RA Hot Works in Enclosed Space

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Premuda

RISK ASSESSMENT and ADDITIONAL RISK ASSESSMENT

VESSEL YEAR MONTH REPORT N.

Additional Risk Assessments will be needed for infrequent activities or those being undertaken for the first time or which may
occur in special circumstances; they have to be assessed in accordance with the general guidance given in Attachment.
Security aspects are not dealt with here, as they are the object of the Ship Security Plan.

Operation: Hot Works Task: Repair Ingress sensor.

Cause of
Hazard hazardous Existing controls Possible effect P C R Actions/ Note
situation

Burns to hands,
eyes or other parts
Crew training People of the body (From A 2
Possible PPE (safety shoes, helmets, gloves, slight to major
goggles, visors etc.) effect )
emission
Eye wash
of sparks First aid onboard
Company procedures for welding
including use of PPE, permit-to-work, Assets No damage A 0
supervision etc.
Welding activity
Environmen No effect A 1
t

To choke or gas Use invertor only for


People B 3 short time.
poisoning

Smoke in
enclosed Working fan during all operation Fire (Extensive
space Assets A 1
damage)

Environmen Minor effect A 1


t
Premuda
Distribution
One copy in ship’s File
One copy must be sent to the Company as soon as issued

Date

Master Signature

Appendix - Instruction to Additional Risk Assessment

-A scale of Consequence ( C : from 0 to 5) is used to indicate potential severity. The consequences are those credible
scenarios that can develop from a particular hazard.

-The Probabilities ( P : A-B-C-D-E) estimated on the basis of historical evidence or experience that the identified
consequences have materialized within the Company or ship.

-For the purpose of assessing Risks ( R : see following colors scale in ref of Appendix A –Ch 12.9) to health this axis
can be modified to provide an exposure rating for a given hazardous agent.

Trivial risk: No additional action required

Moderate risk: Incorporate cost/ effective risk reduction measures

Intolerable risk: Immediate corrective actions

Example:
Operation: _Inspection Tank Task: Cleaning and Inspection