Major Project Report
Major Project Report
Major Project Report
On
Decision Support System to grant funds for national and
international conferences
Submitted to
Vidya Prasarak Mandal Polytechnic, Thane
Submitted By
Name of the Members Enrollment No.
1. Apurva Ambre 2000070246
2. Roshni Poojary 2000070283
3. Advait Kamthekar 2000070295
Guided By
Mrs. Suhasini Shukla
1
CERTIFICATE
2
CERTIFICATE
3
CERTIFICATE
4
5
Acknowledgement
6
Abstract
7
Table Contents
Certificates…………….……………………………………...……1
Acknowledgement.….……………………………………...………2
Abstract...…...………………………………………………………3
Chapter 1 Introduction.……………………………………………5
1.1 Background of the Industry
Chapter 2 Literature Survey…………………………………….…1
Chapter 3 Proposed Work……………………………………….…1
3.1 Problem Definition……..………………………………………1
3.2 Objectives………………………………………………………1
3.3 Methodology…………………………………………………....1
3.4 Designs…………………………………………………………1
3.5 Expected Outcomes……….……………………………………1
3.6 Hardware and Software Requirements…………………………1
3.7 Programming Languages……………………………………….1
3.8 Testing Done……………………………………………………1
3.9 Conclusion……………………………………………………,..1
3.10 Action Plan………..……………………………………………1
Chapter 4 Resources and Consumables required…………………1
Reference and Bibliography.……………………………………….1
8
Chapter 1 Introduction
1.1 Background of the industry
3.2 Objectives
To get the opportunity to apply the knowledge and skills acquired in their
courses to a specific problem or issue.
To extend our academic experience into areas of personal interest, working
with new ideas, issues, organizations, and individuals.
To think critically and creatively about academic, professional, or social
issues and to further develop their analytical and ethical leadership skills
necessary to address and help solve these issues.
To take on the challenges of teamwork, prepare a presentation in a
professional manner, and document all aspects of design work.
3.3 Methodology
1) We have collected the requirements based on their business environment.
2) Doing research and having an understanding of the software application.
3) Going through competitor strategy to test outcomes.
4) Making use of the data collected or given by the respective industry and
should do detail analysis on it in order create visualization.
5) Designing the UI as per requirements.
6) Validating and performing testing.
3.4 Design
We have created the forms which are shown below
10
11
Login Page
Sign Up
12
Dashboard
3.5 Expected Outcomes
13
3.6 Hardware and Software Requirements
14
Java
3.9 Conclusiom
15