The guideline covers concrete encased duct banks and manholes for primary (medium voltage)
power distribution cables and telecommunications cables.
Also included are direct buried ducts for secondary power cables, site lighting cables, and
dedicated telecommunications circuits.
Related Sections
Design Requirements
Use U-M Master Specification 260543, “Underground Services for Electrical Systems” as
basis for design and specifying underground electrical and telecommunication pathway
systems. Edit the specification and details to make them project specific. When editing the
specification, turn on hidden text and follow the Spec Editor notes.
Underground Ducts
Slope duct banks downward, toward manholes, and away from buildings and tunnels, a
minimum of 6 inches per 100 feet. Duct banks shall not route water from manholes into
buildings or tunnels, or contain traps between manholes where water may accumulate.
Horizontal directional changes and sloping vertical changes in duct banks shall be made with
20’-0” minimum radius bends. Where this radius cannot be accommodated, perform detailed
pulling tension and sidewall pressure calculations, to ensure compliance with cable
manufacturer's recommendations. Vertical directional changes in duct banks up into buildings
shall have a minimum 6’-0 radius.
Where power and telecommunications duct banks run in parallel, they shall be separated by a
minimum of 12 inches of soil or concrete - vertically and/or horizontally. If the services need
to be placed one upon the other the (vertically stacked), the power ducts shall be above the
telecommunications ducts. Where UM duct banks are located within the Right of Way, a
minimum separation of 36” from other utilities may be required. Verify with city of Ann Arbor
requirements.
Ground primary power duct banks with a No. 4/0 AWG bare stranded copper ground wire that
is run within the duct bank and is grounded at both ends. Direct buried ducts shall be grounded
by insulated, stranded copper ground wires installed in each duct. Telecommunications duct
banks do not require grounding.
Place marker tape approximately 12 inches above duct banks or direct buried ducts for the
entire length of the duct run. Marker tape shall be plastic, vinyl, or Mylar, 6 inches wide, red
for electrical power and orange for telecommunications, and labeled to indicate the type of
circuit buried below.
Contractor shall cleanout ducts, using a solid mandrel and a stiff bristled brush, prior to cable
pulling (3-1/4” mandrel for 4” ducts and 4” mandrel for 5” ducts). Leave a pulling string in
the duct when cleanout is complete. This will serve as the duct identification on both ends of
the run.
Primary power duct banks shall include No. 4 steel reinforcing bars. Telecommunications duct
banks do not require steel reinforcing.
Prior to concrete encasement, ducts, reinforcing steel and ground wires shall be secured with
nonmetallic straps or cable ties to nonmetallic duct spacers at intervals not exceeding 8 feet.
Duct spacers shall be sized for the ducts being held, and shall provide the minimum spacing
between ducts required for concrete flow and by the NEC. Duct spacers shall be anchored to
the ground using nonmetallic bands and stakes.
Duct banks shall have a minimum of 3 inches of concrete cover on all sides.
PVC conduit for direct burial shall be Schedule 40, UL Labeled for 90 degrees C cables.
Fittings shall be Schedule 40, solvent type, and from the same manufacturer as the conduit.
Direct buried ducts and fittings shall have bend radii greater than the minimum bend radii of
the cables enclosed, and shall not be smaller than the radii of standard manufactured elbows.
Route direct buried ducts at right angles to building lines and site features, and as close to curbs
and sidewalks as possible to avoid interferences with future landscaping.
Where direct buried PVC ducts cannot be buried deep enough to meet the NEC minimum cover
requirements, rigid steel conduits shall be installed instead, or a concrete cover shall be poured
over the ducts.
When installing direct buried ducts under sidewalks, walkways and other paved areas, install
a least one additional 6" PVC sleeve for installation of future ducts without the need to re-open
the paved area.
Sleeves
Under roadways, driveways, parking lots and sidewalks, and all other paved areas, specify
Schedule 40 PVC conduit sleeves to enclose direct buried ducts.
Sleeves shall be Schedule 40 PVC conduit, 6-inch diameter, UL Labeled for 90 degrees C
cables. Couplings shall be Schedule 40, solvent type, and from the same manufacturer as the
conduit.
Sleeves shall be buried at a minimum depth of 24” to their top. Sleeves shall extend a minimum
of 12” beyond the paved areas they pass under.
Spare sleeves shall be taped closed at both ends with duct tape.
Ends of spare sleeves shall be marked with steel stakes, pipes or conduits that are 3’ long
minimum, driven vertically down at the sleeve ends to a depth of 6” below grade to their top.
A marker tape shall be buried in the backfill approximately 12 inches above the sleeves for the
entire length of the sleeves.
Specify pre-cast polymer pull boxes, only in owner-approved locations, where adequate space
does not exist for the installation of manholes.
Manholes and pull boxes shall be accessible on at least three sides by trucks, cable reel trailers,
and other cable pulling equipment.
Manholes - General
Manholes shall be precast, or cast in place, and shall be steel reinforced as needed, to achieve
an MDOT highway loading of H-20.
Provide a cast iron frame with cover, a galvanized steel ladder, and galvanized pulling eyes
embedded in the concrete opposite each duct entrance and in the floor beneath the cover.
Provide a sealed depression in the floor offset slightly from the center, for installation of a
portable sump pump. Drains shall not be installed in floors.
Manholes placed in 'green-belts' and like areas shall have manhole covers with a lighter duty
rating (the manholes themselves and the 'ring', however, are the same as required for the
MDOT, H-20 rating)
All duct entries into manholes shall include provisions for bell end fittings and a means to
securing the duct bank(s) to the manhole wall
1. Precast, or cast-in-place, manholes shall be delivered (or constructed) with the ducts
openings cast in place.
2. Provisions for known future ducts shall have knockouts installed, with the bell end
fittings included.
3. When installing multiple new ducts into manholes without proper knockouts, cut an
opening in the manhole wall, rework steel reinforcing, and install ducts, all in accordance
with the associated U of M standard detail.
4. Alternately, when installing multiple new ducts into manholes without proper knockouts,
the duct openings may be core drilled at the proper locations. The diameter of the corings,
however, shall be 2” to 4" larger than the duct being installed. This larger opening will
allow proper grouting of the ducts and bell ends into the manhole wall.
Where duct banks enter manholes or buildings, they shall be constructed as an integral part of
the wall. (Do not core-drill the wall and then install end bell fittings to the edge of core-drilled
hole without prior written approval from the U-M Primary Systems Engineer.) Duct bank shall
extend to the inside surfaces of the walls, and the duct bank reinforcing shall be integrated with
the wall reinforcing.
Ducts shall enter telecommunications manholes on the short sides only. Ducts may enter
primary manholes on any side, but should be positioned to permit installation of additional
ducts in the future. Ducts should enter as perpendicular to the wall surface as possible.
Ground splices and connections at manholes and pull boxes, where required, shall be
exothermic welds, or copper (or bronze) compression ground fittings, or bolted compression
ground fittings.
Provide a grounding system for each manhole and connect this to grounds run with power duct
banks. Make all grounding system connections using exothermic welds, or copper (or bronze)
fittings as manufactured by Burndy Hyground System.
The frame and 36" cover for electrical power manholes shall be East Jordan Iron Works 1580C
with lettering, “UM ELEC”.
Electric power manholes shall be equipped with 3 Aickenstrut (non-metallic) stanchions per
wall, each bolted to the wall with stainless steel Rawl bolts. Each stanchion shall be fitted with
one Aickenstrut (non-metallic) cable support arm.
The typical medium voltage feeder being installed is composed of 3-1/C, 350 kcmil copper,
15kV (ungrounded) cables, with tape shields, and EPR insulation rated for 133% of the 15kV
nominal rating.
Ground electric power manholes with four, ¾ inch diameter by 10 foot long, ground rods,
one driven inside of the manhole at each corner. Connect the ground rods and any duct bank
ground conductors together with a No. 4/0 AWG bare, stranded copper ground wire loop. A
No. 2 AWG bare stranded copper pigtail from the ground wire loop shall be used to ground
the manhole cover frame, ladder support bracket, any metallic concrete inserts and metallic
cable racks, and the shields of any cables that are spliced are to be grounded in the manhole.
Telecommunications manholes shall contain seven full height vertical concrete inserts in each
long wall, and two in each short wall. Inserts shall be 1-5/8 inch hot dipped galvanized Unistrut
type channel or Aickenstrut nonmetallic channel of equal size and strength. Corner inserts
shall be equipped with 12 inch corner brackets and side inserts shall be equipped with 3 inch
side brackets to support full height perforated cable support racks. Each long wall shall also
be equipped with 2 copper ground bus bars, 6 inches long by 2 inches wide by 1/4 inch thick,
on 2 inch metal stand-offs bolted to the concrete.
Pull boxes
Pull boxes and covers shall be precast polymer concrete or polymer foam, heavy-duty rated,
bottomless, with a single piece cover. Pull boxes shall be one size larger than required to loop
cables out of the opening and back in again without exceeding the minimum bend radii of the
cables. Covers shall be engraved “UM ELECTRIC”, “UM TELEPHONE”, or “UM
OUTSIDE LIGHTING” as applicable, and attached with pentahead stainless steel bolts.
Pull boxes shall be located in mulched areas wherever possible and shall be level with the
existing grade.
Provide barriers in pull boxes containing circuits of two different voltages, or containing both
power and telecommunications circuits.
Manholes shall be installed on a base of pea gravel or MDOT Class II sand at least 12 inches
deep. Pull boxes shall be installed on a base of pea gravel or MDOT Class II sand at least 6
inches deep.
Provide barricades around open holes and trenches, temporary bridges over trenches cut
through major sidewalk routes. Major sidewalk routes shall not be closed to pedestrian traffic.
Trees, shrubs and plantings in the area of excavation shall be removed by the Plant Grounds
Department in advance. Provide barriers to protect landscaping adjacent to the excavation
area.
Where sidewalk sections must be removed for installation of underground ducts, remove the
sidewalk sections (flags) completely from joint to joint.
Cut asphalt to be removed for installation of underground ducts, in two, straight, parallel lines.
UNDERGROUND SERVICES FOR ELECTRICAL SYSTEMS
260543
FEBRUARY 2019 PAGE 6 OF 7
Backfill excavations in 6 inch layers and mechanically compact to 98 percent compaction.
Excavated materials may be used as backfill only if the backfill is sand or clean dirt that is free
of rocks and debris over 3/4 inches in diameter. Dispose of clay, rocks, concrete and other
debris, and replace with MDOT Class II sand.
In landscaped areas, backfill and mechanically compact to a depth of 6 inches below grade.
Backfill the last 6 inches with clean topsoil, and reseed affected lawn areas.
Quality Assurance
U-M Code Inspection Department (EHS) shall be contacted before pouring concrete and before
backfilling excavations.