AIFF ABSTRACT-ROAD WORK CDPL,MUMBAI

BILL OF QUANTITIES FOR ROAD WORKS


SL RATE AMOUNT IN INR
DESCRIPTION OF WORK QTY UNIT
NO
1 Excavation for roadway in soil by mechanical means 4,050.00 Cum
including cutting and pushing the earth to site of
embankement upto a distance of 100 metres (average lead
50 metres), including trimming bottom and side slopes in
accordance with requirements of lines, grades and cross
sections.

2 Filling available excavated earth (excluding rock) in 2,025.00 cum


trenches, plinth, sides of foundations etc. in layers not
exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m. all as specified and directed
by Engineer-in-Charge.
Note: 1. Good earth / Filling Materials will be provided
by the department upto the nearest point of premises.
Loading, unloading, ramming, watering and all related
activities will be borne by the Contractor from the said
point of available earth.
2. Measurement of earth will be based on actual work
done on respective location within the site.
AIFF ABSTRACT-ROAD WORK CDPL,MUMBAI

SL RATE AMOUNT IN INR


DESCRIPTION OF WORK QTY UNIT
NO
3 Preparation and consolidation of sub grade with power 4,500.00 Sqm
road roller of 8 to 12 tonne capacity after excavating earth
to an average of 22.5 cm depth, dressing to camber and
consolidating with road roller including making good the
undulations etc. and re-rolling the sub grade and disposal
of surplus earth with lead upto 50 metres.

4 Supplying, Stacking & spreading moorum 500mm thick 4,500.00 Sqm


back filling for pitching including packing with smaller
stones and consolidation with power roller including
spreading , watering and consolidation of binding material
etc.

5 Construction of granular sub-base 200 mm thick by 900.00 Cum


providing and mixing of Local sand and Stone dust.

6 Providing, laying, spreading and compacting graded stone 675.00 Cum


aggregate (size range 53 mm to 0.075 mm ) to wet mix
macadam (WMM) specification including premixing the
material with water at OMC in mechanical mix plant,
carriage of mixed material by tipper to site, for all leads &
lifts, laying in uniform layers with mechanical paver finisher
in sub- base / base course on well prepared surface and
compacting with vibratory roller of 8 to 10 tonne capacity
to achieve the desired density, complete as per
specifications and directions of Engineer-in-Charge.-2
lAYERS
AIFF ABSTRACT-ROAD WORK CDPL,MUMBAI

SL RATE AMOUNT IN INR


DESCRIPTION OF WORK QTY UNIT
NO
7 Providing and laying bituminous macadam using crushed 300.00 Cum
stone aggregates of specified grading premixed with
bituminous binder,transported to site by tippers,laid over a
previously prepared surface with paver finisher equiped
with electronic sensor to the required grade, level and
alignment and rolling with smooth wheeled, vibratory and
tandem rollers as per specificaton and density, complete as
per specifications and directions of Engg-in Charge.
50 to 100mm average compacted thickness with bitumen
of grade VG-30@3.5% (percentage by weight of total mix)
prepared in Drum type Hot Mix Plant of 60-90 TPH
capacity

8 Providing and laying seal coat over prepared surface of 4,500.00 Sqmt
road with bitumen heated in bitumen boiler fitted with the
spray set spraying using 98 kg of bitumen of grade VG - 10
and blinding surface with 0.90 cum of stone aggregate of
6.7 mm size (Passing 11.2 mm sieve and retained on 2.36
mm sieve) per 100 sqm of road surface, including rolling
and finishing with power road roller all complete.
AIFF ABSTRACT-ROAD WORK CDPL,MUMBAI

SL RATE AMOUNT IN INR


DESCRIPTION OF WORK QTY UNIT
NO
9 Providing and laying at or near ground level factory made 560.00 Rmt
kerb stone of M-25 grade cement concrete in position to
the required line, level and curvature, jointed with CM 1:3,
including making joints with or without grooves (thickness
of joints except at sharp curve shall not to more than
5mm), including making drainage opening wherever
required complete etc. as per direction of Engineer-in-
charge)(Length of finished kerb edging shall be meaured
for payment)(Precast CC kerb stone shall be approved by
Engineer in charge)

10 Providing and applying thermoplastic reflective paint of 450.00 Sqmt


any colour or compound for line markinging, 3 mm thick
of pigment as per MORTH specification no. 803.4 (rate of
application of compound @ 8 kg/Sqm) etc complete.
(Approved by Engineer in Charge)

TOTAL COST
AIFF ABSTRACT-DRAIN WORK CDPL,MUMBAI

BILL OF QUANTITIES FOR STORM WATER DRAIN WORK


SL
DESCRIPTION OF ITEMS QTY UNIT RATE AMOUNT IN INR
No
1 Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas
(not exceeding 1.5 m in width as well as 10 sqm
on plan) including disposal of excavated earth,
lead upto 50m and lift upto 1.5m, disposed earth
to be levelled and neatly dressed.

All kinds of soil 3190 cum

2 Filling available excavated earth (excluding rock) 2166 cum


in trenches, plinth, sides of foundations etc. in
layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming
and watering, lead up to 50 m and lift upto 1.5
m. all as specified and directed by Engineer-in-
Charge.
Note: 1. Good earth / Filling Materials will be
provided by the department upto the nearest
point of premises. Loading, unloading, ramming,
watering and all related activities will be borne
by the Contractor from the said point of available
earth.
2. Measurement of earth will be based on actual
work done on respective location within the site.
AIFF ABSTRACT-DRAIN WORK CDPL,MUMBAI

SL
DESCRIPTION OF ITEMS QTY UNIT RATE AMOUNT IN INR
No
3 Loading and unloading of excavated earth. 1025 cum
(Placing tipper at loading point, loading with
front end loader, dumping, turning for return
trip, excluding time for haulage and return trip)
upto a lead upto 10 kms

4 Supplying and filling in plinth under floors, 350 Cum


including watering, ramming, consolidating and
dressing complete.Moorum/Hard Copra

5 Providing and laying in position cement concrete


of specified grade excluding the cost of
centering and shuttering - All works upto Plinth
Level
5a 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone 134 cum
aggregate 40mm nominal size
5b 1:2:4 (1 cement : 2 coarse sand : 4 graded stone 87 cum
aggregate 20 mm nominal size)-Coping Work
AIFF ABSTRACT-DRAIN WORK CDPL,MUMBAI

SL
DESCRIPTION OF ITEMS QTY UNIT RATE AMOUNT IN INR
No
6 Providing and laying in position ready mixed M-
25 grade concrete for reinforced cement
concrete work, using cement content as per
approved design mix, manufactured in fully
automatic batching plant and transported to site
of work in transit mixer for all leads, having
continuous agitated mixer, manufactured as per
mix design of speicified grade for reinforced
cement concrete work, including pumping of
RMC form transit mixer to site of laying,
excluding the cost of centering, shuttering
finishing and reinforcement, including cost of
admixtures in recommended proportions as per
IS: 9103 to accelerate / retard setting of concrete,
improve workability without impairing strength
and durability as per direction of Engineer-in-
Charge.
(Note: Cement content conisdered in this item is
@ 330 kg/cum. Excess/Less cement used as per
design mix is payable/recoverable separately).

All works upto plinth level 552.00 cum

7 Steel reinforcement for R.C.C. work including


straightening, cutting, bending, placing in
position and binding all complete upto plinth
level.
Thermo-Mechanically Treated bars 46920 kg
AIFF ABSTRACT-DRAIN WORK CDPL,MUMBAI

SL
DESCRIPTION OF ITEMS QTY UNIT RATE AMOUNT IN INR
No

8 Centering and shuttering including strutting, 4176 Sqmt


propping etc. and removal of form work for
:Foundations, footings, bases for columns

9 15 mm cement plaster finished with a floating


coat of neat cement of mix:
1:3 (1 cement : 3 coarse sand) 508 sqm

10 Structural steel work in single section, fixed with


or without connecting plate, including cutting,
hoisting, fixing in position and applying a 32964 kg
priming coat of approved steel primer all
complete.-Hot Galvanised Welding material

12 Providing 50 mm dia CPVC pipe for perforation


150.00 RM
in Drain Cover

13 Providing and laying non-pressure NP2 class


(light duty) RCC pipes with collars jointed with
stiff mixture of cement mortar in the proportion
of 1:2 (1 cement : 2 find sand) including testing
of joints ect complete:

250 mm dia RCC Pipe 160.00 RM

TOTAL COST