Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

ZBP v3 Alsaad HQ DWG SD MC 129 Rev00

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PROJECT : ZAHID BUSINESS PARK

DRAWING SUBMITTAL
PURPOSE OF SUBMITTAL

CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL ELECTRICAL OTHERS


PROVIDED DOCUMENTS
CATALOGUES CERTIFICATES SAMPLE TECHNICAL DATA
DRAWING CALCULATIONS SPECIFICATIONS OTHERS
DOC No. Date of Submittal SUBMITTED FOR
New Request
ZBP-V3-ALSAAD-HQ-DWG-SD-MC-129-REV00 30 November 2022 APPROVAL

Resub. Request YOUR INFO

Contractor's Remarks & Exceptions


DRAWING SUBMITTAL :
No. QTY DRAWING NUMBER / REV TITLE / DESCRIPTION ACTION REMARKS
Zahid Business Park Project - HQ & CC Building

1 1 ZBP-HQ-SD-PW1-111 REV 00 HQ - OVER ALL EIGHTH FLOOR - PLUMBING - WATER CODE-B


SUPPLY LAYOUT - REV00

ATTACHEMENTS HQ EIGHTH FLOOR - PLUMBING - WATER SUPPLY


LAYOUT
Submitted by Contractor: Received By: V3 M.E. Consultants
Signature: Signature:
Name : Imad Shakhshir Name :

Position : PM Position :
Date : 30 November 2022 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks

kaos comments:
- To conform with our review of submitted Toilet SD
Mech Comments:
1. Follow ZBP-PG-001 layout for fixture pipe sizing. WC pipe size to be as per the IFC
layout.
2. Fixture locations and heights to be as per architectural requirements.
3. Water hammer arrestors to be provided as per IFC requirements.
4. Coordination with other disciplines is contractor's responsibility.

A Approved As Submitted For : V3 Middle East Consultant Company Received By:


B Approved As Noted Resubmission not required Signature: Signature:
ACTION
ACTION

C Resubmission required Name: Name :


D Disapproved Position: Position:
E No Action Taken Date : Date :

F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES

LEGEND:

1 2

MECHANICAL ROOM
ELECTROMECHANICAL
LAYOUT SHALL BE
SUBMITTED SEPERATELY

SIGNAGE
KEYPLAN:

A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
3 4 5 6 7 8 9 10 10' 11 12 13 14 15 16

A1
H

A1
I

A1
J
A1
K

PART-1 PART-2
A1
L
SEATING AREA

A1
M

A1
N

A1
O

NAME:
SIGNATURE/
DATE:

A Approved As Submitted D Disapproved


Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required

08-05-2021 00 ISSUED FOR APPROVAL


DATE REVISION NO. REMARKS

CLIENT

[T] +966 26681765


[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

1 2
MEP CONSULTANT

PROJECT MANAGEMENT & SUPERVISION


M I D D

L
E E AS
T

CONTRACTOR

Al Saad General Contractin G Limited Liability Co.

P.O. Box 13028, Jeddah 21493, Saudi Arabia


P.O. Box 16910, Riyadh 11474, Saudi Arabia

JOB NUMBER

2013-154
PROJECT NAME

ZAHID BUSINESS PARK

LOCATION: PLOT NUMBER


JEDDAH KSA
DESIGN BY -
ARCHITECT TK
STRUCTURAL ENGINEER MF
ELECTROMECHANICAL ENGINEER RM
DRAWN: KS
CHECKED: -
LAV - DETAILS LAV (HANDICAP TYPE) DETAILS DESIGN PHASE

VILLEROY & BOCH CONSTRUCTION PHASE CP


DURAVIT- MODEL # 2330650000/2330650070
EWC WITH FUSH VALVE MODEL # 614700 REVISION NUMBER
REVIEW CYCLE: 000
HANDICAP TYPE TYPICAL EWC WITH FUSH VALVE TYPICAL
FORMAT SCALE DATE
WATER PIPE CONNCTION DETAILS WATER PIPE CONNCTION DETAILS A0 1:75 30-11-2022
DRAWING TITLE AND NUMBER
HEAD QUARTERS
8TH FLOOR PLAN
PLUMBING - WATER SUPPLY
LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-AL SAAD-HQ-DWG-SD-MC-129-REV-0 ZBP/HQ/SD/PW1-111
SIZE A0 1189MM x 841MM

You might also like