Done Positive 1

Reviewed workplace inspection at cargo tank


2 IYYANG C/O Main deck
area
Done Positive 1

Crew mess Weekly tested blood pressure and body weight


3 ANDI AHMAD UNIT 2/O room all crew
Done Positive 1

Crew mess Prepared confined space incident drill in crew


4 INDRA 3/O room mess room
Done Positive 1

Crew mess Attended weekly safety meeting and safety


5 JULY MANGIRI C/E room sharing in crew mess room
Done Positive 1

Crew mess Attended weekly safety meeting and safety


6 ACO AKBAR 2/E room sharing in crew mess room
Done Positive 1

Crew mess
7 RATNO SITUMORANG 3/E room
Attended confined space incident drill Done Positive 1

Crew mess Attended weekly safety meeting and safety


8 HENDRA PRATAMA 4/E room sharing in crew mess room
Done Positive 1

Crew mess Attended weekly safety meeting and safety


9 NIKO ARIYO E/E room sharing in crew mess room
Done Positive 1

Crew mess
10 AANG Bosun room
Attended confined space incident drill Done Positive 1

Weekly safety meeting and safety sharing at


11 UDIYANTO AB Sea good
sea good
Done Positive 1

Crew mess Attended weekly safety meeting and safety


12 BAYU SEGARA AB room sharing in crew mess room
Done Positive 1

Crew mess
13 MOHAMMAD ANSORI AB room
Attended confined space incident drill Done Positive 1

Crew mess Attended weekly safety meeting and safety


14 DEDI BIN WARNA OS room sharing in crew mess room
Done Positive 1

Crew mess Attended weekly safety meeting and safety


15 ELIK BUDIANTO FTR room sharing in crew mess room
Done Positive 1

Weekly safety meeting and safety sharing at


16 KAREL PIETERSZ MTM Sea good
sea good
Done Positive 1

Crew mess
17 SUAIB MTM room
Attended confined space incident drill Done Positive 1

Crew mess Attended weekly safety meeting and safety


18 UMAR SAID MTM room sharing in crew mess room
Done Positive 1

Crew mess Attended weekly safety meeting and safety


19 SUMARDI WIPER room sharing in crew mess room
Done Positive 1

20 HASAN C/Cook Galley Daily house keeping cooking equipment Done Positive 1

21 MASRUDI 2ND/Cook Galley House keeping in galley area Done Positive 1

Crew mess
22 HARIANTO SULE TANAN STWD
room
Daily house keeping in crew mess room Done Positive 1
Officer mess
23 BOBBY MANGONTO STWD room
Daily house keeping in officer mess room Done Positive 1

TOTAL 23
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING

6 BUTTERWORTHING COT 1C ( COP NO. 2 )


1ST STAGE ( 4 MTRS ) 17/Mar/17
2ND STAGE ( 8 MTRS ) 17/Mar/17
1ST STAGE ( 12 MTRS ) 17/Mar/17
1ST STAGE ( 16 MTRS ) 17/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 1C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING TOTAL 40 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING BY SAMPLING HOLE BY OIL GAUGING TAPE : 2 CM ( SLUDGE ) ONLY AT BELLMOUTH AREA
7 GAS FREE BY USING I.G.S FIX FAN 18/Mar/17
20/Mar/17
TOTAL TANK CLEANING AND GAS FREE : 61 HRS
8 GAS FREE BY USING 2 SETS PNEUMATIC AIR 21/Mar/17
DRIVEN FAN 22/Mar/17
23/Mar/17
24/Mar/17
25/Mar/17
26/Mar/17
COT ATM RESULTS : O²/ 21.00% - LEL/NIL - CO/NIL - HC/NIL
FREE GAS BY PORTABLE FAN : 5 Days
TANK CLEANING AND GAS FREE COMPLETED FOR COT 1 C : 8 Days
REMARKS :
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24

12
10

10

40

OUTH AREA
11
11
61
22
22
22
22
22
22
193
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

7 BUTTERWORTHING COT 5C ( COP NO. 2 )


1ST STAGE ( 12 MTRS ) 25/Mar/17
1ST STAGE ( 16 MTRS ) 25/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING CLEANING TOTAL 46 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING SAMPLING HOLD BY OIL GAOUGING TAPE : 5 CM SLUDGE AREA BELLMOUTH
7 FREE GAS BY USING I.G.S FIX FAN 25/Mar/17
27/Mar/17

TOTAL TANK CLEANING AND GAS FREE : 59 HRS


27/Mar/17 18.00 pm O2 Content : 18 %, LEL : 29 %, CO : %, H2S : 5 %

ESTIMATE COMPLETED 31 MARCH 2017


8 FREE GAS BY USING I.G.S FIX FAN 28/Mar/17
17.00 pm O2 Content : 18 %, LEL : 12 %, CO : %, H2S : %
29/Mar/17
17.00 pm O2 Content : 18,5 %, LEL : 6 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 30/Mar/17
DRIVEN FAN 17.20 pm O2 Content : 20, %, LEL : 3 %, CO : 0 %, H2S : 0 %
Will be done again Cleaning for Cargo tank 5 C
Tank cleaning COT 5 C 3/Apr/17
FREE GAS BY USING I.G.S FIX FAN 4/Apr/17
15,00 pm O2 Content : 20, 9 %, LEL : 20 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 5/Apr/17
DRIVEN FAN 11,30 pm O2 Content : 20 %, LEL : 11 %, CO : 0 %, H2S : 0 %
6/Apr/17
11,30 pm O2 Content : 20 %, LEL : 10 %, CO : 0 %, H2S : 0 %
7/Apr/17
11,40 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %
8/Apr/17
11,45 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %
9/Apr/17 TANK CLEANING AND GAS FREE COMPLETED

NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS