VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C Nil 0 Nil 0 0 0
2C 15.59 15.360 884 5,563 18.021 17.771 40.93 257 5,305 31.5 88.7 44.6 0.98568 5,229 13.073 5,216 0.12544
3C 6.35 6.121 4,727 29,730 Nil 29,730 31.0 87.8 44.6 0.98613 29,318 73.294 29,244 0.12544
4C 17.94 17.694 78 489 Nil 489 30.6 87.1 44.6 0.98648 482 1.205 481 0.12544
5C Nil 0 Nil 0 0 0
6C 11.24 11.017 2,769 17,418 17.933 17.707 73.01 459 16,959 31.3 88.3 44.6 0.98588 16,720 41.80 16,678 0.12544
7C 3.90 3.675 5,727 36,020 Nil 36,020 30.3 86.5 44.5 0.98680 35,544 88.861 35,455 0.12551
8C 3.78 3.557 5,151 32,398 17.640 17.414 209 1,316 31,082 30.2 86.4 44.6 0.98683 30,672 76.680 30,595 0.12544
SL.P 8.89 8.615 308 1,939 9.200 8.930 298 1,875 64 36.0 96.8 44.6 0.98159 63 0.156 62 0.12544
SL.S 8.87 8.578 306 1,924 11.220 10.933 231 1,451 473 36.0 96.8 44.6 0.98159 464 1.161 463 0.12544
TOTAL
TOTAL 19,950 125,480 852 5,359 120,121 118,492 118,196
REMARKS: 867 52 815 802 800

PRODUCTION LOADING IN TO 2C

Gross Volume :(T.O.V.) 125,480 Oil Volume @ 60 F :(N.S.V.) 118,196 DRAFT FWD 7.70 m AFT
Less Free Water : 5,359 Less OBQ/ROB :
Oil Volume :(G.O.V.) 120,121 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 118,492 Long tons/Metric tons :
Long Tons/Metric Tons : 14,866 15,104 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 9-Apr-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

0 0
656 0.12745 666.463
3,677.591 0.12745 3736.519
60.484 0.12745 61.453
0 0
2,097.323 0.12745 2130.929
4,461.155 0.12752 4532.599
3,847.517 0.12745 3909.168
7.845 0.12745 7.971
58.255 0.12745 59.189

14,866 15,104

10.80 m TRIM 3.10 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 9-Apr-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Juanda Parde

Crude Storage Lifting

24 Hours Total (bbls) 867 Last Lifting 19-Dec

BS and W % 0.25 Lifting Vol (bbls) 141,46

Storage Gross (bbls) Next Lifting


120,121 -

Storage Net / G.S.V (Nbbls) 118,492 Next Lifting Vol (bbls) -

Storage Net / N.S.V (Nbbls) 118,196

Days to Tank Tops 233 Vessel ETA -

Total Crude This Month (Nbbls) 118,492

Water Offtake

Water Received 24hrs (bbls) 52 Offtake 24 Hours (bbls) -

Total Water in Cargo (bbls) 5,359 Note :

Total P/W Received (bbls) 9,731

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 31.5

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 200.27 ### 32.95 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0.00 1.31

Closing (m3) 200.27 31.64 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Reviewed previous day works


2. Gas free in COT 1C & 5C in progress
3. EHS and Security reinduction to all crew
4. Review the workplace inspection / SPKK
5. Table top drill First Aid Familiarization
Tool box meeting 06.30

1. Review deck, engine and galley dept. activity


2. Gas free in COT 1C & 5C in progress
3. Final coating fire hydran and foam monitor valve
Supervisory Meeting 16.30 4. Heating Cargo oil
5. Final Coating Deck Wing Stbd Side
6. House keeping

Incidents

Type Reference Comments


NIL

Drills
Type Time Comment
1. First Aid Familiarization Drill 08.00 - 09.00 Carried out drill with satisfacto

S.T.O.P. Audit program

Observation Card Report : 23


The details see SPKK sheet *)
###
Capt. Juanda Pardede

19-Dec-16

141,460

deg C

deg C

NTO COT 2C
&5C

5281 / 118202
e Vessel

Comment

ss
crew
SPKK
on

pt. activity
ss
monitor valve

Comment
out drill with satisfactory
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 2C
11,20-11,45 lt : Checked O2 Content and LEL in COT 1C
Free Gas COT 1 C & 5C In Progress

Mooring/Unmooring :
18.50 : KST. 51 port alongside

Bunkering/Debunkering :
19.00 : Commenced transferred fresh water to KST. 51
22.00 : Completed transfer fresh water 40T to KST. 51
Personnel & Material Transfer :
05.30 : 14 Persons PKP & 2 person Mafhindo by KST. 51 ( out )
08.10 : 1 Person Santos & 1 person Nalco by KST. 51 ( in )
09.00 : 1 Person Santos & 1 person Nalco by KST. 51 ( Out )
09.30 : 1 Person Santos & 7 persons PKP by KST. 51 ( in )
11.20 : 1 Person Santos, 3 Persons Oryx & 1 Person Altus by KST. 51 ( In )
12.30 : 1 Person Santos & 7 persons PKP by KST. 51 ( out )
12.50 : 4 Sea good materials by KST. 51 ( out )
13.00 : 1 Person Santos, 3 Persons Oryx & 1 Person Altus by KST. 51 ( out )
13.30 : 1 Person Santos rep by KST. 51 ( out )
17.00 : 14 Persons PKP & 2 person Mafhindo by KST. 51 ( in )
18.30 : 1 Person Santos rep by KST. 51 ( in )
19.30 : 1 Person Oryx & 1 Person PKP by Friedrick ( in )
21.20 : 1 Person Oryx & 1 Person PKP by Friedrick ( out )
1.2 Planned/Unplanned Maintenance
DECK :
1. Assisted transfer Santos, Oryx, Nalco, SPJ & contractor personnel
2. Continued free gas by portable fan in COT 1C & 5C
3. EHS and Security reinduction to all crew
4. Reviewed the workplace inspection / SPKK
5. Table top drill First Aid Familiarization
6. Transferred sea good materials
7. Safety meeting & safety sharing at sea good
8. House keeping

ENGINE :
1. Weekly safety meeting and safety sharing at crew mess room
2. EHS and Security reinduction to all crew
3. Reviewed the workplace inspection engine room area
4. Table top drill First Aid Familiarization
5. Running up A/E No. 2 & 3 :
12.30 - 13.30 : - Transferred sea good materials
2. PERMIT TO WORK PW MW HW CSE IP VAL
470 1877 384 181 8 1090
2.1 J HA 470 1877 384 181 6 1090
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1.31 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 40 19
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
29 34
MAN HOURS ( POB X 12 HRS )
Previous man hours 235500 Days W/O LTI 1228 Since 28-Nov-13
Man hours today 276
Total man hours 235776
Safe man hours 235776
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


Video
09-Apr-17 @2400 HRS

`
TOTAL
4010
4008
TRANS ROB
0 200.37
0 31.64
ROB `
81
246
ROB
200
POB
40

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1792 2 1794
3696 23 3719
3 0 3
0 0 0
196 0 196

FIRST AID FAMILIARIZATION DRILL

NIL

NIL

NIL

Video learn : FIRST AID FAMILIARIZATION DRILL


FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( KL ) ( KL ) ( KL ) ( KL ) ( KL ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 43.77 0 0 1.30 0 0.0 0.0 24.0 42.47
02 42.47 0 0 1.30 0 0.0 0.0 24.0 41.17
DO Consumption for Boiler
03 41.17 0 0 1.61 0 8.0 0.0 16.0 39.56 (Burning n Before stop 0.2
KL )

04 39.56 0 0 1.37 0 5.5 0.0 18.5 38.19 Free gas COT 5C


05 38.19 0 0 1.30 0 0.0 24.0 0.0 36.89
06 36.89 0 0 1.31 0 1.0 23.0 0.0 35.58 Transferred materials
07 35.58 0 0 1.32 0 0.0 22.0 2.0 34.26 Transferred materials
Opened & closed garbage
34.26 0 0 1.31 0 0.0 23.0 1.0 32.95 container
08
09 32.95 0 0 1.31 0 0.0 23.0 1.0 31.64 Transferred materials

10

11
12
13
14
15
16
17
18

19

Date

20
21

22

23

24

25

26
27
28

29

30
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09 200.27 0 0 0 0 200.27
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14 12 13
2 13 12 13 14
3 11 14 14 13
4 12 14 13 14
5 12 13 14 12
6 14 13 14 13
7 13 12 13 14
8 12 13 12 13
9 13 14 13 12
10 13 14 13
11 14 12 14
12 12 12 13
13 13 13 13
14 11 13 12
15 13 12 12
16 14 13 13
17 12 14 13
18 13 14 12
19 11 12 13
20 12 12 14
21 12 13 12
22 13 14 12
23 12 14 13
24 14 13 14
25 12 13 14
26 12 14 13
27 14 12 14
28 14 12 13
29 13 14
30 14 13
31 13 13

TOTAL 393 365 405 118 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7 8 8
2 7 8 8 7
3 7 8 8 7
4 8 8 7 8
5 8 7 8 8
6 7 8 8 7
7 8 8 7 8
8 8 8 7 7
9 8 8 8 7
10 7 8 8
11 8 7 8
12 7 8 7
13 7 8 8
14 8 8 8
15 8 8 7
16 8 7 8
17 8 8 7
18 7 8 8
19 7 8 8
20 8 8 7
21 8 7 8
22 8 8 7
23 7 8 8
24 8 8 8
25 8 8 8
26 7 8 7
27 7 7 8
28 8 8 8
29 8 7
30 8 7
31 8 7

TOTAL 237 218 236 67 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970 4,975 4,983
2 4,951 4,968 4,971 4,991
3 4,971 4,971 4,973 4,982
4 4,954 4,970 4,972 4,965
5 4,980 4,975 4,973 4,970
6 4,969 4,969 4,974 4,952
7 4,972 4,974 4,973 4,977
8 4,957 4,972 4,930 4,984
9 4,960 4,977 4,945 4,948
10 4,987 4,978 4,961
11 4,991 4,975 4,952
12 4,984 4,971 4,960
13 4,966 4,977 4,981
14 4,958 4,975 4,972
15 4,963 4,973 4,981
16 4,974 4,969 4,941
17 4,988 4,972 4,959
18 4,964 4,974 4,981
19 4,978 4,976 4,985
20 4,971 4,971 4,994
21 4,973 4,974 4,963
22 4,970 4,975 4,952
23 4,966 4,972 4,958
24 4,960 4,977 4,949
25 4,969 4,970 4,961
26 4,972 4,969 4,983
27 4,974 4,973 4,978
28 4,975 4,970 4,966
29 4,970 4,960
30 4,973 4,959
31 4,978 4,958

TOTAL 154,082 139,237 153,940 44,752 0 0 0 0 0 0 0 0

Average/
Day 4,970 4,973 4,966 1,492 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135 55 160
2 70 120 40 155
3 135 110 95 135
4 80 90 30 140
5 120 120 95 125
6 125 90 145 110
7 130 95 135 90
8 60 110 145 95
9 40 115 145 95
10 110 110 140
11 100 100 150
12 105 110 130
13 100 100 50
14 55 110 65
15 85 70 140
16 90 110 60
17 90 85 80
18 95 95 70
19 55 95 70
20 75 80 125
21 90 155 115
22 80 165 145
23 80 165 120
24 80 165 140
25 95 150 130
26 150 165 135
27 110 140 90
28 150 40 65
29 125 40
30 140 100
31 90 160

TOTAL 2,990 3,195 3,205 1,105 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Apr 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Apr-2017 24 1 21 46
2-Apr-2017 24 1 21 46
3-Apr-2017 24 1 21 46
4-Apr-2017 24 0 21 45
5-Apr-2017 24 1 13 38
6-Apr-2017 24 0 13 37
7-Apr-2017 23 0 15 38
8-Apr-2017 23 1 16 40
9-Apr-2017 23 1 16 40

TOTAL 213 6 157 376


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 9/Apr/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total

Crew Mess
1 BOY RICHARD TOGAS Master Room
First aid familiarization drill as adviser Done Positive 1

Crew Mess
2 IYYANG C/O Room
Attanded table top drill First Aid Familiarization Done Positive 1

Assisted transfer sea good materials as signal


3 ANDI AHMAD UNIT 2/O Main deck
man
Done Positive 1

Crew Mess
4 INDRA 3/O Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
5 JULY MANGIRI C/E Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess Reviewed Workplace inspection in engine room


6 ACO AKBAR 2/E Room area
Done Positive 1

Crew Mess
7 RATNO SITUMORANG 3/E Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
8 LILIK WAHYUWANTO 4/E Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
9 NIKO ARIYO E/E Room
Attanded table top drill First Aid Familiarization Done Positive 1

Assisted transfer sea good materials as crane


10 AANG Bosun Main deck
operator
Done Positive 1

Crew Mess
11 UDIYANTO AB Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
12 BAYU SEGARA AB Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
13 MOHAMMAD ANSORI AB Room
Attanded table top drill First Aid Familiarization Done Positive 1

Weekly safety meeting and safety sharing at


14 DEDI BIN WARNA OS Sea Good
sea good
Done Positive 1

Weekly safety meeting and safety sharing at


15 ELIK BUDIANTO FTR Sea Good
sea good
Done Positive 1

Crew Mess
16 NUR ALI MTM Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
17 SUAIB MTM Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
18 UMAR SAID MTM Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
19 SUMARDI WIPER Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
20 HASAN C/Cook Room
Attanded table top drill First Aid Familiarization Done Positive 1

Crew Mess
21 ROHIM 2ND/Cook
Room
EHS Reinduction to all crew Done Positive 1

Crew Mess
22 RANGGUN JAWI STWD Room
House keeping in crew mess room Done Positive 1
Officer mess
23 BOBBY MANGONTO STWD room
House keeping in officer mess room Done Positive 1

TOTAL 23
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING

6 BUTTERWORTHING COT 1C ( COP NO. 2 )


1ST STAGE ( 4 MTRS ) 17/Mar/17
2ND STAGE ( 8 MTRS ) 17/Mar/17
1ST STAGE ( 12 MTRS ) 17/Mar/17
1ST STAGE ( 16 MTRS ) 17/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 1C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING TOTAL 40 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING BY SAMPLING HOLE BY OIL GAUGING TAPE : 2 CM ( SLUDGE ) ONLY AT BELLMOUTH AREA
7 GAS FREE BY USING I.G.S FIX FAN 18/Mar/17
20/Mar/17
TOTAL TANK CLEANING AND GAS FREE : 61 HRS
8 GAS FREE BY USING 2 SETS PNEUMATIC AIR 21/Mar/17
DRIVEN FAN 22/Mar/17
23/Mar/17
24/Mar/17
25/Mar/17
26/Mar/17
COT ATM RESULTS : O²/ 21.00% - LEL/NIL - CO/NIL - HC/NIL
FREE GAS BY PORTABLE FAN : 5 Days
TANK CLEANING AND GAS FREE COMPLETED FOR COT 1 C : 8 Days
REMARKS :
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24

12
10

10

40

OUTH AREA
11
11
61
22
22
22
22
22
22
193
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

7 BUTTERWORTHING COT 5C ( COP NO. 2 )


1ST STAGE ( 12 MTRS ) 25/Mar/17
1ST STAGE ( 16 MTRS ) 25/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING CLEANING TOTAL 46 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING SAMPLING HOLD BY OIL GAOUGING TAPE : 5 CM SLUDGE AREA BELLMOUTH
7 FREE GAS BY USING I.G.S FIX FAN 25/Mar/17
27/Mar/17

TOTAL TANK CLEANING AND GAS FREE : 59 HRS


27/Mar/17 18.00 pm O2 Content : 18 %, LEL : 29 %, CO : %, H2S : 5 %

ESTIMATE COMPLETED 31 MARCH 2017


8 FREE GAS BY USING I.G.S FIX FAN 28/Mar/17
17.00 pm O2 Content : 18 %, LEL : 12 %, CO : %, H2S : %
29/Mar/17
17.00 pm O2 Content : 18,5 %, LEL : 6 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 30/Mar/17
DRIVEN FAN 17.20 pm O2 Content : 20, %, LEL : 3 %, CO : 0 %, H2S : 0 %
Will be done again Cleaning for Cargo tank 5 C
Tank cleaning COT 5 C 3/Apr/17
FREE GAS BY USING I.G.S FIX FAN 4/Apr/17
15,00 pm O2 Content : 20, 9 %, LEL : 20 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 5/Apr/17
DRIVEN FAN 11,30 pm O2 Content : 20 %, LEL : 11 %, CO : 0 %, H2S : 0 %
6/Apr/17
11,30 pm O2 Content : 20 %, LEL : 10 %, CO : 0 %, H2S : 0 %
7/Apr/17
11,40 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %
8/Apr/17
11,45 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %
9/Apr/17 TANK CLEANING AND GAS FREE COMPLETED

NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24

10
10

10

46

UTH
5
8

59

8
4
%
21

0
8
5
%
21

15

15

15

112

You might also like