uPGRADATON OF Wanbal Road Bwo GII at Different Spots at DAMSAMA
uPGRADATON OF Wanbal Road Bwo GII at Different Spots at DAMSAMA
uPGRADATON OF Wanbal Road Bwo GII at Different Spots at DAMSAMA
cum 20 2.5
For C. conc Drain 0.31 0.91 14.11 5733.60 80,872.43
Centering and shuttering including strutting, propping etc.
5 and removal of form work for Retaining walls, return walls,
walls (any thickness) including attached pilasters
sqm 40 2.5
For C. conc Drain - 0.91 91.00 286.35 26,057.85
12 mm thick cement sand plaster in 1:4 (1 cement : 4 fine
6 sand) complete
sqm 20 2.5
For C. conc Drain - 0.91 45.50 283.80 12,912.90
P/L of RCC spun pipes incl earthwork in excavation,
7 dressingof sides ramming of bottom, necessary cushon,
loading, unloading & all carriage
dia Qty (rft)
L(ft) (inch)
rft 45 8.0 24.00 - 360.00 1350.00 486,000
rft 10 8.0 36.00 80.00 2200.00 176,000
Providing and fixing in position precast R.C.C. manhole
cover and frame of required shape and approved quality.
Circular shape 560mm internal dia.
8
no. 20 20.00 2157.65 43,153
9 Carriage of material by MT
(a) Stone agg avg lead = 14 km cum 14.50 443.06 6,425.23
Amount
6,573.31
5,484.00
19,021.80
63,986.98
20,617.20
17,255.04
6,970.66
6,345.60
3,304.10
149,558.68
1001817.8
Abstract of cost for upgradation of Wanbal road bwo G-II at different spots at
DAMSAMA Kralpora incl Drain.