Process Flow Chart: Symbols Operation Transport Delay Inspection Storage
Process Flow Chart: Symbols Operation Transport Delay Inspection Storage
Process Flow Chart: Symbols Operation Transport Delay Inspection Storage
Transporting these 10 m 10
panels for assembly
Back and front panels 750 Garments 3
attachment at shoulder
line
Attaching sleeves with 1500 sleeves 2
previously attached with 750 bodice
front and back panels
Button hole contruction 750 Garments 3 Time consumption can be be reduced by upto 70% when an fully automated
on button-hole placet workstation is used. On average ROI is about 1.2 years, which is acceptable
Button attachment on 750 Garments 3 Time consumption can be be reduced by upto 70% when an fully automated
button placket workstation is used. On average ROI is about 1.2 years, which is acceptable
Transporting garment to 30 m 30
finishing department
Shipping 10 Cartons