DRAWING SUBMITTAL
PURPOSE OF SUBMITTAL
Position : PM Position :
Date : 30 November 2022 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks
kaos comments:
- To conform with our review of submitted Toilet SD
Mech Comments:
1. Follow ZBP-PG-001 layout for fixture pipe sizing. WC pipe size to be as per the IFC
layout.
2. Fixture locations and heights to be as per architectural requirements.
3. Water hammer arrestors to be provided as per IFC requirements.
4. Coordination with other disciplines is contractor's responsibility.
F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES
LEGEND:
1 2
MECHANICAL ROOM
ELECTROMECHANICAL
LAYOUT SHALL BE
SUBMITTED SEPERATELY
SIGNAGE
KEYPLAN:
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
3 4 5 6 7 8 9 10 10' 11 12 13 14 15 16
A1
H
A1
I
A1
J
A1
K
PART-1 PART-2
A1
L
SEATING AREA
A1
M
A1
N
A1
O
NAME:
SIGNATURE/
DATE:
CLIENT
1 2
MEP CONSULTANT
L
E E AS
T
CONTRACTOR
JOB NUMBER
2013-154
PROJECT NAME