Rekap DT
Rekap DT
Rekap DT
OKTOBER
7 R 1943 FC MANSUR P. YAN 10/9/2022
8 KT 8940 N YUS P. YAN 10/10/2022
9 KT 8230 RM JUNET P. YAN 10/13/2022
HARI KERJA
NOPEMBER
Sep Okt Nop
8 1 1
13 2 2
15 7 4
16 8 6
17 13 8 R 1943 FC (09/10/2
19 14 10 PERIODE OKT - NOP 2
20 16 11 Jumlah Hari Kerja
22 18 14 Total Trip
23 21 15 Total Liter
24 23 16 Over fuel
25 25 17
26 26 19 Total Hari Kerja
27 27 20
28 30 21
29 31 22 Rate Unit/ Month
30 Rate Rental Unit
Back Charge Fuel @23.500
16 15 15 Total Rate Rental Unit
1 R 1943 FC Rp - Rp 13,871,264.71
2 KT 8940 N Rp - Rp 13,354,264.71
3 KT 8230 RM Rp - Rp 5,128,333.33
4 KT 8642 RJ Rp 9,801,444.44 Rp 13,815,789.47
5 KT 8162 RC Rp 13,236,764.71 Rp 12,429,500.00
6 KT 8542 RG Rp 13,382,352.94 Rp 5,833,333.33
7 KT 8975 RN Rp 17,500,000.00 Rp 11,051,500.00
8 KT 8114 RH Rp 17,500,000.00 Rp 12,352,941.18
9 KT 8224 RG Rp 13,013,000.00 Rp 15,441,176.47
Rp 84,433,562.09 Rp 103,278,103.20
R 1943 FC (09/10/2022) KT 8940 N (10/10/2022) KT 8230 RM (13/10/2022
DATE TRIP LITER MATERIAL DATE TRIP LITER MATERIAL DATE TRIP
13 3 20 BATU 8 1 0 BATU 13 4
14 4 20 BATU 13 3 40 BATU 14 6
16 7 40 BATU 14 5 0 BATU 14 1
OKTOBER
16 5 0 OB 16 1 0 BATU 16 2
OKTOBER
18 2 0 BATU 16 5 0 OB 16 6
25 3 20 BATU 18 1 30 BATU 18 1
27 2 0 BATU 23 1 0 BATU 21 7
30 4 20 BATU 25 2 0 BATU 25 3
31 3 20 BATU 27 1 20 BATU
1 2 10 BATU 30 2 10 BATU
2 1 0 BATU 31 3 20 BATU
4 0 10 BATU 2 1 0 BATU
NOPEMBER
6 2 10 BATU 4 0 20 BATU
8 3 9 BATU 8 3 5 BATU
10 0 8 BATU 10 4 32 BATU
SEPT
20 BATU 26 8 0 BATU 29 4
SEPTEMBER
0 OB 27 6 40 BATU 30 7
20 BATU 28 9 20 BATU 1 5
0 OB 29 4 20 BATU 2 2
10 BATU 30 7 40 BATU 7 3
40 BATU 1 5 40 BATU 8 10
20 BATU 2 2 0 BATU 14 5
7 3 20 BATU 14 1
8 9 40 BATU 16 2
OKTOBER
13 5 25 BATU 16 6
14 4 0 BATU 18 1
OKTOBER
14 1 0 OB 21 5
16 2 20 BATU 23 3
16 6 0 OB 25 4
18 1 20 BATU 26 1
230 RM (13/10/2022) 21 7 40 BATU 27 3
ODE OKT - NOP 2022 23 3 0 BATU 30 7
h Hari Kerja 6 27 3 20 BATU 31 4
rip 30 30 5 20 BATU 4 2
iter 150 31 4 20 BATU 6 4
uel 30 1 5 40 BATU 8 3
2 4 40 BATU 10 6
Hari Kerja 18 4 1 20 BATU 11 8
NOPEMBER
Okt 11 6 3 0 BATU 14 6
NOPEMBER
Nop 7 8 3 0 BATU 16 13
nit/ Month 17,500,000 10 5 40 BATU 19 4
ental Unit 5,833,333 11 7 0 BATU 20 7
harge Fuel @23.500 705,000 16 14 60 BATU 22 1
Rate Rental Unit 5,128,333 19 4 15 BATU
20 7 40 BATU
22 1 0 BATU
Note : Note :
Sampai tanggal 22 Nop 2022 Sampai tanggal 22 Nop 2022
KT 8114 RH (28/09/2022) KT 8224 RG (29/09/2022)
LITER MATERIAL DATE TRIP LITER MATERIAL
40 BATU 29 4 0 BATU
SEPT
20 BATU 30 9 40 BATU
40 BATU 1 5 20 BATU
30 BATU 2 2 40 BATU
0 BATU 7 2 20 BATU
20 BATU 8 9 45 BATU
40 BATU 13 3 25 BATU
OKTOBER
0 BATU 14 6 40 BATU
0 OB 14 1 0 OB
20 BATU 21 6 0 BATU
0 OB 25 6 40 BATU
0 BATU 26 1 0 OB
20 BATU 27 3 0 BATU
20 BATU 30 9 20 BATU
20 BATU 31 5 20 BATU
0 OB 1 3 20 BATU
0 BATU 2 5 20 BATU
40 BATU 8 4 0 BATU
20 BATU 10 6 30 BATU
0 BATU 11 7 10 BATU
20 BATU 14 8 20 BATU
0 BATU 15 0 30 BATU
NOPEMBER
40 BATU 16 14 20 BATU
0 BATU 17 4 0 BATU
20 BATU 19 4 40 BATU
40 BATU 20 7 20 BATU
20 BATU 21 1 15 BATU
20 BATU 22 1 5 BATU
0 BATU
Note :
ai tanggal 22 Nop 2022 Sampai tanggal 22 Nop 2022
DATA BASE
CN DRIVER STATUS
KT 8771 DG ANTO P. ADI 10/7/2022
KT 8618 DG RIYAN P. ADI 10/7/2022
KT 8842 DE TANJUNG P. ADI 10/7/2022
KT 8915 LK IMAM P. ADI 10/7/2022
KT 8930 BW EDI P. ADI 10/7/2022
HARI KERJA
Sep Okt Nop
8 1 1
13 2 2
15 7 4
16 8 6
17 13 8
19 14 10
20 16 11
22 18 14
23 21 15
24 23 16
25 25 17
26 26 19
27 27 20
28 30 21
29 31 22
30
16 15 15
OKTOBER
14 6 0 BATU
21 6 40 BATU
25 4 20 BATU
27 2 0 BATU
30 4 20 BATU
31 3 20 BATU
1 4 20 BATU
6 3 8 BATU
NOPEMBER
NOPEMBER
14 5 40 BATU 13 4 20 BATU
OKTOBER
21 7 42 BATU 14 5 20 BATU
25 3 10 BATU 21 7 0 BATU
30 4 20 BATU 25 3 10 BATU
1 1 0 BATU 27 2 0 BATU
2 4 20 BATU 30 3 20 BATU
4 1 0 BATU
NOPEMBER
NOPEMBER
27 2 0 BATU
30 4 30 BATU
31 4 20 BATU
1 4 25 BATU
4 1 0 BATU
6 2 0 BATU
NOPEMBER
KT 8603 RD (07/10/2022)
PERIODE OKT - NOP 2022
Jumlah Hari Kerja 7
Total Trip 20
Total Liter 95
Over fuel 15