Agenda
Introduction to generators
Basic assembly design of generators
Components of generator
SOP’s and Best Industry Practices
Periodic Maintenance and record keeping
Reliability based preventative
maintenance.
Troubleshooting for various failures
WSD 5231, Mod. 3 2
1
Class Introduction
Introduction to Generators
A generator is machinery that converts mechanical energy to electrical energy by
electromagnetic action to generate electrical power
Principle of Generator
1. Diesel Engine
2. Alternator
3. Control Panel
2
Flow of Systems
1. Starter motor starts operation using power supplied by batteries
4. Voltage Regulator
5. Air Intake and Exhaust Systems 9 6
6. Cooling Systems
7. Lubrication System
8. Battery (Engine Starting System) 8
10
9. Control Panel
10. Main Assembly / Frame
WSD 5231, Mod. 3 6
3
Block Diagram of generator
Fuel Air
Electric Panel
Exhaust
Engine Starting
Lubricant Coolant
System
WSD 5231, Mod. 3 7
Injection Pump
Turbocharger
Nozzle
Exhaust
Electric
Panel
Electric
Oil Filter
Starting Motor
Radiator
Oil Pan Oil Lift Pump Batteries
4
1.Engine
The engine is the source of the input
mechanical energy to the generator.
2. Alternator
5
2. Alternator
Alternator
2. Alternator
6
3.Fuel System
Injectors (Nozzles)
Injector
Pipes
Leak off pipe
Store enough fuel for Lift the fuel from the Remove any solid
combustion. fuel tank particle in fuel
7
Components of Fuel System
Fuel Water Separator Injection Pump Nozzle
Separate and remove water Inject fuel through nozzles Throw fuel into the
from the fuel at certain pressure cylinders in small particle
form
WSD 5231, Mod. 3 15
8
5. Air Intake & Exhaust Systems
Turbo
Charger Muffler
Air Filter
Diesel Engine
9
6. Cooling System
Function:
This system maintains the temperature of the engine assembly by introducing coolant
into cooling channels. After completing the cycle coolant temperature increases which is
then passed through radiator to radiate heat.
Components:
1. Radiator/ Charge air cooler
2. Thermostat
Fan
Coolant
Coolant
Radiator
: Coolant Flow
Radiator
Cooling System
10
Components of Cooling System
Radiator Fan
7. Lubricating System
Lubrication system
11
Components of Lubricating System
Oil Pan Oil Lift Pump Oil Filter
Store enough engine oil Lift and send oil from the Remove any pollution
for lubrication oil pan to the oil filter or solid particle in
and keep circulation engine oil
WSD 5231, Mod. 3 23
12
Components of Fuel System
Alternator For
Battery Starter Motor
Battery Charge
Provide starting current to Start rotation of engine Generate power and charge
the starter motor from the rest position the battery by utilizing
engine rotation
WSD 5231, Mod. 3 25
9. Control Panel
This is the user interface of the generator and contains
provisions for electrical outlets and controls.
Electric start and shut-down
Engine gauges
Generator gauges
Alarm monitoring
Data logging
Other controls
13
Components of Electrical System
Alternator (Main) Electrical Panel Cables
14
Fuel System Flow Diagram
Fuel Tank Fuel Lift Pump
Air System
Fuel Filter/Water Separator
Air Filter
Injection Pump
Turbocharger
Nozzle
Exhaust
Electric
Panel
Diesel Engine Alternator
Electric
Oil Filter
Starting Motor
Radiator
Oil Pan Oil Lift Pump Batteries
15
Capacity Calculations
• No specific or standard sizing solution is available.
• Highly depends upon the site conditions and running loads.
• Some manufacturers provide guide to estimate the required generator
sizes.
Capacity Calculations
Following steps are required to calculate required size of the generator:
Step 1: Calculate the power of all non-motor loads
Step 2: Calculate starting power of the largest motor and running power of
all other motors.
Step 3: Add all motor’s running load and starting load of the largest motor
Step 4: Add non motor loads into the value of step 3
Step 5: Select Generator’s rating of at least 125% of the final answer of
step 4
16
Standard Operation Procedure
for Generator
Changeover Switch
Motor of Pump
Electrical Panel
Changeover Switch
Motor of Pump
Electrical Panel
Motor
2
How to operate changeover switch ??
Don’t directly open/turn the
changeover switch during operation
of load Electrical Generator
Company
Motor
•No Leakages
Inspect •No Unusual smell/ odour
the site
3
Best practices in Generator Operations
Standard operating procedure during operation
•Turn on the Main Circuit Breaker of the Generator
•Start the generator
Start and
•The sound of generator should be normal
Observe
•Examine the frequency and voltages
4
Parameters To Be Cared For
Before Operation
6. Site Inspection
5. Coolant Level
General condition of
Leakage Odor
Generator
5
Parameters To Be Cared For
During Operation
5. Earth Leakage 6. Gas, Air, Oil Leakage, Vibrations/ Abnormal noise
Preventative Maintenance
&
Record Keeping
6
Preventive Maintenance
Necessity of Maintenance
An early warning is generated by the generator before the occurrence of many failure.
One should keep special intension to the device during operation, maintenance and
regular inspection to avoid major problems. Some of the problem which can be observed
during the operation of the device are:
a. Engine misfire
b. Vibration
c. Unusual engine noise
d. Sudden changes in engine operating temperatures
e. Excessive smoke
f. Increase in oil consumption
g. Increase in fuel consumption
7
How should the generator be?
Fuel System Air System
Secure Enough Fuel
Fuel Tank Fuel Lift Pump Air Filter
Keep Clean
Fuel Filter Turbocharger
Keep Clean VLL=400V
Injection Pump Charge Air Cooler F=50Hz
Noz
zle Proper Insulation
Electric
Panel
Diesel Engine Alternator
Necessity of maintenance
Fuel Tank Fuel Lift Pump
Turbo
Air Filter
Charger
Fuel Filter
Problems: Problems:
Engine Misfires Engine Misfires
Engine Runs Rough Dark Smoke
Low Output Power Lower Acceleration
Remedy: Remedy:
Replace or clean the fuel filter Replace or clean the air filter
WSD 5231, Mod. 3 16
8
Daily and Periodic Maintenance Sheet
Service Type Year____
Last Activity Month____
Sr. No. Activities
Daily Weekly Monthly 6 Months Date 1 2 3 4 5
1 Visual Inspection
2 Check Coolant Level
3 Check Oil Level
4 Check Fuel Level
5 Check Charge Air Piping
6 Check and Clean Air Cleaner
7 Check Battery Charger
8 Drain Fuel Filter
9 Drain Water From Fuel Tank
10 Check Coolant Concentration
11 Check Drive Belt Tension
12 Drain Exhaust Condensate
13 Check Starting Batteries
14 Change Oil and Filter
15 Change Coolant Filter
16 Clean Crankcase Breather
17 Change Air Cleaner Element
18 Check Radiator Hoses
19 Change Fuel Filters WSD 5231, Mod. 3 17
20 Clean Cooling System
9
Daily Operation & Maintenance Record
Daily Operation and Maintenance Record (Generator)
Standard/ Date
Items Unit
Rated
Average Total
( ) ( ) ( ) ( ) ( ) ( ) ( ) ( )
: ~ : : ~ : : ~ : : ~ : : ~ : : ~ : : ~ : : ~ :
Operating Time -
Voltage RS V 400
Frequency
V
Hz
400
50
Hour, Voltage, Frequency,
Energy Consumption KWh Energy Consumption
Driven Equipment
✔
✔
Coolant Level, Fuel Level, Oil
Walk Around Inspection ✔ Level, Fan Belt, Driven Parts,
Walk-Around Inspection
10
Daily Maintenance Checks
Walk-around inspection
To look for any…
• Leaks
• Damaged Parts
• Worn of Damaged belts
• Any change in engine appearance
• Odor of fuel
11
Daily Maintenance Checks
Cooling fan
Cooling System
12
Cooling System
13
Daily Maintenance Checks
Engine coolant level
Do not remove the pressure cap from
the hot generator. Wait until the coolant
temperature is below 50 ℃ before
removing the pressure cap.
14
Checking the belt tension
15
Daily Maintenance Checks
Engine lubrication oil level
The engine must be level to check the
lubrication oil level.
16
Battery maintenance check
17
Engine Operation Report
Report any of the following issues:
• Low lubrication oil pressure
• Low Power
• Power increases or Engine surge
• Erratic or no accelerator response or control
• Warning lights
• Unusual Engine noise
• Excessive Smoke
Necessary Tools
1. Insulated Rubber Glove 2. Screw Drivers Set 3.Helmet
18
O&M Manual & Specification
1
Introduction of manufacturer’s O&M manual
Specifications
Example: Generator at Aljazari Academy
2
Specifications
Specifications
3
Troubleshooting
4
Trouble shooting systemsystem
7.1 Troubleshooting chart chart
Alternator not working
Causes Correction
Alternator pulley loose Tighten the pulley, refer to owner’s manual
OK
Batteries have malfunctioned Check condition of batteries replace if necessary
OK
Battery cable connections loose/broken Check the battery cables and connections
OK
Alternator is overloaded Install an alternator with higher capacity, refer
owner’s manual
OK
Alternator or AVR malfunctioning Test the alternator output, replace alternator or
AVR if necessary
OK
Battery temperature above specification Position the batteries away from heat source,
refer manual
OK
Check the wire, fuses and connection. Refer to
Electrical system open or blown fuse
manual
OK
Check the gauge, refer to owner’s service
Gauge is malfunctioning
manual
OK
Contact authorize repair facility WSD 5231, Mod. 3 9
5
Possible Fault Situation
Engine Relate Faults
Sr. # Problem Potential Cause Remedies
Lack of fuel., Fuel tank empty Fill it
Air in fuel injection system Bleed the air
Check Battery with Multi-meter Replace or Charge battery
Water contaminants in the fuel Change it
Fault in the fuel lift pump, cold stat system Repair and adjust it
1 Engine does not start Wrong type of grade fuel used Change & use proper
Fault in fuel injection pump Check & repair
Timing of fuel injection pump is incorrect Correct is as required
Inspect rings & pistons and adjust
Bad compression, Shut-off valve closed
valve clearances
Fuel connections are loose on suction side of the fuel pump Check & tight the connections
Lack of fuel., Fuel tank empty Fill it
Air in fuel injection system Bleed the air
Water contaminants in the fuel Change it
2 Engine difficult to start Starter motor defective Repair or replace it
Restriction in filter/ cleaner or in air induction system clean or replace it
Restriction in fuel vent Remove & clean
Restriction in exhaust pipe WSD 5231, Mod. 3 Remove & clean exhaust system11
6
Wrap-up
• Things to take home…
7
EC-M2-01
Generator Flow Diagram Intake
from
Exhaust
Fuel System Air System
1. 2. 3. 4.
1. 2.
Nozzle
Exhaust Electric
Diesel Engine Alternator Panel
1. 2. 3. 1. 2. 1. 3.
EC-M2-02
Components for Engine
(Solution)
Fuel System Air System
Gets the fuel Stores Cleans fuel Injects fuel Compress Cleans air
from the tank enough fuel from air before from Dust
and send it
at certain
for contamination intake Particles
towards filters consumption or particles pressure
Oil Filter Oil Pan Oil Lift Pump Battery Alternator Starting Motor
Radiator
08/12/17
1
EC-M2-03
Generator Flow Diagram Intake
from
Exhaust
Fuel System Air System
1. 2. 3. 4.
1. 2.
Fuel Tank Fuel Lift Pump Fuel Filter Injection Pump Air Filter Turbocharger
Nozzle
Exhaust Electric
Diesel Engine Alternator Panel
1. 2. 3. 1. 2. 1. 3.
08/12/17
2
EC-M2-05
Daily
・Alternator and Fan Belts – Inspect/Adjust/Replace
・Cooling System Coolant Level – Check
・Driven Equipment – Check
・Engine Oil Level – Check
・Fuel System Primary Filter/Water Separator – Drain
・Walk Around Inspection
Every 2 Year
・Cooling System Coolant – Change
8-12-17
EC-M2-08
Generaotr Annual Maintenace Plan (Sample) -Year 2017- Legend : Plan "●", Done "✔"
Total Operation Hours 150 300 450 600 750 900 1050 1200 1350 1500 1650 1800
DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV
Required maintenance
Item Product to be required
cycle
Plan Done Plan Done Plan Done Plan Done Plan Done Plan Done Plan Done Plan Done Plan Done Plan Done Plan Done Plan Done
Engine Air Cleaner Element – Clean/Replace Every 500 hours Air Cleaner Element ●
Engine Oil and Filter – Change Every 500 hours Engine Oil Filter ●
Fuel System Filter Element - Replace Every 500 hours Fuel Filter ●
12/08/2017
EC-M2-09
Page 1 of 5 8-12-17
Page 2 of 5
Page 3 of 5
Page 4 of 5
Page 5 of 5
EC-M2-10
Q2: Write down the procedure of checking electrolyte level and condition of battery in your own words
8-12-17
Operations and Maintenance of
Electrical Equipment
2/22
3/22
1
Objectives of Application of 5S
3/30
4/22
2
5S – A Quality, Productivity, Efficiency and
Safety Tool
5S is an approach to eliminate waste, organize work place to save time and effort to
achieve operational efficiency.
5/22
6/22
3
Place un-necessary items in the red tag area
Allow course participants to re-evaluate the needed items
At the end of evaluation, required items should be returned to proper area
7/22
8/22
4
It is a regular cleaning activity at and near the work area.
Removing unnecessary stickers, posters, pictures and other items.
During operations and maintenance ergonomically establishing the positions for
tools and equipment.
Continuously achieve better level of organized and efficient work place through
brainstorming.
9/22
10/22
5
The goal of this step is to set a standard work place (organized)
This is achieved by providing visual labels and signs
Work place is marked and labeled so that organization is made simple and easy
Organized and marked tool boards etc.
11/22
12/22
6
Before After
13/22
Before After
14/22
7
WASA South Yard, Lahore
Before After
SCBA equipment was buried under this
15/25
16/25
8
5S is a continuous improvement tool !!!
Create necessary documents or forms to support/optimize your operations
Process flow charts
Contact lists
Emergency response procedures
SOPs
Post job instructions
Label equipment for operators
17/25
9
Panel with Labels 19/25
10
Panel with Instructions
21/25
11
Post important forms here !
23/25
Emergency Procedures
24/25
12
Emergency Contact List
25/25
13
5S Activity Track Sheet
January, 2017 Date (activity performed):
Quantity Notes
Items Sorted
Items Stored
Items Discarded
Total Items
February, 2017 Date (activity performed):
Quantity Notes
Items Sorted
Items Stored
Items Discarded
Total Items
March, 2017 Date (activity performed):
Quantity Notes
Items Sorted
Items Stored
Items Discarded
Total Items
April, 2017 Date (activity performed):
Quantity Notes
Items Sorted
Items Stored
Items Discarded
Total Items
May, 2017 Date (activity performed):
Quantity Notes
Items Sorted
Items Stored
Items Discarded
Total Items
June, 2017 Date (activity performed):
Quantity Notes
Items Sorted
Items Stored
Items Discarded
Total Items
Device Inspection Sheet
Evaluation Criteria
:Good ×: No care at all or need to be newly installed
△:Need to be improved -: Not available to be checked
* All components should be purchased as per required specification of each panel according to the installed motor
Preventive Maintenance Sheet for Electrical Facility
Site Name : Motor Specification Evaluation Criteria
:Good
Rated Capacity Rated Voltage Rated Ampere Efficiency Power Factor ×: No care at all or need to be newly installed
△:Need to be improved
Sub Division : (kW) (V) (A) - - -: Not available to be checked
Preventive Maintenance
Visual Condition/Cleanliness Voltage by Clamp Meter (V) Ampere by Clamp Meter (A) Insulation Resistance (MΩ) Vibration Temperature
No. Date Weather Approved by Inspected by Cable/ Bolt 𝑈1 𝑉1 𝑊1 𝑈𝑝𝑝𝑒𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔 Evaluation
Cleanlin Neatness Cable Proper Terminal
wire Tightening RY YB BR R Y B
ess of Cabling Color Sealing Cover 𝐿𝑜𝑤𝑒𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔
Label 𝑈2 𝑉2 𝑊2
1
Preventive Maintenance Sheet for Electrical Facility
Rated
Sub
Division :
Motor Specification Capacity
(kW/HP)
Rated Rated Power
Site Name: Voltage Ampere
Efficiency
Factor
RPM
Equipment
(V) (A) - -
Name:
Date
Inspected By
Weather
Bolt Tightening
U1-E U2-E
V1-E V2-E
Insulation
W1-E W2-E
Resistance
(MΩ) U1-V1 U2-V2
V1-W1 V2-W2
W1-U1 W2-U2
Voltage by RY
Clamp Meter YB
(V) BR
Ampere by R
Clamp Meter Y
(A) B
Power Factor
Upper Lower
Vibration
BearingBearing
Revolution Per Minute (RPM)
Upper Lower
Temperatur Bearing Bearing
e
Shaft
Reference for Insulation Resistance Value: Good → more than 1.0MΩ
Need to Adjust, Clean,Care → 1.0MΩ ~ 0.4MΩ
Need to repair immediately →less than 0.4MΩ
- Remarks -
Check List of Standard Operation Procedure for Electrical Facility
Motor Specification: Rated Capacity (kW/HP) ___________
Approved by : Evaluation Criteria
Rated Voltage (V) ______________Rated Current(A) ___________ :Good ×: No care at all or need to be newly installed
Inspected by : △:Need to be improved -: Not available to be checked
Efficiency_____Power Factor_______RPM_________
Inspection Items for Electrical Panel Condition
Document Visual (Outside) Visual (Inside) Operation
Status/ How to
Identification Frequency
Operation Vender Fault Ampere Voltage Status Selector Intrusion Bypass- Neatness operate
Drawings of Cleanliness of
Record Manual Indication Meter Meter Switch Path Circuit of cabling changeover
Sr. Inspection Lamp/Switch Start/Stop
Site/Pump Name Lamps switch
No. Date
Pump No hole/
all lamps Proper Proper No dust, No
Compare installation Pump/ all lamps crack to Turn off by Maximum
are visibly functioning functioning sand, spider's bypass /
with the , electrical Panel /switches have Ampere Voltage let foreign breaker or 2-3 times/
bright and zero and zero nest, insect, burnt
sample line devices name tag matters switch first. hour
enough adjustment adjustment small animals mark
diagram come in
- Remarks -
Check List of Standard Operation Procedure for Electrical Facility
Evaluation Criteria
:Good ×: No care at all or need to be newly installed
△:Need to be improved -: Not available to be checked
Document Visual (Outside) Visual (Inside) Operation
How to
Identification Status/Fault
Operation Vender Ampere Intrusion Bypass- Neatness of operate Frequency of
Drawings s of Indication Voltage Meter Status Selector Switch Cleanliness
Record Manual Meter Path Circuit cabling changeover Start/Stop
Lamp/Switch Lamps
switch
Pump No dust, No
Proper Proper
Compare installation Pump/ all lamps all lamps are sand, hole/crack to Turn off by
functioning functioning No bypass / Maximum 2-
with the , electrical Panel /switches have visibly bright Ampere Voltage spider's nest, let foreign breaker or
and zero and zero burnt mark 3 times/hour
sample line devices name tag enough insect, small matters come switch first.
adjustment adjustment
diagram animals in
Off lamp
Disposal Station, Chungi
5 3/28/2017 △ × is not △ - △ - △ △
# 9, Panel # 11
working
Total Numbers of items required to be
1 4
replaced*
- Remarks - Motor Specification: Motor Specification:
1. No lamp test was available so status of O/L Lamp can not be checked Rated Capacity: Rated Capacity:
2. Confirm that Current Transformers (CTs) are working fine before replacement of Ampere meter. In case of Rated Voltage (V) : Rated Voltage (V) :
malfunctioning CT, please change CT first and if Ampere meter still not giving correct value then replace it. Rated Current(A) : Rated Current(A) :
Efficiency: Efficiency:
Power Factor: Power Factor:
RPM: RPM:
* All components should be purchased as per required specification of each panel according to the installed motor
Device Inspection Sheet
Motor Specification: Rated Capacity (kW/HP) __________
Approved by : Evaluation Criteria
Rated Voltage (V) _____Rated Current(A) ______Efficiency_____ :Good ×: No care at all or need to be newly installed
Inspected by :
△:Need to be improved -: Not available to be checked
Power Factor_______RPM_________
- Remarks -
Fault Reporting and Maintenance Request Form
Mobile No.______________________
Facility Location:___________________________________________________________
Date: _________________ Time: __________________________
Site In-charge:__________________________________________
Is it an emergency: Yes/No
If yes, please follow the posted emergency reporting procedure
Fault Type
Electrical: Yes/No
Mechanical: Yes/No
Other: (Please describe)___________________________________
Fault Details
______________________________________________________________________________
______________________________________________________________________________
Maintenance Request:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Fault Reporting and Maintenance Request Form
Is it an emergency: Yes/No
If yes, please follow the posted emergency reporting procedure
Fault Type
Electrical: Yes/No
Mechanical: Yes/No
Other: (Please describe)_______________________________
Fault Details
Control Panel is short circuited due to faulty insulation (wires), operator, property and general
public are at risk of electric shock and fire.
Maintenance Request:
An Electrician is required onsite to ensure proper insulation and address the short circuit issue.
______________________________________________________________________________
Incident / Emergency Response Flow Chart
INCIDENT / EMERGENCY
Nearest Hospital
1
4/11/2018
2
4/11/2018
What is a Hazard?
3
4/11/2018
4
4/11/2018
Probability
Severity
Seriousness of harm.
10
5
4/11/2018
Priority Level
Hazard =Probability x Severity
Probability Severity Priority level
2 3 6
2 2 4
3 1 3
Hazard Coding
Priority rating Hazard Level Hazard Code
11 – 25 High H
5 – 10 Medium M
1-4 Low L
11
Electrical Safety
Steps to respond:
5. Perform CPR
12
6
4/11/2018
14
7
4/11/2018
Unblocked
• No Smoking policy
15
More Effective
1 Elimination : Remove unsafe conditions Turn off power supply
6 PPE: Use PPE, wear insulation gloves , Shoes with insulated sole and toe protection
Less Effective
16
8
4/11/2018
Grounding
Path of fault
current
17
18
9
4/11/2018
19
20
10
4/11/2018
21
11
4/11/2018
23
12
Job Safety Analysis
Name: ______________________________
Date: __________________
Job:
Sequence of Tasks Potential Hazards Preventive Measures
Hazard Identification of a Tube well room
Please go through the given picture of a Tube well, identify at least five hazards related to electrical installations, assess priority and propose
action.
2
3
2
4
1 5
Name: __________________________ Date: ________________
5
Name: __________________________ Date: ________________
Sr Priority Due
Condition (Hazard) Proposed Action Comment
# (H/M/L) Date
1 Obstruction to vacate H i) Exit strategy
area (Confined space) ii) Obtain permit to work
iii) Use of PPE
iv) No work alone
2 Missing warning signs H
& labeling of electrical i) Posting of warning
installations signs and labeling
3 Storage of unnecessary H i) Removal of
items unnecessary items
(Trip & Fall) ii) Housekeeping
4 Loose connection & H i) Provision of CO2 fire
unprotected live wires extinguisher
(Electrical shock & fire) ii) Impart training on use
of fire extinguisher
iii) Record keeping of
refilling
5 Opening in wall (rodents M Sealing of wall opening