DPR (05-01-23) Detail
DPR (05-01-23) Detail
DPR (05-01-23) Detail
) LENGTH-
128.00 KM DISTRICT JHELUM 05-01-23
ROAD PORTION
1. Road Work (A)
CG Sft 11100 0 0 27,750.00 10,364,577.31
NGC Sft 11100 0 0 27,750.00 10,364,577.31
Dismantling and removing road pavement etc., including screening and stacking of
1 Cft 5400 4350 0 248,054.63 65,289,210.93
by product upto 1 chain lead (500 Mtr) complete in all respect.
Earth work in ordinary soil for making embankment in lead upto 1/4 mile, including
ploughing and mixing with balde grade or disc harrow or other suitable equipment and
6 compaction by mechanical means at optimum moisture content and dressing to Cft 55040 9065 115116 1,956,249.19 270,079,797.43
design section in all respect 95% to 100% maximum modified AASHTO dry
density.
Earthwork excavation in open cutting upto 5'-0" (1.5 m) depth for storm water
channels, drains, sullage drains in open areas, roads, streets, lanes, including
under pinning of walls and shoring to protect existing works, shuttering and
7 Cft 0 19200 0 166,623.36 77,048,160.28
timbering the trenches, dressed to designed level and dimensions, trimming,
removal of surface water from trenches, back filling and surplus excavated
material disposed of and dressed within 50 ft. (15 m) lead:- Hard Soil