INSPECTION AND TEST PLAN
ELECTRICAL WORK
Document No : DNG1-PM-000-PLN-ENG-50011
Rev. 0
REVISION SHEET
Revision
Page
A B C 0 1
1 X
2 X
3 X
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Detail
INSPECTION AND TEST PLAN
ELECTRICAL WORK
Document No : DNG1-PM-000-PLN-ENG-50011
Rev. 0
COMMENT SHEET
No Page/Bab Revision Date PMC EPC
1 Page Rev A 01/09/2022 Dimanakah lampirannya ( Detail ITP Electrical Noted
( Detail ITP Electrical see attachment-1).
see attachment-1).
2 Page 6 Cables For Rev 0 03/10/2022 Tolong tambahkan pada termination item 4. Noted
Power, Sealer cable inlet
Instrumentation and Tolong tambahkan pada testing item 2.
Communic, Control Grouning testing
KSO Poeser -
COMPANY PT. Kwarsa Hexagon (PMC)
Maharani
BY Beny Haryanto Alifia Rahman
POSITION Electrical Engineer Electrical Engineer
Detail
INSPECTION AND TEST PLAN
ELECTRICAL WORK
Document No : DNG1-PM-000-PLN-ENG-50011
Rev. 0
TABLE OF CONTENTS
1. PURPOSE .................................................................................................................................... 4
2. SCOPE ......................................................................................................................................... 4
3. OBJECTIVE .................................................................................................................................. 4
4. ABBREVIATION AND DEFINITIONS ............................................................................................. 4
5. INSPECTION AND TEST PLAN FOR ELECTRICAL .......................................................................... 4
Detail
INSPECTION AND TEST PLAN
ELECTRICAL WORK
Document No : DNG1-PM-000-PLN-ENG-50011
Rev. 0
1. PURPOSE
The purpose of this procedure is to describing construction activities to be inspected or
tested as required by contract specifications in the sequential manner of construction
work.
2. SCOPE
The execution plan describes the planning for Contractor’s person in-charge/site
organization, time schedule, mobilization, HSSE, facilities of construction work for Tie-in
Sumur HCE-10A Dieng Unit-1 Project.
3. OBJECTIVE
This objective of this procedure is to maintain the uniformity and consistency of
Contractor’s Quality, schedule and safety activities by all parties and personnel involved in
Dieng project.
The objectives of execution plan are that :
Attachment-1
Detail
INSPECTION AND TEST PLAN (ITP)
LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document
1 of 7
INSPECTION AND TEST PLAN (ITP)
LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document
2 of 7
INSPECTION AND TEST PLAN (ITP)
LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document
3 of 7
INSPECTION AND TEST PLAN (ITP)
LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document
4 of 7
INSPECTION AND TEST PLAN (ITP)
LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document
5 of 7
INSPECTION AND TEST PLAN (ITP)
LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document
6 of 7
INSPECTION AND TEST PLAN (ITP)
LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document
Detail
7 of 7