Fia - Ayman Kaoud
Fia - Ayman Kaoud
Fia - Ayman Kaoud
Page 1 of 1
Mr. OSAMA ELGHAMRAWY - HEAD OF PCC
Candidate’s Name: AYMAN KAOUD Interviewed by: Mr. NITIN GULATI – A/MGR (PROG. CONTROLS)
Ms. VANUSHA TENGRY – HHRA
Position Applied for: SR. PLANNING ENGINEER Date of Interview: 14 FEB 2023 5 PM
Interviewer: Please give your evaluation of the candidate based on the following criteria.
Criteria Rating Remarks / Comments
Academic accomplishment.
(Please comment on applicant's performance,
as they relate to position.)
Personal attributes.
(Consider the candidate's personality
confidence, attitude, etc., as they relate to the
requirements of the position.)
Professional/technical knowledge and
experience.
(What's the quality and quantity of the
candidate's professional and/or technical
experience? What professional or technical
knowledge can candidate bring to the job?)
Communication skills.
(How well does the candidate listen and
communicate? Does he/she have sufficient
communication skills to work well with co-
workers, superiors, clients, customers, etc.?)
Accomplishments and special skills.
(Has the candidate had any important
accomplishments in his/her career or outside
the job that relate to his/her qualifications for
the position? Does he/she have any special skills
or expertise that he/she can bring to this job?)
Please comment on the applicant's strengths, as they relate to the position.
Summary
11 years of experience in Dubai & Abu Dhabi in planning & controlling different construction projects
(Horizontal & Vertical) involved in different stages from commencement & engineering works through
enabling, construction works, T&C till handing over & TOC of the project.
Education
Key Skills
Planning, Scheduling, Civil Engineering, Primavera P6, Construction Projects, Landscape Projects, Delay
Analysis, Extension of time.
Work Experience
Current:
Projects:
- Al Hudayriyat Island Leisure Project, Abu Dhabi.
- Al Mugheirah Mangrove Walkway, Mirfa, Abu Dhabi.
- Mubadala Workplace Transformation, Abu Dhabi.
Previous:
➢ Sr. Planning Engineer/Delay Claims Analyst – [Khatib & Alami] | Dubai, UAE
Projects:
- Holiday Inn Hotel & Suites (2B+G+2P+15) Hotel, Dubai Science Park, Dubai
- Opera Grand Tower (4B+G+71) Residential Tower, Downtown, Dubai.
- Al Ahly Club Tower (B+G+3P+21) Residential Tower, Al Nahda1, Dubai.
- Tecom Twin Towers Hotel (2B+G+3P+32) Hotel & Hotel Apartments, Albarsha Heights, Dubai
- Jafza Commodities Centre (Warehouse), Jebel Ali, Dubai
- Al Fahim Motor City Residential Tower (G+17), Al Hebiah First, Dubai
- Hessa Tower (G+3P+16) Residential Tower, JVC, Dubai
- Al Soor Investment Residential Building (B+G+10+Roof), Nadd Alhamar, Dubai
- Dubai Studio City (B+G+4) Residential Development, Dubai Studio City, Dubai.
1
CURRICULUM VITAE
Responsible for:
• Reviewing, Analyzing & Approving baseline schedules and insure its compliance with contract requirements
and best engineering practices.
• Reviewing, Analyzing & Commenting progress reports/updates and insure its compliance with actual site
conditions and best engineering practices.
• Notifying stakeholders of any potential delays at activity/project level in accord ance with the contract conditions
and baseline programme.
• Providing Corrective & Preventive actions for any potential delays to the project.
• Reviewing and replying to the delay notifications submitted by the contractor and insure its compliance with
contract conditions and its validity in terms of time impact analysis.
• Reviewing, analyzing & determining any EOT claims in accordance with cont ract conditions and best
engineering practices.
• Periodically reporting the project status reports and dashboar ds to the client.
Projects:
EMAAR SOUTH DEVELOPMENT, 142 (G+1) Clusters in 3 Plots, Dubai South, UAE
(AED 429 Million)
Client: EMAAR Properties.
Main Contractor: PIVOT Engineering & General Contracting.
Project Management: MACE group.
Consultant: U+A (Ultra Architectural Consultancy)
Responsible for:
▪ Develop full CPM logic generated baseline schedules for projects using Primavera P6.
▪ Resource and cost load baseline schedule.
▪ Prepare Cash flow (S-Curve).
▪ Perform Regular Progress updates & determine the % Completion at the summary/detailed level using
Earned Value technique.
▪ Prepare Time Impact Analysis and EOT Claims.
▪ Prepare and update the Productivity Matrix.
▪ Prepare Recovery/Revised schedules
▪ Participate in project progress meetings and Schedule review
Major Projects:
1- HILTON GARDEN INN (2B+G+14 Typ. Flrs. +HC) 4-Star Hotel, Al Jadaf, Dubai, UAE
(AED 150 Million)
Client: Khamas Group of Investments
Consultant: National Engineering Bureau (NEB)
2
CURRICULUM VITAE
2- RESIDENTIAL BUILDING (2B+G+P1+12 Typ. Flrs +RF), Wadi Alsafa 5, Dubai, UAE
(AED 97 Million)
Client: Khamas Group of Investments
Consultant: National Engineering Bureau (NEB)
3- TWO RESIDENTIAL BUILDINGS (B+G+4 Typ. Flrs +HC), DWC, Dubai, UAE
(AED 66 Million)
Client: Khamas Group of Investments
Consultant: National Engineering Bureau (NEB)
Responsible for:
▪ Develop full CPM logic generated baseline schedules for projects using Primavera P6.
▪ Resource and cost load baseline schedule.
▪ Prepare Cash flow (S-Curve).
▪ Perform Regular Progress updates & determine the % Completion at the summary/detailed level using
Earned Value technique.
▪ Prepare Time Impact Analysis and EOT Claims.
▪ Prepare Recovery/Revised schedules
▪ Participate in project progress meetings and Schedule review.
➢ Planning Engineer
Agroscape Company | Cairo, Egypt
(March 2014 - September 2014)
▪ - Project : " UPTOWN CAIRO - PKG#27D " | Cairo, Egypt
- Budgeted Total Cost : (25 Million L.E)
- Client : " EMAAR MISR "
- Project Manager : " Turner Construction International"
- Consultant : " ABCG "
- Main Contractor : " Agroscape Company "
Responsible for:
▪ Develop full CPM logic generated baseline schedules for projects using Primavera P6.
▪ Resource and cost load baseline schedule.
▪ Prepare Cash flow (S-Curve).
▪ Perform Regular Progress updates & determine the % Completion at the summary/detailed level using
Earned Value technique.
▪ Prepare Time Impact Analysis and EOT Claims.
▪ Prepare Recovery/Revised schedules
▪ Participate in project progress meetings and Schedule reviews.
Responsible for:
▪ Supervising and inspecting Construction works daily.
▪ Quantity surveying & reviewing monthly receipts of the projects.
■ Member of committee for Inspecting the defects & cracks of "Olympic Village
Sportive Stadium – Mansoura University" and writing the technical report for it.
Skills
Languages
Softwares
Other Activities
Personal Skills
4
CURRICULUM VITAE
Personal Details