Chhedagad
Chhedagad
Chhedagad
Bill of Quantity
F/Y-073/74
0
0
3 Earth filling in 150 mm thick layer, watering, ramming including supply of filling m3 0.000
materials all complete as per drawing and specification.
4 Flat dry brick soling in foundation and floor including sand filling in joints, m2 0.000
leveling, ramming etc. all complete
Supplying and laying of one layer of 500 gauge Polythene sheet on prepared
5 surface m2 0.000
Plain cement concret PCC M10, (1:3:6) work in foundation and floors with
8 cement,sand and crussed aggregate of 10 mm to 38mm gauge including mixing m3 0.000
with mixtere machin & compaction by vibrator ,laying in line & level with curing
all type of works complete as per specification &instruction
Plain cement concret PCC M15, (1:2:4) work in foundation and floors with
9 cement,sand and crussed aggregate of 10 mm to 38mm gauge including mixing m3 0.000
with mixtere machin & compaction by vibrator ,laying in line & level with curing
all type of works complete as per specification &instruction
Plain cement Concrete (PCC) in 1:1.5:3 ratio (M20) for RCC works in column,
beam, slab etc. with approved quality of cement, sand and stone aggregate
10 including mixing, laying, compacting and curing etc all complete as per design, m3 0.000
drawing and specification.
STEEL WORK
Steel reinforcement bar of Fe 415/500 grade including straightening, cleaning,
11 cutting, bending, placing in position and binding with annealed binding wire all ton 0.000
complete as per design, drawing and specification.
FORMWORK
16 Supplying and fixing seasoned Sal wood Chaukhat (125mmx100mm) size as per m3
drawings, specifications and instructions of site engineers all complete 0.000
Supplying and fixing of flush doors with seasoned Sal wood frame (65mm
x35mm size), 19 mm thick water proof plywood grooved and prperly fixed as
17 per drawings, hinges 3x6", screws, Locking 12" heavy, handle grip 6" m2 0.000
aluminium, cheskini 6", aluminium etc. specifications and instructions of site
engineers all complete
18 Supplying and fixing 4 mm thick glass glazed fixed glazed shutter ( above doors m2 0.000
with woodn listy
FLOORING WORKS
19 Supplying and laying of 38mm thick PCC (1:2:4) with 20mm down aggregates m2 0.000
all complete within room area
Supplying and laying of glazed or non glazed tiles in cement sand mortar (1:4)
20 ratio with Boarder approved colour on wall and floor all complete. m2 0.000
25mm th. Mosaic flooring with 19mm th. Cement plaster in (1:2) base course
21 and 6mm marble chips white cement(1:1) surface course including rubbing and m2 0.000
polishing all complete as per drawing and specification.
Supplying and laying of good quality marbal in cement sand motar (1:2) ratio
22 with approved colour on floors, skirting and wall s all complete. m2 0.000
3 mm thick cement sand punning on floor, skriting, dado etc, including mixing
23 laying and rubbing with steel trowel to a hard, smooth and shining surface and m2 0.000
curing all complete as per drawing and specification.
PAINTING WORKS
Two coats of water proof cement paint painting work (Distemper) in inner
24 faces of building, within walls, floors, ceilings etc of approved brand and color m2 904.234
as per instruction of site engineer
Rate excluding VAT Total Amount
S.N Description Unit Quantity
In figure In Word
Two coats of weather proof (Apex) paint painting work outer faces of building,
25 within walls, floors, ceilings etc of approved brand as per instruction of site m2 0.000
engineer
26 Two coats of enamel Paint within doors / windows surfaces of approved color m2
as per instructions 0.000
STEEL WORKS
27 Supplying and fixing 3x20mm size M.S. grill with almunium paints as per design m2 0.000
and instruction all complete.
Making and fitting fixing of stainless steel pipe railling with 38mm.dia.stainless
28 steel pipe handrail 2 row 25mm dia. stainless steel pipe in between handrail
and floor and 38mm. dia. stainless steel pipe for vertical post @ 2m. c/c m2 0.000
including welding , cutting all complete
B SANITARY WORK L.S 1.00
C ELECTRICAL WORK L.S 1.00
Err:509
1 Err:509 ### Err:509
2 Err:509 ### Err:509
3 Err:509 ### Err:509
4 Err:509 ### Err:509
5 Err:509 ### Err:509
6 Err:509 ### Err:509
7 Err:509 ### Err:509
8 Err:509 ### Err:509
9 Err:509 ### Err:509
10 Err:509 ### Err:509
11 Err:509 ### Err:509
13 Err:509 ### Err:509
14 Err:509 ### Err:509
15 Err:509 ### Err:509
16 Err:509 ### Err:509
17 Err:509 ### Err:509
18 Err:509 Ls 1.000
Err:509
1 Err:509 ### Err:509
2 Err:509 ### Err:509
3 Err:509 ### Err:509
Rate excluding VAT Total Amount
S.N Description Unit Quantity
In figure In Word
4 Err:509 ### Err:509
5 Err:509 ### Err:509
6 Err:509 ### Err:509
7 Err:509 ### Err:509
8 Err:509 ### Err:509
9 Err:509 ### Err:509
Err:509
1 Err:509 ### Err:509
2 Err:509 ### Err:509
3 Err:509 ### Err:509
4 Err:509 ### Err:509
5 Err:509 ### Err:509
6 Err:509 ### Err:509
7 Err:509 ### Err:509
Err:509
1 Err:509 ### Err:509
2 Err:509 ### Err:509
3 Err:509 ### Err:509
4 Err:509 ### Err:509
5 Err:509 ### Err:509
6 Err:509 ### Err:509
7 Err:509 ### Err:509
8 Err:509 ### Err:509
9 Err:509 ### Err:509
10 Err:509 ### Err:509
11 Err:509
12 Err:509 ### Err:509
13 Err:509 ### Err:509
14 Err:509 ### Err:509
15 Err:509 ### Err:509
16 Err:509 ### Err:509
Bill of Quantity
F/Y-073/74
0
0
3 Earth filling in 150 mm thick layer, watering, ramming including supply of filling m3 0.000
materials all complete as per drawing and specification.
Flat dry brick soling in foundation and floor including sand filling in joints,
4 leveling, ramming etc. all complete m2 0.000
5 Supplying and laying of one layer of 500 gauge Polythene sheet on prepared m2 0.000
surface
BRICK MASONRY WORK
First class local chimney made brick work in cement sand mortar(1:6) in
6 foundation in perfect line and level including wetting the brick, packing the m3 0.000
joints and curing all types of works as per specification and instruction by
Engineer
First class local chimney made brick work in cement sand mortar(1:4) in
7 superstructure in perfect line and level including wetting the brick, packing the m3 0.000
joints and curing all types of works as per specification and instruction by
Engineer
RCC WORK
Plain cement concret PCC M10, (1:3:6) work in foundation and floors with
cement,sand and crussed aggregate of 10 mm to 38mm gauge including mixing
8 with mixtere machin & compaction by vibrator ,laying in line & level with curing m3 0.000
all type of works complete as per specification &instruction
Plain cement concret PCC M15, (1:2:4) work in foundation and floors with
cement,sand and crussed aggregate of 10 mm to 38mm gauge including mixing
9 with mixtere machin & compaction by vibrator ,laying in line & level with curing m3 0.000
all type of works complete as per specification &instruction
Plain cement Concrete (PCC) in 1:1.5:3 ratio (M20) for RCC works in column,
beam, slab etc. with approved quality of cement, sand and stone aggregate
10 including mixing, laying, compacting and curing etc all complete as per design, m3 0.000
drawing and specification.
STEEL WORK
Steel reinforcement bar of Fe 415/500 grade including straightening, cleaning,
11 cutting, bending, placing in position and binding with annealed binding wire all ton 0.000
complete as per design, drawing and specification.
FORMWORK
12.5mm thick cement sand plaster in (1:4) ratio on wall with good finish
14 including supplying of approved quality of cement & sand, racking the joint, m2 0.000
Chiping the concerte surface, wetting of surfaces & curing the work all
complete as per the design, drawing and specification..
15 Skirting work on walls with proper finishing, line and level all complete rm 0.000
WOOD WORKS
Supplying and fixing seasoned Sal wood Chaukhat (125mmx100mm) size as per
16 drawings, specifications and instructions of site engineers all complete m3 0.000
Supplying and fixing of flush doors with seasoned Sal wood frame (65mm
x35mm size), 19 mm thick water proof plywood grooved and prperly fixed as
17 per drawings, hinges 3x6", screws, Locking 12" heavy, handle grip 6" m2 0.000
aluminium, cheskini 6", aluminium etc. specifications and instructions of site
engineers all complete
18 Supplying and fixing 4 mm thick glass glazed fixed glazed shutter ( above doors m2
with woodn listy 0.000
FLOORING WORKS
Supplying and laying of 38mm thick PCC (1:2:4) with 20mm down aggregates
19 all complete within room area m2 0.000
Supplying and laying of glazed or non glazed tiles in cement sand mortar (1:4)
20 ratio with Boarder approved colour on wall and floor all complete. m2 0.000
25mm th. Mosaic flooring with 19mm th. Cement plaster in (1:2) base course
21 and 6mm marble chips white cement(1:1) surface course including rubbing and m2 0.000
polishing all complete as per drawing and specification.
Supplying and laying of good quality marbal in cement sand motar (1:2) ratio
22 with approved colour on floors, skirting and wall s all complete. m2 0.000
3 mm thick cement sand punning on floor, skriting, dado etc, including mixing
23 laying and rubbing with steel trowel to a hard, smooth and shining surface and m2 0.000
curing all complete as per drawing and specification.
PAINTING WORKS
Two coats of water proof cement paint painting work (Distemper) in inner
24 faces of building, within walls, floors, ceilings etc of approved brand and color m2 904.234
as per instruction of site engineer
Two coats of weather proof (Apex) paint painting work outer faces of building,
25 within walls, floors, ceilings etc of approved brand as per instruction of site m2 0.000
engineer
26 Two coats of enamel Paint within doors / windows surfaces of approved color m2 0.000
as per instructions
STEEL WORKS
Supplying and fixing 3x20mm size M.S. grill with almunium paints as per design
27 and instruction all complete. m2 0.000
Making and fitting fixing of stainless steel pipe railling with 38mm.dia.stainless
28 steel pipe handrail 2 row 25mm dia. stainless steel pipe in between handrail m2 0.000
and floor and 38mm. dia. stainless steel pipe for vertical post @ 2m. c/c
including welding , cutting all complete
B SANITARY WORK L.S 1.00
C ELECTRICAL WORK L.S 1.00
Err:509
1 Err:509 ### Err:509
2 Err:509 ### Err:509
3 Err:509 ### Err:509
4 Err:509 ### Err:509
5 Err:509 ### Err:509
6 Err:509 ### Err:509
7 Err:509 ### Err:509
8 Err:509 ### Err:509
9 Err:509 ### Err:509
10 Err:509 ### Err:509
11 Err:509 ### Err:509
13 Err:509 ### Err:509
14 Err:509 ### Err:509
15 Err:509 ### Err:509
16 Err:509 ### Err:509
17 Err:509 ### Err:509
18 Err:509 Ls 1.000
Err:509
1 Err:509 ### Err:509
2 Err:509 ### Err:509
3 Err:509 ### Err:509
4 Err:509 ### Err:509
5 Err:509 ### Err:509
6 Err:509 ### Err:509
7 Err:509 ### Err:509
8 Err:509 ### Err:509
9 Err:509 ### Err:509
Err:509
1 Err:509 ### Err:509
2 Err:509 ### Err:509
3 Err:509 ### Err:509
4 Err:509 ### Err:509
5 Err:509 ### Err:509
6 Err:509 ### Err:509
7 Err:509 ### Err:509
Err:509
1 Err:509 ### Err:509
2 Err:509 ### Err:509
3 Err:509 ### Err:509
4 Err:509 ### Err:509
5 Err:509 ### Err:509
6 Err:509 ### Err:509
7 Err:509 ### Err:509
8 Err:509 ### Err:509
9 Err:509 ### Err:509
10 Err:509 ### Err:509
11 Err:509
12 Err:509 ### Err:509
13 Err:509 ### Err:509
14 Err:509 ### Err:509
15 Err:509 ### Err:509
16 Err:509 ### Err:509
Err:509
1 Err:509 ### Err:509
2 Err:509 ### Err:509
3 Err:509 ### Err:509
4 Err:509 ### Err:509
5 Err:509 ### Err:509
A Civil Works
Project Name: Detail Engineering Design, Architectural Drawing and Design, Structural Design and Drawing and Cost Estimate of Kaldhar Gumba
Location: Temal ward no:7
Site clearance before and after completion of work including desposing the remaining construction
1 LS 1.00 10,000 10,000
materials & plants & making the site in working condition all complete as per drawing and specification.
2 EARTHWORK
Earthwork in excavation in Boulder mixed and hard soil in site levelling including dumping, stacking or filling
2.1 m3 113.32 725.12 82,170
to the lower level ground etc all for site developmen
Earth filling in 150 mm thick layer, watering, ramming including supply of filling materials all complete as per
2.2 m3 67.99 453.20 30,814
drawing and specification.
3 Flat Brick soling in foundation and floor including sand filling in joints, leveling, ramming etc. all complete m2 247.77 1,384.50 343,036
Steel reinforcement bar of Fe 415/500 grade including straightening, cleaning, cutting, bending, placing in
6.1 ton 14.40 119,210.00 1,716,607
position and binding with annealed binding wire all complete as per design, drawing and specification.
7 FORMWORK
Formwork, shuttering, centering with plywood and wooden post necessary propping, scaffolding, staging,
7.1 m2 1226.93 1,208.25 1,482,446
supporting and removal etc all complete in perfect line and level as per design, drawing and specification.
12.5mm thick cement sand plaster in (1:4) ratio on wall with good finish including supplying of approved
8.2 quality of cement & sand, racking the joint, Chiping the concerte surface, wetting of surfaces & curing the m2 1459.79 394.84 576,387
work all complete as per the design, drawing and specification..
8.3 Skirting work on walls with proper finishing, line and level all complete rm 189.849 55.80 10,594
9 WOOD WORKS
Supplying and fixing seasoned Sal wood Chaukhat (75mmx100mm) size as per drawings, specifications and
9.1 m3 1.393 205,458.04 286,244
instructions of site engineers all complete
Supplying and fixing of flush doors with seasoned Sal wood frame (65mm x35mm size), 19 mm thick water
9.2 proof plywood grooved and prperly fixed as per drawings, hinges 3x6", screws, Locking 12" heavy, handle grip m2 17.381 12,448.02 216,357
6" aluminium, cheskini 6", aluminium etc. specifications and instructions of site engineers all complete
9.3 Supplying and fixing 4 mm thick glass glazed fixed glazed shutter ( above doors with woodn listy) m2 58.194 9,031.85 525,600
10 FLOORING WORKS
10.1 Supplying and laying of 38mm thick PCC (1:2:4) with 20mm down aggregates all complete within room area m2 749.612 428.24 321,010
Supplying and laying of 20mm thick terrazzo tiles in cement sand mortar (1:4) ratio with Boarder approved
10.2 m2 479.270 2,166.38 1,038,282
colour on wall and floor all complete.
Supplying and laying of 15mm thick marble in cement sand mortar (1:3) ratio with Boarder approved colour
10.3 on staircase. m2 18.434 4,236.36 78,092
11 PAINTING WORKS
Two coats of water proof cement paint painting work (Distemper) in inner faces of building, within walls,
11.1 m2 904.23 212.98 192,579
floors, ceilings etc of approved brand and color as per instruction of site engineer
Two coats of weather proof (Apex) paint painting work outer faces of building, within walls, floors, ceilings etc
11.2 m2 555.557 246.20 136,778
of approved brand as per instruction of site engineer
11.3 Two coats of enamel Paint within doors / windows surfaces of approved color as per instructions m2 75.575 308.38 23,306
12 RAILING & GRILLS
Making and fitting fixing of stainless steel pipe railling with 38mm.dia.stainless steel pipe handrail 2 row 25mm
12.1 dia. stainless steel pipe in between handrail and floor and 38mm. dia. stainless steel pipe for vertical post @ m2 13.814 2,830.24 39,096
2m. c/c including welding , cutting all complete
Project Name: Detail Engineering Design, Architectural Drawing and Design, Structural Design and Drawing and Cost Estimate of Kaldhar Gumba
Location: Temal ward no:7
Total 1.00
E/W in excavation for preparation of site
2 and foundation work all complete m³
(Boulder mix soil)
E/W excavation of foundation in BM soil
a Isolated Footings
F1 7 1.68 1.68 1.5 29.97
F2 14 1.52 1.52 1.5 49.55
F3 1 1.83 1.83 1.5 5.09
Sub-Total 84.61
b For toe wall
Grid 4-4 1 5.56 0.30 1.0 1.68
Grid 3-3 1 6.25 0.30 1.0 1.88
Grid 2-2 1 7.01 0.30 1.0 2.11
Grid 1-1 1 6.10 0.30 1.0 1.84
Grid A-A 1 2.14 0.30 1.0 0.64
Grid B-B 1 6.78 0.30 1.0 2.04
Grid C-C 1 6.63 0.30 1.0 2.00
Grid D-D 1 6.78 0.30 1.0 2.04
Grid E-E 1 6.78 0.30 1.0 2.04
Grid F-F 1 7.02 0.30 1.0 2.12
Sub-Total 18.40
Total 103.02
Adding 10% to total 113.32
3 Earth Work in Filling m³
Filling work within foundation area 60% of Excavation work 67.99
Total 67.99
Flat Brick soling in foundation and floor
4 including sand filling in joints, leveling, m²
ramming etc. all complete
a Isolated Footings
F1 7 1.68 1.68 19.66
F2 14 1.52 1.52 32.52
F3 1 1.83 1.83 3.34
b For toe wall
Grid 4-4 1 5.56 0.30 1.67
Grid 3-3 1 6.25 0.30 1.88
Grid 2-2 1 7.01 0.30 2.10
Grid 1-1 1 6.10 0.30 1.83
Grid A-A 1 2.14 0.30 0.64
Grid B-B 1 6.78 0.30 2.03
In First Floor
In Top Floor
In grid 4-4 1 8.22 0.23 3.20 6.05
Deduction for window -2 1.83 0.23 1.50 -1.26
Deduction for ventilation -1 1.83 0.23 0.60 -0.25
In grid 3-3 1 8.22 0.23 3.20 6.05
Deduction for door -3 0.90 0.23 2.13 -1.32
In Grid B-B & C-C 2 5.00 0.23 3.20 7.36
In Grid D-D & E-E 2 4.00 0.23 3.20 5.89
e Column
First floor 22 0.30 0.30 3.2 6.34
Second floor 22 0.30 0.30 3.2 6.34
Top floor 8 0.30 0.30 3.2 2.30
Subtotal for
16.97
column
f Slab
First floor 1 217.85 0.13 27.23
Deduction for Staircase -1 4.26 3.35 0.13 -1.78
Second floor 1 217.85 0.13 27.23
Deduction for Staircase -1 4.26 3.35 0.13 -1.78
Top floor 1 11.30 7.30 0.13 10.31
Subtotal 61.21
h Band lintel/sill
lintel
In Ground Floor
In grid 4-4 1 10.96 0.23 0.1 0.25
In grid 1-1 1 10.96 0.23 0.1 0.25
In grid B-B 1 7.30 0.23 0.1 0.17
In grid F-F 1 10.67 0.23 0.1 0.25
In grid C-C/ bet 3-4 1 3.96 0.23 0.1 0.09
In grid C-C/ bet 1-3 1 6.70 0.12 0.1 0.08
In grid 2-2/ bet A-B 1 2.74 0.12 0.1 0.03
In First Floor
In grid 4-4 1 10.96 0.23 0.1 0.25
In grid 1-1 1 10.96 0.23 0.1 0.25
In grid B-B 1 7.30 0.23 0.1 0.17
In grid F-F 1 10.67 0.23 0.1 0.25
In grid C-C/ bet 3-4 1 3.96 0.23 0.1 0.09
In grid C-C/ bet 1-3 1 6.70 0.12 0.1 0.08
In grid 2-2/ bet A-B 1 2.74 0.12 0.1 0.03
In Top Floor
In grid 4-4 1 8.22 0.23 0.1 0.19
In grid 3-3 1 8.22 0.23 0.1 0.19
In Grid B-B & C-C 2 5.00 0.23 0.1 0.23
In Grid D-D & E-E 2 4.00 0.23 0.1 0.18
Sill
In Ground Floor
In grid 4-4 1 10.96 0.23 0.1 0.19
In grid 1-1 1 10.96 0.23 0.1 0.19
In grid B-B 1 7.30 0.23 0.1 0.13
In grid F-F 1 10.67 0.23 0.1 0.18
In grid C-C/ bet 3-4 1 3.96 0.23 0.1 0.07
In grid C-C/ bet 1-3 1 6.70 0.12 0.1 0.06
Deduction for door -1 1.83 0.12 0.1 -0.02
In grid 2-2/ bet A-B 1 2.74 0.12 0.1 0.02
Deduction for door -1 0.90 0.12 0.1 -0.01
In First Floor
In grid 4-4 1 10.96 0.23 0.1 0.19
In grid 1-1 1 10.96 0.23 0.1 0.19
In Top Floor
In grid 4-4 1 8.22 0.23 0.1 0.14
In grid 3-3 1 8.22 0.23 0.1 0.14
Deduction for door -3 0.90 0.23 0.1 -0.05
In Grid B-B & C-C 2 5.00 0.23 0.1 0.17
In Grid D-D & E-E 2 4.00 0.23 0.1 0.14
Subtotal 5.20
Total 140.69
adding 10% 154.76
f Column
First floor 22 1.20 3.2 84.48
Second floor 22 1.20 3.2 84.48
Top floor 8 1.20 3.2 30.72
g Slab
First floor 1 217.85 217.85
Deduction for Staircase -1 4.26 3.35 -14.27
h Staircase
First floor
First flight 1 3.30 1.18 3.89
Landing 1 3.40 1.45 4.93
Second flight 1 3.30 1.18 3.89
Steps 18 1.18 0.2 3.19
Second Floor
First flight 1 3.30 1.18 3.89
Landing 1 3.40 1.45 4.93
Second flight 1 3.30 1.18 3.89
Steps 18 1.18 0.2 3.19
i Band lintel/sill
lintel
In Ground Floor
In grid 4-4 2 10.96 0.1 2.19
In grid 1-1 2 10.96 0.1 2.19
In grid B-B 2 7.30 0.1 1.46
In grid F-F 2 10.67 0.1 2.13
In grid C-C/ bet 3-4 2 3.96 0.1 0.79
In grid C-C/ bet 1-3 2 6.70 0.1 1.34
In grid 2-2/ bet A-B 2 2.74 0.1 0.55
In First Floor
In grid 4-4 2 10.96 0.1 2.19
In grid 1-1 2 10.96 0.1 2.19
In grid B-B 2 7.30 0.1 1.46
In grid F-F 2 10.67 0.1 2.13
In grid C-C/ bet 3-4 2 3.96 0.1 0.79
In grid C-C/ bet 1-3 2 6.70 0.1 1.34
In grid 2-2/ bet A-B 2 2.74 0.1 0.55
In Top Floor
In grid 4-4 2 8.22 0.1 1.64
In grid 3-3 2 8.22 0.1 1.64
In Grid B-B & C-C 4 5.00 0.1 2.00
In Grid D-D & E-E 4 4.00 0.1 1.60
Sill
In Ground Floor
In grid 4-4 2 10.96 0.1 1.64
In grid 1-1 2 10.96 0.1 1.64
In grid B-B 2 7.30 0.1 1.10
In grid F-F 2 10.67 0.1 1.60
In grid C-C/ bet 3-4 2 3.96 0.1 0.59
In grid C-C/ bet 1-3 2 6.70 0.1 1.01
Deduction for door -2 1.83 0.1 -0.27
In First Floor
In grid 4-4 2 10.96 0.1 1.64
In grid 1-1 2 10.96 0.1 1.64
In grid B-B 2 7.30 0.1 1.10
In grid F-F 2 10.67 0.1 1.60
In grid C-C/ bet 3-4 2 3.96 0.1 0.59
In grid C-C/ bet 1-3 2 6.70 0.1 1.01
Deduction for door -2 1.83 0.1 -0.27
In grid 2-2/ bet A-B 2 2.74 0.1 0.41
Deduction for door -2 0.90 0.1 -0.14
In Top Floor
In grid 4-4 2 8.22 0.1 1.23
In grid 3-3 2 8.22 0.1 1.23
Deduction for door -6 0.90 0.1 -0.41
In Grid B-B & C-C 4 5.00 0.1 1.50
In Grid D-D & E-E 4 4.00 0.1 1.20
Sub total 1115.39
Adding 10% to total 1226.93
First floor
Top Floor
In grid B-B 1 5.63 3.6 19.99
In grid 4-4 1 9.45 3.6 33.55
deduction for windows -2 1.83 1.50 -4.12
deduction for ventilation -1 1.83 0.60 -0.55
In grid E-E 1 4.60 3.6 16.33
In grid 3-3 1 9.45 3.6 33.55
deduction for doors -2 0.90 2.13 -2.88
Partition wall
In grid C-C 2 11.43 3.4 77.72
deduction for door -1 1.83 2.13 -3.90
In grid 2-2 2 2.74 3.4 18.65
deduction for door -1 0.90 2.13 -1.92
First floor
Outer wall
In grid B-B 1 8.53 3.4 29.00
deduction for windows -1 1.83 1.5 -2.75
In grid 4-4 1 12.50 3.4 42.50
deduction for windows -2 1.83 1.5 -4.12
deduction for ventilation -1 1.83 0.6 -0.55
In grid F-F 1 12.00 3.4 40.80
In grid 1-1 1 12.50 3.4 42.50
deduction for windows -2 1.83 1.5 -5.49
Partition wall
In grid C-C 2 11.43 3.4 77.72
Top Floor
Outer wall
In grid B-B 1 5.63 3.6 19.99
In grid 4-4 1 9.45 3.6 33.55
deduction for windows -2 1.83 1.5 -4.12
deduction for ventilation -1 1.83 0.6 -0.55
In grid E-E 1 4.60 3.6 16.33
In grid 3-3 1 9.45 3.6 33.55
deduction for doors -2 0.90 2.1 -2.88
Partition wall
In grid C-C
Side 1 1 5.34 3.6 18.96
Side 2 1 4.00 3.6 14.20
In grid D-D 2 4.00 3.6 28.40
13.3 Column
First floor 22 1.20 3.2 84.48
Second floor 22 1.20 3.2 84.48
Top floor 8 1.20 3.2 30.72
Total 822.03
Adding 10% to Interior wall plaster 904.23
Total Plastering Work 1459.79
Skirting work on walls with proper
14 rm
finishing, line and level all complete
In Ground Floor
In grid 4-4 1 10.96 10.96
In grid 1-1 1 10.96 10.96
In grid B-B 1 7.30 7.30
In grid F-F 1 10.67 10.67
In grid C-C/ bet 3-4 2 3.96 7.92
In grid C-C/ bet 1-3 2 6.70 13.40
Deduction for door -2 1.83 -3.66
In grid 2-2/ bet A-B 2 2.74 5.48
Deduction for door -2 0.90 -1.80
In First Floor
In grid 4-4 1 10.96 10.96
In grid 1-1 1 10.96 10.96
In grid B-B 1 7.30 7.30
In grid F-F 1 10.67 10.67
In grid C-C/ bet 3-4 2 3.96 7.92
In grid C-C/ bet 1-3 2 6.70 13.40
Deduction for door -2 1.83 -3.66
In grid 2-2/ bet A-B 2 2.74 5.48
Deduction for door -2 0.90 -1.80
In Top Floor
In grid 4-4 1 9.00 9.00
In grid 3-3 2 9.00 18.00
Deduction for door -6 0.90 -5.40
Staircase
landing 2 3.00 1.20 7.20
steps 18 0.30 1.18 6.37
Total 749.61
Total 435.70
adding 10% extra 479.27
Remarks
Clause 26.5.3.1
Clause 26.5.2.1
TRANSPORTATION RATES TRUCK PORTER Easy load: 0.1969 Per KG/Kosh in NRs
Uneasy load: Per KG/Kosh in NRs
Most Uneasy load: Per KG/Kosh in NRs
High volume load: Per KG/Kosh in NRs
Ghoda, KHACHCHAD 2.4000 Per KG/Kosh in NRs
39.65
RATE OF MATERIALS
S.N. DESCRIPTION OF MATERIALS TOTAL RATE UNIT ORIGINAL COST VAT LOAD/ ADDITIONAL DESCRIPTION OF
UNLOAD VALUES ADDITIONAL VALUES
26 Exterior emulsion paint (weather coat) 645.00 Lit 645 83.85 0.19 2.00
25
S.N. DESCRIPTION OF MATERIALS TOTAL RATE UNIT ORIGINAL COST VAT LOAD/ ADDITIONAL DESCRIPTION OF
UNLOAD VALUES ADDITIONAL VALUES
26
Temal Rural Municipality
Project Name: Detail Engineering Design, Architectural Drawing and Design, Structural Design and Drawing and Cost Estimate of Kaldhar Gumba
Rate Analysis
Project Name: Detail Engineering Design, Architectural Drawing and Design, Structural Design and Drawing and Cost Estimate of Kaldhar Gumba
Total 725.12
Rate per unit 725.12
Total 453.2
Rate per unit 453.2
4.Stonework
Norms no H15-11-15-ka Norms Unit 1 CU.M.
Items Description : Stone soling on flat in foundation including sand filling in joints
5. Brickwork
Norms no H15-11-15-ka Norms Unit 10 SQ.M
Items Description : Flat dry brick soling on flat in foundation and floor including sand filling in joints
8. Form work
Norms no 8-2-ka Norms Unit 10 Sq.m
Items Description : Preparation of formwork ,fixing and removing all complete including 30 m lead in Floor, slab
13.Painting work
Norms no 13,4,Kha Norms Unit 100 Sq.m.
Items Description : Water proof cement paint in white washed surface two coat
Description Quantity Unit Rate Amount
Labour Skilled 5 md 1100.00 5500
Unskilled 5 md 880.00 4400
Materials Cement paint 48.5 K.g. 235.00 11397.5
Total 21297.5
Rate per unit 212.975
BELOW PLINTH
Foundatio
n Mesh
F1 Along X 12 126 1.677 211.280 211.280 0.888 187.616
Along Y 12 126 1.677 211.280 211.280 0.888 187.616
Column Reinforcement
column C1
Main Bar 20 8 1.982 15.853 15.853 2.466 39.093
Stirrups 8 15 1.300 19.500 19.500 0.395 7.702
Column Reinforcement
column C2
Main Bar 20 28 1.982 55.488 55.488 2.466 136.833
Main Bar 16 28 1.982 55.487 55.487 1.578 87.558
Stirrups 8 15 1.300 19.500 19.500 0.395 7.702
Column Reinforcement
column C3
Main Bar 20 52 1.982 103.048 103.048 2.466 254.116
Main Bar 16 52 1.982 103.048 103.048 1.578 162.609
Stirrups 8 15 1.300 19.500 19.500 0.395 7.702
STRAP
BEAM
Along 1-
1,4-4.
Main Bar 12 8 12.425 99.400 99.400 0.888 88.267
Stirrups 8 144 0.991 142.682 142.682 0.395 56.359
Along 2-
2,3-3.
Main Bar 12 8 14.634 117.073 117.073 0.888 103.960
Stirrups 8 176 0.991 174.390 174.390 0.395 68.884
Along A-A
Main Bar 12 4 3.354 13.414 13.414 0.888 11.911
Stirrups 8 22 0.991 21.798 21.798 0.395 8.610
Along A-
A,B-B,C-
C,D-D
Main Bar 12 16 11.814 189.024 189.024 0.888 167.853
Stirrups 8 272 0.991 269.512 269.512 0.395 106.457
PLINTH
BEAM
Along 1-
1,4-4.
Main Bar 16 4 12.425 49.700 49.700 1.578 78.426
Main Bar 12 6 12.425 74.550 74.550 0.888 66.200
Stirrups 8 144 0.991 142.682 142.682 0.395 56.359
Along 2-
2,3-3.
Main Bar 16 4 14.634 58.536 58.536 1.578 92.369
Main Bar 12 6 14.634 87.804 87.804 0.888 77.969
Stirrups 8 176 0.991 174.390 174.390 0.395 68.884
Along A-A
Main Bar 16 2 3.354 6.707 6.707 1.578 10.583
Main Bar 12 3 3.354 10.060 10.060 0.888 8.933
Stirrups 8 22 0.991 21.798 21.798 0.395 8.610
Along A-
A,B-B,C-
C,D-D
Main Bar 16 8 11.814 94.512 94.512 1.578 149.139
Main Bar 12 12 11.814 141.768 141.768 0.888 125.889
Stirrups 8 272 0.991 269.512 269.512 0.395 106.457
Slab
Reinforce
ment
First
Floor Slab
Bottom
bar along 96 12.000 1152.000 1152.000
X 8 0.395 455.040
Bottom bar
100 12.500 1250.000 1250.000
along Y
8 0.395 493.750
Top Bar
39 6.910 269.490 269.490
along X 8 0.395 106.448
Top Bar
43 4.870 209.410 209.410
along Y 8 0.395 82.716
DEDUCTI
ON FOR
STAIR
Bottom
bar along 24 3.000 72.000 72.000
X 8 0.395 -28.440
Bottom bar
32 4.000 128.000 128.000
along Y
8 0.000 0.000
Top Bar
24 2.000 48.000 48.000
along X 8 0.395 -18.960
Top Bar
32 2.000 64.000 64.000
along Y 8 0.000 0.000
ADD
SLAB A-
A - B-B
Bottom
bar along 20 3.659 71.386 71.386
X 8 0.395 28.197
Bottom bar
29 2.439 71.386 71.386
along Y
8 0.395 28.197
Top Bar
20 1.725 33.658 33.658
along X 8 0.395 13.294
Top Bar
29 1.689 49.434 49.434
along Y 8 0.395 19.526
F.FLOOR
BEAM
Along 1-
1,4-4.
Main Bar 16 10 12.425 124.251 124.251 1.578 196.068
Extra bar 12 4 1.625 6.500 6.500 0.888 5.772
Stirrups 8 0 0.991 0.000 0.000 0.395 0.000
Along 2-
2,3-3.
Main Bar 16 10 14.634 146.341 146.341 1.578 230.926
Extra bar 12 4 14.634 58.536 58.536 0.888 51.979
Stirrups 8 96 0.991 95.121 95.121 0.395 37.572
Along A-A
Main Bar 16 5 3.354 16.768 16.768 1.578 26.459
Extra bar 12 2 3.354 6.707 6.707 0.888 5.955
Stirrups 8 22 0.991 21.798 21.798 0.395 8.610
Along A-
A,B-B,C-
C,D-D
Main Bar 16 20 11.814 236.280 236.280 1.578 372.849
Extra bar 12 8 11.814 94.512 94.512 0.888 83.926
Stirrups 8 272 0.991 269.512 269.512 0.395 106.457
Slab
Reinforce
ment
First
Floor Slab
Bottom
bar along 96 12.000 1152.000 1152.000
X 8 0.395 455.040
Bottom bar
100 12.500 1250.000 1250.000
along Y
8 0.395 493.750
Top Bar
39 6.910 269.490 269.490
along X 8 0.395 106.448
Top Bar
43 4.870 209.410 209.410
along Y 8 0.395 82.716
ADD
SLAB A-
A - B-B
Bottom
bar along 20 3.659 71.386 71.386
X 8 0.395 28.197
Bottom bar
29 2.439 71.386 71.386
along Y
8 0.395 28.197
Top Bar
20 1.725 33.658 33.658
along X 8 0.395 13.294
Top Bar
29 1.689 49.434 49.434
along Y 8 0.395 19.526
Slab
Reinforce
ment
First
Floor Slab
Bottom
bar along 73 4.268 312.314 312.314
X 8 0.395 123.364
Bottom bar
34 9.146 312.314 312.314
along Y
8 0.395 123.364
Top Bar
73 1.880 137.231 137.231
along X 8 0.395 54.206
Top Bar
34 5.793 196.951 196.951
along Y 8 0.395 77.795
2 FLOORS Bands
Main Bar 10 16 176.000 2816.000 2816.000 0.617 1737.472
Stirrups 8 3486 0.600 2091.600 2091.600 0.395 826.182
RMK
MT
Madi Municipality
PROJECT :-Preparation of Detailed Project Report of Krishna Pranami Mandir and Natural Park
Sankhuwasava
Abstract of Cost
Amount
S.N. Description of Work Quantity Unit Rate Rs. Remarks
Rs
A.SANITARY WORK
1 Porceling clay white glaze one piece comode
with p & S trap and slow falling seat cover
with all complete accessories ready for
operation (Bola,Tita,Akwa or Eqv,)
size CP Towel Rod (Heavy quality) all complete 2.00 nos 927.82 1,855.64
5
Supplying and Fixing of CP Soap Dish all
complete
2.00 nos 936.56 1,873.12
6 Supplying and fixing in position of 110mm dia.
PVC
Floor trap of approved quality and make with CP
jali cover. 4.00 nos 716.91 2,867.64
7 Supply and fixing in position of CP 1.2 m flexible
pipe with spray all complete 2.00 nos 2667.20 5,334.39
8 Supply and fixing in position of CP Toilet Paper
Holder all complete 2.00 nos 636.41 1,272.82
9 Supply and fixing Long body Bib Cock of jaquar
0.00
11.1 25mm dia. 8.40 Rm 815.93 6,853.77
11.2 15dia 14.55 Rm 706.68 10,282.12
12 Supply and fixing of CPVC Ball Vaulve Valves of
approved quality and make. 0.00
12.1 25mm dia. 1.00 nos 1,029.02 1,029.02
12.2 15 mm dia 1.00 nos 911.72 911.72
13 Supply and fixing of polythene water tank of
1000L of approved quality with necessary
fittings (eq: Hilltake, Nepatop) 2.00 nos 13000.00 26,000.00
14 Supplying and Fixing Electric moter Pump single
or three phase phase with base, nut and bolts all
complete set (Kirloskar, Compton,or equiv.) 1HP
Electric motor Pump monoblock.
1.00 nos 14152.82 14,152.82
15 Pressure sensor switch for pump auto switch off
including Contractor all complete with cable all
complete set. 1.00 set 6867.57 6,867.57
Sub Total (A) 176,443.41