Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Untitled

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CONSTRUCTION NOTE

1.STRUCTURE - FRAMED STRUCTURE


2.FOUNDATION HEIGHT-1.5M
C1 W2 C2 V V C3 W2 C4 C1 GB1 C2 GB2 C3 GB3 C4
3.WALL THICKNESS
BATH
WC
ROOM PB6
1.5 x 1.7
1.5 x 1.7
OUTER WALL THICKNESS-0.23M
W2 BEDROOM D2 D2 BEDROOM
W2 PB7
4.2 x 4.5 4 x 4.50 GB4 PB5 PB8 GB9
INNER WALL THICKNESS-0.15M

D1 D1
4.HEIGHT FROM FLOOR TO BOTTOM OF SLAB-3M
PB10 PB11 PB12
C5 O C8 C5 C8
C6 C7 C6 C7
5.SLAB THICKNESS-0.15M
STORE PUJA
W2 ROOM W2 GB13 PB14 PB15 PB16 GB17
ROOM

C10
1.9 x 2 1.95 x 2
C10
6.PLINTH HEIGHT-0.6M
C9 C9
O C11 D1 D1
C12
PB18 PB19 C11 PB20
C12

7.PROJECTIONS

KITCHEN
LIVING ROOM
7.18 x 5.0
W1 i]PLINTH PROJECTION-0.075M
W2 4.2 x 5.0 O GB21 PB22 GB23

ii]CHAJJA PROJECTION-0.6M
W1
iii]SLAB PROJECTION-0.15M
D1
C13 W2 C14 C15 W1 C16 C13 C14 C15 C16
GB24 GB25 GB26
8.FOR FINISHING ANCIENT PAINTS ARE USED
GROUND FLOOR STRUCTURAL PLAN
9.FOR PLASTERING PURE ACRYLIC CEMENT
10.STAIRCASE:-

C1 FB1 C2 FB2 C3 FB3 C4 C1 FB1 C2 FB2 C3 FB3 C4


RISE:-0.175M
S1 S2
FB6
S3 S4 S1 S2
FB6
S3 S4
TREAD:-0.25M

FB7 FB7
HEADROOM HEIGHT:-2.2M
FB4 FB5 S5 FB8 FB9 FB4 FB5 S5 FB8 FB9

11.PARAPET WALL HEIGHT:-0.9M


FB10 FB11 FB12 FB10 FB11 FB12
C5 C8 C5 C8
C6 S7 C7 C6 S7 C7
S6 S8 S9 S6 S8 S9

FB13 FB14 FB15 FB16 FB17 FB13 FB14 FB15 FB16 FB17 MVP'S KBTCOE NASHIK
C10 C10
C9 C12 C9 C12
S10
FB18
S11
FB19 C11 FB20 S10
FB18
S11
FB19 C11 FB20 NAME:

START ON:
FB21 FB22 FB23 FB21 FB22 FB23

END ON:

REMARK
C13 FB24 C14 FB25 C15 FB26 C16 C13 FB24 C14 FB25 C15 FB26 C16

FIRST FLOOR STRUCTURAL PLAN TYPICAL SECOND AND THIRD FLOOR STRUCTURAL PLAN

You might also like