Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Article 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

IOP Conference Series: Materials Science and Engineering

PAPER • OPEN ACCESS

Study the impact of railway crossing severity on the traffic characteristics


To cite this article: Qais Sahib Banyhussan et al 2020 IOP Conf. Ser.: Mater. Sci. Eng. 870 012062

View the article online for updates and enhancements.

This content was downloaded from IP address 184.174.58.53 on 18/07/2020 at 18:09


ICEAT 2020 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 870 (2020) 012062 doi:10.1088/1757-899X/870/1/012062

Study the impact of railway crossing severity on the traffic


characteristics
Qais Sahib Banyhussan1*, Azaldeen Ali Abdulhussein1, Lubna Najim Abdullah1,
Mahmood Ali Al-Haidary1
1
Highway and Transportation Engineering Department, College of Engineering, Al-
Mustansiriyah University, Baghdad, Iraq.
*
Corresponding Author E-Mail: qaisalmusawi@uomustansiriyah.edu.iq

Abstract: The surfaces of the road must not be contain undesired condition such as
loose aggregates, potholes, cracking, rutting, bad railway crossing which the quality of
road service and indeed the quantity of traffic provided would be reduced significantly.
The main purpose and objectives of the present study are to measure traffic volume and
speed under control condition and then evaluating them under adverse condition of
railway crossing with different severity: low, medium, and high. In the present study,
traffic and speed were recorded. Greenshields model is adopted to find the relationship
between the traffic characteristics. The results show that the traffic characteristics of the
control section were 86.86 (Km/h) and 1592 (vph) for speed and traffic flow,
respectively. The impact of the railway crossing on the traffic can be summarized, where
the speed reduced to 28.8%, 46.27%, and 70.57% for low, medium, and high railway
crossing severity, respectively. Finally, the models for traffic capacity; speed with
pavement condition index PCI have been found. The predicted models have a good
correlation between traffic capacity; speed with PCI where the correlation coefficient
(R2) was greater than 0.9. .

Keywords: Traffic Characteristics; Pavement Condition; Railway crossing; Greenshields Model

1. Introduction
Adverse conditions such as traffic congestion, inclement weather [1][2] and pavement distress among
others have significant impacts on vehicle speed and traffic flow. With respect to motorist, they limit
visibility [3], vehicle control, surfacing grip, driving comfort and also increase vehicle operating costs
[4][5][6]. In addition, they are source of extra maintenance and safety costs to road providers [7][8].
Three primary measures namely flow, speed and density characterize the operational state of any given
traffic stream. For the purpose of measuring quantity, the parameters, density and flow are important,
whereas speed and flow are often relied on for measuring quality of road service [9]. Flow (q) can be
determined by:
n ∗ 3600
q= (vph) … … … … … … … … … … … . . … … … … . . (1)
T
Where:
n = Number of vehicles crossing a point in T sec. and,
q = Equivalent hourly flow.
The general equation regarding traffic flow, density, and space can be used:

Flow = density * speed (q = k ∗ v̅s ) … … … … … … … … . . … . (2)

Each of the variables in Eq. (2) also depends on several other factors including the characteristics of the
roadway, characteristics of the vehicle, characteristics of the driver, and environmental factors such as
the weather (e.g. rainfall, wind).
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution
of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.
Published under licence by IOP Publishing Ltd 1
ICEAT 2020 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 870 (2020) 012062 doi:10.1088/1757-899X/870/1/012062

Regarding traffic flow relationships, it can be mathematically grouped into two general classifications;
macroscopic and microscopic counting on the style used in the evolution of these relationships [10]. The
two main familiar used models in term the macroscopic relationship are the Greenberg models and
Greenshields. Pavement distress measurements are usually taken in literatures as percentage of affected
area relative to road section with particular attention on sizes, numbers and depth of the distress.
Studying the effect of distress on the traffic characterize are limited, especially the effect of railway
crossing defects. For example, Ben-Edigbe (2010) [11] studied the effect of adverse pavement condition
on traffic characteristics. The author found out the rutting distress on the traffic flow and the speed. The
results stated that a significant reduction in speed and traffic flow up to 50% and up to 20% resulted
from adverse road surface condition, respectively. Wang et al. (2014) [12] investigated the effect of
improvements in pavement roughness on driving performance regarding speed. The results stated that
the pavement roughness has a slightly effect on free-flow speed. A change in international roughness
index (IRI) of 1 m/km led in a reduction in average free-flow speed of about 25%. Al-Obaedi, (2019)
[13] investigated the impact of speed hump on the U-turn traffic. He showed that the time spent of the
merging traffic is clearly decreased when building speed humps. The literatures show a gap in
knowledge in terms the impact of the railway crossing on the traffic flow and speed.

2. Objectives of the Research


Railway crossing defects considered as a distress effects on the traffic flow characteristics and may
increase the accidents. The objective of the present study is to determine the effects of the railway
crossing and its severity on the speed and traffic flow.

3. Methodology

3.1 Study Area


The study area is located near the International Iraqi Railway Station. 14th Tamuze Street that joins
Aden intersection and Al Alawi Terminal station has a several railway crossings, which considered as
adverse pavement condition. Such condition can effect on the traffic serviced in the above street. In
addition to the adverse pavement condition, normal pavement condition without distresses was selected.
The locations of the selected railways crossing (RC) and the normal section are shown in Figure 1.

Figure 1 Study Area and Location of the Selected Railway Crossing

14th Tumuze Street has four lanes with width of 3.5m. The distances between the railways crossing
were manually measured. The distances are RC1 to RC2 =683m, RC2 to RC3=465m, and RC3 to
Normal section =695. The reason of measuring the distances between railway crossings is to evaluate
the mutual impact of each one on the other if found. At the same time, the observed average free flow
speed of 90 km/h (design speed at normal section) was adopted in the study. Then, the acceleration and
deceleration sight distances of motorists were estimated using Eq. (3) and Eq. (4), respectively. The
results show that the distance for acceleration and deceleration are 223m and 110 m, respectively. The

2
ICEAT 2020 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 870 (2020) 012062 doi:10.1088/1757-899X/870/1/012062
total distance to reach 90 km/h and then dropped to zero is (333m). The distances between railway
crossings are greater than the minimum required distance. Thus, there is no mutual impact.

S=0.385*a1*V ………………….………… (3)

B = 0.278V + 0.01V/a2 ……………….…... (4)

Where:
S= Acceleration distance;
B= Stopping sight distance, (m) and,
V= Design speed, (km/h);
a1= Driver acceleration, 1.4 (m/s2) and,
t= Brake reaction time, 2.5s and,
a2= Driver deceleration, 3.4 (m/s2).

3.2 Railway Crossing Severity and PCI


The type and railway severity level were determined using ASTM D6433 [14]. The inspector should
drive at the normal operating speed and standard car. The severity can be determined according to speed
reduction at railway crossing, where for low severity there is noteworthy, but no decrease in speed is
necessary for safety or comfort. For medium severity, vibrations of the vehicle are considerable and
some decrease in speed is necessary for safety and comfort. On the other hand, vehicle vibrations are
too much that speed must be decreased considerably for safety and comfort, where it can be considered
as high severity railway crossing. For calculating the pavement condition index (PCI), prepared charts
[14] can be used. The charts depend on the railway crossing severity by which the PCI is found.

3.3 Flow and Speed Recording


Video recordings style was adopted to collect the data needed for estimating traffic flow (see Figure 2).
Speed radar “Bushnell Speedster III” was used (Figure 2) which is better than using video recording for
estimating speed. The use of such device in estimating of speeds provides more reliable results than the
estimating of speeds from video recordings. The used speed gun device provides speed measurements
with an accuracy of ±1 mi/hr for collecting the desired speed data [15]. In addition to the standard speed
radar that mentioned above, smart phone technique to estimate the low speed was adopted in the present
study. This technique can be used to measure the speed depending on the vertical distance between the
moving bodies (e.g. car) and the observer (Figure 3).

Figure 2 Video Recording and Speed Spot Recorder

Figure 3 Smart Phone Technique for Measuring Speed.

3
ICEAT 2020 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 870 (2020) 012062 doi:10.1088/1757-899X/870/1/012062

Before starting measuring the speed in the field, calibration between standard speed gun (radar), smart
phone and real speed of the car (specified car) were achieved. The results show that the smart phone
technique could be used especially with speed less than 20 Km/h (e.g. at railway with high severity).

4. Results and Discussions

4.1. Effect of railway crossing on PCI


Ride quality was evaluated in order to establish a severity level for the selected railway crossing (RC).
The results show that the selected RCs have a different severity. In addition, the pavement condition
index (PCI) was calculated (Section 3.2) for each railway and the control section according to ASTM
D6433 [14] as shown in Table 1.

Table 1. Severity Level of the Selected Railway Crossing

Location Ride quality (Severity) PCI


Control section NO 100
RC1 High 20
RC2 Low 80
RC3 Medium 50

4.2. Impact the Railway Crossing Severity


The data of traffic volume and spot speed were collected for all four locations; control section, RC1,
RC2, and RC3. The observed and Greenshields models for speed-density relationship, speed-traffic flow
were drawn. Figures (4) show the results of the above models for the control section. The models for
railway crossing (RC2); low severity level are shown in the Figures (5). At RC2, the results indicate that
the speed reduced from 86.86 (Km/h) (speed at control section) to 61.86 (Km/h) which is equal to a
reduction in speed around 28%. In addition, the traffic flow were 1592 (vph) and 1134(vph) for control
section and RC2, respectively.

(A) (B)
Figure 4. The Observed and Fitted (Greenshields Model) Relationship; (A) Speed-Density, (B) Traffic
Flow-Speed Relationships for Control Section.

(A) (B)
Figure 5. The Observed and Fitted (Greenshields Model) Relationship; (A) Speed-Density, (B) Traffic
Flow-Speed Relationships for RC2 (PCI 80).
4
ICEAT 2020 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 870 (2020) 012062 doi:10.1088/1757-899X/870/1/012062

Figures (6) show the effect of railway crossing of medium severity on the traffic, speed and density.
These figures show that the free flow speed reduced to 46.67 (Km/h) and flow rate also reduced to 878
(veh./h).

At the railway crossing with high severity, the pattern of the traffic speed relationship is changed. Due
to the impact of this type of crossing, the traffic flow tends to increase with increasing speed until reach
capacity. Figures (7) show the effect of high severity railway crossing on the traffic characteristics. They
show that the maximum speed can be reached to 25.56 (km/h) with corresponding traffic flow of 432
(veh./h).

(A) (B)
Figure 6. The Observed and Fitted (Greenshields Model) Relationship; (A) Speed-Density, (B) Traffic
Flow-Speed Relationships for RC3 (PCI 50).

(A) (B)
Figure 7. The Observed and Fitted (Greenshields Model) Relationship; (A) Speed-Density, (B) Traffic
Flow-Speed Relationships for RC1 (PCI 20).

4.3. Modeling the Traffic Flow and Speed with PCI


The relationship between the predicted traffic capacity; speed verses pavement condition index (PCI)
were determined using Excel software (Figure 8). Figure (8) shows a high correlation coefficient R2
values (0.97) specify that there is a good agreement between traffic capacity and pavement condition
index. Analysis of Variance (ANOVA) is usually used as a primary estimation tool to evaluate the
degree of influence of the studied parameters on the test (Table 2).
In Table (2), p-values are 0.015 and 0.014 which indicate that the parameter and model are significant
(model and term p-value < 0.05 indicate the model and the term are significant for 95% confidence
intervals) for evaluating the value of responses.

5
ICEAT 2020 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 870 (2020) 012062 doi:10.1088/1757-899X/870/1/012062

Figure 8. Traffic Capacity and Speed Verses PCI

Table 2. Analysis of Variance for Traffic Capacity and Speed with PCI

Speed Versus PCI Volume Versus PCI


Source DF SS MS F P Source DF SS MS F P
Regression 1 1940.02 1940.02 66.92 0.015 Regression 1 685998 685998 69.98 0.014
Error 2 57.98 28.99 Error 2 19606 9803
Total 3 1998.00 Total 3 705604

5. Conclusions
In the present study, efforts were made to evaluate of railway effects on the traffic characteristics, where
three types of crossing severity were selected in addition to control section. The following conclusions
were drawn:

The traffic characteristics of the control section were 86.86 (Km/h) and 1592 (vph) for speed and traffic
capacity, respectively. For low severity railway crossing, the speed reduced to be 61.86 (Km/h) and with
maximum traffic capacity of 1134(vph). Furthermore, same trend has been occurred at railway crossing
of medium severity, where the speed was 46.67 (Km/h) and traffic capacity 878 (veh./h). Dramatically
dropped in speed and traffic capacity were found at the railway crossing with high severity, the pattern
of the traffic speed relation-ship was changed. The maximum speed can be reached to 25.56 (km/h) with
corresponding traffic capacity of 432 (veh./h). Finally, predicted model for traffic capacity and speed
show a significant correlation with PCI where the correlation coefficient R2 was greater than 0.9.

6. Acknowledgment
The authors would like to thank the Mustansiriyah University, College of Engineering, Highway and
Transportation Department for their support and help to accomplish this modest work contained in this
study. This research did not receive any specific grant from funding agencies in the public, commercial,
or not-for-profit sectors.

7. References
1. Akin, D., Sisiopiku, V. P., & Skabardonis, A. (2011). Impacts of weather on traffic flow
characteristics of urban freeways in Istanbul. Procedia-Social and Behavioral Sciences, 16, 89-
99.
2. Yuan-qing, W., & Jing, L. (2017). Study of rainfall impacts on freeway traffic flow
characteristics. Transportation research procedia, 25, 1533-1543.
3. Hussein, N. A., Hassan, R. A., & Evans, R. (2015, June). Assessing the Impacts of Pavement
Surface Condition on the Performance of Signalized Intersections. In 9th International
Conference on Managing Pavement Assets.
4. Chatti, K., & Zaabar, I. (2012). Estimating the effects of pavement condition on vehicle
operating costs (Vol. 720). Transportation Research Board.

6
ICEAT 2020 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 870 (2020) 012062 doi:10.1088/1757-899X/870/1/012062

5. Santos, J., Flintsch, G., & Ferreira, A. (2017). Environmental and economic assessment of
pavement construction and management practices for enhancing pavement
sustainability. Resources, Conservation and Recycling, 116, 15-31.
6. Qais Sahib Banyhussan, Ali j. Kadhim, Ali Al-Dahawi, (2018) Enhancement of Pavement
Condition and Its Impact on Pavement Sustainability: Environmental and Economic
Assessments. Civil and Environmental Research.
7. Chen, S., Saeed, T. U., & Labi, S. (2017). Impact of road-surface condition on rural highway
safety: A multivariate random parameters negative binomial approach. Analytic methods in
accident research, 16, 75-89.
8. Alhasan, A., Nlenanya, I., Smadi, O., & MacKenzie, C. (2018). Impact of Pavement Surface
Condition on Roadway Departure Crash Risk in Iowa. Infrastructures, 3(2), 14.
9. Fred L.M. and Scott S.W. (2013). "Principles of Highway Engineering and Traffic
Analysis",Fifth Edition. WILEY, John Wiley & Sons, Inc.
10. Garber, N.J. and Hoel, L.A. (2009), "Traffic and Highway Engineering", Cengage Learning
Publishers, USA.
11. Ben-Edigbe, J. (2010). Assessment of speed-flow-density functions under adverse pavement
condition. International Journal of Sustainable Development and Planning, 5(3), 238-252.
12. Wang, T., Harvey, J., Lea, J., & Kim, C. (2014). Impact of pavement roughness on vehicle free-
flow speed. Journal of Transportation Engineering, 140(9), 04014039
13. Al-Obaedi, J. (2019). Investigation the Effect of Speed Humps on Merging Time of U-turn
Traffic. Ain Shams Engineering Journal, 10(1), 1-4.]
14. American Society for Testing and Materials, West Conshohocken. PA, United States, 2011
15. Al-Obaedi J., Muhanad Al-temimy and Amal Ali. (2018)" Traffic Characteristics for A Freeway
Normal Section at Baghdad City" International Journal of Engineering & Technology.

You might also like