Republic of the Philippines

National Irrigation Administration


Regional Office No. III
Tarlac-Zambales Irrigation Management Office

PROJECT COMPLETION REPORT

for

DAVID CIP

San Jose, Tarlac


Project Cost : P 3,000,000
CY 2019 : Service Roads-CIS
FINAL STATEMENT OF PROJECT ACCOUNT

MEMORANDUM FOR: The Administrator


This Agency
Subject : Financial Statement for Project Account for David CIP
Name of Project : David CIP
Location : San Jose, Tarlac
Name of IA : David Communal Farmer Irrigators Association
Potential Area : 300 hectares

UNIT
SN ITEMS OF WORK UNIT QUANTITY AMOUNT
COST
A. Direct Cost
1. Civil Works
1. Contract Works
Temporary Facilities / Mobilization / Demobilization l.s. 1.00 118,271.50 118,271.50

Service Road
1. Excavation cu.m. 4.00 229.80 919.20
2. Aggregate Base Course cu.m. 342.00 861.00 294,462.00
3. Concrete Pavement cu.m. 330.00 6,782.70 2,238,291.00
4. Backfill with Borrow Haul cu.m. 142.00 595.90 84,617.80

SUBTOTAL 2,618,290.00

TOTAL CIVIL WORKS 2,736,561.50


2. Institutional Development Program lot 1.00 34,134.80 34,134.80
3. Construction Survey lot 1.00 26,313.40 26,313.40
4. Parcellary Mapping/ Survey lot 1.00 113,113.69 113,113.69
5. Right of Way Acquisition, Plant/ Properties Damages
6. Procurement of Equipment Vehicles
7. Field Support Supervision and Monitoring lot 1.00 89,876.61 89,876.61
8. Consulting Services
9. Taxes
10. Contigencies

TOTAL 3,000,000.00

Prepared by : Submitted by:

KATE DIANNE S. ESTRADA JAIME A. MANANGHAYA


Acting Sr. Accounting Processor A Division Manager

Approved by:

JOSEPHINE B. SALAZAR
Regional Manager

Brgy. Jefmin, Concepcion, Tarlac, Philippines


Telephone Nos.: (045) 491 4323
Website: region3.nia.gov.ph • Facebook: www.facebook.com/niar03
TIN: 206-008-273-000
NIAR3-RO-RIM-INT-Form12-Rev01
Republic of the Philippines
National Irrigation Administration
Regional Office No. III
Tarlac-Zambales Irrigation Management Office

CERTIFICATE OF PROJECT TURNOVER

This is to certify that David CIP located at the Municipality of San Jose,
Province of Tarlac is now completed (as per Certificate of Completion hereto attached)
and is hereby turned over to David Communal Farmer Irrigators Association for its
Operation and Maintenance.

Done this 28th day of July 2022.

Presented by:

JOSEPHINE B. SALAZAR
Regional Manager

Accepted by:

BERNABE MACADANGDANG
David Communal IA President

Witnessed by:

JAIME A. MANANGHAYA CHRISTIAN C. MANALO


Division Manager Acting Manager, EOD

Brgy. Jefmin, Concepcion, Tarlac, Philippines


Telephone Nos.: (045) 491 4323
Website: region3.nia.gov.ph • Facebook: www.facebook.com/niar03
TIN: 206-008-273-000
NIAR3-RO-RIM-INT-Form12-Rev01
Republic of the Philippines
National Irrigation Administration
Regional Office No. III
Tarlac-Zambales Irrigation Management Office

CERTIFICATE OF PROJECT COMPLETION

This is to certify that the David CIP located at Municipality of San Jose,
Province of Tarlac which has a service area of 300 hectares has been completed last
October 29, 2019 in accordance with NIA Engineering Standards with the following
facilities:

1. Service Road 0.55 km.

Issued this 28th day of July 2022.

Conformed by:

BERNABE MACADANGDANG
David Communal IA President

Attested by:

JAIME A. MANANGHAYA JOSEPHINE B. SALAZAR


Division Manager Regional Manager

Witnessed by:

ARVIN MAYNARD C. MUSNI CHRISTIAN C. MANALO


Acting Chief, Engineering Section Acting Manager, EOD

Brgy. Jefmin, Concepcion, Tarlac, Philippines


Telephone Nos.: (045) 491 4323
Website: region3.nia.gov.ph • Facebook: www.facebook.com/niar03
TIN: 206-008-273-000
NIAR3-RO-RIM-INT-Form12-Rev01
Republic of the Philippines
National Irrigation Administration
Regional Office No. III
Tarlac-Zambales Irrigation Management Office

CERTIFICATE OF PROJECT ACCEPTANCE

This is to certify that as of October 29, 2019 the Irrigation System of David
Communal Farmer Irrigators Association located at Municipality of San Jose, Province of
Tarlac covering an area of Three Hundred (300) hectares is fully COMPLETED and is ready
for actual use.

This is to certify further that David Communal Farmer Irrigators Association


represented by its President Mr. Bernabe Macadangdang accepts the Irrigation System
as of October 29, 2019 as complete and ready for actual use.

David Communal Farmer Irrigators Association likewise accepts the cost of


the irrigation system not exceeding TWO MILLION SEVEN HUNDRED EIGHT THOUSAND
TWO HUNDRED TWENTY-SIX PESOS AND 20/100 (P 2,708,226,20).

Done this 28th day of July 2022.

Accepted by:

BERNABE MACADANGDANG
David Communal IA President

Attested by:

JAIME A. MANANGHAYA JOSEPHINE B. SALAZAR


Division Manager Regional Manager

Brgy. Jefmin, Concepcion, Tarlac, Philippines


Telephone Nos.: (045) 491 4323
Website: region3.nia.gov.ph • Facebook: www.facebook.com/niar03
TIN: 206-008-273-000
NIAR3-RO-RIM-INT-Form12-Rev01

You might also like