Egat-Gridcode-Connection 62
Egat-Gridcode-Connection 62
Egat-Gridcode-Connection 62
õćÙñîüÖìĆüę ĕðǰ
CCA5 øć÷úąđĂĊ÷éøĎðĒïïÖćøđßČęĂöêŠĂ
SPP Firm
EGAT Transmission System (69 kV or 115 kV)
Transmission Line Transmission Line
Electricity Authority
Cogeneration or Residue Power Producer
3CT 3CT
21BU 50BF 50BF 21BU
3CT 3CT
* Please see 87L 87L * Please see
87B
3VT MCB
Visible air gap and Lockable
Disconnecting Switch
27
3CT XM
KWH LAN and
KVARH 27 Modem
3CT (Back Up) XM KWH
3VT KVARH
3 (Main)
59
3 27
50 3CT
51
1
3CT 68
Interconnection 1VT
52B 1 1
Breaker 25 81
3 LA
87T
1
Isolation
63
Transformer
3 1
51 51N
3CT
3CT
52T
1
52 52 52 25 52B Generator Breaker
KWH
KVARH LAN and Modem
Load
Gen
Note * The protection for transmission line shall be composed of primary and backup protection. The primary protection
shall be line current differential relay (87L) and the backup protection shall be distance relay (21BU). However, the backup
protection shall be changed to current differential relay (87L) in case the source impedance ratio (ZS/ZL) is or more than 4.
** In case the power plant substation can be bypassed, the primary protection shall be distance relay (21P) including
directional earth fault protection with tele-protection schemes. The communication channels of distance and directional earth
fault protection shall be separated. The backup protection shall be distance relay (21BU).
CCA-35ǰ