Metro Knittin & Dyeing Mills LTD 312.2RT VRF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

@

0llke : House # 2711 l3d & 4th Floor), Rood # l3/A


Wattson
Heod

Dhonmondi, Dhoko-l 209, Bonglodesh


Phone : 88-02-55000740, 55000741, 58157757
Engineering & Consultants Ltd, E-moil : wotlson_engg1 @yohoo.com
Website : www.wotlsong roup. com
ISO 9OO1-2015 CERTIFIED COMPANY

Ref. : I{ECL lttKDtttl-l0Blz0zz


Date:24.08.2022

QIX)TATION FOR SUPPIY, INSTATI^ATION, TESTING & COiIIIISSIONING


OF VRF TYPE AIR CONDITIONING STSTEM.
PROIECT: METRO IINITTIXG & DYEING MII-l-s LID.
(Capacity- 312.2RT)

TOTAJ,AHOUNT
SHORT DESCRIPTIONS OF ITEMS CURRENCY

OF IMPORTED ITEMS

'AILIITK}N Of }MPORTED ITEMS AND


SCHEDUTE.A
& INSTALLATION OF LOCAJ, ITEMS

TOTAI COST IN USD/IAKA (C& F at Chottagram) L85,872.OO

Terms & Conditions:


Warranty Service :24 Months for the compFessor. For Other Component 18 months from the date of Shipment & 12
months from the date of commissioning whichever come first including spares and free services.
Delivery ; 1/ithin 3 (Three ) Months from the date of opening LC.
Payment: For Imported ltems - 100% lrrevocable LC by client
For Local Item - 5006 advance with work order and 40% progress bill and rest 10% after completion of works.
Vdidity: 30 days from the date of this quotation.
Work Completlon : Within 04 months after work order.
Importted Duty & Tax and Local Vat & Ait : Excluded
Item Excluded:Electrica[ Pane[ Board, Cable works, Loading & Unloading"Any other works which is not included in offer

Thankingyou
-FoTWATTSON ENGINEERING & CONSUTTANTS LTD.

iMd. Ashraf Uddin


Managing Director
ll

@
0llke : House # l3rd & 4th Floor), Rood # 1 3/A
Wattson
Heod 27

Dhonmondi, Dhokq-l 209, Bonglodesh


Phone : 88-02-55000740, 55000741, 58157757
Engineering & Consultants Ltd, E-moil :wottson_enggl@yohoo.com
Website : www.wottson group.com
ISO 9OO1-2015 CERTIFIED COMPANY

QUOTATION FOR SUPPLY, INSTALIJITION, TESTING & COMMISSIONING


OT VRF TYPE AIR CO]IDTNOTIIIIG SI]STEiI.
PROJECT: METRO I(NITTING &DYEING IIILI.S tTD.

Schedule - A : SUPPLY AJ{D INSTALLATION OF VRf SI1STEH


SUPPLY RATE III USD II{STALI.ATION RATE IN TAXA

TOTAL RATE IN
ugr I TAXA

n*trra Fltr w".f/YRU miB hniry @liry


tn€ilioo.d b€|fl. Ea.i tmit sh.ll be modular[,pe omplete
lwertei type Compr€ser, DX Condenser with Copp€r tube
Fins. Condenser Fan witl Fan guard, complete in
The unit shall operate when supplied with 4OO*.LOtyoV I
3 Ph Eleclric
supply includes all accessories to complete VRF mechanism

typ€: Duel Digital lnverter cooling only

Outdoor unit Capacity 80.0KW/ 22.3 RT

of Fan coil units baving cooling capacites as mentioned


unit shall be operated with variable referigerant flow,
/VRV) outdoor units. FCU shall have refrigerant control
washable filter,fan speed controller etr.comlete in all r
unit shall operate when supplied with 220110%V/5O Hz/L
power. Nominal Cooling Capacides are based on
27"CDB/ 19"CWB.

:4.5KV,l [L.27
@
# # 1 3/A
Wattson Heod 0llke r House 27 11 (3rd & 4th Floor), Rood

Dhonmondi, Dhokq-l 209, Bonglodesh


Phone : 88-02-55000740, 55000741, 58157757

Engineering & Consultants Ltd, E-moil : woltson_engg1 @yohoo.com


Website : wwwwotlsong roup. com
ISO 9OO1-2015 CERTIFIED COMPANY

Schedule - A: SUPPLYAI{D INSTALLATION OF

TNSTALLATION RATE IN TAKA


shoftD*crlp{toodltl,
I u* I .tsv' lu.ttR^TE*I TOTALRATEIN
TAIG

112 I(W (3.18

RefNet foint for indoor & outdoor

of Central Control System to control operation of


its to control indoor units along with all accessories.

& installation of medium grade (L) copper piping


necessary accessories,pipe should be made of pure
insulation pressure tolerance not less than 450

Supply and.installation of pipe insulationof the following


lnsulation should be Nitrile Rubber at least 18mm with d

\-
lleod ffia r House # 27 ll (3rd & lth Floor), Rood # I 3/A
Dhonmondi, Dhoko- I 209, Bonglodesh

@Ilfilllift *
ISO 9OO1-2015 CERTIFIED COMPANY
consurtants Ltd
Phone : 88-02-55000740, 55000711, 58157757
E-moil : wotlson_enggl @yohoo.com
Website : www.wottsongroup.com

INSTAIIATION RATE IN TAKA


Short D6€rlpdon of lteEs Unit ary.
I'IIIT RATC IN
TAIA
6

rft I z,ffi I rso I seo,ooo.oo I

Supply, ineallatio* and estia6 of @ gted€ U-PyC PiF


following sizes indudirg suppty and instalatioo of Soc*ets ,
te€s. ventiqg, hengers, unknrs der consrnrables
in all respects. Pipe work shall be properly plumbed, leveled
fix.The pipe shall be insulatcd with at least 12mm thick NiE ile

Fabrication and installation of galvanized sheet steel


with bends, tees, reducers, branch takeoffs,
etc as per direction and drawing Hangers,
and isolator boxes shall be fabricated with MS angle
or rod as per drawing and direction and shall be

shall be constructrd witt best-bloomed galvanized


Before installation duct inside and out side shall be cleaned
any dust Between flanges, for flanged end du6
of gasket shdl be used Approved type of sealing
be used to make the ductwork leak proof. Duct shall
or supported at an int€rvd of not more than rl feet

fabricated with 24 BWG sheet

and installation of rubber insulation is to insulate


. The thiclmess of insulation is 19 mm witdt 20-22

installation of fiesh air louver constructed


aluminlum/ galvanized steel sheet, complete with

and installadon and esdng of ffexible duct to


between AHU and ducts as per drawing and
specification including suplly of all materials
and sample shall be approved by the consultants.

proper insalladon and certification the system shall


teste4 commissioned and balanced as per direction
recommendation by t}te Manufacturer.

TOT/IL COST IN USDIAKA (C& F at Chotta$am) 3,435,146.00